Professional Documents
Culture Documents
Publication - Painting, Coating & Corrosion Protection - AkzoNobel - International Paints - Mining and Minerals Applications
Publication - Painting, Coating & Corrosion Protection - AkzoNobel - International Paints - Mining and Minerals Applications
Publication - Painting, Coating & Corrosion Protection - AkzoNobel - International Paints - Mining and Minerals Applications
Fimiston
Location: Australia
Type of project: CIL Tank Internals
Products/system used: Polibrid 705E
Project owner: KCGM (Kalgoorlie Consolidated
Gold Mine)
Area inspected
The combination of an abrasive and chemically rich
environment makes CIL tank internals highly vulnerable
to corrosion.
www.international-pc.com
pc.communication@akzonobel.com
Boddington Gold Mine
Track record 2009
Location of project Project owner Project size
Perth, Western Australia Newmont 7,589 tons
Products/system used Applicator Project volume
Intercure® 200, Intergard® 345 Cape Industrial Services PLC 565,000 L (124,300 gals)
Interseal® 670HS, Interzone® 954 ISO12944 environment
Interfine® 629, Polibrid® 705E Ranging from Immersion to C5 - I
www.international-pc.com
pc.communication@akzonobel.com
UAN 32-0-0 Tank Lining
Track record 2010
Location of project Area 2 - Floor ISO12944 environment
USA Enviroline 376F-30LT @ 750-1,000μm (30-40 mils) Immersion
Products/system used Applicator Total area
Area 1 - Walls Johnson Contracting 1,394m2 (15,000ft2)
Enviroline® 376F-30LT @ 500-750μm (20-30 mils)
www.international-pc.com
pc.communication@akzonobel.com
Coal Reclaimer
Track record 2009
Location of project Project owner Project size
Port Warratah, Australia Port Warratah Coal Services (PWCS) Approx. 1,000 tons
Products/system used ISO12944 environment Project volume
Interzinc® 52HS, Intergard® 475HS, C5-M 99,000 L (1,980 gals)
Interfine® 878
www.international-pc.com
pc.communication@akzonobel.com
Lake Lindsay, Bowen Basin
Track record 2009
Location of project Project owner Project size
Australia Anglo Coal Australia 7,000 tonnes
Products/system used Applicator Project volume
Area 1 - External Transcote External 8,000 L (1,759 gals)
Interprime® 198, Interthane® 990 ISO12944 environment Internal 1,600 L (352 gals)
Area 2 - Internal C2 (Non industrial high durability)
Interprime® 198, Interlac® 649
www.international-pc.com
pc.communication@akzonobel.com
Lihir Gold Mine
Track record 2007
Location of project Project owner Project size
Lihir Island, Papua New Guinea Lihir Gold Limited 8,000m2 (86,111ft2)
Products/system used Applicator Project volume
Interseal® 670HS, Interzone® 954, Placement Solbow Joint Venture 17,000 L (4,490 gals)
Interzone® 485, Intertherm® 751CSA & Sun Engineering
ISO12944 environment
C3-C4
www.international-pc.com
pc.communication@akzonobel.com
San Rafael Las Flores
El Escobal Silver Mine
Track record 2013
Location of project Project owner ISO12944 environment
Guatemala Tahoe Resources Inc. C4
Products/system used Applicator Project size
Area 1 - Intergard® 345, Interthane® 990 TIPIC-DEMESA 30,000m2 (322,917ft2)
Area 2 - Interzone® 954 Fabricator
International®
www.international-pc.com
pc.communication@akzonobel.com
BMA Hay Point
Stacker/Reclaimer
Track record 2013
Location of project Project owner Project type
Australia BMA Maintenance project
Products/system used Applicator ISO12944 environment
Interplus® 356 @ 75μm (3 mils) McElligotts -Mackay C5
Interzone® 278 @ 300μm (12 mils)
www.international-pc.com
pc.communication@akzonobel.com
Meta Nickel & Cobalt Mining -
Ore Processing Plant
Track record 2013
Location of project Area 2 - Tank Exterior Applicator
Turkey Interseal® 1052 - 125μm Orkay Muhendislik
Products/system used Interthane® 990SG - 125μm ISO12944 environment
Area 1 - Tank Interior Project owner C4 Semi industrial (Medium durability)
Interline® 925 - 400μm Meta Nickel & Cobalt Mining Project size
or Interzone® 954 - 400μm 3 tanks: 3,271m2 (35,209ft2)
Interseal® 1052
Interthane® 990SG
www.international-pc.com
pc.communication@akzonobel.com
CSA Cobar Focus products: Ceilcote® 380, Ceilcote 6640,
Ceilcote 242 Flakeline
Location: Australia
The solution
Ceilcote was chosen due to its chemical resistant
properties and durability. The system was suitable
for nitric acid (up to 35%) chemical exposure
with occasional splash and spill, and a maximum
temperature of -40°C (-40°F).
