Estimate of A Hospital

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 203

Construction of Sanquelim commercial cum office building

GSUDA Measurement Sheet


for Sanquelim Municipal Council at Sanquelim – Goa

Construction of Sanquelim commercial cum office building for Sanquelim Municipal Council at
Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

I DISMANTLING WORK

Demolishing cement concrete 1:3:6


1 12028 or richer mix including disposal of
material within 50 m lead.

a Main muncipal buildings 1 64.80 9.10 0.15 88.45


b Chicken , mutton centre 1 18.30 6.60 0.15 18.12
c Other structures… 1 10.50 7.60 0.15 11.97
1 13.80 10.70 0.15 22.15
1 40.60 4.60 0.15 28.01

Demolishing cement concrete 1:3:6


1 12028 m3 168.70 300.00

Demolishing R.C.C work including


2 12030 stacking of steel bars and disposal of
unserviceable material within
50R.mt. Lead.

Demolishing First Floor of main


A Building….
Main columns 36 0.60 0.35 4.10 31.00
passage columns 24 0.40 0.25 2.65 6.36
2 0.55 0.40 2.80 1.23
Lintels 20 64.80 0.30 0.30 116.64
Slab chujjas 40 64.80 0.60 0.15 233.28
Roof Slab over passage 1 64.80 2.10 0.15 20.41
Beams 34 64.80 0.30 0.40 264.38
18 1.50 0.30 0.40 3.24
Staircase roof slab 1 9.10 4.00 0.15 5.46
Beams 2 9.40 0.30 0.58 3.27
3 4.00 0.30 0.58 2.09
slab pardi 1 64.80 0.15 0.55 5.35
Passage parapet wall 16 3.50 0.15 1.10 9.24
1 4.20 0.15 1.10 0.69

1 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
2 1.50 0.15 1.10 0.50

B Ground Floor
Columns 36 0.70 0.35 4.10 36.16
Lintels for shutters 4 30.15 0.30 0.30 10.85
Beams 18 9.10 0.35 0.68 38.98
32 3.50 0.35 0.50 19.60
16 3.50 0.25 0.40 5.60
2 4.20 0.35 0.68 2.00
Slabs 2 30.15 9.10 0.15 82.31
Chujja 2 64.80 0.60 0.15 11.66
Pardi 1 64.80 0.15 0.50 4.86
staircase ,landing 2 4.20 1.80 0.15 2.27
staircase… 2 3.20 1.80 0.25 2.88
1 0.90 1.80 0.25 0.41
Footing / plinth columns 50 0.70 0.35 1.10 13.48

C Chicken shop
Columns 7 0.60 0.30 3.50 4.41
Beams 7 6.20 0.30 0.75 9.77

Total Demolishing R.C.C work ….


2 12030 m3 948.37 367.00

Scrapping ,cleaning and


3 12033 straightening reinforcement from
R.C.C or Reinforced brick work.

Qty. @ 50 kg/ cu.m


Total R.C.C =367.06 Cu.m
Steel Qty. in Quintel = (50x
367.06 ) /100=183.53 quintel 183.53
Total quantity for Extra For
3 12033
Srapping , cleaning….. Qtl. 183.53 184.00

Demolishing laterite stone masonry


in cement mortar including stacking
4 12038 of serviceable material & disposal
of unserviceable material within 50
R.mt. lead.

2 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
A Main muncipal building
First Floor
Long walls H=(4+5.3)/2=4.65m 9 6.30 0.35 4.65 92.28
Short walls 32 3.40 0.35 4.00 152.32
2 4.15 0.35 3.20 9.30

Ground Floors
Long Walls 18 6.30 0.35 4.20 166.70
Short Walls 32 3.40 0.35 4.20 159.94
1 4.15 0.35 2.80 4.07

Foundations L/W 18 6.30 0.70 0.80 63.50


S/W 16 3.40 0.70 0.60 22.85
S/W 16 3.40 0.70 1.10 41.89

Mangalore tiles structure..


walls 8 4.80 0.30 3.80 43.78
4 4.20 0.30 2.60 13.10
3 7.20 0.30 3.80 24.62
1 13.00 0.30 2.60 10.14
1 10.30 0.30 2.80 8.65
1 20.50 0.30 2.60 15.99
2 7.20 0.30 3.70 15.98
1 6.50 0.30 2.80 5.46
6 4.90 0.30 3.00 26.46
2 2.90 0.15 2.30 2.00

Deduction for doors and windows

Windows 43 1.00 0.35 1.50 -22.58


4 1.00 0.30 1.20 -1.44
Doors 15 1.00 0.35 2.40 -12.60
2 1.10 0.30 2.20 -1.45
5 0.90 0.30 2.20 -2.97
Shutters 32 2.50 0.35 2.35 -65.80
12 2.30 0.30 2.30 -19.04

Demolition of laterite stone


4 12038
masonary….. m3 753.15 754.00

3 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

Dismantling wood work of


sectional area 40 sq.cm. and above
5 12040 wrought framed and fixed in
frames, other frames and trusses
including stacking of material
within 50 mts. lead (span upto 10
mtrs.)

a Main muncipal building


Purlins ( 15x10) cm. 6 31.80 0.10 0.15 2.86
Trusses 3 7.30 0.10 0.15 0.33
6 3.80 0.10 0.15 0.34
6 1.60 0.10 0.15 0.14
3 1.30 0.10 0.15 0.06

b Other Structures…..
4 6.80 0.10 0.15 0.41
1 14.80 0.10 0.15 0.22
2 24.00 0.10 0.15 0.72
2 10 0.10 0.15 0.30
2 7.3 0.10 0.15 0.22
26 8.70 0.07 0.10 1.58
21 6.40 0.07 0.10 0.94
14 4.80 0.07 0.10 0.47
21 5.20 0.07 0.10 0.76

Dismantling wood work of


5 12040
sectional area 40 sq.cm. ……… m3 9.36 9.50

Taking out doors, windows and


6 12043 clerestory windows shutters (steel
or wood) including stacking within
50 R.mt. lead
a) Of area 3 sq.m. and below

a Main muncipal building


windows 43 43.00
Doors 15 15.00

b Other buildings
windows 4 4.00
Doors 7 7.00

4 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

Taking out doors, windows and


6 12043
clerestory windows ……….. Nos 69.00 69.00

Dismantling steel work in built up


sections in angles, tees, flats
&channels including all gazzate
7 12048
plats , bolts, nuts,cutting,
dismembering and stacking within
50 R.mt. Lead.

Total roofing area to be dismantled


with steel trusses =
2x35.3x3.80+2x19.3x4.5=441.98 m2

Cosidering steel work @ 10 kg/m2 ,


including purlins, rafters,trusses etc.

Total quantity =10 x441.98 = 4419.80


kg
Total quantity in Quintal = 441.98
qtl. 441.98

Dismantling steel work in built up


7 12048
sections in channels……. Qtl. 441.98 442.00

Dismantling asbestos sheet roofing


including ridges, hips, valleys &
8 12056
gutters and stacking the material
50R.mt. Lead.

Roof above the muncipal main


building 2 65.80 3.80 500.08
Roof over chiken, mutton shop 2 19.30 4.50 173.70

Dismantling of Asbestos sheet


8 12056
roofing…….. Sq.m 673.78 674.00

5 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

Dismantaling tiled roofing


(mangalore or pot or country tiles)
with battens etc. complete including
9 12058
stacking of serviceable material &
disposal of unserviceable material
with in 50 mts. Lead.

Other mangalore tile roof


structure…
L=(27.20+17.3)/2=22.25 2 22.25 6.20 275.90
1 9.80 6.20 60.76
1 14.40 4.60 66.24
1 8.70 4.30 37.41
1 6.50 3.40 22.10

Dismantaling tiled roofing


9 12058 (mangalore or pot or country tiles)
………. Sq.m 462.41 463.00

Dismantaling rolling shutters, top


covers and shafts etc. and stacking
10 12070
the serviceable material with in lead
of 50 mts.

a Main muncipal building 32 2.55 2.40 195.84


b Other structures… 12 2.30 2.40 66.24

Dismantaling rolling shutters, top


10 12070
covers …………….. Sq.m 262.08 262.00

Dismantling False ceiling including


supporting members , frame works
RA- etc.for all height & stacking of
11
01/WA materials within 50mts. Lead as
directed by Eingineer- in - charge at
site

Office at F.F. 1 7.15 6.60 47.19


Mahiti ghar 1 3.40 6.60 22.44
Muncipal officer 1 3.40 6.60 22.44
Library 2 7.15 6.60 94.38
Talathi room 1 7.15 6.60 47.19
Other structures 4 3.80 6.00 91.20

6 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
2 8.00 9.00 144.00

RA- Total Quantity of dismantling of


11
01/WA false Ceiling
Sq.m 468.84 469.00

Carriage of unserviceable
dismentelled material such as
12 3065 i moorum, lime, stones, sands etc. by
tipper truck including loading,
unloading and staking up to a lead
of 5.00 kms.

i Demolition of P.C.C. works 168.70


ii Demolition of R.C.C. works 948.37

iii Demolition of Laterite masonry


work 753.15
iv Carriage of existing debris…. 45.00

v
Carriage of excavated balance soil… 603.83

12 3065 i Total Quantity Cu.m 2519.05 1938.00

II EARTHWORKS

7 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

Earth work in excavation by mechanical


means over areas in all types of stratas
comprising of any type of materials
such as soil, silt clay, sand ,
gravel,murrum of all types of
conglomerates, laterite rock, soft rock
ordinay rock disintegrated rock
fissured/ shattered rock, decomposed
rocks weathered rock, bituminous road
layers and all such other materials
either in full or part as the case may be
adopting any method / methods as
RA
14 may be convenient or permitted
02/WA including chisseling, wedging etc. in all
conditions such as dry moist, foul,
saturated, submerged etc. as directed by
Engineer etc. all complete including
dressing of sides ramming of bottom
including all lead and lift , including
gettting out the excavated soil as
directed including pumping and bailing
out water, barricading danger,
lightening, guarding as directed by
engineer upto depth of 1.5m (Blasting
Prohibited)

i for lift 2 4.20 3.500 1.50 44.10

ii Retaining wall For Front ramp 2 75.80 1.500 1.50 341.10

iii Roads
North side road 1 26.50 3.500 0.50 46.38
West side road 1 56.70 3.000 0.50 85.05
West side road 1 12.00 7.780 0.50 46.68
West side road 1 13.50 3.000 0.50 20.25
South side road 1 33.90 3.000 0.50 50.85
South side road 1 9.90 3.000 0.50 14.85
External 4 wheeler parking 1 10.50 5.100 0.50 26.78
External 2 wheeler parking 1 15.00 3.000 0.50 22.50
Front side 1 37.99 4.000 0.50 75.98
Front side 1 21.62 4.000 0.50 43.24
Front side 1 14.38 6.400 0.50 46.02
iv Storage sump( 50,000 lts. Capacity) 1.0 8.10 5.10 1.50 61.97

