Download as pdf or txt
Download as pdf or txt
You are on page 1of 28

COMPANY’S DOC. NO.

EPC001-00-CE-EU-CPC-00028

JOB No. DOC. NO. REV.


4058 4058-VW-CX-00OO000028 1

DATE 02 Feb 2021 SHEET 1 of 26


Relocation of deep ground bed

SONATRACH

REALISATION DU 4eme TRAIN GPL A ZCINA – HASSI MESSAOUD


ALGERIE

CT-EPC/001/SH/EPM-G/EP/18

RELOCATION OF DEEP GROUND BED

Acceptance status Eng. Dept. Date


code

A B.LENKA PROCS 03-02-2021


Comment status code:
A – Accepted CR–Commented-Resubmit for Acceptance
AC – Accepted with Comment, Resubmit NA – Not accepted, Resubmit
IMPORTANT: CONTRACTOR acceptance of this Document does not relieve the
VENDOR from full compliance with contractual obligation

Cathodic Protection Co Ltd


SUBCONTRACTOR ID CODE
CPC

Rev. Date Description Prep’d Chk’d App’d

0 03 Dec 2020 Issued for Approval S. Filmore A. Bonetti D. Marshall

0 02 Feb 2021 Issued for Approval S. Filmore A. Bonetti D. Marshall

This document is Tecnimont’s/Sonatrach’s property and cannot be used by others for any purpose, without prior written consent
COMPANY’S DOC. NO. EPC001-00-CE-EU-CPC-00028

JOB No. DOC. NO. REV.


4058 4058-VW-CX-00OO000028 1

Relocation of deep ground bed SHEET 2 of 26

Table of Contents
1 INTRODUCTION......................................................................................................................................................... 3
1.1 Scope................................................................................................................................................................. 3
1.2 International Standards .................................................................................................................................... 3
1.3 Project Reference Documents .......................................................................................................................... 3
1.4 CPCL Project Reference Documents ................................................................................................................. 5
1.5 Abbreviations List ............................................................................................................................................. 6
2 DESIGN ...................................................................................................................................................................... 7
3 BILL OF MATERIALS ................................................................................................................................................. 10
4 DATA SHEETS .......................................................................................................................................................... 11
4.1 ANODE JUNCTION BOX ................................................................................................................................... 11
4.2 MMO/Ti TUBULAR ANODE ............................................................................................................................. 14
4.3 PETROLEUM COKE BACKFILL .......................................................................................................................... 16
5 DRAWINGS .............................................................................................................................................................. 19
6 INSTALLATION PROCEDURE .................................................................................................................................... 20
6.1 3-PIN METHOD ANODE RESISTANCE MEASUREMENT ................................................................................... 23
7 COMMISSIONING PROCEDURE ............................................................................................................................... 24
7.1 CHECKLIST FOR DEEP WELL GROUND BED INSTALLATION ............................................................................. 25
7.2 COMMISSIONING CHECK LIST FOR DEEP GROUND BED................................................................................. 26

This document is Tecnimont’s/Sonatrach’s property and cannot be used by others for any purpose, without prior written consent
COMPANY’S DOC. NO. EPC001-00-CE-EU-CPC-00028

JOB No. DOC. NO. REV.


4058 4058-VW-CX-00OO000028 1

Relocation of deep ground bed SHEET 3 of 26

1 INTRODUCTION
This document is the Relocation of deep ground bed document which contains the design calculation, drawings, data
sheets, installation procedure, testing and commissioning for the relocation of the existing deep ground bed GB1 to
protect the existing piping associated with the 4th LPG train in ZCINA plant in Hassi Messaoud, Algeria.

1.1 Scope
The Scope is to provide the design calculation, bill of materials, drawings, data sheets, installation procedure, testing
and commissioning for the relocation of the existing deep ground bed GB1.

1.2 International Standards


All CP equipment shall be designed, manufactured, tested and supplied in accordance with applicable codes of
practice, EN, NACE and other applicable standards listed below.

Control of External Corrosion on Underground or Submerged


NACE SP0169-2013
Metallic Piping Systems

EN 14505: 2005 Cathodic Protection of Complex Structures

Cathodic Protection of Buried or Immersed Metallic Structures –


EN 12954: 2001
General Principles and Application for Pipelines

EN 13509: 2003 Cathodic Protection Measurement Techniques

Petroleum, petrochemical and natural gas industries - Cathodic


ISO 15589-1:2015
protection of pipeline systems - Part 1: On-land pipelines

1.3 Project Reference Documents

4058-VW-SG-00OO000006-IS0 CATHODIC PROTECTION SPECIFICATION

4058-VW-SG-00OO000007-IS0 MATERIAL SPECIFICATION AND DATASHEET

4058-VW-SG-0000000005 COATING SPECIFICATION FOR BURIED SURFACES

4058-AQ-DX-A100000001 UNDERGROUND GENERAL DRAWINGS - KEY PLAN

This document is Tecnimont’s/Sonatrach’s property and cannot be used by others for any purpose, without prior written consent
COMPANY’S DOC. NO. EPC001-00-CE-EU-CPC-00028

JOB No. DOC. NO. REV.


