New - Desk Study Report of Karnashi Thuligad Micro Hydro Project
New - Desk Study Report of Karnashi Thuligad Micro Hydro Project
OF
KARNASHI THULIGAD MICRO HYDRO PROJECT
(KTMHP - 0.94 MW)
SEPTEMBER 2018
ASOJ 2075
SUBMITTED BY:
BIRAAT ENGINEERING SERVICES PVT. LTD.
SUBMITTED TO:
DEPARTMENT OF ELECTRICITY DEVELOPMENT (DOED)
ANAAMNAGAR, KATHMANDU, NEPAL
TABLE OF CONTENT
1. INTRODUCTION...........................................................................................................................3
3. LOCATION.....................................................................................................................................4
4. AVAILABLE MAPS.......................................................................................................................4
5. HYDROLOGICAL DATA..............................................................................................................4
6. TYPE OF PROJECT.......................................................................................................................6
6.1.1 HEADWORKS...................................................................................................................6
6.1.2 WATERWAYS..................................................................................................................6
6.1.3 SURGE SHAFT..................................................................................................................6
6.1.4 POWERHOUSE AND TAILRACE...................................................................................6
6.1.5 TRANSMISSION LINE.....................................................................................................6
6.1.6 ACCESS ROAD.................................................................................................................6
8. SCOPE OF WORK..........................................................................................................................7
8.1 TOPOGRAPHY SURVEY........................................................................................................8
8.2 HYDROLOGY AND SEDIMENTLOGY................................................................................9
8.2.1 HYDROLOGY...................................................................................................................9
8.2.2 SEDIMENTLOGY.............................................................................................................9
8.3 GEOLOGY AND GEOTECHNICAL.......................................................................................9
8.4 DESIGN AND COST ESTIMATION......................................................................................9
8.5 CONSTRUCTION PLANNING AND SCHEDULES.............................................................9
8.6 ENVIRONMENT AND SOCIOLOGY..................................................................................10
8.7 ECONOMIC AND FINANCIAL ANALYSIS.......................................................................10
1. INTRODUCTION
A preliminary desk study has been carried out based on available maps with a view of
identifying potential hydropower sites at Doti District. A team consisting of hydropower
engineers and geologist has a plan to visit the site to verify the site of the project and
necessary technical document for the project. The name of the project is designated as
Karnashi Thuligad Micro Hydro Project (KTMHP).
Salient Features
To verify the findings of this preliminary study and also to upgrade it, additional studies
will be required. This would include visits to site, survey of the area, and some field
investigations to proceed to “Feasibility Study” level.
3
Birat Engineering Service Private Limited 4
DESK STUDY REPORT OF KARNASHI THULIGAD MICRO HYDRO PROJECT(KTMHP 0.94 MW
3. LOCATION
Thuligad is one of the small tributaries of Karnali River. The proposed Karnashi Thuligad
Micro Hydro Project is located at Jorayal Rural Municipality – 4, Doti district, State – 7 of
Nepal. The proposed intake of the project lies at approximately 80 0 40’ 07’’ E and 290 03’
49’ N and an elevation of 1085.0 masl. Likewise the powerhouse is located at
approximately 800 39’ 10’’E and 290 03’ 25’’N and an elevation of 1030.0 masl.
The location of the project area is shown in Appendix A. The villages bordering the project
area are shown in Table 2.
The latitude and longitude of the four boundary points defining the project area are
shown in Table 3.
4. AVAILABLE MAPS
5. HYDROLOGICAL DATA
Thuligad is an ungauged stream, therefore at this stage of study, the methods applicable
for ungauged catchment HYDEST (WECS), MHSP and CAR (Station No 170) methods are
used. Thuligad is one of the small tributary of Karnali River.
The catchment area of Karnashi Thuligad Micro Hydro Project at intake is shown in
Appendix A.
HYDEST results
The parameters used for the estimation of flow at intake is Shown in Table 4.
4
Birat Engineering Service Private Limited 5
DESK STUDY REPORT OF KARNASHI THULIGAD MICRO HYDRO PROJECT(KTMHP 0.94 MW
Summary of results from the various method of analysis is shown in Table 5 to Table 6.
Table 6 gives the flow duration curve based on CAR method. The flow for 40% probability
of exceedance is used to estimate the installed capacity of the project.