RA total excavation over


14 Cu.m 925.73 926.00
02/WA areas…………………

8 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

Earth work in excavation by mechanical


means over areas in all types of stratas
comprising of any type of materials
such as soil, silt clay, sand ,
gravel,murrum of all types of
conglomerates, laterite rock, soft rock
ordinay rock disintegrated rock
fissured/ shattered rock, decomposed
rocks weathered rock, bituminous road
layers and all such other materials
either in full or part as the case may be
adopting any method / methods as
RA
15 may be convenient or permitted
03/WA including chisseling, wedging etc. in all
conditions such as dry moist, foul,
saturated, submerged etc. as directed by
Engineer etc. all complete including
dressing of sides ramming of bottom
including all lead and lift , including
gettting out the excavated soil as
directed including pumping and bailing
out water, barricading danger,
lightening, guarding as directed by
engineer for depth above 1.5m (Blasting
Prohibited)

i for lift 2 4.20 3.500 0.50 14.70

ii Retaining wall For Front ramp 2 75.80 1.500 0.50 113.70


iii Storage sump( 50,000 lts. Capacity) 1.0 8.10 5.10 1.85 76.42

RA total excavation over


15 Cu.m 204.82 205.00
03/WA areas…………………

Earth work in foundation, pipeline


trenches, drain in all types of stratas
comprising of any type of materials
such as soil, silt clay, sand ,
RA gravel,murrum of all types of
16
04/WA conglomerates, laterite rock, soft
rock ordinay rock disintegrated rock
fissured/ shattered rock,
decomposed rocks weathered
rock, .................................

i Excavation for column footings

9 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
F1 10 3.40 3.400 1.50 173.40
F2 13 3.10 3.100 1.50 187.40
F3 16 2.90 2.900 1.50 201.84
F4 22 2.70 2.700 1.50 240.57
F5 26 2.40 2.400 1.50 224.64
F6 35 2.20 2.200 1.50 254.10
F7 30 1.80 1.800 1.50 145.80

ii for staircase footings 2 2.00 1.200 1.50 7.20

iii for water supply pipeline


32 mm dia 1 65.000 0.500 0.60 19.500
50 mm dia. 1 40.000 0.500 0.60 12.000

iv sewage line

110 mm dia chamber to chamber


1 55.000 0.500 0.80 22.000

v gully trap 4 1.200 1.200 1.20 6.912

vi Manholes
manhole chamber 60 x 60 x 60 6 1.20 1.200 0.90 7.78
manhole chamber 90 x 80 x 60 5 1.50 1.40 0.90 9.45

vii Compound wall 1 4.43 0.600 0.80 2.13


1 1.00 0.600 0.80 0.48
1 6.72 0.600 0.80 3.23
1 17.46 0.600 0.80 8.38
1 42.80 0.600 0.80 20.54
1 4.60 0.600 0.80 2.21
1 41.92 0.600 0.80 20.12
1 8.38 0.600 0.80 4.02
1 1.00 0.600 0.80 0.48
1 23.14 0.600 0.80 11.11
1 6.34 0.600 0.80 3.04
1 4.27 0.600 0.80 2.05
1 9.02 0.600 0.80 4.33

vii Excavation for cross drainage 4 4.00 0.900 0.80 11.52

ix Excavation for road Gutter 1 28.50 0.900 0.80 20.52


1 25.50 0.900 0.80 18.36
1 52.50 0.900 0.80 37.80
1 6.00 0.900 0.80 4.32
1 4.50 0.900 0.80 3.24

10 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
1 13.50 0.900 0.80 9.72
1 36.40 0.900 0.80 26.21
1 30.00 0.900 0.80 21.60
1 9.90 0.900 0.80 7.13
1 15.00 0.900 0.80 10.80
1 66.00 0.900 0.80 47.52

x Excavation for Kerbs stone 1 4.50 0.45 0.60 1.22


1 14.00 0.45 0.60 3.78
1 1.60 0.45 0.60 0.43
1 9.50 0.45 0.60 2.57
1 3.20 0.45 0.60 0.86
1 5.60 0.45 0.60 1.51
5 3.00 0.45 0.60 4.05
1 6.70 0.45 0.60 1.81
1 9.00 0.45 0.60 2.43
1 20.00 0.45 0.60 5.40
1 6.50 0.45 0.60 1.76
1 25.50 0.45 0.60 6.89

RA
16 Total excavation for pipeline….. Cu.m 1846.13 1847.00
04/WA

Earth work by mechninal means in


foundation, pipeline trenches, drain in
all types of stratas comprising of any
type of materials such as soil, silt clay,
sand , gravel,murrum of all types of
conglomerates, laterite rock, soft rock
ordinay rock disintegrated rock
fissured/ shattered rock, decomposed
rocks weathered rock, and all such
RA other materials either in full or part as
17
05/WA the case may be adopting any method /
methods as may be convenient or
permitted including chisseling, wedging
etc. in all conditions such as dry moist,
foul, saturated, submerged etc. as
directed by Engineer etc. all complete
including dressing of sides ramming of
bottom including all lead and lift ,
including gettting out the excavated soil
as directed including pumping and
bailing out water, barricading danger,
lightening, guarding as directed by
engineer for depth above 1.5m
(Blasting Prohibited)
i Excavation for column footings

11 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
F1 10 3.40 3.400 0.70 80.92
F2 13 3.10 3.100 0.70 87.45
F3 16 2.90 2.900 0.70 94.19
F4 22 2.70 2.700 0.70 112.27
F5 26 2.40 2.400 0.70 104.83
F6 35 2.20 2.200 0.70 118.58
F7 30 1.80 1.800 0.70 68.04

ii for staircase footings 2 2.00 1.200 1.00 4.80

RA
17 Total excavation for pipeline….. Cu.m 671.08 671.00
05/WA

Refilling of pipeline/ foundation


trenches , plinth sides, foundation
etc. with available excavated earth
in layers not exceeding 20 cm depth
18 4012
consolidating each layer ramming
and watering lead upto 50 m and all
lifts and disposal of surplus earth as
directed by Engineer in charge

i Total Excavation 3647.77


Deduction
Rubble in footing ( ref. item No.
-655.06
11- a )
P.C.C. in footing ( ref. item No. 14-
-280.21
a)
R.C.C. in footing ( ref. item No. 30-
-843.24
a)
R.C.C. in columns up to G.L. ( ref.
-3.11
item No. 24- b - i )
ii compund wall refilling
Deduct
Masonary in foundations -29.94

Total quantity of refilling in


18 4012 Cu.m 1836.21 1837.00
foundation

12 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

Supplying and filling in plinth


under floors, trenches including
19 4017
watering, ramming, consolidating,
dressing ,complete.

b Moorum
i For front main ramp 1 24.90 4.000 3.80 189.24
1 11.77 9.000 3.80 402.53
1 37.99 4.000 3.80 288.72
Wheel chair ramp 1 9.50 1.000 0.60 2.85
1 31.00 1.000 3.80 58.90

19 4017 Total Quantity Cu.m 942.25 943.00

III MASONRY WORKS

Brick work using common burnt


clay building bricks in cement
20 5008 mortar 1:4 (1 cement cement : 4
coarse sand) in superstructure upto
floor five level.

b)with bricks of class designation 40


kg/cm2

A First Floor
Wall Along Longer side of bldg.,
i
Ht.= 3.5 -0.6 =2.9m
C1-C2, C12-C13 2 3.40 0.23 1.00 1.56
C2-C3, C3-C4, C4-C5, C9-C10, C10-
6 2.40 0.23 1.00 3.31
C11, C11-C12
C5-C6, C6-CF6, Cf6-C8, C8-C9 4 2.77 0.23 2.90 7.39
Wall A 2 12.90 0.23 2.90 17.21
C20-C21 1 4.40 0.23 2.90 2.93
CF1- wall B 1 4.40 0.23 2.90 2.93
C53-C54 1 4.00 0.23 2.90 2.67
C22-C23, C23-C24, C24-C25, C25-
C26, C26-C27, C27-C28, C28-C29, 8 2.50 0.23 2.90 13.34
C29-C30

C32- wall B, C47-wall B, C65-C64 3 4.35 0.23 2.90 8.70

C39-C40, C40-C41, C55-C56,


4 4.20 0.23 2.90 11.21
C56-C57,
Wall C 2 7.00 0.23 2.90 9.34

13 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
C41- C42, C44-C45, C57-C58, C60-
4 1.20 0.23 1.00 1.10
C61
C42-C43, C43-C44, C58- C59, C59-
4 2.70 0.23 1.00 2.48
C60
C45-C46 1 6.50 0.23 2.90 4.34
C61- C62, C62-C63 2 3.20 0.23 2.90 4.27
C70 - C54 7 & C88, C88 -C89 2 2.77 0.23 2.90 3.70
C70-C71, C89-C90 2 5.60 0.23 2.90 7.47
C71-C72, C90-C91 2 2.50 0.23 2.90 3.34
C91-C92 1 8.50 0.23 2.90 5.67
C73-C74 1 5.77 0.23 2.90 3.85
C74-C75, C75 -CF3, C92-C93,
6 2.77 0.23 2.90 11.09
C93-C94, C94-C95, C95- C7
C14-C15 1 3.80 0.23 2.90 2.53
C15-C16 1 5.00 0.23 2.90 3.34
Wall D 1 5.60 0.23 2.90 3.74
Wall E - C38, Wall E-C69,
4 3.50 0.23 2.90 9.34
C102 -C103, C116 -C117
C48 -C49, C83 -C84 2 3.00 0.23 2.90 4.00
Wall F 1 2.74 0.23 2.90 1.83
C49- C50, C50 -C51 2 2.77 0.23 1.00 1.27
Wall G 1 5.77 0.23 2.90 3.85
C66- C67 1 5.77 0.23 2.90 3.85
C100 - CF5, CF5- C101 2 2.77 0.23 2.90 3.70
Wall H 1 6.00 0.23 2.90 4.00
C111- C112 1 3.40 0.23 2.90 2.27
C81- C82 1 2.77 0.23 1.00 0.64
CF3- C81 1 18.50 0.23 1.00 4.26
C113-C114, C114 -C115, C115- CF2,
4 2.77 0.23 1.00 2.55
CF2 -C116
C116 -C117 1 1.70 0.23 1.00 0.39

