Client : PT PLN

Plant/Unit : SULUT-1 CFSPP 2X50 MW


Work No : 17231
Doc No : S1-IK-000-HSE-LST-00002
Document Title: Wastewater Source List
Rev : A
Date : 28 Jan 2020

1. PRELIMINARY OILY WASTEWATER SOURCE LIST

OILY WATER VOLUME (m3)


NO AREA/BUILDING

SULUT
1 Boiler Area A 6,3
2 Boiler Area B 6,3
3 Turbine Building 21,7
4 Compressor Area 7,5
5 Transformer Unit 1 Area 29,7
6 Transformer Unit 2 Area 29,7
7 Town Yard transformer 22

BIGGEST OILY WATER VOLUME 29,7

2. PRELIMINARY CHEMICAL WASTEWATER SOURCE LIST

FLOWRATE COMPOSITION
NO SOURCE Remark
(m3/hr) TDS TSS COD BOD DISSOLVED IRON AMMONIA TEMPERATURE pH
note 1
1 Boiler Blowdown for 2 unit 31.4 Hold Hold Hold Hold Hold Hold 60 C Hold Regular, Continue
2 Ammonia drain 4 Hold Hold Hold Hold Hold 250000 (mg/l) Hold Hold Irregular, intermitten

NOTE
1. Preliminary info to be updated base on IKPT process calculation