Professional Documents
Culture Documents
Sub Station Structure.
Sub Station Structure.
EDC/VCM EXTENTION
CLIENT:
www.suriaengineering.com
1
+
TABLE OF CONTENTS
DOC NO.:-QC-FIL-001
2
3
1. QUA
LITY
INPE
CTIO QUALITY INSPECTION PLAN OF STRUCTURE WORK FOR
EDCVCM DE-BOTTLENECKING PLANT-SB Structure
Rev. :
Date :
2
21-Apr-20
ITEM
1
1.1
DOCUMENTATION
Drawings
N ACTIVITY ACCEPTANCE CRITERIA VERIFYING DOCUMENTS
Drawings
Status
H
EPCL
Sign
MANUFACTURER
Status
H
Sign
REMARKS
PLA
1.3 Marking and Cutting Plan As per Drawing - R R
1.4 Material Identification/ Verification & Control of Heat Number Material Test Certificate MTCs H H
2 Material Identification/ Verification & Control of Heat Number PO/ ASME II Part A/ DWGS MTCs H W
2.1 Column As per Drawing Specs. R
2.2 Base Plates As per Drawing Specs. R
2.3 Corner Beams As per Drawing Specs. R
2.4 Mid Beams As per Drawing Specs. R
2.5
2.6
2.7
2.8
Mid Support Beams
Gusset Plates
Bracings of Structure N
Internal and External Direct Attachments
As per Drawing Specs.
As per Drawing Specs.
As per Drawing Specs.
As per Drawing Specs.
R
R
R
R
2.9 Supporting Saddles As per Drawing Specs. R
3 FABRICATION Drawings QIP W H
3.1.1 Marking Inspection Before Cutting of All Parts As per Drawing W H
3.1.2 Cutting of marked parts As per Drawing W H
3.2 MACHINING AND DRILLING As per Dwg.Specifciation QIP/Insp Report W H
3.2.1 Inspection of hole marking before drilling As per Drawing W H
3.2.2 Drilling of Plates / Hole diameter measurement As per Drawing W H
3.2.3 Extra edges flushing and Burr Removal As per Drawing W H
3.3 FIT-UP Drawings QIP H H
3.3.1 Fit-up check of each weld as per Drawing
3.4 WELDING ASME Sec:IX & QIP W R
3.4.1 Welding of each weld as per WPS Dwgs.
4 FINAL INSPECTION ASME SEC-V,Drawings Inspection & Test Reports H H
4.1 Visual & Dimensional inspection according to last revised drawing H W
4.2 Surface preparation for painting W W
4.3 Painting and DFT as per specifications R R
5 NDE
5.1 100% DPT of all column joints W H
5.2 20% DPT of bracings W H
5.3 100% VT of all Joints W H
ROUTE PREPARED BY REVIEWED BY APPROVED BY
NAME ALTAF KHAN NAUMAN SURIA
SIGNATURE
DATE 11/12/2020 11/12/2020
Legends
H = Hold Point (Mandatory)
M = Monitor
R = Review (Documentation)
W = Witness
4
2. BOQ SUMMARY REPORT
5
BILL OF MATERIAL FOR S.B STRUCTURE (REV-04)
S.NO PROFILE DIMENSION QTY. UOM KG/M WEIGHT(KG) Qty.in 12M Pcs Remarks
1 HEA200 200x200 12 Meter 50 600 1 One Spare Available
2 IPE300 300x150 24 Meter 50 1200 2
3 IPE240 250x125 24 Meter 40 960 2
4 UPN200 200x75 48 Meter 26 1224 4
5 UPN150 150x75 12 Meter 13 160 1
6 L70 75x75 12 Meter 6 77 1
7 MS Plate-10mm 10 3 SQ.M 236 707
8 MS Plate-20mm 20 3 SQ.M 471 1413
Weight (KG) 6340
6
3. MATERIAL TEST CERTIFICATE
7
8
IDENTIFICATION MARK ON BEAM-200x200
MTC Document:
9
10MM Plate
MTC Document:
10
20MM PLATE
11
.