Wall Along Shorter side of bldg,


ii
Ht.= 3.5 -0.6 =2.9m
C53 -CF1, CF1- C20 2 3.25 0.23 2.90 4.34
C20- Wall A 1 2.77 0.23 2.90 1.85
C54- C88 1 4.40 0.23 2.90 2.93
wall B 2 10.00 0.23 2.90 13.34
C1-Wall A 1 2.60 0.23 1.00 0.60

C89 -C70, C71 -C90, C72- C91, wall 4 2.77 0.23 2.90 7.39

C39 -C55, C41- C57 2 4.71 0.23 2.90 6.28


Wall C- C40, Wall C - C56 2 2.24 0.23 2.90 2.99
C22- Wall A 1 2.50 0.23 2.90 1.67
C24-C5 1 5.77 0.23 2.90 3.85

14 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
C6-C25 1 5.40 0.23 2.90 3.60
C26-CF6 1 4.37 0.23 2.90 2.91
C8-C27 1 5.40 0.23 2.90 3.60
C9- C28 1 5.77 0.23 2.90 3.85
C45 -C61, C46 -C63 2 4.71 0.23 2.90 6.28

Wall C - C62, Wall C - C45 & C46 2 2.24 0.23 2.90 2.99

C30- wall A 1 2.77 0.23 2.90 1.85


C92- C73, C93 - C73 & C74, C74-
5 2.77 0.23 2.90 9.24
C94, C75- C95, CF3- C7
C65- C47 1 3.50 0.23 2.90 2.33
C47-C32, C32- wall A 2 2.50 0.23 2.90 3.34
Wall A - C13 1 2.60 0.23 1.00 0.60
C14-C33 1 3.00 0.23 2.90 2.00
C33-C66 1 5.20 0.23 2.90 3.47
C67- C34 1 4.00 0.23 2.90 2.67
wall bet. Cash counter 1 2.77 0.23 2.90 1.85
C82- C99, C99-C100 2 2.77 0.23 1.00 1.27
C110- C113 1 1.70 0.23 2.90 1.13
C48- C83, C49 -C84 1 5.77 0.23 2.90 3.85
C84- C100 1 2.60 0.23 2.90 1.73
C100-C112 1 2.30 0.23 2.90 1.53
CF5 - wall H, C101- Wall H 2 2.50 0.23 2.90 3.34
C51 -C68, C68- C85, C85-C101 3 2.77 0.23 1.00 1.91
Wall I 1 4.00 0.23 2.90 2.67
Wall E 1 16.00 0.23 2.90 10.67
C102- C116& C117, C103 -C117 2 4.80 0.23 2.90 6.40
C103 -C86, C86- C69 2 2.50 0.23 2.90 3.34
C69- C52 1 2.70 0.23 2.90 1.80
C38- C52 1 1.50 0.23 2.90 1.00
C19 - C38 1 6.50 0.23 2.90 4.34

sub Total … 320.23

iii Deductions for openings


Rolling Shutters , RS1 21 2.40 0.23 2.10 -24.34
Rolling Shutters , RS2 5 1.50 0.23 2.10 -3.62
Doors, D1 4 1.80 0.23 2.25 -3.73
Doors, D2 13 0.90 0.23 2.25 -6.05
Windows W1 38 1.50 0.23 1.25 -16.39

Deduction for walls as per revised


iv
plan
wall 3 4 3.46 0.23 2.90 -9.23
wall 10 1 3.74 0.23 2.90 -2.49

15 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

Total Deduction cu.m -65.86

Sub Total of Brick work for First


A Cu.m 254.37
Floor

B Brick Work in Second Floor

i Walls along Longer side of Bldg.

C1- C2 1 3.20 0.23 0.90 0.66


C2-C3, C3- C4, C4-C5, C9 -C10,C10
5 2.77 0.23 0.90 2.87
-C11
C5- C9 1 14.50 0.23 3.50 11.67
C11- C13, 1 6.60 0.23 1.00 1.52
C41- C42, C44-C45, C57- C58, C60
4 1.30 0.23 1.00 1.20
-C61
C42-C43, C43-C44, C58-C59, C59-
4 2.77 0.23 1.00 2.55
C60
C63- C65 1 6.60 0.23 4.57 6.94
C71-C72, C90-C91 2 2.50 0.23 4.40 5.06
C73-C74 1 5.77 0.23 4.40 5.84
C74-C75, C75-CF3 2 2.77 0.23 4.40 5.61
C91-C92 1 8.50 0.23 3.80 7.43

C93-C92, C93-C94, C94-C95,C95-C7 4 2.77 0.23 3.80 9.68

C65-C66 1 11.80 0.23 1.00 2.71


C81-CF3 1 18.50 0.23 1.00 4.26
C81-C82 1 2.77 0.23 1.00 0.64
C14-C15 1 3.80 0.23 3.50 3.06
C15-C16 1 4.80 0.23 3.50 3.86
C33-C34 1 5.77 0.23 3.90 5.18
C34-C35 1 2.77 0.23 3.90 2.48
C35-C36 1 5.77 0.23 3.90 5.18
C36-C37 1 2.77 0.23 3.90 2.48
C37-C38 1 5.50 0.23 3.90 4.93
Wall A 1 4.20 0.23 4.50 4.35
C49-C50, C50 -C51 2 2.77 0.23 1.00 1.27
C66-C67 1 5.77 0.23 4.40 5.84
C83 -C84 1 3.40 0.23 4.50 3.52
C100 -CF5, CF5- C101 2 2.77 0.23 2.90 3.70
C111 -C112 1 3.40 0.23 2.90 2.27
wall B 1 6.00 0.23 2.90 4.00
C113- C114, C114-C115,C115-CF2,
4 2.77 0.23 1.00 2.55
CF2 -C116
C116 -C117 1 5.60 0.23 1.00 1.29

16 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

ii Walls along shorter side of Bldg.

C1-C20 1 5.40 0.23 4.00 4.97


C20 -C53 1 6.50 0.23 4.70 7.03
C53- C104 1 7.50 0.23 4.10 7.07
C41- C57 1 4.50 0.23 4.70 4.86
C71- C90, C70- C91 2 2.77 0.23 4.00 5.10
C90- C106 1 2.50 0.23 3.80 2.19
C73- C92, C93- C73 & C74, C74-
5 2.40 0.23 3.80 10.49
C94, C75- C95, CF3- C7
C45- C61 1 4.60 0.23 4.70 4.97
C11-C30 1 5.50 0.23 4.00 5.06
C30 -C46 1 1.80 0.23 4.60 1.90
C46- C63 1 4.60 0.23 4.70 4.97
C13- C32 1 5.77 0.23 1.00 1.33
C32- C65 1 6.50 0.23 1.00 1.50
C14- C33 1 3.00 0.23 3.80 2.62
C33-C66 1 5.50 0.23 4.50 5.69
C34-C67 1 5.50 0.23 4.50 5.69
C67- C82, C110 -C113 2 1.80 0.23 1.00 0.83
C82- C99, C99- C110 2 2.77 0.23 1.00 1.27
Wall A -C49 1 2.77 0.23 1.00 0.64
Wall A -C84 1 2.80 0.23 3.80 2.45
C84- C100 1 2.60 0.23 3.60 2.15
C100 -C112 1 2.20 0.23 2.90 1.47
C16 -C35 1 6.20 0.23 4.00 5.70
C17 -C36 1 7.50 0.23 4.20 7.25
Wall B -CF5, Wall B- C101 2 2.77 0.23 2.90 3.70
C51- C68, C68- C85, C85 - C101 3 2.77 0.23 1.00 1.91
C19 - C38 1 6.50 0.23 4.20 6.28
C38 -C52 1 1.80 0.23 1.00 0.41
C52- C69 1 2.77 0.23 1.00 0.64
C69 -C103 1 5.77 0.23 1.00 1.33
C103- C117 1 4.50 0.23 1.00 1.04

Sub Total Of second Floor Cu.m 237.08

iii Deductions
Doors, D1 10 1.80 0.23 2.25 -9.32
Doors, D2 6 0.90 0.23 2.25 -2.79
Windows W1 6 1.50 0.23 1.25 -2.59
Fixed Glass opening
C1-C5 1 13.00 0.23 2.60 -7.77
C5- C9 1 9.20 0.23 2.60 -5.50

17 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
C9 -C13 1 13.00 0.23 2.60 -7.77

Total Deduction cu.m -35.75

Sub Total of Brick work in Second


B Cu.m 201.33
Floor

Brick work using common burnt


20 5008 Cu.m 455.71 456.00
clay building bricks …….

Half brick masonry in cement


mortar 1:3 (1 cement : 3 coarse
sand) with hoop iron 25 mm x 1.6
mm or equivalent reinforcement
21 5021
at every third course embedded
in cement mortar.,with bricks of
class designation (40 kg/sqcm) in
superstructure above plinth.