Table 6 Flow Duration Data for Karnashi Thuligad Micro Hydro Project
6. TYPE OF PROJECT
5
Birat Engineering Service Private Limited 6
DESK STUDY REPORT OF KARNASHI THULIGAD MICRO HYDRO PROJECT(KTMHP 0.94 MW
The project is a “Run-of-the River” type, without any provision for seasonal flood storage
for power generation. The proposed intake of the Karnashi Thuligad Micro Hydro Project
(KTMHP) has a catchment area about 173 km2. The gross head available is approximately
55 m. The different components is of the projects are describe below.
Project Layout
Layout of the Project is shown in Appendix A.
6.1.1 Headworks
Headworks consist of a low height diversion weir with the crest elevation at approximately
1085.0 masl and a side intake. It will also consist of a gravel trap and a surface settling
basins on the right bank of the Thuligad stream.
6.1.2 Waterways
The waterways will require about 2.0 km of Headrace Pipe to convey the design discharge
between outlet of the settling basin and surge tank. There will be about 150 km long steel
pressure penstock pipe, which will convey water from surge tank to powerhouse.
6.1.3 Surgetank
A surgetank of suitable diameter and height will be designed in the different scenario of
turbine operation.
6
Birat Engineering Service Private Limited 7
DESK STUDY REPORT OF KARNASHI THULIGAD MICRO HYDRO PROJECT(KTMHP 0.94 MW
Q for Outage
No power Net and Net Enegy
of River generation head(m Turbine Powe Energy losses Generation
Months Days Flow(m3/s) (m3/s) ) efficiency r (kW) (kWh) 5% kWh
Baisak
h 31 1.07 0.96 53.84 86% 413 307630 15381 292248
Jestha 31 3.01 2.90 52.25 86% 943 701875 35094 666782
Asad 31 9.98 9.87 52.25 86% 943 701875 35094 666782
Srawan 32 19.95 19.84 52.25 86% 943 724517 36226 688291
Bhadra 31 19.52 19.41 52.25 86% 943 701875 35094 666782
Asoj 30 9.88 9.77 52.25 86% 943 679234 33962 645273
Kartik 30 3.98 3.87 52.25 86% 943 679234 33962 645273
Mangsi
r 30 2.02 1.91 52.68 86% 804 578652 28933 549720
Paush 29 1.48 1.37 53.34 86% 584 406497 20325 386172
Magh 29 1.28 1.17 53.58 86% 501 348846 17442 331404
Falgun 30 1.30 1.19 53.56 86% 510 366892 18345 348547
Chaitra 31 1.20 1.09 53.68 86% 468 348121 17406 330715
0.
Dry Energy(GWH) 1.40 07 1.33
0.
Wet Energy (GWH) 4.82 24 4.6
0.
Total Enegry (GWH) 6.22 32 5.9
Dry-Total Enegry Ratio 22.5%
8. SCOPE OF WORK
The scope of work at various stages of the study to determine the feasibility of the project
is presented below. The Technical team of Infra Partners Private Limited will be
responsible for conducting feasibility study. The Terms of Reference for these works is
given Appendix B.
7
Birat Engineering Service Private Limited 8
DESK STUDY REPORT OF KARNASHI THULIGAD MICRO HYDRO PROJECT(KTMHP 0.94 MW
6. Design of the Design of the layouts and the structures for headwork,
different headrace, penstock, powerhouse and tailrace and
components transmission lines, determination of the components for
including electromechanical design
electromechanical
design
7. Cost estimate Determination of the quantities and costs of the different
components
8. Financial analysis Financial analysis to determine the financial feasibility of the
project
9. Construction Planning of the phases of the construction schedules
planning
10. Miscellaneous Required administrative and quality control works
11. Environment and Determination of the environmental effects and methods to
sociology mitigate them
Determination of the social consequences and the methods to
mitigate them
Boundaries of private and public land, cultivated land, forest etc. are to be defined on the
survey drawings. Existing permanent and semi-permanent structures such as sheds,
boundary walls, big trees, large boulders located in the project area are also to be marked
on the survey drawings.
8
Birat Engineering Service Private Limited 9
DESK STUDY REPORT OF KARNASHI THULIGAD MICRO HYDRO PROJECT(KTMHP 0.94 MW
8.2.2 Sedimentology
Sediment samples from the riverbed will be collected and mineralogical analysis and
particle size distribution analysis will be carried out.