12
S U R IA E N G IN E E R IN G
W E L D IN G P R O C E D U R E S P E C IF IC A T IO N (W P S )
11-December-2020
C lie n t : EPCL D a te :
W e ld in g P r o c e d u r e S p e c if ic a t i o n N o . : SE-QC-WPS-MS36B-03F Project: EPCL (SB STRUCTURE)
R e v is io n : S u p p o rtin g P Q R N o .: S E -Q C -P Q R -M S 3 6 B -0 1 A
W e ld in g P r o c e s s ( e s ) : SM A W T y p e (s ) : M anual
C ode / STD : A s p e r A S M E S e c tio n IX
N o te :
R o o t , F illin g a n d c a p p in g to b e d o n e b y S M A W p r o c e s s
P la te T h ic k n e s s M a x im u m 4 0 m m
S h e ll to S h e ll a n d F ille t w e ld a ll th ic k n e s s e s .
to P .N o . 1 G ro u p N o . 1
P .N O . 1 G ro u p N o . 1
B A S E M E T A L (Q W .4 0 3 ) O R
S p e c ific a tio n ty p e a n d G r a d e A S T M S A -3 6 G ra d e B
to S p e c ific a tio n ty p e a n d G r a d e A S T M S A -3 6 G ra d e B
O R
F IL L E R M E T A L S PO STW E LD H E AT TR E A TM E N T
(Q W .4 0 4 ) ( Q W .4 0 7 )
SM AW SM AW
R O O T H O T PA SS F IL L /C A P R O O T F IL L C A P T e m p eratu re R an g e : N /A
S p e c . N o . (S F A ) 5 .1 5 .1 T im e R a n g e : N /A
A W S N o . ( C la s s ) E -7 0 18 E -7 0 18 S o a k in g T im e a t M a x T e m p : N /A
F .N o . 4 4
A . N o. 1 1
S iz e o f F ille r M e t a ls 3 .2 m m / 4 m m 3 .2 m m / 4 m m G A S
W e ld M e ta l F /C -E 70 18 E 7018 (Q W -4 0 8 )
F ille t A ll T h ic k n e s s A ll T h ic k n e s s S h ie ld in g G a s ( e s ) :
E le c tr o d e F lu x (C la s s ) P ercen t :
F lu x T r a d e N a m e F lo w :
C o n s u m a b le I n s e r t ` G as : N /A
O th er T r a ilin g S h ie ld in g G a s C o m p o s itio n : N /A
E a c h b a s e & f ille r m e ta l c o m b in a tio n s h o u ld r e c o r d in d iv id u a lly
P O S I T I O N S ( Q W .4 0 5 ) P O S T W E L D H E A T T R E A T M E N T ( Q W .4 0 7 )
P o s itio n ( s ) o f G r o o v e V e r tic a l T e m p e r a tu r e R a n g e
W e ld in g P o s it io n : U p 3 G T im e R a n g e
P o s itio n ( s ) o f F ille t A L L
P R E H E A T ( Q W .4 0 6 ) G A S ( Q W .4 0 8 )
P e r c e n t C o m p o s itio n
P r e h e a t T e m p . M in . 55 D eg C G a s (e s ) (M ix tu r e ) F lo w R a te
I n t e r p a s s T e m p M a in t a in . 250 D eg C S h ie ld in g
P r e h e a t M a in te n a n c e (I f R e q u ir e d ) B y P r o p a n e T o rc h T r a ilin g - - -
B a k in g o f e le c t r o d e 250 D eg C B a c k in g - - -
E L E C T R I C A L C H A R A C T E R I S T I C S ( Q W .4 0 9 )
C u rren t A C or D C D C SM AW S T -(E N )
P o la r ity
A m p s . (R a n g e ) SM AW 8 0 -2 0 0 R E V (E P )
V o lts (R a n g e ) 1 8 -2 8
E le c t r o d e w ir e fe e d s p e e d 4” – 6”
E le c t r o d e S i z e a n d T y p e 2 .3 m m -4 m m
T E C H N I Q U E ( Q W .4 1 0 )
S trin g o f W e a v e B e a d A ll S tr in g
O r ific e o r G a s C u p S iz e N /A