A Ground Floor
i Gents Toilet wall 2 2.77 2.40 13.30
Gents Toilet wall 2 1.50 2.40 7.20

ii Ladies toilet wall 2 2.77 2.40 13.30


Ladies toilet wall 2 1.50 2.40 7.20

Sub total 40.99

iii Deduction for doors


Gents Toilet , D4 4 0.80 2.10 -6.72
ladies toilet, D4 4 0.80 2.10 -6.72

Sub total -13.44

A Total ground floor half brick wall m2 27.55

B First Floor
i Gents Toilet wall 2 2.77 2.40 13.30
Gents Toilet wall 2 1.50 2.40 7.20

ii Ladies toilet wall 2 2.77 2.40 13.30


Ladies toilet wall 2 1.50 2.40 7.20

18 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
Sub total 40.99

iii Deduction for doors


Gents Toilet , D4 4 0.80 2.10 -6.72
ladies toilet, D4 4 0.80 2.10 -6.72

Sub total -13.44

B Total First floor half brick wall m2 27.55

C Second Floor
i Gents Toilet wall 1 2.77 2.40 6.65
Gents Toilet wall 1 1.50 2.40 3.60

ii Ladies toilet wall 1 2.77 2.40 6.65


Ladies toilet wall 1 1.50 2.40 3.60

Sub total 20.50

iii Deduction for doors


Gents Toilet , D4 2 0.80 2.10 -3.36
ladies toilet, D4 2 0.80 2.10 -3.36

Sub total -6.72

C Total Second floor half brick wall m2 13.78

Half brick masonry in cement


21 5021 mortar 1:3 (1 cement : 3 coarse Sq.m 68.88 69.00
sand)

Providing , supplying and Laying


Rubble packing with hard laterite
stone under floors including
22 5027 watering ramming and
consolidating etc. in pipeline
trenches and other foundations
complete.

a Rubble for footings


i for column footings
F1 10 3.40 3.400 0.20 23.12
F2 13 3.10 3.100 0.20 24.99
F3 16 2.90 2.900 0.20 26.91

19 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
F4 22 2.70 2.700 0.20 32.08
F5 26 2.40 2.400 0.20 29.95
F6 35 2.20 2.200 0.20 33.88
F7 30 1.80 1.800 0.20 19.44

ii for staircase footings 2 2.00 1.200 0.20 0.96

iii for lift 2 4.20 3.500 0.20 5.88

iv for steps footings


Entrance steps 1 9.00 7.000 0.20 12.60
Steps 1 7.00 2.000 0.20 2.80
outside steps 2 8.00 2.000 0.20 6.40

v Retaining wall to Front ramp 2 75.80 1.500 0.20 45.48


wheel chair ramp wall footing 1 10.50 0.80 0.20 1.68
1 6.50 0.80 0.20 1.04
1 26.60 1.00 0.20 5.32

vi gully trap 4 1.20 1.20 0.20 1.15

vii Manholes
manhole chamber 60 x 60 x 60 6 1.20 1.200 0.20 1.73
manhole chamber 90 x 80 x 60 5 1.50 1.40 0.20 2.10

ix Roads
North side road 1 26.50 3.500 0.30 27.83
West side road 1 56.70 3.000 0.30 51.03
West side road 1 12.00 7.780 0.30 28.01
West side road 1 13.50 3.000 0.30 12.15
South side road 1 33.90 3.000 0.30 30.51
South side road 1 9.90 3.000 0.30 8.91
External 4 wheeler parking 1 10.50 5.100 0.30 16.07
External 2 wheeler parking 1 15.00 3.000 0.30 13.50
Front side 1 37.99 4.000 0.30 45.59
Front side 1 21.62 4.000 0.30 25.94
Front side 1 14.38 6.400 0.30 27.61

x Compound wall 1 4.43 0.600 0.20 0.53


1 1.00 0.600 0.20 0.12
1 6.72 0.600 0.20 0.81
1 17.46 0.600 0.20 2.10
1 42.80 0.600 0.20 5.14
1 4.60 0.600 0.20 0.55
1 41.92 0.600 0.20 5.03

20 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
1 8.38 0.600 0.20 1.01
1 1.00 0.600 0.20 0.12
1 23.14 0.600 0.20 2.78
1 6.34 0.600 0.20 0.76
1 4.27 0.600 0.20 0.51
1 9.02 0.20 0.00

xi for cross drainage 4 4.00 0.900 0.20 2.88

for Gutter foundation trenches at


xii 1 28.50
road 0.900 0.20 5.13
1 25.50 0.900 0.20 4.59
1 52.50 0.900 0.20 9.45
1 6.00 0.900 0.20 1.08
1 4.50 0.900 0.20 0.81
1 13.50 0.900 0.20 2.43
1 36.40 0.900 0.20 6.55
1 30.00 0.900 0.20 5.40
1 9.90 0.900 0.20 1.78
1 15.00 0.900 0.20 2.70
1 66.00 0.900 0.20 11.88

xiii Rubble for Kerbs stone 1 4.50 0.45 0.20 0.41


1 14.00 0.45 0.20 1.26
1 1.60 0.45 0.20 0.14
1 9.50 0.45 0.20 0.86
1 3.20 0.45 0.20 0.29
1 5.60 0.45 0.20 0.50
5 3.00 0.45 0.20 1.35
1 6.70 0.45 0.20 0.60
1 9.00 0.45 0.20 0.81
1 20.00 0.45 0.20 1.80
1 6.50 0.45 0.20 0.59
1 25.50 0.45 0.20 2.30
Rubble for Storage sump( 50,000 lts.
xiv 1.0 6.90 3.90 0.20 5.38
Capacity)
a Total in Footing 655.06

b Flooring
Portion (a) 1 32.60 24.800 0.20 161.70
Portion (b) 1 20.70 23.500 0.20 97.29
Portion © Deduction 1 9.50 3.400 0.20 -6.46
Portion (d) 1 25.26 22.300 0.20 112.66
Front ramp 1 83.60 4.000 0.20 66.88
wheel chair ramp 1 48.00 1.000 0.20 9.60

21 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
Area in front of main entrance 1 11.77 8.60 0.20 20.24

b Total in Flooring 461.91

22 5027 Rubble packing in foundation…… Cu.m 1116.97 1117.00

Laterite masonry in neatly dressed


stones of size as specified in cement
23 5031
mortar 1:5 (1 cement :5 coarse
sand)in foundation and basement.

A Laterite masonary in foundation

i For wheel chair ramp


footing 1 10.50 0.60 0.80 5.04
1 6.50 0.60 0.80 3.12
1 26.60 0.80 0.80 17.02
above ground 1 10.50 0.40 0.60 2.52
1 6.50 0.60 0.90 3.51
1 26.60 0.60 1.20 19.15
1 26.60 0.40 0.50 5.32

ii For Staircase
C83- C84, C111- C112 2 3.30 0.30 0.60 1.19
C84-C100, C100- C112 2 3.77 0.30 0.60 1.36

For Staircase
C72 -C91 1 2.50 0.30 0.60 0.45

Security maintnance
C55 -C70, C70 - C89, C55- C54 3 2.77 0.30 0.60 1.50

iii compound wall upto ground level 1


4.43 0.400 0.50 0.89
1 1.00 0.400 0.50 0.20
1 6.72 0.400 0.50 1.34
1 17.46 0.400 0.50 3.49
1 42.80 0.400 0.50 8.56
1 4.60 0.400 0.50 0.92
1 41.92 0.400 0.50 8.38
1 8.38 0.400 0.50 1.68
1 1.00 0.400 0.50 0.20
1 23.14 0.400 0.50 4.63

22 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
1 6.34 0.400 0.50 1.27
1 4.27 0.400 0.50 0.85
1 9.02 0.400 0.50 1.80

compound wall above ground


iv 1
level 4.43 0.400 0.15 0.27
1 1.00 0.400 0.15 0.06
1 6.72 0.400 0.15 0.40
1 17.46 0.400 0.15 1.05
1 42.80 0.400 0.15 2.57
1 4.60 0.400 0.15 0.28
1 41.92 0.400 0.15 2.52
1 8.38 0.400 0.15 0.50
1 1.00 0.400 0.15 0.06
1 23.14 0.400 0.15 1.39
1 6.34 0.400 0.15 0.38
1 4.27 0.400 0.15 0.26
1 9.02 0.400 0.15 0.54

Compound walls Columns 49 0.30 0.300 1.45 6.39


Total span 48 3.19 0.230 1.35 47.54

Laterite masonry in neatly dressed


23 5031 Cu.m 158.60 159.00
stones of size as ….

Laterite masonry in neatly dressed


stones for 23 cms thick masonry
5036+5
24 walls in cement mortar 1:5 (1
039
cement :5 coarse sand)in
superstrucrure upto floor V level

A Ground Floor
Walls along longer side of bldg,
i
Ht.= 4.0- 0.75= 3.25
Bet. C1 -C2 , C20 -C21, C12-C13,
4 3.20 0.23 3.25 9.57
C31-C32,

C2-C3, C3-C4, C4 -C5, C5 -C6, C6


CF6, CF6 -C8, C8 -C9, C9 -C10, C10
-C11, C11 -C12, C21-C22, C22-C23,
20 2.40 0.23 3.25 35.88
C23 -C24, C24-C25, C25 -C26, C26
-C27, C27 -C28, C28 -C29, C29 -C30,
C30 -C31,

23 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
C14-C15 1 4.00 0.23 3.25 2.99
C15- C16 1 5.00 0.23 3.25 3.74
C16 -C17 1 5.20 0.23 3.25 3.89
C17 -C18, C35-C36, C36 -CF7, CF7
4 2.40 0.23 3.25 7.18
-C37
C18 -C19,C37 -C38 2 5.77 0.23 3.25 8.63
Wall A 1 8.70 0.23 3.25 6.50
Wall B 1 4.40 0.23 3.25 3.29
C53-C54 1 4.20 0.23 3.25 3.14
C39-C40, C40- C41, C55 -C56, C56-
4 3.10 0.23 3.25 9.27
C57
Wall C 2 7.60 0.23 3.25 11.36
C45-C46 1 6.60 0.23 3.25 4.93
C61-C62, C62-C63 2 3.10 0.23 3.25 4.63
Wall D -C47 1 4.60 0.23 3.25 3.44
Wall D- C64, C64-C65 2 2.19 0.23 3.25 3.27
C33- C34, C66-C67 2 5.77 0.23 3.25 8.63
Wall E 1 6.25 0.23 3.25 4.67
C48-C49, C84-C83 2 3.20 0.23 3.25 4.78
Wall F 1 3.74 0.23 3.25 2.80
Wall G - C52, Wall G - C69, Wall G-
3 3.60 0.23 3.25 8.07
C86,
Wall H 1 2.80 0.23 3.25 2.09
Wall H - C70, C70- C71, C88-C89,
4 2.77 0.23 3.25 8.28
C90-C91
C71 -C72, C89-C90 2 5.77 0.23 3.25 8.63
C91-C92 1 8.50 0.23 3.25 6.35
C73-C74 1 5.77 0.23 3.25 4.31
C74-C75, C75-CF3, C92-C93, C93-
6 2.77 0.23 3.25 12.42
C94, C94-C95, C95-C7
C76-C77,C77-C78, C78-C79, C79-
4 2.40 0.23 3.25 7.18
C80
C96- C97, C97-C98 2 5.77 0.23 3.25 8.63
C100-C101 1 5.77 0.23 3.25 4.31
Wall I 1 6.00 0.23 3.25 4.49
C102- C103 1 3.30 0.23 3.25 2.47
Wall J 2 3.79 0.23 3.25 5.67
C104- C105 1 5.50 0.23 3.25 4.11

ii Vertical Side wall


C20- C1, C2-C21, C3-C22, C4-C23,
6 5.77 0.23 3.25 25.88
C5-C24, C6-C25
C20- CF1 1 3.25 0.23 3.25 2.43
CF1-C53 & C54 1 3.74 0.23 3.25 2.80
Wall B - C53, C54 1 3.74 0.23 3.25 2.80