4058 4058-VW-CX-00OO000028 1

Relocation of deep ground bed SHEET 4 of 26

UNDERGROUND LAYOUT CONSTRUCTION DRAWINGS-WBS


4058-AQ-DA-A100000001
A100, A101 & A102
UNDERGROUND LAYOUT CONSTRUCTION DRAWINGS-WBS
4058-AQ-DA-A220000002
A210 & A220
UNDERGROUND LAYOUT CONSTRUCTION DRAWINGS-WBS
4058-AQ-DA-A310000004
A310, A320 & A370
UNDERGROUND LAYOUT CONSTRUCTION DRAWINGS-WBS
4058-AQ-DA-A330000005
A330, A360 & A380
UNDERGROUND LAYOUT CONSTRUCTION DRAWINGS-WBS
4058-AQ-DA-A340000003
A340 & A350
UNDERGROUND LAYOUT CONSTRUCTION DRAWINGS-WBS
4058-AQ-DA-A430000011
A430
UNDERGROUND LAYOUT CONSTRUCTION DRAWINGS-WBS
4058-AQ-DA-A630000008
A630, A710 & A720
UNDERGROUND LAYOUT CONSTRUCTION DRAWINGS-WBS
4058-AQ-DA-A800000009
A800
LAYOUT OF HAZARDOUS AREA CLASSIFICATION OVERALL LPG
4058-SN-DH-00OO000001-IS0
TRAIN 4
LAYOUT OF HAZARDOUS AREA CLASSIFICATION
4058-SN-DH-00OO000003-IS0
PROCESS TRAIN 4
LAYOUT OF HAZARDOUS AREA CLASSIFICATION
4058-SN-DH-00OO000004-IS0
COMPRESSOR
ELECTRICAL OVERALL PRIMARY EARTHING SYSTEM (UNDER
4058-NN-DK-A100000001-IS1
GROUND) PLANT LAYOUTS 4th LPG TRAIN AND UTILITIES
ELECTRICAL OVERALL PRIMARY EARTHING SYSTEM (UNDER
4058-NN-DK-A100000002-IS1
GROUND) PLANT LAYOUTS FLARE AREA
PLANT AREA PRIMARY EARTHING SYSTEM (UNDER GROUND)
4058-NN-DK-A100000003-IS0 LAYOUTS - UNIT 100

4058-NN-DK-A100000010-IS0 OVERALL SECONDARY EARTHING SYSTEM PLANT LAYOUTS

PLANT AREA SECONDARY (ABOVEGROUND) EARTHING


4058-NN-DK-A100000011-IS0 SYSTEM LAYOUTS - UNIT 100
PLANT AREA PRIMARY EARTHING SYSTEM (UNDER GROUND)
4058-NN-DK-A200000001-IS0 LAYOUTS - UNIT 200
PLANT AREA SECONDARY EARTHING SYSTEM (ABOVE
4058-NN-DK-A200000010-IS0 GROUND) LAYOUTS - UNIT 200
PLANT AREA PRIMARY EARTHING SYSTEM (UNDER GROUND)
4058-NN-DK-A300000001-IS0 LAYOUTS - UNIT 300

This document is Tecnimont’s/Sonatrach’s property and cannot be used by others for any purpose, without prior written consent
COMPANY’S DOC. NO. EPC001-00-CE-EU-CPC-00028

JOB No. DOC. NO. REV.


4058 4058-VW-CX-00OO000028 1

Relocation of deep ground bed SHEET 5 of 26

PLANT AREA PRIMARY EARTHING SYSTEM RESIDUAL FLARE


4058-NN-DK-A400000001-IS0 KO DRUM UNIT 430
PLANT AREA SECONDARY (ABOVE GROUND) EARTHING
4058-NN-DK-A400000010-IS0 SYSTEM LAYOUTS - UNIT 400
PRIMARY EARTHING SYSTEM UNDERGROUND - SUBSTATION
4058-NN-DK-A630000001-IS0 LAYOUT

4058-NN-DK-A630000010-IS0 SECONDARY EARTHING SYSTEM SUBSTATION LAYOUT

PLANT AREA PRIMARY EARTHING SYSTEM (UNDER GROUND)


4058-NN-DK-A700000001-IS0 LAYOUTS UNIT 700 - UTILITY AREA-1
PLANT AREA PRIMARY EARTHING SYSTEM (UNDER GROUND)
4058-NN-DK-A700000002-IS0 LAYOUTS UNIT 700 - UTILITY AREA-2
PLANT AREA SECONDARY EARTHING SYSTEM
4058-NN-DK-A700000010-IS0 (ABOVEGROUND) LAYOUTS UNIT 700 - UTILITY AREA-1
PLANT AREA SECONDARY EARTHING SYSTEM
4058-NN-DK-A700000011-IS0 (ABOVEGROUND) LAYOUTS UNIT 700 UTILITY AREA-2
PRIMARY & SECONDARY EARTHING SYSTEM EXISTING PIPE
4058-NN-DK-A800000010-IS0 RACK UNIT 800

