LEGEND AND ABBREVIATIONS KEY PLAN

00
500
50
0
FOR CONSTRUCTION

860
GAS PIPELINE 50

867

50
088

86
0
CONDENSATE PIPELINE 825 N3 N 3152000

862

E3
E3
3
08 N
LPG PIPELINE N3

E3

50
TRUNKLINE 34"-PH-220037-D01L-1S-NI 8 750
08

857
FLOWLINE N3
34" GAS EXPORT LINE

E3
PIPELINE SURVEY CORRIDOR
UGP U/G EXISTING PIPELINE PI-05 FROM CPF TO TIE-IN GAS
A AGP A/G EXISTING PIPELINE 12" CONDENSATE EXPORT LINE 2 A
1+584.46KM N
U/G EXISTING CABLE
EXISTING FENCE FROM CPF TO TIE-IN (MEDERBA) SDX-01
ASPHALT ROAD 14" LPG EXPORT LINE 1 KP=1+530.19 N 3122000
TRACK ROAD PI-06
WADI MINOR FROM CPF TO TIE-IN LPG
WADI MEDIUM/MAJOR PIPELINE SURVEY CORR 2+286.85KM
IDOR

60.61
SAND DUNES
EXISTING FOC/FOC
PLOT PLAN FENCE

476.50
477.00
477.50
478.00
4777..500
4 77 . 50
476.00
476
4
477.00

474.50
0

474.00
475.00

473.50
473.00
477.50
476.5

472.50
0

478.00

472.00
8.0 0
475.5

478.50

471.50

471.00
479.00

470.5
479.50

470.0
480.

0
480.50
481.00
481.500

1+600
MANIFOLD FENCE 469

48822.5.000

469

468
4 83 .50

4
1+650

467
4 83 .00

467
.50

4 84
4

46
00

6
0
0

466.00
1+700

8
4.5 .00

.00
.0
46

.50
485.00

.00

6
466

1+550

.50

.00
48 485

1+750
484.50

.50
6.0

484
.50 0
2
0

483.50

1+800
483.00
6.5

482 0

46
482..500
46

465
481.50

1+850
481.00
480.

