Professional Documents
Culture Documents
Cycle Drop Test 5/22/2021 5/22/2021 Unit-2 Unit-3
Cycle Drop Test 5/22/2021 5/22/2021 Unit-2 Unit-3
dea ex
makeip
boiler eff corr
turbine heat rate as per con flow attrition method
attrition fsteam flow http://www.regaltanks.co.uk/fr
5/22/2021 5/22/2021
Unit-3 Unit-4 Deaerator
17:30 - 18:30 16:30 - 17:30 17:30 - 18:30 dimention mm m
4801 5016 4684 radius 1724 1.7 3448
4516 4684 4346 length 16028 16.0
285 332 338 Design volume 150
1708 1708 1708
2.61 3.04 3.10
p://www.regaltanks.co.uk/frhttp://www.regaltanks.co.uk/free-tools/tank-volume-calculator/horizontal-tank/
gooseneck aph inlet aph outlet
2.6 4.6 5.4
2.8 4.2 5.8
1598.55
1593.12
108,855 108,855
108,855 107,669
0.00 -1186.46
### 61317.39
### ###
-97.28 97.28
1602 1604
1604 1599