P Ple Als 220 30001 0

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 3 4 5 6 7 8 9 10

LEGEND AND ABBREVIATIONS KEY PLAN

000

500
750

250
N 308
GAS PIPELINE 8250
FOR CONSTRUCTION

E 388
SECURITY FENCE

E 387
E 387

E 387
PI-03 N 3152000
CONDENSATE PIPELINE N
LPG PIPELINE 0+824.01KM
N 308 12" CONDENSATE EXPORT LINE
8500 2

000
TRUNKLINE
FLOWLINE FROM CPF TO TIE-IN (MEDERBA)

E 387
PIPELINE SURVEY CORRIDOR FOR CONT. REFER OVERALL PLOT PLAN CPF PROPOSED BURIED
UGP U/G EXISTING PIPELINE 1 14" LPG EXPORT LINE
A DWG NO. C-PIP-LAY-000-30001 ELECTRICAL CABLE
AGP A/G EXISTING PIPELINE FROM CPF TO TIE-IN LPG A

DWG NO. P-PLE-DWG-200-30005


U/G EXISTING CABLE N N 308

MATCH LINE FOR CONT. REFER


EXISTING FENCE 825 0
ASPHALT ROAD PI-04 N 3122000
TRACK ROAD 1+140.75KM
WADI MINOR

0+85
00
0
9.0
WADI MEDIUM/MAJOR 46

DOR

0+8
0
9.5

SAND DUNES I 46

ORR

0+90
0

0
0.0
C

50

470.50
47
EXISTING FOC/FOC
VEY
2

471.00
0+7

0+95
R

0
PLOT PLAN FENCE S U 469.00

INE

0046
1

9.0
0
9.0 .50 0
L

1+00
0
MANIFOLD FENCE E 4646970.00.50

1.500

0
0+7
0
PIP

44771.
4 47 472.00

34"-PH-220037-D01L-1S-NI
472.50

472

471.50
.50
472 73.00 N 3092000

.5

472.00
50
OVERHEAD POWERLINE

1+05
0
OHL 4

473.00

472.5
472.50
34" GAS EXPORT LINE

472.00

0+6

473
100
MAJOR CONTOUR LINES

0
AT-21

471.5

.00

02
FL-0
AT-14
18 TL-
TL-2 212
3
FL-00

471.0

1+10
0
AT-20

0
FROM CPF TO TIE-IN GAS
AT-13

THIS DRAWING
TL-217 161

00
FL-

50
MINOR CONTOUR LINES
TXNO-1 AT-23 FL-00
4

473

0
AT-8

TL-218
AT-10

47
.00

TL-212
1

FL-041
0
60.6
AT-28

0+6
.50
AT-11

AT-22

TRIAL PIT

216
0

18

TL-

FL-
TL-2
1+15

E 340000

011

E 400000

E 430000
AT-1

E 370000
AT-12 AT-5

470.0
PI-01
PLANIMETRY SCALE 1:2500

31
-18

FL-111

-0
FL

FL
50
182 AT-30
FL- AT-25

TL-214
PIPELINE MARKER
AT-27
AT-19

TL-216
FL-121

0
AT-18

0+088.73KM
AT-15

473.0
AT-29

R
CPF

0
FL-052

FL-122
0+5
IDO
FL-051

B B
AT-16
AT-24

FL-061
AT-17

1+2

FL-141
473.50

14
TL-2
AERIAL MARKER
ORR DISPOSAL AREA
AT-9 AT-31

A
FL-
081

GATHERING SYSTEM

082
FL-
DETAIL-A
SCALE - 1:50000 AT-33 AT-32

474.00
AT-26

00
0

YC

VEC
.0

91
-0
469

FL
00
469.00 AT-2

CP TEST POST E

0+5
V

1+2
N 308

39
SUR

HIL

47
8750

4
49.