Firstly 50-60μm (2 - 2.4 mils) of Ceilcote 380 Primer
was applied. Then Ceilcote S-1 Powder sand and
resin mix to cover the holes created by the acid.
This was followed by troweling Ceilcote 6640 @
1000μm (40 mils), then a layer of fibreglass matt was
placed on the wet coating. The final step was to
spray Ceilcote 242 Flakeline @ 500μm (20 mils).
www.international-pc.com
pc.communication@akzonobel.com
Dalrymple Bay Coal
Terminal 7X Project
Track record 2009
Location of project Project owner Project size
Australia DBCT Coal management 20,000m2 (215,278ft2)
Products/system used Applicator/Fabricator
Ship Loader - Interzinc® 52, Intergard® 475Au John Holland
All Steelwork above deck - ISO12944 environment
Interzinc® 52, Intergard® 475Au C5M
www.international-pc.com
pc.communication@akzonobel.com
Mount Arthur Focus product: Interzone® 954 @ 500μm (20 mils)
The tank was inspected in 2010 and these pictures show the
coating was still performing very well after six years in service
and there was no evidence of corrosion. This practically
demonstrates the abrasion resistance of Interzone 954 in
a coal processing environment.
www.international-pc.com
pc.communication@akzonobel.com
Black Otter Coal
Preparation Facility
Track record 2009
Location of project Fabricator Project size
Montana, United States Taggart 1000 tons
Products/system used ISO12944 environment
Intercure® 200, Interthane® 990 C4 Semi industrial
www.international-pc.com
pc.communication@akzonobel.com
Buckeye Coal
Preparation Facility
Track record 2008
Location of project Project owner ISO12944 environment
Ohio, United States Cline Resources C4 Semi industrial
Products/system used Fabricator Project size
Intergard® 345 Taggart 580 tons
www.international-pc.com
pc.communication@akzonobel.com
Burr Oak
Preparation Facility
Track record 2009
Location of project Project owner ISO12944 environment
Ohio, United States Buckingham Coal C4 Semi industrial
Products/system used Fabricator Project size
Intercure® 200, Interthane® 990 Taggart 200 tons
www.international-pc.com
pc.communication@akzonobel.com
Hidden Valley Gold
Track record 2008
Location of project Products/system used Applicator/Fabricator Project size
Papua New Guinea Area 1 LILAMA 69-3 (Vietnam) 60,000m2 (645,835ft2)
Intergard® 251, Interthane® 990 ISO12944 environment
Project owner
Morobe Mining Joint Ventures Area 2 C5-l
Intergard® 251, Intergard® 475HS
www.international-pc.com
pc.communication@akzonobel.com
Licking River
Preparation Plant
Track record 2008
Location of project Project owner ISO12944 environment
Kentucky, United States Licking River Resources C4 Semi industrial
Products/system used Fabricator Project size
Intergard® 345 Taggart 300 tons
www.international-pc.com
pc.communication@akzonobel.com
Mining Shovel
Track record 2013
Location of project ISO12944 environment Total volume
Wisconsin, USA C3 27,482 L (7,260 gals)
Products/system used Surface preparation Total area
Devguard® 4180, Interlac® 665 SSPC-SP1 185,806m2 (2,000,000ft2)
Applicator
WI Contractor
www.international-pc.com
pc.communication@akzonobel.com
Mosaic Potash Colonsay Mine
Track record 2009
www.international-pc.com
pc.communication@akzonobel.com
Nui Phao Tungsten
Track record 2007
Location of project Project owner ISO12944 environment
Vietnam Tiberon Mineral Ltd Thai Nguyen C5-l
