Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

PROGRAM TITLE: Unit 02: Networking

UNIT TITLE: NETWORKING

ASSIGNMENT NUMBER:02

ASSIGNMENT NAME: NETWORK INFORMATION

SUBMISSION DATE: 24/2/2021

DATE RECEIVED: …………………………………………….

TUTORIAL LECTURER: TRAN HOANG BACH

WORD COUNT:5311

STUDENT NAME:NGO THI NGAN HA


STUDENT ID: BKC19100

MOBILE NUMBER: 0349685127


Summative Feedback:

Internal verification:
I) The current status and the need to build the network of Gold Star

Gold star is a newly established company with a completely new build status (or
network but not yet standard). The number of employees is less than 260 people.
Only one website requires Internet access. The company is currently located in a
building in Hanoi. The company's building structure includes 1 ground floor and
three floors. The first floor has been used for two departments. The second floor
is for two departments , the third floor is for centralized management of the
company's important servers.

Details: Human resources and departments in the company:

• Administration and personnel: 85 people (2nd floor)

• Sales Department: 70 people (3rd floor)

• Finance - Accounting Department: 80 people (2nd floor)

• Board of Directors: 5 people (3rd floor)

• Technical Department: 20 people (1st floor)

LO3 Design efficient networked systems.

[P5] Design a networked system to meet a given specification.

I) Solution to build network system for Gold Star Company

A. Selection of equipment and technology

You might also like