.50
50
FOC SPLICE PIT E TYP REFERENCE DOCUMENT TITLE

50
ELIN
47

EP
5.0

0+4
0 0

9.5
9.5

1+3
PIP
46

46
BLOCK VALVE STATIONS (BVS) P-PLE-BOD-200-30001 EXPORT SYSTEM PIPELINES BASIS OF DESIGN

ROT
00

00
9.0
.50

+40
46
0+1

468
L/R LEFT / RIGHT

8.0

1+3
A-PLE-SPE-200-30010 PIPELINE CONSTRUCTION SPECIFICATION

46
00

ECT
475.50

0
POINT OF INTERSECTION
0

50
468.0
PI 476.00

50

50
46
9.5
N 308 TYPICAL DRAWING - PIPELINE RIGHT OF WAY MULTIPLE

DWG NO. P-PLE-ALS-220-30002


0 0+1 476

ION
.50
8500

0+0
T4 A-PLE-DWG-200-30004

0
477

0+3

1+ 4
8.5
0 .00 47
CROSSING TYPES / DETAILS 470.0 50 PIPELINES (EXPORT SYSTEM)

46
7.5

MATCH LINE FOR CONT. REFER


0 478
.00

0
4747478.

9.0
50

00
00

00
9.59.0

46

LIN
00
APX ABOVE GROUND PIPE CROSSING T5 A-PLE-DWG-200-30005 TYPICAL DRAWING - PIPELINE TRENCH DETAILS

1+ 4
0+3
0+0

4 70

E
UPX UNDER GROUND PIPE CROSSING

.50
T6 A-PLE-DWG-200-30006 TYPICAL DRAWING - HIGHWAY CROSSING

50

50
UCX UNDER GROUND CABLE CROSSING

0
9.5

0+2
46
FLX-01 TYPICAL DRAWING - ASPHALT ROAD/TRACK CROSSING
FLX FENCE CROSSING T7 A-PLE-DWG-200-30007

470.00
KP=0+000.00km DETALS - OPEN CUT

00
FOX FIBRE OPTIC CROSSING 0.5
0

0+2
47
OHX OVERHEAD POWERLINE CROSSING TYPICAL DRAWING - PIPELINE CROSSING EXISTING
START POINT T8 A-PLE-DWG-200-30008
FSX FALAISE CROSSING UNDERGROUND SERVICES (PIPELINE & CABLE)
C HDX NATIONAL HIGHWAY CROSSING 0+000.00KM
TYPICAL DRAWING - EXISTING ABOVE GROUND PIPELINES
C
T9 A-PLE-DWG-200-30009
RDX ASPHALT ROAD CROSSING PI-02 CROSSING DETAILS

750
TRX TRACK ROAD CROSSING 0+188.23KM TYPICAL DRAWING - OVERHEAD POWERLINE CROSSING

E 386
T10 A-PLE-DWG-200-30011
WDX WADI CROSSING MEDIUM / MAJOR DETAILS

000
500
000

750
MWX WADI CROSSING MINOR

250
N 308 T11 A-PLE-DWG-200-30015 TYPICAL DRAWING - MINOR WADI CROSSINGS DETAILS

E 387
E 387
E 388

E 387
SDX SAND DUNES CROSSING 8750

E 387
TYPICAL DRAWING - MEDIUM / MAJOR WADI CROSSINGS
T12 A-PLE-DWG-200-30016
DETAILS
T13 A-PLE-DWG-200-30018 TYPICAL DRAWING - SAND DUNE CROSSING

PI-04
CPF PLOT FENCE(FLX-01)

PI-02

PI-03
PI-01

P-PLE-MAP-200-30001 EXPORT SYSTEM - OVERALL MAP

VECHILE PROTECTION DITCH


CH. 0+636.47 DEPTH - 2.5m
EXPORT SYSTEM PIPELINE UPHEAVAL BUCKLING
P-PLE-CAL-200-30002
CALCULATION
INSTALLATION DETAILS DRAWING FOR PIPELINE CATHODIC
ELEVATION IN METERS

A-MEC-DWG-000-47962
PROTECTION SYSTEM
HORIZONTAL SCALE TEST FACILITY SCHEDULE FOR PIPELINE CATHODIC
1 : 2500 A-ELE-LST-000-47961
PROTECTION SYSTEM
D D
PROFILE