Mineral Company
Products/system used
Area 1 - Intergard® 269, Interzone® 954 Applicator/Fabricator
Area 2 - Intercure® 200, Interzone® 954 COMA Corporation
www.international-pc.com
pc.communication@akzonobel.com
Tusky Preparation Plant
Track record 2008
Location of project Project owner ISO12944 environment
Ohio, United States Rosebud Mining Company C4 Semi industrial
Products/system used Fabricator Project size
Intergard® 345 Taggart 300 tons
www.international-pc.com
pc.communication@akzonobel.com
BMA Goonyella/
Riverside Dragline
Track record 2008
Location of project Applicator Total volume
Moranbah, Australia Ausblast Protective Coatings 2,300 litres (600 gals)
Products/system used ISO12944 environment Total area
Interprime® 198 @ 75μm (3 mils) C2 Non industrial (high durability) 4,500m2 (48,400ft2)
Interfine® 629 @ 75μm (3 mils) Surface preparation
Project owner/specifier Spot blast 2.5
BMA
www.international-pc.com
pc.communication@akzonobel.com
BHP Billiton
Stacker Reclaimer
Track record 2006
Location of project Area 3 - Sealed internal steel structure Applicator
Dalian, China surface DHI.DCW Group Co., Ltd. 2nd
Interzinc® 52 @ 75μm (3 mils) manufacture department
Products/system used
Area 1 - Steel structure surface exposed Area 4 - Galvanised steel structure ISO12944 environment
Interzinc® 52 @ 75μm (3 mils) Intergard® 269 @ 40μm (2 mils) C5-I Heavy industrial (high durability)
Intergard® 475HS @ 200μm (8 mils) Interthane® 990 @ 50μm (2 mils) Total volume
Interthane® 990 @ 75μm (3 mils) 19,900 litres (5,200 gals)
Project owner
Area 2 - Steel structure surface exposed Dalian Huarui Heavy Industrial Int’l Co.,Ltd Total area
Interzinc® 52 @ 75μm (3 mils) 46,600m2 (501,500ft2)
Interzone® 954 @ 250μm (10 mils)
www.international-pc.com
pc.communication@akzonobel.com
BHP Billiton Yabulu
Quench Liquor Tank
Track record 2007
Location of project Applicator Total volume
Yabulu, Australia QNI Yabulu Refinery 81 litres (21 gals)
Products/system used ISO12944 environment Total area
Intergard® 269 @ 40μm (2 mils) Immersed conditions e.g. tank lining 100m2 (1,200ft2)
Interzone® 954 @ 500μm (20 mils) Surface preparation
Project owner Clean/SA2.5
BHP Billiton
www.international-pc.com
pc.communication@akzonobel.com
Carborough Downs
Track record 2008
Location of project Specifier Total volume
Via Moranbah, Australia Roche Mining 1,100 litres (200 gals)
Products/system used Applicator Total area
Interzinc® 52 @ 75μm (3 mils) Ausblast Protective Coatings 3,000m2 (32,200ft2)
Intergard® 475 @ 200μm (8 mils) ISO12944 environment
C3 Light industrial (high durability)
www.international-pc.com
pc.communication@akzonobel.com
Dawson Coal Mine
Stacker/Reclaimers
Track record 2007
Location of project Specifier Surface preparation
Moura, Australia Sedgman Ltd Spot blast 2.5
Products/system used Applicator Total volume
Interzinc® 52 - Spot prime Transcote Pty Ltd 2,100 litres (500 gals)
Intergard® 475 @ 175μm (7 mils) ISO12944 environment Total area
Interthane® 990 @ 75μm (3 mils) C2 Non industrial (high durability) 4,500m2 (48,400ft2)
www.international-pc.com
pc.communication@akzonobel.com
Ore Carriages, Bobos
Track record 2007
Location of project Project owner/applicator Total volume
Broken Hill, Australia Bobos Engineering 500 litres (100 gals)
Products/system used Surface preparation Total area
