GENERAL NOTES
TANK SCHEDULE (STARCHY WASTEWATER TANK)
(1) ALL DIMENSIONS ARE IN MILLIMETER, LEVELS ARE IN METER.
TANK NO. LENGTH WIDTH LIQUID HEIGHT FREEHEAD TOTAL HEIGHT NET VOLUME TOTAL VOLUME
B109 10.00 m 9.70 m 5.80 m 0.90 m 6.70 m 562.60 m³ 649.90 m³ (2) TO BE GROUTED AFTER MOUNTING OF PIPING AND/OR EQUIPMENT.
1 PLANT NORTH (3) GRADE LEVEL IS SET TO +3.600. 1
(4) LOADS :

A106 =± 0.85 kN
S106 =± 2.45 kN
S107 =± 3.77 kN

(5) SURFACE PREPARATION FOR SURFACES TO BE COATED :


- THE SURFACE MUST BE DRY, CLEAN AND FAT-FREE, NO SHARP EDGES OR
HOLES ARE ALLOWED.
- MILD SAND OR GRIT BLASTING IS NECESSARY FOR LARGE SURFACES.

(6) TO BE SUPPLIED BY CIVIL CONTRACTOR.


B
C103 (21) COVERS ARE LOOSE (NOT BOLTED) GAS-TIGHT W/ RUBBER GASKET
(SUPPLIED BY CIVIL CONTRACTOR).

B
NOZZLE SCHEDULE
10000
C103 NOZZLE NO. DESCRIPTION

2000 1047 2000 3003 1 WASTEWATER FROM S106

2 = 300 = = 300 = 2A DAP + UREA DOSING FROM P108


2
10000
2150 +7.400 +7.400 2B NaOH DOSING FROM P103A/B
910 1250 1580 1710 1094 1100 2356
(OPENING) (OPENING) 1150 3 PREATREATED WASTEWATER TO B105

=
+7.350 +7.350
3
500 +7.400 +7.400 +7.400 +7.400 4 WASTEWATER RECYCLE TO E104 VIA P117

2000
300
650
+7.350 +7.350 +7.350 +7.350

(OPENING)
5 WASTEWATER RECYCLE FROM E104

250 400
CONTAINER PARKING

=
PAINTED GALVANIZED
STEEL HANDRAIL (6) AREA
6 LEVEL MEASUREMENT

+11.150 +11.150 +11.150 +11.150


+3.550 7 MANHOLE (6)
1150

1150
PLINTH FOR PLINTH FOR

500
+3.600
S107 S106 3 +3.550 +3.600 9 EFFLUENT RECYCLE FROM B102
3 500 x 500 x 300 DEEP
3 300 +3.250
DRAIN PIT
250 250 250 250 +3.550 +3.550 10 VENT AIR TO I103
2190

(6)

2468
7
3 2035 1830 1610 1044 3481
SEE DWG. NO. C114 FOR DETAILS 12 DRAIN 3
250 x 250
12
BLOCK-OUT (2)
250 x 250 300 x 300 300 x 300
1 4 5
BLOCK-OUT (2) 200 x 200 BLOCK-OUT (2) BLOCK-OUT (2)
2B
BLOCK-OUT (2)
1000

531
250 x 250
6
200 x 200 BLOCK-OUT (2)
2A
BLOCK-OUT (2)

REFERENCE DRAWING

SLOPE
2501
(20)
34122A-411-C101 - GENERAL CIVIL LAYOUT
B109 B109
9700

9700
34122A-411-C103 - B109 (HIGH COD WASTEWATER TANK) SECTIONS
(5)
200 x 200

SL
CLOSED GRID GRP COVER (6)(21) 9 34122A-411-C114 - TYPICAL MANHOLE AND COVER DETAILS

OP
BLOCK-OUT (2)

E
SEE DWG. NO. C114 FOR DETAILS
4 4
+10.550
(OPENING)

A A A ℄ OF A106 A
500

500
C103 C103 C103 C103

1100
(OPENING)

3000
2750

250 x 250
767 3
BLOCK-OUT (2)
1200

250 x 250 BLOCK-OUT (2)


FOR ORIENTATION +3.600
SEE DWG. NO. C109-C111 +3.600
250

3 03/08/20 RELEASED HOLD AS PER VENDOR DATA / PIPING REQUIREMENTS JPM JCP
2 19/06/20 REVISED AS PER B.E./PIPING REQUIREMENTS JPM JCP
1 26/04/20 FOR DETAILED ENGINEERING JPM JCP
0 17/04/20 PRELIMINARY JPM JCP
5 250 x 250
BLOCK-OUT (2)
10
250 x 250 BLOCK-OUT (2)
FOR ORIENTATION
REV DATE DESCRIPTION BY CKD.
SEE DWG. NO. C112-C113
CLIENT : CARGILL
PANDAAN, INDONESIA

B
TOP VIEW B
LOWER PLAN VIEW
SCALE = 1 : 50 SCALE = 1 : 50
C103 C103

PROJECT : WASTEWATER TREATMENT PLANT

6 B109 (STARCHY WASTEWATER TANK)


TOP VIEW AND LOWER PLAN VIEW
CIVIL GUIDELINE DRAWING
This document is the property of GLOBAL WATER ENG'G. It shall not be copied, reproduced, transmitted
or communicated to third parties without the explicit agreement of GLOBAL WATER. International conventions
of Berne (1836) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brusselsc(1948).

DRAWN CHECKED DATE APPROVED DATE APPROVED DATE


J P M J C P
SCALE : 1 : 50 REF :
PROJECT No. DRAWING No. REV.