Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

z

PRECAST CONCRETE
z
PRECAST BEAM
BEAMS
BEAMS
BEAMS
7 DESIGN OF PRECAST BEAM COMPONENT
Calculation Stage 2
Calculation Stage 1 (Erection Stage)
Preliminary of Beam Section (lifting stage) (Load = Selfweight + Precast
Before Composite Slab Component)
Before Composite

Calculation Stage 4 Calculation Stage 3


Flexture & Shear Reinf. Of (add overtopping)
Deflection Control of Precast
Section of Beam Precast Beam Section (Load = Selfweight + Precast
(Accommodate Live load Slab + Overtopping +
based on building function). Construction Load)
SHEAR CONNECTOR CALCULATION

Perhitungan stud pelat lantai :


Dipakai stud 5 kaki Ø10 mm
1
𝐴𝑣 = 5 × 4 × 𝜋 × 102 = 392,70 𝑚𝑚2

Vnh = 27.500 N 𝐴𝑣 𝑓𝑦𝑡 𝑑


𝑉𝑠 =
𝑠
Vu = Vnh / Ø = 27.500 N / 0,75 = 36.666 N 392,70 × 240 × 50
36.666 =
𝑠
392,70 ×240×50
𝑠= 36.666 𝑁
= 128,52 mm ≈ 125mm

Pasal 17.6.1 berbunyi bahwa bila pengikat sengkang tidak boleh kurang luas daripada luas yang diperlukan oleh
11.4.6.3, dan spasi pengikat tidak boleh melebihi empat kali dimensi terkecil elemen yang ditumpu, atau melebihi 600
mm.
Smaks = 4 x 50 mm = 200 mm atau S ≤ 600 mm
Maka, Spakai = 125 mm < 200 mm (OK)
SNI 03-2847-2013 Pasal 11.4.6.3 :
5 × 𝜋 × 102 𝑏𝑤 × 𝑆
𝐴𝑣 = <
4 3𝑓𝑦
𝑏𝑤 × 𝑆
= 392,70 𝑚𝑚2 > = 173,61 𝑚𝑚2 (𝑂𝐾)
3𝑓𝑦
Maka dipakai tulangan stud 5Ø10 mm – 125mm (Per 1m’ lebar pelat terdapat 5 kaki tulangan stud / geser). 8
Kemudian arah memanjang, dipasang sejarak 125mm
Force Transfer Mechanisms

You might also like