Interprime® 484 @ 40μm (2 mils) Abrasive blast Sa2.5 or SP10 1,000m2 (10,700ft2)
Interlac® 649 @ 50μm (2 mils)
Interlac® 649 @ 50μm (2 mils)
www.international-pc.com
pc.communication@akzonobel.com
Rio Tinto Dust Collectors
Track record 2008
Location of project Project owner Surface preparation
Yarwun, Australia Rio Tinto Aluminium, Yarwun Abrasive blast Sa2.5 or SP10
Products/system used Applicator Total volume
Intertherm® 228 @ 100μm (4 mils) S & L Steel Pty Ltd 700 litres (100 gals)
Intertherm® 228 @ 100μm (4 mils) ISO12944 environment Total area
High heat areas 2,500m2 (26,900ft2)
www.international-pc.com
pc.communication@akzonobel.com
Taseko Mines Process Tanks
Track record 2007
Location of project Tank internals Surface preparation
Saskatoon, Canada Interzone® 954 @ 406μm (16 mils) Abrasive blast Sa2.5 or SP10
Products/system used Project owner/applicator Total volume
Tank exteriors Thermo Plus Coatings Ltd. 200 litres (56 gals)
Interzinc® 52 @ 76μm (3 mils) ISO12944 environment Total area
Intergard® 345 @ 152μm (6 mils) C3 Light industrial (high durability) 400m2 (5,000ft2)
www.international-pc.com
pc.communication@akzonobel.com
Thyssenkrupp
Stacker Reclaimer
Track record 2007
Location of project Area 2 - Galvanised steel structure ISO12944 environment
Dalian, China Intergard® 269 @ 40μm (2 mils) C5-I Heavy industrial (high durability)
Products/system used Interseal® 670HS @ 125μm (5 mils) Total volume
Area 1 - Steel structure surface exposed Area 3 - Front part of boom 11,800 litres (3,100 gals)
Interzinc® 52 @ 75μm (3 mils) Interzone® 485 @ 1,500μm (59 mils) Total area
Interseal® 670HS @ 125μm (5 mils) Interthane® 990 @ 50μm (2 mils) 26,700m2 (287,300ft2)
Interseal® 670HS @ 125μm (5 mils)
Project owner/applicator
Dalian Huarui Heavy Industrial Int’l Co., Ltd
www.international-pc.com
pc.communication@akzonobel.com
Bozshakol
Copper Project
Track record 2014
Location of project Manufacturer
Kazakhstan HeNan Changcheng Aluminium Engineering Co., Ltd
Products/system used Total volume
Interseal® 670HS @ 125μm (5 mils) 40,000 litres (8,799 gals)
Interthane® 990 @ 50μm (2 mils)
www.international-pc.com
pc.communication@akzonobel.com
CITIC SINO
Iron Ore Phase 2
Track record 2014
Location of project Manufacturer
Australia Jiangsu Huning Steel Mechanism Co., Ltd
Products/system used Total volume
Intergard® 251@ 75μm (3 mils) 200,000 litres (43,994 gals)
Intergard® 475HS @ 150μm (6 mils)
Interthane® 990 @ 75μm (3 mils)
www.international-pc.com
pc.communication@akzonobel.com
Formosa Vietnam
Steel Mills
Track record 2014
Location of project Manufacturer
Vietnam MCC No. 5 & Jiangsu ChangHong steel structures Co., Ltd
Products/system used Total volume
Interseal® 670HS @ 190μm (8 mils) 200,000 litres (43,994 gals)
Interthane® 990 @ 50μm (2 mils)
www.international-pc.com
pc.communication@akzonobel.com
Indonesia SB1
Cement Plant
Track record 2014
Location of project Manufacturer
Indonesia Sinoma (Suzhou) steel structures Co., Ltd
Products/system used Total volume
Intergard® 251@ 100μm (4 mils) 60,000 litres (13,198 gals)
Interthane® 990 @ 60μm (2 mils)
www.international-pc.com
pc.communication@akzonobel.com
Kitimat Modernization
Project
Track record 2014
Location of project Manufacturer
Canada Dalian Bihai Environmental Protection Equipment Co.,Ltd
Products/system used Total volume