1.4 CPCL Project Reference Documents

4058-VW-SG-00OO000010 PRE-DESIGN SITE SURVEY SPECIFICATION

4058-VW-RT-00OO000011 PRE-DESIGN SITE SURVEY REPORT

4058-VW-SG-00OO000012 DESIGN PHILOSOPHY & SPECIFICATION

4058-VW-CX-00OO000013 DETAILED DESIGN CALCULATION REPORT

4058-VW-LN-00OO000014 POWER SUPPLY REQUIREMENTS

4058-VW-SG-00OO000015 MATERIALS SPECIFICATION

4058-VW-LM-00OO000016 BILL OF MATERIAL LIST

4058-VW-SG-00OO000017 INSTALLATION SPECIFICATION

This document is Tecnimont’s/Sonatrach’s property and cannot be used by others for any purpose, without prior written consent
COMPANY’S DOC. NO. EPC001-00-CE-EU-CPC-00028

JOB No. DOC. NO. REV.


4058 4058-VW-CX-00OO000028 1

Relocation of deep ground bed SHEET 6 of 26

4058-VW-DW-00OO000018 INSTALLATION DRAWINGS

4058-VW-DG-00OO000020 GENERAL LAYOUT DRAWINGS

4058-VW-DN-00OO000021 SCHEMATIC WIRING DRAWINGS

4058-VW-DW-00OO000022 FOUNDATION AND BASE FRAME DETAIL DRAWINGS

4058-VW-LK-00OO000023 CABLE SCHEDULE

4058-VW-PQ-00OO000024 INSPECTION & TEST PLAN (ITP)

4058-VW-PC-00OO000025 PRE-COMMISSIONING AND COMMISSIONING PROCEDURE

4058-VW-RC-00OO000026 PRE-COMMISSIONING AND COMMISSIONING CHECK SHEETS

1.5 Abbreviations List


ADB Anode Distribution Box
CP Cathodic Protection
CPCL Cathodic Protection Co Limited
GACP Galvanic Anode Cathodic Protection
HMWPE High Molecular Weight PolyEthylene
ICCP Impressed Current Cathodic Protection
MMO Mixed Metal Oxides
PVDF PolyVinyliDene Fluoride
TP Test Post
TRU Transformer Rectifier Unit
XLPE Cross Linked PolyEthylene

This document is Tecnimont’s/Sonatrach’s property and cannot be used by others for any purpose, without prior written consent
COMPANY’S DOC. NO. EPC001-00-CE-EU-CPC-00028

JOB No. DOC. NO. REV.


4058 4058-VW-CX-00OO000028 1

Relocation of deep ground bed SHEET 7 of 26

2 DESIGN
The existing deep well ground bed GB1, associated with the existing CP system, is installed within the new Booster
Area. The ground bed has a total depth of 102 m which consists of an inactive section (from surface to 12 m deep)
and an active section 90 m long.
Due to the proximity of the existing ground bed (GB1) to new pipe to be installed within the Booster Area (~1 m), the
complete ground bed will be relocated to 100 m outside the fence.
Since a 90 m section with 10 no. anodes (each 1 m long) is not efficient – around a third of the whole “active” section
will be actually discharging CP current into the soil – the relocated deep ground bed will keep the same number of
anodes but across a shorter active section. Refer to Section 3 for the Bill of Materials, Section 4 for the materials data
sheets and to Section 5 for the drawings.
The total anode ground bed (active) length is calculated with the following formula:
𝐿𝐿 = 10 ∗ 𝐿𝐿𝐴𝐴 + (9 ∗ 𝑑𝑑𝐴𝐴 ) + 𝑑𝑑𝑈𝑈 + 𝑑𝑑𝐵𝐵
Where,
LA = MMO Anode Length 1 m

dA = Anode Spacing (from bottom of 3.0 m


anode to top of following anode)
dU = Distance from top of GB to top of 3.0 m
first anode
dB = Distance from bottom of GB to 3.0 m
bottom of last anode
L = Groundbed Active Length 43 m

The minimum number of anodes is calculated based on the maximum current output for each individual anode using
the following formula:

It
An =
Ia
Where,
It = Total Current 50 A

Ia = Individual Anode Current (from 8 A


anode datasheet, see Section 4.2)
An = Minimum Anode Number 7 No

As previously said, the total number of installed anodes will be 10.

This document is Tecnimont’s/Sonatrach’s property and cannot be used by others for any purpose, without prior written consent
COMPANY’S DOC. NO. EPC001-00-CE-EU-CPC-00028

JOB No. DOC. NO. REV.


4058 4058-VW-CX-00OO000028 1

Relocation of deep ground bed SHEET 8 of 26

The deepwell groundbed resistance is calculated using the following Modified Dwight’s Equation from Control of
Pipeline Corrosion 2nd Edition, A.W. Peabody. The water resistivity is assumed based on CPCL extensive experience
of deep well groundbeds in the area of ZCINA plant.