50
N 3092000

49.39
480.50

.0
OVERHEAD POWERLINE

6.0
479.5
479.000

1+900

46
OHL 47

1+500

46
.50
0
1+950
0

5.0
8.5

478

4.5
00

857
2+000
0

477.5

0
4

2+050
.00

464.00
100
MAJOR CONTOUR LINES

7
476

2+100
7

1+450
.00
1

0
AT-21

2+150
47

463.50
.50

02
E3
2+200

FL-0
AT-14
8 TL-

6.0
TL-21 212

47
FL-003

2+250
THIS DRAWING

0
50
MINOR CONTOUR LINES
AT-20

5
AT-13

1+400
.50
TL-217 161
FL-

2+3
TXNO-1 AT-23 FL-00
4

AT-8

TL-218
AT-10

TL-212
FL-041
TRIAL PIT
AT-28
AT-11

1+350
AT-22

216
18

TL-

FL-
TL-2
PLANIMETRY SCALE 1:2500

011
AT-1

475.0

00
AT-12
AT-5

00

31
181

FL-111

-0
FL-

PIPELINE MARKER

FL
2+3
M

1+300
474.50
182 AT-30
FL- AT-25

TL-214
0

E 340000

E 400000

E 430000
AT-27

E 370000
AT-19

TL-216
870
FL-121
AT-18

B B
AT-29 AT-15

463.00
FL-052

FL-122
FL-051

1+250
AT-16

PIPELINE SURVEY CORR


AT-24

AERIAL MARKER

FL-061
AT-17

4 74
A

50

462.50

FL-141

214
E3
0

TL-
AT-9 FL-0 AT-31

IDOR 900
81

.00
47

2+4

082
GATHERING SYSTEM

462.00

FL-
DETAIL-A
AT-32

1+200
3.5
SCALE - 1:50000 AT-33
AT-26

08
0

0
091

3.0
CP TEST POST N3
FL-
AT-2

47

00

2+4
FOC SPLICE PIT TP-52 TYP REFERENCE DOCUMENT TITLE

50
BLOCK VALVE STATIONS (BVS) KP=1+452.976

2+5
1.5
46
0 N=3088479.255 P-PLE-BOD-200-30001 EXPORT SYSTEM PIPELINES BASIS OF DESIGN
L/R LEFT / RIGHT 08 850

00
N3 MATCH LINE FOR CONT. REFER E=386743.423

2+5
.00 A-PLE-SPE-200-30010 PIPELINE CONSTRUCTION SPECIFICATION

DWG NO. P-PLE-ALS-220-30003


PI POINT OF INTERSECTION 46
1

DWG NO. P-PLE-ALS-220-30001


461.0

MATCH LINE FOR CONT. REFER

50
0
TYPICAL DRAWING - PIPELINE RIGHT OF WAY MULTIPLE

2+6
CROSSING TYPES / DETAILS T4 A-PLE-DWG-200-30004
PIPELINES (EXPORT SYSTEM)

00
APX ABOVE GROUND PIPE CROSSING T5 A-PLE-DWG-200-30005 TYPICAL DRAWING - PIPELINE TRENCH DETAILS
UPX UNDER GROUND PIPE CROSSING
UCX UNDER GROUND CABLE CROSSING T6 A-PLE-DWG-200-30006 TYPICAL DRAWING - HIGHWAY CROSSING
FLX FENCE CROSSING DISPOSAL AREA T7 A-PLE-DWG-200-30007
TYPICAL DRAWING - ASPHALT ROAD/TRACK CROSSING
FOX FIBRE OPTIC CROSSING DETALS - OPEN CUT
OHX OVERHEAD POWERLINE CROSSING TYPICAL DRAWING - PIPELINE CROSSING EXISTING
T8 A-PLE-DWG-200-30008
C FSX FALAISE CROSSING UNDERGROUND SERVICES (PIPELINE & CABLE)
C
HDX NATIONAL HIGHWAY CROSSING TYPICAL DRAWING - EXISTING ABOVE GROUND PIPELINES
RDX ASPHALT ROAD CROSSING T9 A-PLE-DWG-200-30009
CROSSING DETAILS
TRX TRACK ROAD CROSSING TYPICAL DRAWING - OVERHEAD POWERLINE CROSSING
WDX WADI CROSSING MEDIUM / MAJOR T10 A-PLE-DWG-200-30011
DETAILS

00

50
00

00
MWX WADI CROSSING MINOR

865

862
870

867

860
0 T11 A-PLE-DWG-200-30015 TYPICAL DRAWING - MINOR WADI CROSSINGS DETAILS
SDX SAND DUNES CROSSING 75 0 900

E3

E3
08
E3

E3
088

E3
N3 N3 T12 A-PLE-DWG-200-30016
TYPICAL DRAWING - MEDIUM / MAJOR WADI CROSSINGS
DETAILS

SAND DUNE CROSSING(SDX-01)(67.84m)

SAND DUNE CROSSING(SDX-01)(67.84m)


PI-05

PI-06
T13 A-PLE-DWG-200-30018 TYPICAL DRAWING - SAND DUNE CROSSING
483.00 P-PLE-MAP-200-30001 EXPORT SYSTEM - OVERALL MAP
EXPORT SYSTEM PIPELINE UPHEAVAL BUCKLING
480.50 P-PLE-CAL-200-30002
CALCULATION
ELEVATION IN METERS

INSTALLATION DETAILS DRAWING FOR PIPELINE CATHODIC


A-MEC-DWG-000-47962
HORIZONTAL SCALE 478.00 PROTECTION SYSTEM
1 : 2500 GROUND PROFILE TEST FACILITY SCHEDULE FOR PIPELINE CATHODIC
D A-ELE-LST-000-47961 D
475.50 PROTECTION SYSTEM
PROFILE