Interzinc® 52 @ 75μm (3 mils) 150,000 litres (32,995 gals)
Intershield® 300 @ 150μm (6 mils)
Interthane® 990 @ 60μm (2 mils)
www.international-pc.com
pc.communication@akzonobel.com
Roy Hill Iron Ore Mine
Track record 2014
Location of project Manufacturer
Queensland, Australia Shanghai SCK/Shanghai MHI
Products/system used Total volume
Interzone® 954 @ 500μm (20 mils) 250,000 litres (54,992 gals)
www.international-pc.com
pc.communication@akzonobel.com
Vale S11D
Track record 2014
Location of project Manufacturer
Brazil RHM & TZME
Products/system used Total volume
Intergard® 5600 @ 120μm (5 mils) 150,000 litres (32,995 gals)
Interthane® 990 @ 50μm (2 mils)
www.international-pc.com
pc.communication@akzonobel.com
Aggregate Plant Project
Track record 2015
Location of project Project owner ISO12944 environment
Turkmenistan Polimeks Holding C5
Products/system used Distributor Project size
System for structural steel Kemipaz Endustri Tic. San. ve A.S. 5,600m2 (60,278ft2)
Interseal® 670HS @ 230µm (9 mils) Applicator
Interthane® 990SG @ 70µm (3 mils) Optima Muhendislik Ltd. Sti.
www.international-pc.com
pc.communication@akzonobel.com
Sulphuric Acid Pool Lining
Track record 2015
Location of project Project owner ISO12944 environment
Turkey Meta Nickel Processing Plant Immersion
Products/system used Applicator Project size
System for structural steel - Internal system Bakım Mühendislik 250m2 (2,691ft2)
Intercrete™ 4802, Intercrete 4820, Ceilcote® 2000MR
www.international-pc.com
pc.communication@akzonobel.com
Crushing and Screening Plant
Track record 2015
Location of project Project owner ISO12944 environment
Turkey ThyssenKrupp C5-I
Products/system used
Industrial Solutions AG Project size
System for steel structure - Applicator 2,200 ton
Primer; Intergard® 251 Red @ 1x60μm Kemipaz A.Ş.
Intermediate; Intergard 251 Grey @ 1x60μm
Top coat; Interthane® 990SG Dark grey @ 1x60μm
www.international-pc.com
pc.communication@akzonobel.com
Ravensdown Fertiliser Plant
Acid Tank and Stairs
Track record 2012
Location of project Applicator
Christchurch, New Zealand H W Hendriks Ltd.
Products/system used Project Size
Interzone® 954 @ 400µm (16 mils), Interfine® 870 @ 75µm (3 mils) 2,000m2
www.international-pc.com
pc.communication@akzonobel.com
Gold Mine Caustic
Tank Lining
Track record 2015
Location of project Applicator Total volume
Turkey Atilla Makina A.Ş. 225 litres (59 gals)
Products/system used ISO12944 environment Total area
Internal system - Immersion 200m2 (2,153ft2)
Ceilcote® 282HB 1x750μm
www.international-pc.com
pc.communication@akzonobel.com
Baturaja Cement Plant
Track record 2016
Location of project Fabricator
Indonesia Sinoma Tangshan HaiGang Technology & Equipment Co., Ltd.
Products/system used Project size
Interseal® 1052 @ 150µm (6 mils), Interthane® 990 @ 50µm (2 mils) 50,000L (13,209 gals)
Project owner
Baturaja cement plant/ Tianjin cement Industry
Design & Research Institute Co., Ltd.
www.international-pc.com
pc.communication@akzonobel.com
Kazakhstan Aktogay
Copper factory
Track record 2016
Location of project Applicator
Kazakhstan The Sixth Construction Company Ltd. of
Products/system used
China National Chemical Engineering (SCCCNCE)
Interzone® 485 @ 2 x 1,000µm (40 mils) Project size
Project owner
5,000L (1,320 gals)
Kazakhmys PLC
www.international-pc.com
pc.communication@akzonobel.com