ρ  8L 
RGB = 1.4 *  ln − 1
2.π .L  d 
Where,

1.4 = (Maximum) interference factor for 1.4


multiple vertical anodes in deep well
ground bed as per von Beckmann
ρ = Assumed Water Resistivity 15 Ohm.m
L = Groundbed Active Length 43 m
d = Groundbed Diameter (10”) 0.25 m
RGB = Groundbed Resistance to Earth 0.48 Ohm

Finally, the quantity of cokebreeze is calculated. There must be sufficient present to allow for consumption during the
life of the groundbed:
The mass is calculated using:

M tot = L.(r ) 2 .π .CBd


Where,

𝜋𝜋 = Pi 3.142
L = Groundbed Length 43 m
r = Groundbed Radius (diameter/2) 0.125 m
CBd = Cokebreeze Density (for Loresco SC3, 1185 kg/m³
see Section 4.3)
Mtot = Mass of Cokebreeze 2,501 kg

It is then confirmed that this number is more than or equal to the weight of cokebreeze required based on the
consumption rate. This is calculated using the following formula:

This document is Tecnimont’s/Sonatrach’s property and cannot be used by others for any purpose, without prior written consent
COMPANY’S DOC. NO. EPC001-00-CE-EU-CPC-00028

JOB No. DOC. NO. REV.


4058 4058-VW-CX-00OO000028 1

Relocation of deep ground bed SHEET 9 of 26

C R .I t .t
M min =
U
Where,

Cr = Consumption Rate 1.0 kg/A/y


It = Total Current 50 A
t = Time 25 Years
U = Utilisation Factor (as per CPCL 95 %
experience)
Mmin = Minimum Mass of Cokebreeze 1,316 kg

This document is Tecnimont’s/Sonatrach’s property and cannot be used by others for any purpose, without prior written consent
COMPANY’S DOC. NO. EPC001-00-CE-EU-CPC-00028

JOB No. DOC. NO. REV.


4058 4058-VW-CX-00OO000028 1

Relocation of deep ground bed SHEET 10 of 26

3 BILL OF MATERIALS

Item Description Quantity Unit Manufacturer


MMO anode, 25 x 1000 mm, rated at
8 A for 25 years c/w individual tail
1 cable 1c 16 mm2 10 No CPCL, UK
Copper/PVDF/HMWPE red cable,
length 110 m

2 Petroleum Coke Backfill, Loresco SC3 3 tonnes Loresco, USA

3 Plastic centralisers 10 No CPCL, UK

Anode distribution box, Painted


Carbon Steel, 1000 x 800 x 300. 10+1
4 way, including 11 no. shunts, 10 no. 1 No CPCL, UK
resistors and galvanized steel angle
frame
1" Vent pipe, slotted, with header
5 130 m CPCL, UK
accessories

6 Anode rope and end weight 1 No CPCL, UK

Wellhead: locally cast concrete shaft Local Supply


7 1 No
and cover (BY OTHERS)

Local Supply
8 Anode fitting pipe 1 Lot
(BY OTHERS)

10” Casing Bare Metallic Pipe, Active Local Supply


9 43 m
length (BY OTHERS)

10” Casing Coated Metallic or Non- Local Supply


10 59 m
metallic Pipe, Inactive length (BY OTHERS)

This document is Tecnimont’s/Sonatrach’s property and cannot be used by others for any purpose, without prior written consent
COMPANY’S DOC. NO. EPC001-00-CE-EU-CPC-00028

JOB No. DOC. NO. REV.


4058 4058-VW-CX-00OO000028 1

Relocation of deep ground bed SHEET 11 of 26

4 DATA SHEETS
4.1 ANODE JUNCTION BOX

GENERAL
Description: Anode Junction Box for Groundbed Replacement
Manufacturer: CPCL, UK
ENVIRONMENTAL DATA
Application: Onshore safe area
Temperature Range: - 5° C to +50° C
TECHNICAL DATA
Enclosure material: Painted Carbon Steel
RAL colour code: RAL 7032
Dimensions (H x W x D): 1000 x 800 x 300 mm
Protection category: IP 66
Mounting type: Galvanised steel free-standing angle frame
Cable support: Galvanised steel cable tray
Internal fixings: Copper Bus Bar
12 no. M8 Stud Terminals
1 no. M12 Stud Terminal
1 no. Shunt (100 mV / 100 A)
10 no. Shunts (100 mV / 10 A)
10 no. Variable Resistors 0-1.0 ohm
Cable entries: 1 no. Brass cable glands to suit 1c 35 mm2
XLPE/PVC/SWA/PVC cable
10 no. Brass cable glands to suit 1c 16 mm2 PVDF/HMWPE
cables
2 no. Blanking Plugs
TESTING REQUIREMENTS As per ITP document no. 4058-VW-PQ-00OO000024

This document is Tecnimont’s/Sonatrach’s property and cannot be used by others for any purpose, without prior written consent
COMPANY’S DOC. NO. EPC001-00-CE-EU-CPC-00028

JOB No. DOC. NO. REV.


4058 4058-VW-CX-00OO000028 1

Relocation of deep ground bed SHEET 12 of 26

This document is Tecnimont’s/Sonatrach’s property and cannot be used by others for any purpose, without prior written consent
COMPANY’S DOC. NO. EPC001-00-CE-EU-CPC-00028

JOB No. DOC. NO. REV.