24 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
C21- C54 1 6.65 0.23 3.25 4.97
C87- C104 1 2.30 0.23 3.25 1.72
wall H, C70 -C89, C71-C89 & C90,
5 2.77 0.23 3.25 10.35
C90- C71 & C72, C72 -C91
wall C - C55, wall C -C56, Wall C-
4 2.24 0.23 3.25 6.70
C39,Wall C-C40
C57-C41 1 4.71 0.23 3.25 3.52
Wall K 1 2.77 0.23 3.25 2.07
Wall K 1 2.98 0.23 3.25 2.23
C90- C73, C93 - C73 & C74,
5 2.30 0.23 3.25 8.60
C74- C94, C75- C95, CF3 -C7
C45 -C61, C63-C64 2 4.71 0.23 3.25 7.04
wall C -C62, wall C -C45 & C46 2 2.24 0.23 3.25 3.35
C8- C27, C9-C28, C10- C29, C 11-
6 5.77 0.23 3.25 25.88
C30, C12 -C31, C13-C32
Wall D 1 7.00 0.23 3.25 5.23
C64- C47 & wall D 1 3.40 0.23 3.25 2.54
C32-C47 1 2.40 0.23 3.25 1.79
C47-C65 1 3.40 0.23 3.25 2.54

C96-C76, C77-C96 & C97, C78-C97,


5 3.80 0.23 3.25 14.20
C79 - C97 & C98, C80 -C98

C14-C33 1 3.00 0.23 3.25 2.24


C33-C66, C34-C67 2 5.20 0.23 3.25 7.77
wall E - C66 & C67, Wall E - C33&
2 2.84 0.23 3.25 4.25
C34
Wall A- C15 1 3.00 0.23 3.25 2.24
Wall A- C15 & C16 1 4.00 0.23 3.25 2.99

C16- C35, C36 -C16 & C17, C17 -


6 6.30 0.23 3.25 28.26
CF7, C18 -C37, C39 -C19, Wall L

C48 -C83, C49- C84 2 5.80 0.23 3.25 8.67


C84-C100 1 2.60 0.23 3.25 1.94
C100- C112 1 2.20 0.23 3.25 1.64

Wall I- C100& C101, wall I - C101 2 2.77 0.23 3.25 4.14

wall M 1 5.00 0.23 3.25 3.74


Wall G 1 10.90 0.23 3.25 8.15
C38 -C52 1 1.40 0.23 3.25 1.05
C52- C69, C69 -C86, C86-C103 3 2.77 0.23 3.25 6.21
C103-C117 1 4.50 0.23 3.25 3.36

Sub Total of upper ground Floor cu.m 452.89

25 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
iii Deductions for openings
Rolling Shutters , RS1 75 2.40 0.23 2.10 -86.94
Rolling Shutters , RS2 19 1.50 0.23 2.10 -13.77
Doors, D2 4 0.90 0.23 2.25 -1.86
Windows W1 10 1.50 0.23 1.25 -4.31
Deduction for walls as per revised
plan
wall-1 2 5.40 0.23 3.25 -8.07
wall-2 1 3.74 0.23 3.25 -2.80
wall-3 4 3.46 0.23 3.25 -10.35
wall-4 1 4.62 0.23 3.25 -3.45
wall-5 1 3.74 0.23 3.25 -2.80
wall-6 1 3.00 0.23 3.25 -2.24
wall-7 1 4.00 0.23 3.25 -2.99
wall-8 2 2.84 0.23 3.25 -4.25
wall-9 5 3.79 0.23 3.25 -14.17
wall-10 1 3.74 0.23 3.25 -2.80

Total Deduction cu.m -160.78

A Total upper Ground Floor Cu.m 292.10

5036+5 Laterite masonry in neatly dressed


24 Cu.m 292.10 292.00
039 stones for 23 cms ………

IV PLAIN AND REINFORCED


CONCRETE WORKS

Providing & laying cement concrete


1: 2: 4 (1 cement: 2 coarse sand:
4 graded granitic or basaltic
25 6010
stone aggrt. 20 mm. nominal size)
excluding cost of centering and
shuttering in:

A All works upto plinth level

a P.C.C. in footing
i for column footings
F1 10 3.40 3.400 0.10 11.56
F2 13 3.10 3.100 0.10 12.49
F3 16 2.90 2.900 0.10 13.46
F4 22 2.70 2.700 0.10 16.04

26 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
F5 26 2.40 2.400 0.10 14.98
F6 35 2.20 2.200 0.10 16.94
F7 30 1.80 1.800 0.10 9.72

ii for staircase footings 2 2.00 1.200 0.10 0.48

iii for lift 2 4.20 3.500 0.10 2.94

iv for steps footings


Entrance steps 1 9.00 7.000 0.10 6.30
Steps 1 7.00 2.000 0.10 1.40
outside steps 2 8.00 2.000 0.10 3.20

v Retaining wall to Front ramp 2 75.80 1.500 0.10 22.74


wheel chair ramp wall footing 1 10.50 0.80 0.10 0.84
1 6.50 0.80 0.10 0.52
1 26.60 1.00 0.10 2.66

vi gully trap 4 1.20 1.20 0.10 0.58

vii Manholes
manhole chamber 60 x 60 x 60 6 1.20 1.200 0.10 0.86
manhole chamber 90 x 80 x 60 5 1.50 1.40 0.10 1.05

ix Roads
North side road 1 26.50 3.500 0.10 9.28
West side road 1 56.70 3.000 0.10 17.01
West side road 1 12.00 7.780 0.10 9.34
West side road 1 13.50 3.000 0.10 4.05
South side road 1 33.90 3.000 0.10 10.17
South side road 1 9.90 3.000 0.10 2.97
External 4 wheeler parking 1 10.50 5.100 0.10 5.36
External 2 wheeler parking 1 15.00 3.000 0.10 4.50
Front side 1 37.99 4.000 0.10 15.20
Front side 1 21.62 4.000 0.10 8.65
Front side 1 14.38 6.400 0.10 9.20

x Compound wall 1 4.43 0.600 0.10 0.27


1 1.00 0.600 0.10 0.06
1 6.72 0.600 0.10 0.40
1 17.46 0.600 0.10 1.05
1 42.80 0.600 0.10 2.57
1 4.60 0.600 0.10 0.28
1 41.92 0.600 0.10 2.52
1 8.38 0.600 0.10 0.50

27 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
1 1.00 0.600 0.10 0.06
1 23.14 0.600 0.10 1.39
1 6.34 0.600 0.10 0.38
1 4.27 0.600 0.10 0.26
1 9.02 0.600 0.10 0.54

xi for cross drainage 4 4.00 0.900 0.10 1.44

xii For Road Gutters 1 28.50 0.900 0.10 2.57


1 25.50 0.900 0.10 2.30
1 52.50 0.900 0.10 4.73
1 6.00 0.900 0.10 0.54
1 4.50 0.900 0.10 0.41
1 13.50 0.900 0.10 1.22
1 36.40 0.900 0.10 3.28
1 30.00 0.900 0.10 2.70
1 9.90 0.900 0.10 0.89
1 15.00 0.900 0.10 1.35
1 66.00 0.900 0.10 5.94

xiii P.C.C. for Kerbs stone 1 4.50 0.45 0.10 0.20


1 14.00 0.45 0.10 0.63
1 1.60 0.45 0.10 0.07
1 9.50 0.45 0.10 0.43
1 3.20 0.45 0.10 0.14
1 5.60 0.45 0.10 0.25
5 3.00 0.45 0.10 0.68
1 6.70 0.45 0.10 0.30
1 9.00 0.45 0.10 0.41
1 20.00 0.45 0.10 0.90
1 6.50 0.45 0.10 0.29
1 25.50 0.45 0.10 1.15
xiv Storage sump( 50,000 lts. Capacity) 1.0 6.90 3.90 0.10 2.69

a Total p.c.c. in footing Cu.m. 280.21

b Flooring
Portion (a) 1 32.60 24.800 0.10 80.85
Portion (b) 1 20.70 23.500 0.10 48.65
Portion © Deduction 1 9.50 3.400 0.10 -3.23
Portion (d) 1 25.26 22.300 0.10 56.33
Front ramp 1 83.60 4.000 0.10 33.44
wheel chair ramp 1 48.00 1.000 0.10 4.80
Area in front of main entrance 1 11.77 8.60 0.10 10.12

28 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

b Total p.c.c. in flooring Cu.m. 230.96

25 a Total P.C.C of all works…… Cu.m 511.17 512.00

Providing & laying cement concrete


1: 2: 4 (1 cement: 2 coarse sand:
4 graded granitic or basaltic
26 6010
stone aggrt. 20 mm. nominal size)
excluding cost of centering and
shuttering in:

a All works up to plinth level

i Road gutter wall 2 28.50 0.200 0.50 5.70


2 25.50 0.200 0.50 5.10
2 52.50 0.200 0.50 10.50
2 6.00 0.200 0.50 1.20
2 4.50 0.200 0.50 0.90
2 13.50 0.200 0.50 2.70
2 36.40 0.200 0.50 7.28
2 30.00 0.200 0.50 6.00
2 9.90 0.200 0.50 1.98
2 15.00 0.200 0.50 3.00
2 66.00 0.200 0.50 13.20

ii cross drainage wall 8 4.00 0.200 0.50 3.20

26 a All works up to plinth level Cu.m 60.76 61.00

Providing and laying upto floor five


level cement concrete 1:2:4 (1
cement: 2 coarse sand: 4 graded
granitic or basaltic stone aggregate
27 6015 20 mm nominal size) including
smooth finishing to exposed
surfaces, with cement mortar 1:3 (1
cement: 3 fine sand) including
centering and shuttering etc.

kerbs , steps and like at or near gr.


a
Level.