473.00 469.00
GROUND PROFILE NOTES:
1. ALL COORDINATES ARE IN METERS HAVING REFERENCE TO THE UNIVERSAL TRANSVERSE
470.50 466.50 MERCATOR GRID (UTM) ZONE 32 NORTH. DATUM: WGS 84.
VERTICAL SCALE 2. ALL DIMENSIONS AND ELEVATIONS ARE IN METERS UNLESS OTHERWISE SPECIFIED.
1 : 250 468.00 464.00 3. FOC SHALL BE INSTALLED ALONG SIDE PIPELINE, FOR DETAILS REFER TELECOM DRAWING NO.
A-TEL-DWG-970-30038.
4. ALL BURIED SERVICES TO BE SURVEYED AND PROBED BY METAL/CABLE DETECTOR PRIOR
TO COMMENCEMENT OF TRENCH EXCAVATION DURING PRE CONSTRUCTION SURVEY. REQUIRED
465.50 461.50 UNDERGROUND INVESTIGATIONS (SCANNING OR SLIT TRENCHING) SHALL BE IMPLEMENTED TO
DATUM LEVEL : 459.0m DETERMINE THE DEPTH OF EXISTING BURIED 3rd PARTY UTILITIES / PIPELINES
DATUM LEVEL : 463.0m 5. PIPELINE CROSSING CONFIGURATION SHALL BE VERIFIED AT SITE DURING CONSTRUCTION
BASED ON BURIAL DEPTH OF EXISTING PIPE/CABLE.

2+400.00
1+584.46

2+000.00

2+050.00

2+200.00

2+250.00

2+286.85
2+300.00

2+350.00
1+400.00

1+450.00
1+200.00

1+250.00

1+300.00

1+350.00

1+500.00

1+550.00

1+598.03
1+600.00

1+650.00

1+700.00

1+750.00

1+800.00

1+850.00

1+900.00

1+950.00

2+100.00

2+150.00
1+530.19

6. HAND EXCAVATION SHALL BE 2m AS PER CONSTRUCTION SPECFICATION. EXCAVATION OF


EXISTING PIPELINE/CABLE SHALL BE DONE MANUALLY USING HAND TOOLS WITH ADEQUATE
CUMULATIVE HORIZONTAL CHAINAGE (km) SUPPORTING TO THE PIPE/CABLE. CONTRACTOR SHALL OBTAIN ALL REQUIRED APPROVALS
FROM CONCERNED AUTHORITIES PRIOR TO EXCAVATION.
E 7. THE DEPTH OF EXISTING SERVICES SHOWN ARE TENTATIVE AND THE EXACT DEPTH SHALL E
BE VERIFIED DURING PRE CONSTRUCTION SURVEY . METHOD OF CROSSING SHALL BE DECIDED
FOR INDIVIDUAL CASE AFTER CONSULTING WITH CONCERNED STATUTORY AUTHORITIES.
484.54

464.47
473.48

474.32

474.85

478.94

478.84

474.78

466.34

464.26

464.35

463.48

462.94
476.09

476.53

469.87

469.70

467.97

466.06

466.58

465.69

462.99
474.91

477.91
475.12

471.58

465.13

463.13

461.75
CROSSINGS SHALL BE MADE IN ACCORDANCE WITH TYPICAL CROSSING DRAWINGS TO THE
GRADE ELEVATION (m) MAXIMUM EXTENT POSSIBLE.
SURVEY