4058 4058-VW-CX-00OO000028 1

Relocation of deep ground bed SHEET 13 of 26

This document is Tecnimont’s/Sonatrach’s property and cannot be used by others for any purpose, without prior written consent
COMPANY’S DOC. NO. EPC001-00-CE-EU-CPC-00028

JOB No. DOC. NO. REV.


4058 4058-VW-CX-00OO000028 1

Relocation of deep ground bed SHEET 14 of 26

4.2 MMO/Ti TUBULAR ANODE

GENERAL
Description: MMO/Ti Tubular Anode c/w individual cable tail for
Groundbed Replacement
Manufacturer: CPCL, UK
ENVIRONMENTAL DATA
Application: Buried onshore
Temperature Range: - 5° C to +50° C
ANODE DATA
Type: MMO/Ti tubular anode
Diameter: 25.4 mm
Wall Thickness: 0.9 mm
Length: 1000 mm
Coating composition: IrO2 / TaO5 coating on Ti substrate (ASTM B338 Grade 1
or 2)
Performance: 8 A for minimum 25 years in backfill
Anode Current Density: 100 A/m2
Life Test Reference Standard: NACE TM0108-2012
Consumption Rate: 1.0 mg/(A∙year) maximum
Cable connection: Centre connection, resin encapsulated and helium tested
Contact Resistance: ≤ 1.0 mΩ
ANCILLARY ITEMS
Individual Cable: 1 core 16 mm2 Copper/PVDF/HMWPE Red cable
Bending Radius: 8 x OD (nominal)
Cable Length: 110 m
TESTING REQUIREMENTS As per ITP document no. 4058-VW-PQ-00OO000024

This document is Tecnimont’s/Sonatrach’s property and cannot be used by others for any purpose, without prior written consent
COMPANY’S DOC. NO. EPC001-00-CE-EU-CPC-00028

JOB No. DOC. NO. REV.


4058 4058-VW-CX-00OO000028 1

Relocation of deep ground bed SHEET 15 of 26

ANODE SECTION

This document is Tecnimont’s/Sonatrach’s property and cannot be used by others for any purpose, without prior written consent
COMPANY’S DOC. NO. EPC001-00-CE-EU-CPC-00028

JOB No. DOC. NO. REV.


4058 4058-VW-CX-00OO000028 1

Relocation of deep ground bed SHEET 16 of 26

4.3 PETROLEUM COKE BACKFILL

GENERAL
Description: Petroleum Coke Backfill for Groundbed Replacement
Manufacturer: Loresco, USA
ENVIRONMENTAL DATA
Application: Buried onshore
Temperature Range: - 5° C to +50° C
TECHNICAL DATA
Type: Loresco SC3
Particles Size: 1 mm maximum
Bulk Density: 1185 kg/m3
BACKFILL COMPOSITION
Fixed Carbon: 99.35%
Ash: 0.6%
Moisture: 0.05%
Volatiles: nil
Additive: Surfactant to reduce particle surface tension for compact
settling under water (to assist pumping and settling)
TESTING REQUIREMENTS As per ITP document no. 4058-VW-PQ-00OO000024

This document is Tecnimont’s/Sonatrach’s property and cannot be used by others for any purpose, without prior written consent
COMPANY’S DOC. NO. EPC001-00-CE-EU-CPC-00028

JOB No. DOC. NO. REV.


4058 4058-VW-CX-00OO000028 1

Relocation of deep ground bed SHEET 17 of 26

This document is Tecnimont’s/Sonatrach’s property and cannot be used by others for any purpose, without prior written consent
COMPANY’S DOC. NO. EPC001-00-CE-EU-CPC-00028

JOB No. DOC. NO. REV.


4058 4058-VW-CX-00OO000028 1

Relocation of deep ground bed SHEET 18 of 26

This document is Tecnimont’s/Sonatrach’s property and cannot be used by others for any purpose, without prior written consent
COMPANY’S DOC. NO. EPC001-00-CE-EU-CPC-00028

JOB No. DOC. NO. REV.


4058 4058-VW-CX-00OO000028 1

Relocation of deep ground bed SHEET 19 of 26

5 DRAWINGS

This document is Tecnimont’s/Sonatrach’s property and cannot be used by others for any purpose, without prior written consent
800 300

COPPER BUS BAR


PN1021670

10 NO. VARIABLE
RESISTOR
ENCLOSURE PN1022566 0-1 OHM 10A
MATERIAL MILD STEEL PN1016446
FINISH RAL 7032
INGRESS IP66
THIS DOCUMENT IS TECNIMONT'S/SONATRACH'S PROPERTY AND CANNOT BE USED BY OTHERS FOR ANY PURPOSE, WITHOUT PRIOR WRITTEN CONSENT