29 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

i Kerbs for roads 1 4.50 0.15 0.60 0.41


1 14.00 0.15 0.60 1.26
1 1.60 0.15 0.60 0.14
1 9.50 0.15 0.60 0.86
1 3.20 0.15 0.60 0.29
1 5.60 0.15 0.60 0.50
5 3.00 0.15 0.60 1.35
1 6.70 0.15 0.60 0.60
1 9.00 0.15 0.60 0.81
1 20.00 0.15 0.60 1.80
1 6.50 0.15 0.60 0.59
1 25.50 0.15 0.60 2.30

27 a total kerbs, steps……. Cu.m 10.90 11.00

Providing and laying upto floor five


level cement concrete 1:2:4 (1
cement: 2 coarse sand: 4 graded
granitic or basaltic stone aggregate
28 6015 20 mm nominal size) including
smooth finishing to exposed
surfaces, with cement mortar 1:3 (1
cement: 3 fine sand) including
centering and shuttering etc.

b window sills, coping…


i upper ground floor
W1 10 1.80 0.23 0.10 0.41

ii First Floor
W1 38 1.80 0.23 0.10 1.57

iii Second Floor


W1 6 1.80 0.23 0.10 0.25

iv compound wall column coping 49 0.35 0.35 0.20 1.20

28 b total copings, window sill……. Cu.m 3.44 4.00

30 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

Making plinth protection 50mm


thick of cement concrete 1:3:6 (1
cement : 3 coarse sand : 6graded
stone aggregate 20mm nominal size)
29 6027 over 75mm bed of dry laterite
aggregate 40mm nominal size well
rammed and consolidated and
grouted with fine sand including
finishing the top smooth.

perimeter of the bldg

L=
16.11+5.77+16.11+11.77+9.85+14.38+
1 184.25 1.30 239.53
4.89+23.26+18.23+4.5+6+12.23+6.65
+9+6.5+15+4= 184.25m

Total quantity of Plinth Protection


29 6027 Sq.m. 239.53 240.00
……..

Centering and shuttering including


30 6045 strutting, proping etc. and removal
of form for :
Foundation, footings, bases of
i
columns, etc and mass concrete

a Column footings
F1, P= 3.1X4 = 12.4 10 12.40 0.60 74.40
F2, P= 2.8X4 =11.20 13 11.20 0.60 87.36
F3, P= 2.6X4 =10.40 16 10.40 0.50 83.20
F4, P= 2.4X4 =9.60 22 9.60 0.50 105.60
F5P= 2.1X4 =8.40 26 8.40 0.45 98.28
F6P= 1.9X4 =7.60 35 7.60 0.40 106.40
F7P= 1.5X4 =6.00 30 6.00 0.30 54.00

b Column Pedestals
F1, P= 0.6X4 = 2.4 10 2.40 1.15 27.60
F2, P=0.6X4 =2.4 13 2.40 1.15 35.88
F3, P= 0.6X4 =2.4 16 2.40 1.25 48.00
F4, P= 0.6X4 = 2.4 22 2.40 1.25 66.00
F5P= 0.4X4 =1.6 26 1.60 1.30 54.08
F6P= 0.4X4 =1.6 35 1.60 1.35 75.60
F7P= 0.4X4 =1.6 30 1.60 1.45 69.60

31 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

b for lift , p= 4.0 x2 + 3.3 x 2 =14.6 2 14.60 0.50 14.60

c Ramp retaining wall footing 4 75.40 0.40 120.64


4 1.60 0.40 2.56

d Roads Gutter
North side road 2 26.50 0.50 26.50
West side road 2 56.70 0.50 56.70
West side road 2 12.00 0.50 12.00
West side road 2 13.50 0.50 13.50
South side road 2 33.90 0.50 33.90
South side road 2 9.90 0.50 9.90
External 4 wheeler parking 2 10.50 0.50 10.50
External 2 wheeler parking 2 15.00 0.50 15.00
Front side 2 37.99 0.50 37.99
Front side 2 21.62 0.50 21.62
Front side 2 14.38 0.50 14.38

e Cross drainage 8 4.00 0.50 16.00

30 i total of foundation,footings….. Sqm 1391.79 1392.00

Centering and shuttering including


31 6045 strutting, proping etc. and removal
of form for :

Vertical surfaces such as retaing


walls, return walls, Partitions, walls
ii (any thickness) including attached
Pilasters, Buttresses, Plinth and
string courses, Fillets and the like

for basement side retaining wall,


a
Ht. = 2.1 +0.4= 2.5 ( Both Sides )

Wall 1, L = 37.99-7 x 0.6-3 x0 .23 - 2x


2
0.12 =32.86 32.86 2.50 164.30
Wall 2 4 3.50 2.50 35.00
Wall 3 2 11.00 2.50 55.00
Wall 4 , L = 24.23 - 0.6 -2x 0.23
2
-0.23=22.94 22.94 2.50 114.70

Ramp retaining wall 4 73.20 3.20 936.96

32 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

b lift walls
North side lift wall 2 2.70 16.50 89.10
North side lift wall 2 1.90 16.50 62.70

South side lift wall 2 3.10 16.50 102.30


South side lift wall 2 1.90 16.50 62.70

c Water sump
outer side 2 6.40 3.35 42.88
2 3.40 3.35 22.78
inner side 2 6.00 3.20 38.40
2 3.00 3.20 19.20

31 ii total of wall (any... Sqm 1746.02 1746.00

Centering and shuttering including


32 6045 strutting, proping etc. and removal
of form for :

Columns, Piers, Pillars,


iii Aburments, Posts and struts
(square rectangle polygon in plan)

a Stilt Floor
F1 10 1.80 4.20 75.60
F2 13 1.80 4.20 98.28
F3 16 1.60 4.20 107.52
F4 22 1.60 4.20 147.84
F5 26 1.40 4.20 152.88
F6 35 1.40 4.20 205.80
F7 30 1.40 4.20 176.40

a Total of Stilt floor 964.32

b Ground Floor
F1 10 1.80 3.45 62.10
F2 13 1.80 3.45 80.73
F3 16 1.60 3.45 88.32
F4 22 1.60 3.45 121.44
F5 26 1.40 3.45 125.58
F6 35 1.40 3.45 169.05
F7 30 1.40 3.45 144.90

Floating Column

33 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
CF1 10 1.60 3.45 55.20

b Total Ground Floor Sq.m 847.32

c First Floor
F1 10 1.60 2.90 46.40
F2 13 1.60 2.90 60.32
F3 16 1.40 2.90 64.96
F4 22 1.40 2.90 89.32
F5 26 1.40 2.90 105.56
F6 35 1.30 2.90 131.95
F7 30 1.30 2.90 113.10
2.90 0.00
Floating Column 2.90 0.00
CF1 10 1.40 2.90 40.60

c Total of First Floor Sq.m 652.21

32 iii total of columns, pillars….. Sq.m 2463.85 3366.00

Centering and shuttering including


33 6045 strutting, proping etc. and removal
of form for :

Sides and Soffits of beams, Beam


Haunchings, Cantilever, Girders,
iv
Bressumers and Lintels plinth
beams not exceeding 1m in depth

a Plinth Beams

34 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

Beams along horizontal direction

Beams along A PB2 1 24.60 1.03 25.34


Beams along A PB2 1 37.30 1.03 38.42
Beams along A PB2 1 23.80 1.03 24.51
Beams along B PB2 1 14.60 1.03 15.04
Beams along B PB2 1 47.00 1.03 48.41
Beams along C PB2 1 5.20 1.03 5.36
Beams along D PB2 1 45.40 1.03 46.76
Beams along D PB2 1 16.20 1.03 16.69
Beams along E PB2 1 34.80 1.03 35.84
Beams along E PB1 1 5.30 1.03 5.46
Beams along F PB2 1 22.00 1.03 22.66
Beams along G PB2 1 39.90 1.03 41.10
Beams along H PB1 1 6.60 1.03 6.80
Beams along H PB1 1 9.10 1.03 9.37
Beams along H PB1 1 5.60 1.03 5.77
Beams along H &I PB1 1 15.60 1.03 16.07
Beams along J PB2 1 51.20 1.03 52.74
Beams along K PB2 1 64.00 1.03 65.92
Beams along L PB1 1 16.50 1.03 17.00
Beams along L PB2 1 14.80 1.03 15.24
Beams along L PB2 1 16.50 1.03 17.00
Beams along M PB2 1 46.90 1.03 48.31
Beams along N PB2 1 13.60 1.03 14.01
Beams along N PB2 1 10.70 1.03 11.02
Beams along O PB2 1 16.20 1.03 16.69
Beams along Vertical direction
Beams along 1 PB2 1 12.20 1.03 12.57
Beams along 1 PB1 1 6.50 1.03 6.70
Beams along 2 PB1 1 18.50 1.03 19.06
Beams along 3&4 PB2 1 18.50 1.03 19.06
Beams along 5 PB1 1 10.30 1.03 10.61
Beams along 7 PB1 1 8.00 1.03 8.24
Beams along 8 PB1 1 4.00 1.03 4.12
Beams along 9 PB1 1 4.40 1.03 4.53
Beams along 10 PB2 1 18.30 1.03 18.85
Beams along 11 PB2 1 18.00 1.03 18.54
Beams along 12 PB2 1 21.90 1.03 22.56
Beams along 13&14 PB1 1 21.80 1.03 22.45
Beams along 15 & 16 PB1 1 21.40 1.03 22.04
Beams along 18-22 PB2 5 22.80 1.03 117.42
Beams along 23 PB2 1 21.20 1.03 21.84
Beams along 24,25,28,29,30,32&33
7 20.60 1.03 148.53
PB2

35 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

a Total Plinth beams Sq.m 1098.60

b Stilt Floor
Beam along longer side of the
b1
bldg., P = 2 X0.45 +0.3= 1.2
C1 - C13 1 37.99 1.20 45.59
C20 -C32 1 37.99 1.20 45.59
C39- C46 1 24.20 1.20 29.04
CF1 - C39 & C55 1 6.80 1.20 8.16
C47 - C46 & C63 1 6.80 1.20 8.16
Bet. C39 & C55 TO C57 & C41 2 7.60 1.20 18.24
C53 - C65 1 37.99 1.20 45.59
Wall 15 - C76 1 34.00 1.20 40.80
C87 - C7 1 33.00 1.20 39.60
C7 - C99 1 21.70 1.20 26.04
C76 - C82 1 18.20 1.20 21.84
C65 - C67 1 18.20 1.20 21.84
C47 - C48 1 20.00 1.20 24.00
C32- C33 1 12.00 1.20 14.40
Above wall 3 1 12.00 1.20 14.40
C33- C32, C47-C33 & C66 2 11.50 1.20 27.60
Above wall 4 1 24.23 1.20 29.08
C14 - C16 1 10.00 1.20 12.00
C33 - C36 1 12.00 1.20 14.40
C36 - C38 1 12.00 1.20 14.40
C48 - C52 1 16.25 1.20 19.50
C67 - C49 & C84 1 6.30 1.20 7.56
C82- C84 1 6.30 1.20 7.56
C110 - C112 1 6.30 1.20 7.56
C113 - C 115 1 6.30 1.20 7.56
C100 - C101 1 5.80 1.20 6.96
C112 TO C101 & C116 1 5.80 1.20 6.96
C15 - C16 1 5.80 1.20 6.96
C68 - C69, C85 - C86, C101 - C103,
4 6.30 1.20 30.24
C116 - C117

Bet. C101 & C116 TO C103 & C117 1 6.30 1.20 7.56

b2 Beam along shorter side of bldg.