STATION APPROACH DRAWING FOR EXPORT PIPELINES AT


P-PLE-DWG-200-30005
CPF
475.00
GROUND PROFILE C-PIP-LAY-000-30001 OVERALL PLOT PLAN CPF
472.50 NOTES:
VERTICAL SCALE 1. ALL COORDINATES ARE IN METERS HAVING REFERENCE TO THE UNIVERSAL TRANSVERSE
1 : 250 470.00
MERCATOR GRID (UTM) ZONE 32 NORTH. DATUM: WGS 84.
2. ALL DIMENSIONS AND ELEVATIONS ARE IN METERS UNLESS OTHERWISE SPECIFIED.
3. FOC SHALL BE INSTALLED ALONG SIDE PIPELINE, FOR DETAILS REFER TELECOM DRAWING NO.
A-TEL-DWG-970-30038.
467.50 4. ALL BURIED SERVICES TO BE SURVEYED AND PROBED BY METAL/CABLE DETECTOR PRIOR
TO COMMENCEMENT OF TRENCH EXCAVATION DURING PRE CONSTRUCTION SURVEY. REQUIRED
DATUM LEVEL : 465.0m UNDERGROUND INVESTIGATIONS (SCANNING OR SLIT TRENCHING) SHALL BE IMPLEMENTED TO
DETERMINE THE DEPTH OF EXISTING BURIED 3rd PARTY UTILITIES / PIPELINES

0+400.00

0+450.00

0+636.47
0+000.00

0+050.00

0+088.73

0+200.00

0+250.00

0+300.00

0+350.00

0+500.00

0+550.00

0+600.00

0+650.00

0+700.00

0+750.00

0+800.00

0+850.00

0+900.00

0+950.00
0+824.01
0+100.00

0+150.00

0+188.23

1+000.00

1+050.00

1+200.00
1+140.75
1+100.00

1+150.00
5. PIPELINE CROSSING CONFIGURATION SHALL BE VERIFIED AT SITE DURING CONSTRUCTION
BASED ON BURIAL DEPTH OF EXISTING PIPE/CABLE.
CUMULATIVE HORIZONTAL CHAINAGE (km) 6. HAND EXCAVATION SHALL BE 2m AS PER CONSTRUCTION SPECFICATION. EXCAVATION OF
EXISTING PIPELINE/CABLE SHALL BE DONE MANUALLY USING HAND TOOLS WITH ADEQUATE
E SUPPORTING TO THE PIPE/CABLE. CONTRACTOR SHALL OBTAIN ALL REQUIRED APPROVALS E
FROM CONCERNED AUTHORITIES PRIOR TO EXCAVATION.
7. THE DEPTH OF EXISTING SERVICES SHOWN ARE TENTATIVE AND THE EXACT DEPTH SHALL

469.44
469.54

470.48

469.64

468.74

469.48

473.48
469.93

469.93

469.58

470.28

470.26

469.23

469.02

468.08

468.99

469.72

470.50
470.73

468.52

468.76

469.75

473.07
471.94
469.81

471.38

471.06

473.31

473.17
470.11
BE VERIFIED DURING PRE CONSTRUCTION SURVEY . METHOD OF CROSSING SHALL BE DECIDED
GRADE ELEVATION (m) FOR INDIVIDUAL CASE AFTER CONSULTING WITH CONCERNED STATUTORY AUTHORITIES.
SURVEY