RATING SAFE AREA ONLY


1000

IDENTIFICATION PLATE 1 NO. SHUNT


PN1007277 100mV 100A
PN1001093
1500

10 NO. SHUNT
100mV 10A
PN1000199
STEEL ANGLE FRAME 1 2 3 4 5 6 7 8 9 10 TRU
HOT DIP GALVANISED 1 NO. M12 STUD TERMINAL
PN1018099

CABLE TRAY 11 NO. M8 STUD TERMINALS


HOT DIP GALVANISED
PN1001175

2 NO. Ø50 PVC CONDUITS 1 NO. BRASS CABLE GLAND TO SUIT


(BY OTHERS) 1C 35mm² Cu/XLPE/PVC/SWA/PVC CABLE
C/W SHROUDS - PN1000550
VIEW ON INTERNALS
GRADE SCALE 1:10 10 NO. BRASS CABLE GLAND TO SUIT
770 290 1C 16mm² Cu/PVDF/HMWPE CABLE
C/W SHROUDS - PN1000984
830 400
600

CONCRETE FOUNDATION
1100 (BY OTHERS) 600
Eng. Dept. Date
Acceptance status
code
TO BE SEALED USING
BITUMINOUS COMPOUND
IN ORDER TO AVOID
WATER INGRESS
Comment status code:

A - Accepted CR - Commented. Resubmit for Acceptance

AC - Accepted with Comment, Resubmit NA - Not accepted, Resubmit

IMPORTANT: CONTRACTOR acceptance of this Document does not relieve the


VENDOR from full compliance with contractual obligation

1 02DEC20 REISSUED FOR APPROVAL L.HULL N.SIPPEL A.BONETTI Realisation du 4 4058-aa-bb-nnnnnnnnnn


eme Train GPL a ZCINA, Hassi Messaoud
0 17APR20 ISSUED FOR APPROVAL L.HULL N.SIPPEL S.FILMORE
CT-EPC/001/SH/EPM-G/EP/18 A3 1/1

EPC001-aa-bb-c-dddd-eeeeee-E
ANODE DISTRIBUTION BOX CATHODIC PROTECTION CO. Ltd
VENTURE WAY, GRANTHAM, NG31 7XS
+44 (0)1476570666
VENDOR IDENTIFICATION CODE

FOR GB REPLACEMENT www.cathodic.co.uk


1021671-42119-CGA-020
1:12 1
GRAVEL AND SAND

INDIVIDUAL ANODE CABLE TAILS


1C 16mm² PVDF/HMWPE CABLE PETROLEUM BACKFILL

1" VENT PIPE

LENGTH - 59m
INACTIVE
CENTRALISER
VENT PIPE (SOLID)
ANODE DISTRIBUTION BOX

10 NO. ANODE CABLES


COATED CASING
TIE WRAPPED TO
VENT PIPE
WELLHEAD

TOTAL GROUNDBED LENGTH - 102m


SECTION A-A
STRUCTURE TOP OF BACKFILL
UNCOATED CASING
(BY OTHERS)

3m
VENT PIPE
1mm WIDE SLOTS ANODE CABLE
VENT PIPE (SLOTTED)

10 NO. MMO ANODES

GROUNDBED LENGTH
Ø25 x 1000 LG.

43m ACTIVE
WELL CASING
CONCRETE
(BY OTHERS)
FOUNDATION
(BY ANODE CABLE TAIL
1" VENT CENTRALISER
OTHERS) PIPE DETAIL
ROPE
DETAIL

4m
FRONT ELEVATION
CENTRALISER
OF WELLHEAD
(1 NO. PER ANODE)
NOTES:

1. SLOTTED VENT PIPE TO BE INSTALLED IN THE ACTIVE


A A PORTION OF THE GROUNDBED. SOLID VENT PIPE TO BE
ATTACHMENT DISK INSTALLED IN THE INACTIVE PORTION OF THE GROUNDBED.
FOR END WEIGHT PETROLEUM 2. 1 NO. CENTRALISER TO BE FITTED ABOVE EACH ANODE ON
COKEBREEZE THE STRING.
BACKFILL 3. ROPE TO BE CABLE TIED TO THE ANODE STRING EVERY

3m
METER AND THE ROPE TIED OFF TO THE SUPPORT TUBE
ANODE END WEIGHT 4. EACH ANODE TO HAVE INDIVIDUAL CABLE TAIL.
5. 10 NO. ANODE STRINGS TO BE INSTALLED TO MAKE 1 NO.
ANODE CHAIN.
BENTONITE PLUG
Ø250mm

2 02FEB21 REISSUED FOR APPROVAL L.HULL N.SIPPEL S. FILMORE


1 02DEC20 REISSUED FOR APPROVAL L.HULL N.SIPPEL S. FILMORE Realisation du 4eme Train GPL a ZCINA, 4058-aa-bb-nnnnnnnnnn
0 17APR20 ISSUED FOR APPROVAL L.HULL N.SIPPEL S. FILMORE Hassi Messaoud
CT-EPC/001/SH/EPM-G/EP/18 A3 1/1

EPC001-aa-bb-c-dddd-eeeeee-E
CATHODIC PROTECTION CO. Ltd
VENTURE WAY, GRANTHAM, NG31 7XS
+44 (0)1476570666
www.cathodic.co.uk

N.T.S 2
COMPANY’S DOC. NO. EPC001-00-CE-EU-CPC-00028

JOB No. DOC. NO. REV.


