Professional Documents
Culture Documents
Process Instruction Sheet / Assembly Guide
Process Instruction Sheet / Assembly Guide
Process Instruction Sheet / Assembly Guide
No of
Item pieces
no. req. Part No. Material Description
GJ 1050MM TD 63 FUSED PP Injection molded grooved
1 1 GJ06AE0054
PIPE support tube completed
NW 65 750 mm GJ 7311 /
GJ 7311 / 7312 EPDM 45+/- 5
2 1 GJ05AE0010 7312 EPDM C-34 tube
Shore A
diffuser sleeve
Figure 1
2 3
Figure 2
Approved by:
_____ _ ___ __ __ ___ ____ Date effective: _04/26/2007
(QA) (Plant Manager)
. .
Rev.: - Process Instruction Sheet /
Engineering Excellence in Rubber & Plastics
Rubber Technology, Inc.
2. Sleeve assembly
NON-PERFORATED AREA
Figure 7
. .
Rev.: - Process Instruction Sheet /
Engineering Excellence in Rubber & Plastics
Rubber Technology, Inc.
Figure 9
Set the OETIKER Clamp on
both ends, Figures 9,10.
Figure 8 NOTE ALIGNMENT OF PRINTING
AND CLAMP
Make sure clamp located
proper behind the bead and is
not partially sitting on bead
before crimping! Figure 8
shows the bead.
Figure 12
Figure 13
. .
Rev.: - Process Instruction Sheet /
Engineering Excellence in Rubber & Plastics
Rubber Technology, Inc.
Date: 02/07/11 Removal of old and clamps installation of new clamps. Page 2 of 2