CROSSINGS SHALL BE MADE IN ACCORDANCE WITH TYPICAL CROSSING DRAWINGS TO THE


MAXIMUM EXTENT POSSIBLE.
8. AT CROSSINGS AND ALONG THE PIPELINE, WARNING TAPE SHALL BE INSTALLED AS PER
RELEVANT TYPICAL/DETAILED DRAWINGS.
9. ALL WARNING SIGNS AND MARKER POSTS SHALL BE INSTALLED AS PER PIPELINE
CONSTRUCTION SPECIFICATION.
TOP OF PIPE ELEVATION (m) TO BE FURNISHED DURING AS-BUILT STAGE 10. LOCALIZED SAND DUNES SHALL BE GRADED TO LEVEL TO AVOID ANY LOW POINTS IN THE
ALIGNMENT.
11. PIPELINE MINIMUM ELASTIC BEND RADIUS SHALL BE 950m AND COLD BEND RADIUS SHALL BE
34.560m.
12. CP INSTALLATION SHALL BE AS PER DOC. NO. A-MTL-SPE-000-30036.
SOIL TYPE OCHRE RED SILTY CLAY 13. FOC SPLICE PIT LOCATIONS SHOWN IN THE ALIGNMENT SHEET ARE INDICATIVE ONLY.
CONSTRUCTION CONTRACTOR SHALL INSTALL SPLICE PITS BASED ON ACTUAL SITE
CONDITION.
14. INSTALLATION TEMP. SHALL BE 25° AND SHALL BE RECORDED DURING CONSTRUCTION.

MATCH LINE FOR CONT. REFER DWG. NO. P-PLE-ALS-220-30002


MINIMUM DEPTH / COVER (m) 1.7 1.0 0.8 3.7 0.8 15. MAXIMUM VERTICAL BEND (OVERBEND) ANGLE SHALL BE LIMITED TO 1.46° PER 18m LENGTH
F OF LINE PIPE. F
FOR CONT. REFER DWG. NO. P-PLE-DWG-200-30005

PI REFERENCE PI-01 PI-02 PI-03 PI-04 16. THE SAND DUNE CROSSINGS SHOWN IN THE ALIGNMENT ARE INDICATIVE. CONSTRUCTION
SHALL MAKE ADEQUATE JUDGEMENT TO CONSTRUCT THESE AS SAND DUNE CROSSING OR
90.00° R 90.00° L 46.96° R 5.00° R STANDARD CONSTRUCTION BY GRADING TO REQUIRED LEVEL.
PI DIRECTION ANGLE (ALL COLD BENDS) 17. FOR EXISTING AG PIPELINE CROSSING REFER TO DOC. NO. P-CIV-STD-000-30106.
ENGINEERING

18. CLASSIFICATION OF WADI CROSSING (MINOR, MEDIUM, MAJOR) TO BE VERIFIED PRIOR TO


DISTANCE BETWEEN PI's (m) EXECUTION OF PIPELINE CONSTRUCTION.
START POINT KP.0+000.00km

88.73 99.5 635.78 316.74 59.25 19. AT CROSSING, ZONE Ia/I PIPE LENGTH SHALL BE ROUNDED UP MAXIMUM TO THE NEAREST
PIPELINE DESIGN CODE 9.0m AS PER THE TABLE BELOW.
ASME B31.8 ZONE Ia/I LENGTH x (m) x<9.0m 9.0m<x<18.0m 18.0m<x<27.0m 27.0m<x<36.0m Etc,.....
MAXIMUM ROUNDED UP 9.0m 18.0m 27.0m 36.0m
LENGTH OF ZONE Ia/I (m)
CROSSING TYPE FLX-01 0 25 50 100 150 200 250M
REFERENCE DRAWINGS T3,T4,T5
(SCALE: 1:2500)
LINE PIPE SPECIFICATION / DESIGN PRESSURE API 5L GR. X65 PSL2 (NON-SOUR SERVICE) / 91.5 barg DRAWING SCALE
THIS DOCUMENT HAS BEEN PREPARED BY PETROFAC FOR THE USE OF GROUPEMENT ISARENE (EACH REFERRED TO AS A "COPYRIGHT OWNER") AND IS
SUBJECT TO STRICT CONFIDENTIALITY OBLIGATIONS AND PROPRIETARY RIGHTS; ALL INTELLECTUAL PROPERTY THEREIN, INCLUDING ALL PROPRIETARY AND
G PIPE O.D. / WALL THICKNESS 864 / 22.3 864 / 13.99 CONFIDENTIAL INFORMATION AND DATA, REMAINS VESTED WITH AND OWNED BY THE RELEVANT COPYRIGHT OWNER. REPRODUCTION IN WHOLE OR IN PART G
FOR ANY PURPOSE OTHER THAN WORK FOR GROUPEMENT ISARENE, IS FORBIDDEN EXCEPT BY EXPRESS WRITTEN PERMISSION OF THE RELEVANT COPYRIGHT
OWNER(S). IT IS TO BE SAFEGUARDED AGAINST BOTH DELIBERATE AND INADVERTENT DISCLOSURE TO ANY UNAUTHORIZED THIRD PARTY.
Zone Ia / 207.35 Zone III / 992.65
MATERIALS