4058 4058-VW-CX-00OO000028 1

Relocation of deep ground bed SHEET 20 of 26

6 INSTALLATION PROCEDURE
All installation works associated with the Cathodic Protection system shall be conducted in accordance with this
procedure and the appropriate design drawings (see Section 1.3 for list). Any conflict between this procedure and the
drawings and / or other project specifications and drawings shall be brought to the attention of the CP Engineer in
writing for clarification as soon as it is discovered.
All installation works shall be supervised by a CP engineer that shall be as a minimum a NACE CP 2 certified or similar
and demonstrate at least 8 years relevant experience. The Sub-contractor shall issue for approval to Contractor the
CV of the certified supervisor in CP.

This procedure assumes that the borehole for the deep well ground bed has been drilled and lined as required (i.e.
steel/conductive casing in the active section and coated steel/non-conductive casing in the inactive section). Prior to
ground bed installation, the location shall be checked as indicated on the design (see section 1.3 for relevant
document list). Drilling of the borehole is outside the scope of the CP Vendor and an approved procedure shall be
sought from the relevant Sub-contractor.

Prior to installation of the anodes, these shall be physically checked for any damages and the cable tails shall be holiday
tested.
For the ground bed installation, the following method shall apply:
• The anode chain is ‘flaked out’ on the ground.
• It is advised to prepare anode assembly (anodes marked at specified spacing, vent pipes are coupled
and tied at regular intervals, centralizer) as one unit and then lower the whole assembly inside the bore
hole. Once the anode assembly has been lowered inside the bore hole, coke breeze slurry can be
poured.
• A soft lifting strop is attached to the anode chain at distance from the bottom of the end weight equal
to the height that the crane/excavator will lift.
• The anode chain is lifted so that the end weight is off the ground and placed over the borehole. The
distance from top of the borehole and the first anode is shown on the relevant drawing.
• The first section of vent pipe (slotted) is held vertically above the deepwell and the first anode is cable
tied 1.5 m up the pipe. The anode cable is cable tied, not the anode.
• The anode centraliser is attached to the cable just above the anode.

This document is Tecnimont’s/Sonatrach’s property and cannot be used by others for any purpose, without prior written consent
COMPANY’S DOC. NO. EPC001-00-CE-EU-CPC-00028

JOB No. DOC. NO. REV.


4058 4058-VW-CX-00OO000028 1

Relocation of deep ground bed SHEET 21 of 26

• The anode and vent pipe are lowered until the top of the first section of vent pipe is just above the
deepwell. Under no circumstance the anode cable shall be used to lower the anode and vent pipe
assembly.
• The second section of vent pipe is attached (threaded coupling) and the anode chain cable tied to it.
• The second section of vent pipe is lowered until the top of vent pipe is just above the deepwell. The
anode cable tail shall be fixed to the vent pipe every 2 m using tie-wraps.
• The above process is repeated until the strop is 1 m above the borehole.
• The anode chain is then supported by a temporary support bar and the strop removed.
• The strop is reattached to the anode chain at distance from the borehole equal to the height that the
crane/excavator can lift.
• The anode chain is lifted so that the weight is off the temporary support bar and installation continues
as before.
• The above process is repeated until vent pipe is on the bottom of the borehole.
• The anode chain is then supported by a temporary support bar and the soft strop removed.
• The coke breeze backfill shall be installed after the installation of the anode string and vent pipe.
• Coke breeze shall be pumped. To avoid bridging of the coke breeze, it shall be fluidized with water to
form a slurry (the minimum amount of water shall be added to form a pumpable slurry acceptable to
the installation Sub-contractors equipment) and shall be pumped into the borehole from the bottom
up.
• The coke breeze shall be pumped in stages as described above until it reaches the required level (refer
to installation drawing).
• Forty-eight (48) hours after filling the borehole the level of coke breeze shall be measured and topped
up to the specified height above the top anode.
• The total quantity of coke breeze backfill required to encase the anodes up to the desired level is
normally calculated prior to installation, however a quantity may be lost during pouring activities, this
discrepancy shall be made up to the desired level.
• The remainder of the borehole shall be filled with gravel or imported backfill as specified to a depth of
100 mm below ground level.
• The ends of the cable shall be identified with a semi-permanent identification label.
• The location of the buried cable shall be initially marked (with a wooden stake) on the surface and GPS

This document is Tecnimont’s/Sonatrach’s property and cannot be used by others for any purpose, without prior written consent
COMPANY’S DOC. NO. EPC001-00-CE-EU-CPC-00028

JOB No. DOC. NO. REV.


4058 4058-VW-CX-00OO000028 1

Relocation of deep ground bed SHEET 22 of 26

recorded to ease location of the cable when it is required.