36 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

C1 - C20, C2 -C21, C3-C22, C4-C23,


C5-C24, C6-C25, CF6 - C26, C8- C27,
13 5.70 1.20 88.92
C9- C28, C10 -C29, C111- C30, C12-
C31, C13- C32

C20 -C53,C54 -C21 2 6.60 1.20 15.84


beam above ramp 1 4.00 1.20 4.80

C39 -C55, C40- C56, C41 -C57, C45


6 4.50 1.20 32.40
-C61, C62-C45 & C46, C46 -C63

C65 -C47 3 3.80 1.20 13.68


C32 -C47 2 2.50 1.20 6.00
C53 -C87 1 4.80 1.20 5.76
C88 -C54, C55- C89, C56-C89 & C90,
C57 - C90, C58 - C91, C60 - C92, C61
10 4.70 1.20 56.40
- C93, C62 - C94, C63 - C95, C7 -
CF3,
C65 - C96 1 6.00 1.20 7.20
C77- C96 & C97, C78 - C87, C79 -
4 4.27 1.20 20.50
C97 & C98, C80 - C98
C14- C33 1 3.00 1.20 3.60
Above wall 2 1 3.00 1.20 3.60
C77 - wall 3, C78 - wall 3, C79 - wall
3 11.20 1.20 40.32
3
C33- C66 1 5.50 1.20 6.60
C66 - C80 1 1.60 1.20 1.92
C81- C33 & C34 1 8.20 1.20 9.84
C15 - Wall 4 1 1.80 1.20 2.16
C15 - C66 & C67 1 10.00 1.20 12.00
C46 -C35 1 6.40 1.20 7.68
C36 - C69 & C70 1 6.40 1.20 7.68
C17 - C36 & C37 1 6.40 1.20 7.68
C18 - C37 1 6.20 1.20 7.44
C19 - C38 1 6.40 1.20 7.68
C35 -C48, C36 -C49,CF7 -CF8, C37 -
5 1.80 1.20 10.80
C51, C38 -C52
C83 - C84, C84 -C49 2 5.60 1.20 13.44
C51 -C68, C52 - C69, C68 - C85, C69
6 2.77 1.20 19.94
- C86, C85 - C101, C86- 103
C102 - C37 & C38 1 10.80 1.20 12.96

C99- C110, C100- C112, C84 - C100 3 2.60 1.20 9.36

C110- C113, C111- C114, C112- C115 3 1.80 1.20 6.48

C101- C116,CF2- C111 2 4.50 1.20 10.80

37 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

C103 - C117, C102 - C116 & C117 2 2.50 1.20 6.00

b Total lower ground floor beam Sq.m 1068.66

c Ground floor
Beam along longer side of the
c1
bldg., P = 2 X0.45 +0.3 = 1.2
C1 - C13 1 37.99 1.20 45.59
C20 -C32 1 37.99 1.20 45.59
C39- C46 1 24.20 1.20 29.04
CF1 - C39 & C55 1 6.80 1.20 8.16
C47 - C46 & C63 1 6.80 1.20 8.16
Bet. C39 & C55 TO C57 & C41 2 7.60 1.20 18.24
C53 - C65 1 37.99 1.20 45.59
Wall 15 - C76 1 34.00 1.20 40.80
C87 - C7 1 33.00 1.20 39.60
C7 - C99 1 21.70 1.20 26.04
C76 - C82 1 18.20 1.20 21.84
C65 - C67 1 18.20 1.20 21.84
C47 - C48 1 20.00 1.20 24.00
C32- C33 1 12.00 1.20 14.40
Above wall 3 1 12.00 1.20 14.40
C33- C32, C47-C33 & C66 2 11.50 1.20 27.60
Above wall 4 1 24.23 1.20 29.08
C14 - C16 1 10.00 1.20 12.00
C33 - C36 1 12.00 1.20 14.40
C36 - C38 1 12.00 1.20 14.40
C48 - C52 1 16.25 1.20 19.50
C67 - C49 & C84 1 6.30 1.20 7.56
C82- C84 1 6.30 1.20 7.56
C110 - C112 1 6.30 1.20 7.56
C113 - C 115 1 6.30 1.20 7.56
C100 - C101 1 5.80 1.20 6.96
C112 TO C101 & C116 1 5.80 1.20 6.96
C15 - C16 1 5.80 1.20 6.96
C68 - C69, C85 - C86, C101 - C103,
4 6.30 1.20 30.24
C116 - C117

Bet. C101 & C116 TO C103 & C117 1 6.30 1.20 7.56

c2 Beam along shorter side of bldg.

38 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

C1 - C20, C2 -C21, C3-C22, C4-C23,


C5-C24, C6-C25, CF6 - C26, C8- C27,
13 5.70 1.20 88.92
C9- C28, C10 -C29, C111- C30, C12-
C31, C13- C32

C20 -C53,C54 -C21 2 6.60 1.20 15.84


beam above ramp 1 4.00 1.20 4.80

C39 -C55, C40- C56, C41 -C57, C45


6 4.50 1.20 32.40
-C61, C62-C45 & C46, C46 -C63

C65 -C47 3 3.80 1.20 13.68


Pergollas, p= 0.2 x 2 + 0.1= 0.5 20 1.80 1.20 43.20
C32 -C47 2 2.50 1.20 6.00
C53 -C87 1 4.80 1.20 5.76
Pergollas, p= 0.2 x 2 + 0.1= 0.5 9 1.80 1.20 19.44
C88 -C54, C55- C89, C56-C89 & C90,
C57 - C90, C58 - C91, C60 - C92, C61
10 4.70 1.20 56.40
- C93, C62 - C94, C63 - C95, C7 -
CF3,
C65 - C96 1 6.00 1.20 7.20
C77- C96 & C97, C78 - C87, C79 -
4 4.27 1.20 20.50
C97 & C98, C80 - C98
C14- C33 1 3.00 1.20 3.60
Above wall 2 1 3.00 1.20 3.60
C77 - wall 3, C78 - wall 3, C79 - wall
3 11.20 1.20 40.32
3
C33- C66 1 5.50 1.20 6.60
C66 - C80 1 1.60 1.20 1.92
C81- C33 & C34 1 8.20 1.20 9.84
C15 - Wall 4 1 1.80 1.20 2.16
C15 - C66 & C67 1 10.00 1.20 12.00
C46 -C35 1 6.40 1.20 7.68
C36 - C69 & C70 1 6.40 1.20 7.68
C17 - C36 & C37 1 6.40 1.20 7.68
C18 - C37 1 6.20 1.20 7.44
C19 - C38 1 6.40 1.20 7.68
C35 -C48, C36 -C49,CF7 -CF8, C37 -
5 1.80 1.20 10.80
C51, C38 -C52
C83 - C84, C84 -C49 2 5.60 1.20 13.44
C51 -C68, C52 - C69, C68 - C85, C69
6 2.77 1.20 19.94
- C86, C85 - C101, C86- 103
C102 - C37 & C38 1 10.80 1.20 12.96

C99- C110, C100- C112, C84 - C100 3 2.60 1.20 9.36

39 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

C110- C113, C111- C114, C112- C115 3 1.80 1.20 6.48

C101- C116,CF2- C111 2 4.50 1.20 10.80

C103 - C117, C102 - C116 & C117 2 2.50 1.20 6.00

c Total Upper ground floor beam Sq.m 1131.30

d First floor
Beam along longer side of the
d1
bldg., P = 2 X0.45 +0.3 = 1.2
C1 - C13 1 37.99 1.20 45.59
C20 -C32 1 37.99 1.20 45.59
C39- C46 1 24.20 1.20 29.04
CF1 - C39 & C55 1 6.80 1.20 8.16
C47 - C46 & C63 1 6.80 1.20 8.16
Bet. C39 & C55 TO C57 & C41 2 7.60 1.20 18.24
C53 - C65 1 37.99 1.20 45.59
Wall 15 - C76 1 34.00 1.20 40.80
C87 - C7 1 33.00 1.20 39.60
C7 - C99 1 21.70 1.20 26.04
C76 - C82 1 18.20 1.20 21.84
C65 - C67 1 18.20 1.20 21.84
C47 - C48 1 20.00 1.20 24.00
C32- C33 1 12.00 1.20 14.40
Above wall 3 1 12.00 1.20 14.40
C33- C32, C47-C33 & C66 2 11.50 1.20 27.60
Above wall 4 1 24.23 1.20 29.08
C14 - C16 1 10.00 1.20 12.00
C33 - C36 1 12.00 1.20 14.40
C36 - C38 1 12.00 1.20 14.40
C48 - C52 1 16.25 1.20 19.50
C67 - C49 & C84 1 6.30 1.20 7.56
C82- C84 1 6.30 1.20 7.56
C110 - C112 1 6.30 1.20 7.56
C113 - C 115 1 6.30 1.20 7.56
C100 - C101 1 5.80 1.20 6.96
C112 TO C101 & C116 1 5.80 1.20 6.96
C15 - C16 1 5.80 1.20 6.96
C68 - C69, C85 - C86, C101 - C103,
4 6.30 1.20 30.24
C116 - C117

Bet. C101 & C116 TO C103 & C117 1 6.30 1.20 7.56

40 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

d2 Beam along shorter side of bldg.