LOCATION CLASS & LENGTH (m)


CASING LENGTH (m) This revision is originated, checked, signed off and accepted by.
PIPELINE COATING : PIPE/JOINTS PIPELINE EXTERNAL COATING : 3LPE COATING, FIELD JOINT : PE HEAT SHRINK SLEEVES Name Function or job Title
CHANDRAMOHAN (CM) PETROFAC DRAFTER
PIPELINE & FOC MARKERS RAMKUMAR SG (SG) PETROFAC PIPELINE ENGINEER
SAHOO PRADIPTA (PS) PETROFAC LEAD PIPELINE ENGINEER
CATHODIC PROTECTION INSTALLATIONS NOTE-12 PETROFAC PROJECT ENGINEER MANAGER
M. T. SIDDIQUIE (MTS)
29.61m 10.05m 10.34m 10.61m 17.00m 6.00m 26.39m COORDINATES LIST (PI/BM/TP/BH) TITLE:
GL GL AIN TSILA
Petrofac
LIMIT OF RIGHT

LIMIT OF RIGHT

FOC DENOMINATION EASTING NORTHING GRADE EL(m)


EXPORT SYSTEM ALIGNMENT SHEET
TRAFFIC MOVEMENT

(2 Nos.) START POINT 387981.803 3088786.854 469.932


OF WAY

OF WAY

H PI-01 387914.336 3088729.232 469.544


Nursulu
Messag
Digitally signed by
Nursulu Messaggi
DN: cn=Nursulu
Messaggi, o=Petrofac,
ou=Pipeline ,
email=nursulu.sarbalin
AIN TSILA DEVELOPMENT
MAIN EPC CONTRACT
34" GAS EXPORT LINE FROM CPF TO TIE-IN GAS H
gi
a@petrofac.com, c=AE
Date: 2020.05.20
18:10:24 +04'00'

KP 0+000 TO KP 1+200
PIPELINE SURVEY

PIPELINE SURVEY

Chand Digitally Pradipt Pradip byDigitally signed

PI-02 387849.714 3088804.894 470.484 by


signed

ramoh Chandramohan
P
Date: 2020.05.19
a
Digitally signed
by Pradipta
Sahoo
Date: 2020.05.19
ta
Sahoo
Date:
Pradipta

2020.05.19 S. Palit
Digitally signed
by S. Palit
Date: 2020.05.22 CONTRACT NO. : A-CNT-CON-000-00282
an P 15:10:38 +05'30' Sahoo 16:47:21 +05'30'
Sahoo +05'30'
16:47:37 21:12:07 +04'00'
AREA

12" CONDENSATE EXPORT LINE 14" LPG EXPORT LINE 34" GAS EXPORT LINE PI-03 387366.263 3088391.988 469.477 0 ISSUED FOR CONSTRUCTION CM SG PS MTS . 19.05.20 PETROFAC JOB NO. : JI-2045 CLIENT: GROUPEMENT ISARENE
CORRIDOR

CORRIDOR

FROM CPF TO TIE-IN (MEDERBA) FROM CPF TO TIE-IN LPG FROM CPF TO TIE-IN GAS
PI-04 387051.529 3088427.615 473.174 ORIGINAL DWG SIZE : A1
SECTION A-A A ISSUED FOR REVIEW & COMMENTS CM SG PS MTS . 20.03.20 DWG. P-PLE-ALS-220-30001 SH. 0001 REV 0
(SCALE-NTS) REV DESCRIPTION DRWN CHK'D APP'D APP'D ACC'D DATE SCALE : 1:2500 ELECTRONIC FILE : P-PLE-ALS-220-30001.DWG
1 2 3 4 5 6 7 8 9 10

You might also like