• Terminate the cable tail into the relevant anode junction box or fix to a wooden stake if the junction
box has not been installed (refer to section 4.5).
• Conduct anode-to-earth resistance test using the 3-pin method (see following Section for details). The
3-pin method shall be undertaken by a suitably experienced and certified CP technician.
• The location of each groundbed installation shall be identified by GPS coordinates and the General
Layout drawing updated for “As Built” issue.

This document is Tecnimont’s/Sonatrach’s property and cannot be used by others for any purpose, without prior written consent
COMPANY’S DOC. NO. EPC001-00-CE-EU-CPC-00028

JOB No. DOC. NO. REV.


4058 4058-VW-CX-00OO000028 1

Relocation of deep ground bed SHEET 23 of 26

6.1 3-PIN METHOD ANODE RESISTANCE MEASUREMENT


An earth ground tester together with two stakes shall be used to measure the anode-to-earth resistance test using
the 3-pin method. The measurement procedure is the following.

This document is Tecnimont’s/Sonatrach’s property and cannot be used by others for any purpose, without prior written consent
COMPANY’S DOC. NO. EPC001-00-CE-EU-CPC-00028

JOB No. DOC. NO. REV.


4058 4058-VW-CX-00OO000028 1

Relocation of deep ground bed SHEET 24 of 26

7 COMMISSIONING PROCEDURE
The purpose of the commissioning procedure should be used to show that the installed systems operate as specified
and that the required design criteria have been met.
The Commissioning check lists included in Sections 7.1 and 7.2 shall be completed and these will form the basis of the
Commissioning report.
The commissioning procedure for the relocated deep ground bed shall include as a minimum the following:

• Activating the cathodic protection systems (TRs shall be energized one by one).
• Measurement of current and voltage from transformer rectifier.
• Output modes of transformer rectifiers after the completion of commissioning.
• Measurement of current at anode circuits (with shunt or clamp meter).
• Apparent anode resistances and overall circuit resistances.
• AC voltages at structures before and after commissioning.
• Standard forms for recording commissioning results (Sections 7.1 and 7.2).

A commissioning report will be prepared by the CP Engineer, which shall include all commissioning results. The report
shall include a discussion of the results obtained giving conclusions. The commissioning report shall be signed by
VENODR, TCM and OWNER.

This document is Tecnimont’s/Sonatrach’s property and cannot be used by others for any purpose, without prior written consent
COMPANY’S DOC. NO. EPC001-00-CE-EU-CPC-00028

JOB No. DOC. NO. REV.


4058 4058-VW-CX-00OO000028 1

Relocation of deep ground bed SHEET 25 of 26

7.1 CHECKLIST FOR DEEP WELL GROUND BED INSTALLATION


LOCATION:

Results:
SI
Description Acc, Reject,
No.
N/A
1 Borehole Installed at correct location, depth and diameter
2 Borehole excavation free from metallic debris prior to installation
3 Bentonite plug installed in bottom of borehole
4 Number of MMO Anodes (10) is correct, each with 110 m long cable tail
5 MMO Anode String visually inspected for damage prior to installation
6 Anode cables holiday tested prior to installation
7 Anodes centralisers installed to Anode String
Ensure anodes are installed at correct depths from bottom and top of
8
borehole
Cables have no physical damage with sufficient slack cable to permit
9
removal of terminated cables from terminals
10 Vent pipe installed correctly, slotted in active zone and plain in inactive zone
Anode correctly installed and cable left long enough to terminate the cable
11
in the junction box
12 Coke breeze backfill installed in the active zone
13 Measure active and inactive zones
Fill the inactive zone with gravel free from rocks, boulders and metallic
14
debris
15 Well head cover installed
16 Vent pipe exits the wellhead cover
17 Measure resistance-to-earth for anode installation using 3-pin method *
18 Reinstatement completed and waste materials removed from site
*This reading must be measured on site

Note for all parameters the installation drawing shall be referred to where missing.

Comments:

Measurement Equipment (Model, Serial No. and calibration due date)

Vendor, CPCL, UK Tecnimont Sonatrach


Name
Signature
Date

This document is Tecnimont’s/Sonatrach’s property and cannot be used by others for any purpose, without prior written consent
COMPANY’S DOC. NO. EPC001-00-CE-EU-CPC-00028

JOB No. DOC. NO. REV.


4058 4058-VW-CX-00OO000028 1

Relocation of deep ground bed SHEET 26 of 26

7.2 COMMISSIONING CHECK LIST FOR DEEP GROUND BED

SI Inspection
Description Date
No. Sub-Contractor Contractor Client
1 Pre-commissioning checks
1.1 Number & location of anodes
as per drawings
1.2 Anode cables terminated &
labelled as per drawings at
ADB
1.3 ADB’s shunt & resistor ratings
as per datasheet
1.4 TRU positive cable is
connected to ADB
2 After energising the TRUs
2.1 Verify that TRU meters are
functioning and measure
current / voltage
2.2 Verify output voltage polarity
2.3 Measure current and circuit
resistances
2.4 Measure AC voltages

Comments:

Vendor, CPCL, UK Tecnimont Sonatrach


Name
Signature
Date

This document is Tecnimont’s/Sonatrach’s property and cannot be used by others for any purpose, without prior written consent