I n i tia l a n d in t e r p a s s C le a n in g (B r u s h in g , G r i n d in g , e tc .) B r u s h in g & G r in d in g / P o w e r g rin d in g
M e th o d o f B a c k G o u g in g P o w er B ru sh
O s c i lla t io n P o w e r G r in d in g
C o n ta c t T u b e to W o r k D is ta n c e N /A
M u lt i p le o r S in g le P a s s ( p e r s id e ) M u lti p le s
M u lt i p le o r S in g le E le c t r o d e s S i n g le
T ra v e l S p e e d (R a n g e ) 4 " -6 "
P e n n in g
O th e r
F ille r M e ta l C urren t
W e ld T ype A m p V o lt T ravel O th e r
L ayers P ro cess C la s s D ia . P o la r R ange R ange Sp eed
R O O T SM A W E 7018 3 .2 / 4 D .C 8 0 -2 0 0 18 -2 8 4 "- 6 "
H O T P A S S (I f R e q .) SM A W E 7018 3 .2 / 4 D .C 8 0 -2 0 0 18 -2 8 4 "- 6 "
F IL L IN G 1 SM A W E 7018 3 .2 / 4 D .C 8 0 -2 0 0 18 -2 8 4 "- 6 "
FILLING 2(If Req.) SM A W E 7018 3 .2 / 4 D .C 8 0 -2 0 0 18 -2 8 4 "- 6 "
C A P P IN G SM A W E 7018 3 .2 / 4 D .C 8 0 -2 0 0 18 -2 8 4 "- 6 "
Prepared By Approved By
SURIA ENGINEERING SURIA ENGINEERING
Name: Altaf Khan Name: Nauman Suria
Signature: Signature:
Date: Date:
13
SURIA ENGINEERING
Welder Qualification
WPS NO. SE-QC-WPS-MS36B-03F Test Date 04-11-2020
ACTUAL VALUES
QUALIFICATION RANGE
VARIABLE USED IN
ASME IX
QUALIFICATION
Process SMAW SMAW
Process Type MANUAL MANUAL
Backing Yes Yes
Material Specification SA-36 SA-36
P No. & Group No. (QW-423) P.No 1 & Gr.1 P.No.1 to 15F
Thickness 10mm 20mm
Diameter N/A N/A
Groove 60 DEGREE 60 DEGREE
Fillet ALL ALL
Filler Metal Space SFA No. 5.1 5.1
Filler Metal Class E-7018 E-7018
Filler Metal No. 4 3&4
Deposited Weld Thickness 10MM 20MM
Position 3G 3G
Welding Progression UPHILL UPHILL
Shielding Gas N/A N/A
Backing Gas N/A N/A
Current Amp 105-155 105-155
Polarity DC+VE DC+VE
14
15
SURIA ENGINEERING
Welder Qualification
WPS NO.SE-QC-WPS-MS36B-03F Test Date 12-09-2020
ACTUAL VALUES
QUALIFICATION
VARIABLE USED IN
RANGE ASME IX
QUALIFICATION
Process SMAW SMAW
Process Type MANUAL MANUAL
Backing Yes Yes
Material Specification SA-36 SA-36
P No. & Group No. (QW-423) P.No 1 & Gr.1 P.No.1 to 15F
Thickness 10mm 40mm
Diameter N/A N/A
Groove 60 DEGREE 60 DEGREE
Fillet ALL ALL
Filler Metal Space SFA No. 5.1 5.1
Filler Metal Class E-7018 E-7018
Filler Metal No. 4 3&4
Deposited Weld Thickness 12MM 20MM
Position 3G 3G
Welding Progression UPHILL UPHILL
Shielding Gas N/A N/A
Backing Gas N/A N/A
Current Amp 105-155 105-155
Polarity DC+VE DC+VE
16
17
7. DIMENSIONAL INSPECTION
REPORT
18
ELEVATION.102.970
Beam to beam distance found as per drawing.
ELEVATION.105.970
Beam to beam distance found as per drawing.
19
ELEVATION.108.970
Beam to beam distance found as per drawing.
ELEVATION.109.670
Beam to beam distance found as per drawing.
20
LINE FRAME-2
Beam to beam distance found as per drawing.
21
LINE FRAME-16A
Beam to beam distance found as per drawing.
22
LINE FRAME-15G
Beam to beam distance found as per drawing.