8. AT CROSSINGS AND ALONG THE PIPELINE, WARNING TAPE SHALL BE INSTALLED AS PER
RELEVANT TYPICAL/DETAILED DRAWINGS.
9. ALL WARNING SIGNS AND MARKER POSTS SHALL BE INSTALLED AS PER PIPELINE
CONSTRUCTION SPECIFICATION.
10. LOCALIZED SAND DUNES SHALL BE GRADED TO LEVEL TO AVOID ANY LOW POINTS IN THE
TOP OF PIPE ELEVATION (m) ALIGNMENT.
TO BE FURNISHED DURING AS-BUILT STAGE 11. PIPELINE MINIMUM ELASTIC BEND RADIUS SHALL BE 950m AND COLD BEND RADIUS SHALL BE
34.560m.
12. CP INSTALLATION SHALL BE AS PER DOC. NO. A-MTL-SPE-000-30036.
13. FOC SPLICE PIT LOCATIONS SHOWN IN THE ALIGNMENT SHEET ARE INDICATIVE ONLY.
CONSTRUCTION CONTRACTOR SHALL INSTALL SPLICE PITS BASED ON ACTUAL SITE
SOIL TYPE OCHRE RED SILTY CLAY CONDITION.
14. INSTALLATION TEMP. SHALL BE 25° AND SHALL BE RECORDED DURING CONSTRUCTION.
15. MAXIMUM VERTICAL BEND (OVERBEND) ANGLE SHALL BE LIMITED TO 1.46° PER 18m LENGTH
2.5 OF LINE PIPE.

MATCH LINE FOR CONT. REFER DWG. NO. P-PLE-ALS-220-30003


MINIMUM DEPTH / COVER (m) 0.8 0.8
MATCH LINE FOR CONT. REFER DWG. NO. P-PLE-ALS-220-30001

F (NOTE-16) 16. THE SAND DUNE CROSSINGS SHOWN IN THE ALIGNMENT ARE INDICATIVE. CONSTRUCTION
F
SHALL MAKE ADEQUATE JUDGEMENT TO CONSTRUCT THESE AS SAND DUNE CROSSING OR
PI REFERENCE PI-05 PI-06 STANDARD CONSTRUCTION BY GRADING TO REQUIRED LEVEL.
17. FOR EXISTING AG PIPELINE CROSSING REFER TO DOC. NO. P-CIV-STD-000-30106.
PI DIRECTION ANGLE (ALL COLD BENDS) 16.20° R 19.93° R 18. CLASSIFICATION OF WADI CROSSING (MINOR, MEDIUM, MAJOR) TO BE VERIFIED PRIOR TO
EXECUTION OF PIPELINE CONSTRUCTION.
ENGINEERING

19. AT CROSSING, ZONE Ia/I PIPE LENGTH SHALL BE ROUNDED UP MAXIMUM TO THE NEAREST
DISTANCE BETWEEN PI's (m) 384.46 702.39 113.15 9.0m AS PER THE TABLE BELOW.
ZONE Ia/I LENGTH x (m) x<9.0m 9.0m<x<18.0m 18.0m<x<27.0m 27.0m<x<36.0m Etc,.....
PIPELINE DESIGN CODE ASME B31.8 MAXIMUM ROUNDED UP 9.0m 18.0m 27.0m 36.0m
LENGTH OF ZONE Ia/I (m)

CROSSING TYPE SDX-01 0 25 50 100 150 200 250M


REFERENCE DRAWINGS T3,T4,T5 T13 T3,T4,T5
(SCALE: 1:2500)
LINE PIPE SPECIFICATION / DESIGN PRESSURE API 5L GR. X65 PSL2 (NON-SOUR SERVICE) / 91.5 barg DRAWING SCALE
THIS DOCUMENT HAS BEEN PREPARED BY PETROFAC FOR THE USE OF GROUPEMENT ISARENE (EACH REFERRED TO AS A "COPYRIGHT OWNER") AND IS
SUBJECT TO STRICT CONFIDENTIALITY OBLIGATIONS AND PROPRIETARY RIGHTS; ALL INTELLECTUAL PROPERTY THEREIN, INCLUDING ALL PROPRIETARY AND
G PIPE O.D. / WALL THICKNESS 864 / 13.99 CONFIDENTIAL INFORMATION AND DATA, REMAINS VESTED WITH AND OWNED BY THE RELEVANT COPYRIGHT OWNER. REPRODUCTION IN WHOLE OR IN PART G
FOR ANY PURPOSE OTHER THAN WORK FOR GROUPEMENT ISARENE, IS FORBIDDEN EXCEPT BY EXPRESS WRITTEN PERMISSION OF THE RELEVANT COPYRIGHT
OWNER(S). IT IS TO BE SAFEGUARDED AGAINST BOTH DELIBERATE AND INADVERTENT DISCLOSURE TO ANY UNAUTHORIZED THIRD PARTY.
Zone III / 1200
MATERIALS