9
Birat Engineering Service Private Limited 10
DESK STUDY REPORT OF KARNASHI THULIGAD MICRO HYDRO PROJECT(KTMHP 0.94 MW
The required manpower for the study of the project is shown in the table 9.
10
Birat Engineering Service Private Limited 11
DESK STUDY REPORT OF KARNASHI THULIGAD MICRO HYDRO PROJECT(KTMHP 0.94 MW
S. Description Amount in
No NRS.
.
1 Topographical Survey and Mapping 300,000
2 Geological & Geotechnical Investigation Including Geological Mapping 150000
3 Headwork design and drawings 175,000
4 Headrace Pipe and Surge tank Design and drawings 175,000
Hydro-mechanical design and drawings (Penstock, gates, draft tube, 250,000
5 bifurcation, etc.)
6 Power House Design and drawings 250,000
7 Electromechanical Design and drawings 200,000
8 Optimization Study 100,000
10 Economical and Financial Analysis 7,5000
11 Preparation of Detail Feasibility Report 100,000
12 EIA Study and Report Preparation 175,000
13 Logistic support 150,000
Total 2,100,000
Contingency (10%) 210,000
Grand Total = 2,310,000
11
Birat Engineering Service Private Limited 12
DESK STUDY REPORT OF KARNASHI THULIGAD MICRO HYDRO PROJECT(KTMHP 0.94 MW
APPENDIX A
SEPTEMBER 2018
12
Birat Engineering Service Private Limited 13
DESK STUDY REPORT OF KARNASHI THULIGAD MICRO HYDRO PROJECT(KTMHP 0.94 MW
13
Birat Engineering Service Private Limited 14
DESK STUDY REPORT OF KARNASHI THULIGAD MICRO HYDRO PROJECT(KTMHP 0.94 MW
14
Birat Engineering Service Private Limited 15
DESK STUDY REPORT OF KARNASHI THULIGAD MICRO HYDRO PROJECT(KTMHP 0.94 MW
APPENDIX B
TERMS OF REFERENCE
SEPTEMBER 2018
15
Birat Engineering Service Private Limited 16
DESK STUDY REPORT OF KARNASHI THULIGAD MICRO HYDRO PROJECT(KTMHP 0.94 MW
TERMS OF REFERENCE
These terms of reference specifically describe the responsibilities of the developers (the
Client) and the consultant to be appointed for the job. A suitable qualified hydro power
consultant will be used to provide necessary services.
The responsibility of the Consultant for the Scope of Services including production of the
drawing and reports shall be as follows.
Survey
Detail Topographic survey and mapping of the headwork’s, surge tank, power
house and tailrace area.
Feasibility study
Project Definition Report
Hydrology review and update, Sedimentology (sediment samples from the riverbed
will be collected and mineralogical analysis and particle size distribution analysis
will be carried out, no river solid discharge measurement will be taken)
Geological and geotechnical field investigation including geological survey and
mapping
Preparation of general layout drawing of the project
Preparation of final Feasibility Study report
Temporary and permanent site layouts as listed below but not limited to (the
Consultant shall provide the camp area location):
Site plan for temporary works
Housing (temporary and permanent)
Offices (temporary and permanent)
Water supply, sewage treatment and other facilities
Construction power
Mass waste management and landscaping
Electro mechanical design, layout and detailing of transmission line
Liaison with concern government and local authorities and the local communities
Water rights, irrigation compensation, land ownership and other issues
Initial Environment Examination and related issues
Construction Planning and schedules
Economic and Financial studies and Optimisation study & Energy Calculation
16
Birat Engineering Service Private Limited 17
DESK STUDY REPORT OF KARNASHI THULIGAD MICRO HYDRO PROJECT(KTMHP 0.94 MW
APPENDIX C
WORK SCHEDULE
SEPTEMBER 2018
17
Birat Engineering Service Private Limited 18
DESK STUDY REPORT OF KARNASHI THULIGAD MICRO HYDRO PROJECT(KTMHP 0.94 MW
(Duration-Months)
S.N. Description Of Works 2 4 6 8 10 12 14 16
1 Literature Review
18