23
DOCUMENT NO – DVD-010-016
REV- 00
DATE- 15-11-2019
PAGE- 01 of 01
Size (mm)
Serial No. Location Description QTY. Remarks
Drawing Accepted Rejected
01 EL-102.970 TOS UNO. IPE240/SSC1 01 2320 Accepted
02 EL-105.970 TOS UNO. IPE240/SSC1 01 2320 Accepted
03 EL-108.970 TOS UNO. IPE240/SS/SS 01 7220 Accepted
04 EL-108.970 TOS UNO. IPE240/SS/SS 01 7220 Accepted
05 EL-108.970 TOS UNO. IPE240/SSC1 01 1245 Accepted
06 EL-108.970 TOS UNO. IPE240/SSC1 01 2320 Accepted
07 EL-108.970 TOS UNO. L70/LT/LT 01 1414 Accepted
08 EL-108.970 TOS UNO. L70/LT/LT 01 1414 Accepted
09 LINE FRAME 2 CT150/LT/KRC1 01 3520 Accepted
10 LINE FRAME 2 CT150/LT/KRC1 01 3520 Accepted
11 SECTION-14A CT150/LT/KRC1 01 1920 Accepted
12 SECTION-14A CT150/LT/KRC1 01 1920 Accepted
13 EL-109.670 TOS UNO. IPE300/SS1 01 8735 Accepted
14 EL-109.670 TOS UNO. IPE300/SSC2/SSC3 01 8720 Accepted
15 EL-109.670 TOS UNO. UPN120/SS/SS 01 1720 Accepted
16 EL-109.670 TOS UNO. UPN120/SS/SS 01 1720 Accepted
17 EL-109.670 TOS UNO. UPN120/SS/SS 01 1720 Accepted
18 EL-109.670 TOS UNO. L70/LT/LT 01 2439 Accepted
19 EL-109.670 TOS UNO. L70/LT/LT 01 1219.5 Accepted
20 EL-109.670 TOS UNO. L70/LT/LT 01 609.75 Accepted
21 EL-109.670 TOS UNO. L70/LT/LT 01 2439 Accepted
22 EL-109.670 TOS UNO. L70/LT/LT 01 1219.5 Accepted
23 EL-109.670 TOS UNO. L70/LT/LT 01 609.75 Accepted
24 SECTION-15G HEA200/PST-1 01 3735 Accepted
25 Detail ST-01 UPN200 01 4740 Accepted
26 Detail ST-01 UPN200 01 4740 Accepted
27 Detail ST-01 UPN200/SS 01 1305 Accepted
28 Detail ST-01 UPN200/SS 01 1305 Accepted
29 Detail ST-01 UPN200 01 5073 Accepted
30 Detail ST-01 UPN200 01 5073 Accepted
31 Detail ST-01 UPN200/SS 01 1824 Accepted
32 Detail ST-01 UPN200/SS 01 1824 Accepted
33 Detail ST-01 UPN200 01 5026 Accepted
34 Detail ST-01 UPN200 01 5026 Accepted
35 Detail ST-01 UPN200/SS 01 1385 Accepted
36 Detail ST-01 UPN200/SS 01 1385 Accepted
24
Limited. 8. SAND BLASTING AND
Purchaser: Engro Polymer & Chemical
S a n d B l a s ti n g a n d P a i n ti n g A p p l i c a ti o n
PO:
Doc. No.: SE/EPCL/001
Project: EDC/VCM EXTENSION P ro ce d u re
Rev.:00
PROCEDURE
DOCUMENT CHANGE RECORD
Name Designation
. Signature
1) General:
This procedure covers the outline of procedure adapted for the sand blasting
and primer application for structure.
2) Surface Preparation:
Sand blasting could be done in late hours of a day but subject to weather condition.
Sand blasting shall not be done when surface temperature is less than 3°C above
the dew point and relative humidity is greater than 85% or there is a possibility that
blasted surface shall be subject to wetting before application of primer.
Before blasting, oil, grease or other oily objects, if any, shall be removed with the
help of any detergent wash.
27
Purchaser: Engro Polymer & Chemical
PO:
Limited. Sand Blasting and Painting Application
Doc. No.: SE/EPCL/001
Project: EDC/VCM EXTENSION Procedure
Rev.:00
3) PAINT APPLICATION:
Base will be stirred thoroughly to homogenize. Then hardener will be added to base
in recommended ratio as mentioned in “Manufacturer's Data Sheet” with constant
stirring. A
recommended solvent shall be mixed for required thinning of primer.
Roller and or brush shall be used for application of Primer, if not restricted by Primer
Specification Sheets” by manufacturer.
After sand blasting primer shall be applied within 3 to 4 hours of blasting activity.
After each coat, surface will be left for a period recommended for drying and recoating.
Such quantity of primer shall be removed from containers and mixed with
hardeners and thinner, which must be consumed same day and with-in the Pot-life
time.
While applying the primer care shall be taken that paint should not be dripped,
sagged, skipped or dripped-off during application or immediately after application, if
these defects are detected then immediately be dressed with brush. If defect is not cured
then primer shall be removed completely and re-coated with the same system.
28
Purchaser: Engro Polymer & Chemical
PO:
Limited. Sand Blasting and Painting Application
Doc. No.: SE/EPCL/001
Project: EDC/VCM EXTENSION Procedure
Rev.:00
4) INSPECTIONS:
During surface preparation and primer application following inspection shall be carried out.
DFT of each coat shall be 80-100 Microns and should be measured at 5 spots per 9
SQ.M, and for area less than 9 SQ.M; at least 3 spots shall be measured.
5) Paint System:
Following paint system shall be adopted for structure including (ladder /Platforms):
29
7. FIT UP LAYOUT & RANDOM
PICTURES
30
31
32
33