LOCATION CLASS & LENGTH (m)


CASING LENGTH (m) This revision is originated, checked, signed off and accepted by.
PIPELINE COATING : PIPE/JOINTS PIPELINE EXTERNAL COATING : 3LPE COATING, FIELD JOINT : PE HEAT SHRINK SLEEVES Name Function or job Title
CHANDRAMOHAN (CM) PETROFAC DRAFTER
PIPELINE & FOC MARKERS RAMKUMAR SG (SG) PETROFAC PIPELINE ENGINEER
SAHOO PRADIPTA (PS) PETROFAC LEAD PIPELINE ENGINEER
CATHODIC PROTECTION INSTALLATIONS NOTE-12 PETROFAC PROJECT ENGINEER MANAGER
M. T. SIDDIQUIE (MTS)
29.61m 10.05m 10.34m 10.61m 17.00m 6.00m 26.39m COORDINATES LIST (PI/BM/TP/BH) TITLE:
GL GL AIN TSILA
Petrofac
LIMIT OF RIGHT

LIMIT OF RIGHT

FOC DENOMINATION EASTING NORTHING GRADE EL(m)


EXPORT SYSTEM ALIGNMENT SHEET
TRAFFIC MOVEMENT

(2 Nos.) PI-05 386616.667 3088515.780 477.908


OF WAY

OF WAY

H PI-06 385994.571 3088841.886 462.942 Nursulu


Messag
Digitally signed by
Nursulu Messaggi
DN: cn=Nursulu
Messaggi, o=Petrofac,
ou=Pipeline ,
email=nursulu.sarbalina
AIN TSILA DEVELOPMENT
MAIN EPC CONTRACT
34" GAS EXPORT LINE FROM CPF TO TIE-IN GAS H
gi
@petrofac.com, c=AE

KP 1+200 TO KP 2+400
Date: 2020.05.20
18:11:06 +04'00'
PIPELINE SURVEY

PIPELINE SURVEY

Chand byDigitally signed Pradip Digitally signed

TP-52 386743.423 3088479.255 479.832 Chandramohan


ramoh PDate:
Pradipt
a Sahoo
Digitally signed by
Pradipta Sahoo
Date: 2020.05.19
16:48:27 +05'30'
ta
by Pradipta
Sahoo
Date:
2020.05.19
Digitally signed

S. Palit byDate:S. Palit


2020.05.22
CONTRACT NO. : A-CNT-CON-000-00282
Sahoo 16:48:39 +05'30'
21:13:27 +04'00'
an P 2020.05.19
15:11:26 +05'30'
AREA

12" CONDENSATE EXPORT LINE 14" LPG EXPORT LINE 34" GAS EXPORT LINE
0 ISSUED FOR CONSTRUCTION CM SG PS MTS . 19.05.20 PETROFAC JOB NO. : JI-2045 CLIENT: GROUPEMENT ISARENE
CORRIDOR

CORRIDOR

FROM CPF TO TIE-IN (MEDERBA) FROM CPF TO TIE-IN LPG FROM CPF TO TIE-IN GAS
SECTION A-A A ISSUED FOR REVIEW & COMMENTS CM SG PS MTS . 20.03.20 ORIGINAL DWG SIZE : A1 DWG. P-PLE-ALS-220-30002 SH. 0001 REV 0
(SCALE-NTS) REV DESCRIPTION DRWN CHK'D APP'D APP'D ACC'D DATE SCALE : 1:2500 ELECTRONIC FILE : P-PLE-ALS-220-30002.DWG
1 2 3 4 5 6 7 8 9 10

You might also like