Prasad Patil Raju Honule - Plinth Beam
Prasad Patil Raju Honule - Plinth Beam
REMARKS
1. NOTES REFER: DRW.NO.RCC-01
2. ALL CONCRETE SHALL BE OF MINIMUM M20 GRADE WHEREVER
NOT SPECIFIED.
-
3. GRADE OF STEEL: FE500
Continous
4. ALL DIMENSIONS ARE IN INCHES.
0.25 2
5. WRITTEN DIMENSIONS TAKE PREFERENCE OVER SCALED
Edge
DIMENSIONS.
6. ANY DESCRIPANCY IN DRAWING SHALL BE BROUGHT TO NOTICE
Full span
NO OF
2
LEGS
7. PROPER TESTING OF CONCRETE TO BE CARRIED OUT AS PER IS
PB2
PB2
PB2
Full
Top
CODE TO ACERTAIN TO THE CONCRETE STRENGTH AS REQUIRED.
Continous
1. COLUMNS AND FOOTINGS ARE DESIGNED FOR G+1.
6"
6"
6"
STIRRUPS
2. SBC OF SOIL IS 18.00 T/SQ.M
0.3 2
3. CLEAR COVER FOR REINFORCEMENT IN CONCRETE SHALL BE: FOR
Edge
SPACING
COLUMNS : 40 mm (1 21")
FOR FOOTINGS : 50 mm (2")
4. COLUMN REINFORCEMENT SHALL HAVE A LAP OF 50 TIMES DIA.
C4
PB2 C5
5. FOR DIMENSIONS AND DETAILS OTHER THAN STRUCTURAL
C6
6"
6"
6"
REFER ARCHITECTURAL DRAWING.
6. ALL CONCRETE SHALL BE OF MINIMUM M20 GRADE WHEREVER
0.1 1
NOT SPECIFIED.
PB3
Continous
0.3 1
NOTES FOR FOOTINGS
Center span
DIA
DIA
12
10
-
BELOW FOOTING.
PB2
SUPPORT
Full
Top
4. S.B.C OF SOIL IS 18.00 T/SQ.M
PB1
PB1
PB1
(-VE)
1
STRIPPING TIME FOR FORM WORK
NOS
PB2
Discontinous
Forms to be struck only after casting of concrete as indicated
-
below
Striking of forms
Full span
REINFORCEMENT
Edge
Type of Form work Period
DIA
FULL SPAN
12
12
10
Vertical formwork to columns, walls and beams 24 -48 h
Soffit to slabs 3 days
0.25 1
Soffit to beams 7 days
PB3
0.1 1
NOS
TOP,
PROPS TO SLABS
PB1
2
7 days
C7 C9 Spanning over 4.5 m 14 days
C8
DIA
PROPS TO BEAMS AND ARCHES
12
12
CENTER
-
REINFORCEMENT
SPAN
Spanning upto 6.0 m 14 days
NOS
Spanning over 6.0 m 21 days
-
DATE REV NO. PARTICULARS NAME SIGN
BOTTOM,
PB2
DIA
12
12
12
DEPTH FULL SPAN
11/01/2021 00 DRAWN NS
DESIGNED NS
NOS
CHECKED VD
PB2
PB1
PB1
2
3
APPROVED AS
PROJECT:
15"
12"
PROPOSED CONTRUCTION OF RESIDENTIAL BUILDING
9"
FOR MR . PRASAD PATIL AT BELGAUM.
SIZE
WIDTH
9"
9"
9"
CLIENT: MR. PRASAD PATIL
PLINTH BEAM SCHEDULE:
BEAM NO
PB2 PB2
PB1
PB2
3
1
PROPOSED CONTRUCTION OF RESIDENTIAL BUILDING FOR MR. PRASAD PATIL AT BELGAUM. REFERENCE DWG: