Copy of circular No. NHB 6042/83 dated. 9.3.84 from C.E, NH
Thiruvananthapuram,
Sub :- Preparing 5.R. reg.
The following norms are suggested to be followed for
preparing the SR of acquired buildings and structures arrived by the
Pevate parties Mowever the inspecting officers may decide the actual
Quantity avaiable at site, their rates according to the conditions of the
structures.
SI.No. Items
Wire cut brick In C.M
Latente in C.M
Laterite in LM
Laterite in Surkd or mud
Sundried bricks in mud
Rubble
Brick in lime or mud _
for doors, wind
Main switch } ’
Light point }
fan point} 75% 50%
“Ceiling bell }
ri Water supply
1 Brass value 100%
Sone
23
2. «SOB tap 100%