C1 - C20, C2 -C21, C3-C22, C4-C23,


C5-C24, C6-C25, CF6 - C26, C8- C27,
13 5.70 1.20 88.92
C9- C28, C10 -C29, C111- C30, C12-
C31, C13- C32

C20 -C53,C54 -C21 2 6.60 1.20 15.84


beam above ramp 1 4.00 1.20 4.80

C39 -C55, C40- C56, C41 -C57, C45


6 4.50 1.20 32.40
-C61, C62-C45 & C46, C46 -C63

C65 -C47 3 3.80 1.20 13.68


C32 -C47 2 2.50 1.20 6.00
C53 -C87 1 4.80 1.20 5.76
C88 -C54, C55- C89, C56-C89 & C90,
C57 - C90, C58 - C91, C60 - C92, C61
10 4.70 1.20 56.40
- C93, C62 - C94, C63 - C95, C7 -
CF3,
C65 - C96 1 6.00 1.20 7.20
C77- C96 & C97, C78 - C87, C79 -
4 4.27 1.20 20.50
C97 & C98, C80 - C98
C14- C33 1 3.00 1.20 3.60
Above wall 2 1 3.00 1.20 3.60
C77 - wall 3, C78 - wall 3, C79 - wall
3 11.20 1.20 40.32
3
C33- C66 1 5.50 1.20 6.60
C66 - C80 1 1.60 1.20 1.92
C81- C33 & C34 1 8.20 1.20 9.84
C15 - Wall 4 1 1.80 1.20 2.16
C15 - C66 & C67 1 10.00 1.20 12.00
C46 -C35 1 6.40 1.20 7.68
C36 - C69 & C70 1 6.40 1.20 7.68
C17 - C36 & C37 1 6.40 1.20 7.68
C18 - C37 1 6.20 1.20 7.44
C19 - C38 1 6.40 1.20 7.68
C35 -C48, C36 -C49,CF7 -CF8, C37 -
5 1.80 1.20 10.80
C51, C38 -C52
C83 - C84, C84 -C49 2 5.60 1.20 13.44
C51 -C68, C52 - C69, C68 - C85, C69
6 2.77 1.20 19.94
- C86, C85 - C101, C86- 103
C102 - C37 & C38 1 10.80 1.20 12.96

C99- C110, C100- C112, C84 - C100 3 2.60 1.20 9.36

41 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

C110- C113, C111- C114, C112- C115 3 1.80 1.20 6.48

C101- C116,CF2- C111 2 4.50 1.20 10.80

C103 - C117, C102 - C116 & C117 2 2.50 1.20 6.00

d Total First floor beam Sq.m 1068.66

42 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

f1 Ground Floor
Rolling Shutters , RS1, P =2x 0.2
75 3.00 0.63 141.75
+0.23 = 0.63
Rolling Shutters , RS2 19 2.10 0.63 25.14
Doors, D2 4 1.50 0.63 3.78
Doors, D3, p= 0.2 x2 +0.15=0.55 4 1.40 0.55 3.08
Doors, D4 4 1.30 0.55 2.86
Windows W1 10 2.10 0.63 13.23

f2 First Floor
Rolling Shutters , RS1 21 3.00 0.63 39.69
Rolling Shutters , RS2 5 2.10 0.63 6.62
Doors, D1 4 2.40 0.63 6.05
Doors, D2 13 1.50 0.63 12.29
Doors, D3, p= 0.2 x2 +0.15=0.55 4 1.40 0.55 3.08
Doors, D4 4 1.30 0.55 2.86
Windows W1 38 2.10 0.63 50.27

C5- C9 1 9.20 0.63 5.80


C9 -C13 1 13.00 0.63 8.19

f Total lintel quantity m2 324.68

Sides and Soffits of beams, Beam


33 iv Sq.m 4691.89 5467.00
Haunchings, ……..

Centering and shuttering including


34 6045 strutting, proping etc. and removal
of form for :

vi Staircases (except spiral


staircases) excluding landing ..

a North side staircase


a1 Lower Ground Floor

43 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
Flight -1 1 3.20 1.700 5.44
Steps( risers ) 10 1.50 0.15 2.25
Flight -3 1 3.20 1.700 5.44
Steps( risers ) 10 1.50 0.15 2.25

a2 Upper Ground Floor


Flight -1 1 3.20 1.700 5.44
Steps( risers ) 10 1.50 0.15 2.25
Flight -2 1 3.45 1.700 5.87
Steps( risers ) 11 1.50 0.15 2.48
Flight -3 1 3.20 1.700 5.44
Steps( risers ) 10 1.50 0.15 2.25

a3 First Floor
Flight -1 1 3.20 1.700 5.44
Steps( risers ) 10 1.50 0.15 2.25
Flight -2 1 2.00 1.700 3.40
Steps( risers ) 5 1.50 0.15 1.13
Flight -3 1 3.20 1.700 5.44
Steps( risers ) 10 1.50 0.15 2.25

a4 Second Floor
Flight -1 1 3.20 1.700 5.44
Steps( risers ) 10 1.50 0.15 2.25
Flight -2 1 2.00 1.700 3.40
Steps( risers ) 5 1.50 0.15 1.13
Flight -3 1 3.20 1.700 5.44
Steps( risers ) 10 1.50 0.15 2.25

b South side Staircase


b1 Lower Ground Floor
Flight -1 1 2.90 1.400 4.06
Steps( risers ) 10 1.40 0.15 2.10
Flight -3 1 2.90 1.400 4.06
Steps( risers ) 10 1.40 0.15 2.10

b2 Upper Ground Floor


Flight -1 1 2.90 1.400 4.06
Steps( risers ) 9 1.40 0.15 1.89
Flight -2 1 3.20 1.400 4.48
Steps( risers ) 12 1.40 0.15 2.52
Flight -3 1 2.90 1.400 4.06
Steps( risers ) 9 1.40 0.15 1.89

b3 First Floor

44 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
Flight -1 1 2.90 1.400 4.06
Steps( risers ) 9 1.40 0.15 1.89
Flight -2 1 2.00 1.400 2.80
Steps( risers ) 6 1.40 0.15 1.26
Flight -3 1 2.90 1.400 4.06
Steps( risers ) 9 1.40 0.15 1.89

b4 Second Floor
Flight -1 1 2.90 1.400 4.06
Steps( risers ) 9 1.40 0.15 1.89
Flight -2 1 2.00 1.400 2.80
Steps( risers ) 6 1.40 0.15 1.26
Flight -3 1 2.90 1.400 4.06
Steps( risers ) 9 1.40 0.15 1.89

Staircases (except spiral


34 vi Sq.m 142.05 142.00
staircases) excluding landing ..

Centering and shuttering including


35 6045 strutting, proping etc. and removal
of form for :

xiii Suspended floors, roofs landings,


shelves & their supports

a Stilt Floor slab


Area =1097.71 sq. 1097.71
Staircase landing for north side
staircase 1 5.80 1.50 8.70
Staircase landing for south side
staircase 1 5.80 1.40 8.12

Side slab shujja for path way


1 16.11 1.900 30.61
1 5.77 1.900 10.96
1 16.11 1.900 30.61
2 1.00 1.900 3.80
1 14.00 1.900 26.60
2 1.00 1.900 3.80
1 14.00 1.900 26.60
1 2.00 1.900 3.80
1 6.50 1.900 12.35
1 15.50 1.900 29.45
1 6.00 1.900 11.40
1 5.00 1.900 9.50

45 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
1 6.00 1.900 11.40
1 4.50 1.900 8.55
1 13.00 1.900 24.70
1 10.00 1.900 19.00
1 23.60 1.900 44.84
1 1.00 1.900 1.90
1 15.38 1.900 29.22
1 9.85 1.900 18.72
2 5.00 1.900 19.00
1 4.00 1.900 7.60

i Deduction for staircases blocks


North side staircase 1 5.80 4.70 -27.26
South side staircase 1 5.80 4.00 -23.20

ii Deduction for beams


Total length of beams=890.54
Note - total length of beam is
1 890.54 0.23 -204.82
taken from centering work
calculatoin of beams

a Total of Stilt floor slab…. Sq.m 1243.65

b Ground Floor slab


Area =1097.71 sq. 1097.71
Staircase landing for north side
staircase 2 1.50 1.50 4.50
Staircase landing for south side
staircase 2 1.40 1.40 3.92
i Deduction for staircases
North side staircase 1 5.80 4.70 -27.26
South side staircase 1 5.80 4.00 -23.20

ii Deduction for beams


Total length of beams=907.61 1 907.61 0.23 -208.75

b Total Ground floor Sq.m 846.92

c First Floor slab


Area =966.11 sq. 966.11
Staircase landing for north side
staircase 2 2.50 1.50 7.50
Staircase landing for south side
staircase 2 2.00 1.40 5.60
i Deduction for staircases

46 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
North side staircase 1 5.80 4.70 -27.26
South side staircase 1 5.80 4.00 -23.20

ii Deduction for beams


Total length of beams=890.54 1 890.54 0.23 -204.82

c Total of First floor slab Sq.m 723.93

d Second Floor slab


Slab above North side staircase 1 6.00 6.50 39.00
toilet slab 4 2.77 2.77 30.69
Slab above south side staircase 1 5.80 5.80 33.64
toilet slab 2 2.77 2.77 15.35
corridoor 1 12.00 1.80 21.60
Staircase landing for north side
staircase 2 2.50 1.50 7.50
Staircase landing for south side
staircase 2 2.00 1.40 5.60

d Total Second floor slab Sq.m 153.38

e Water tanks
Water sump 1.0 6.00 3.00 18.00

e Total of water tanks Sq.m 18.00

Suspended floors, roofs landings,


35 xiii Sq.m 2985.88 2986.00
…….

Centering and shuttering including


36 6046 strutting proping etc. and removal
of form for sloping or battering
surface (slabs,beams, louvers etc. )
including folded plates:

Where inclination to horizontal


i
plane does not exceed 30 degrees
requiring shuttering only on the
under side.
a Ground floor
a1 Beams

47 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
C77- C96 & C97, C78- C97, C79 - 3
C97 & C98, P = 1.53 5.20 1.53 23.87
a2 slab1 , L =(12 +7.5)/2=9.75 1 9.75 3.200 31.20
slab2 , L =(15.8 +7.5)/2=11.65 1 11.65 5.600 65.24
slab3 2 4.50 2.80 25.20
slab4, L =(6.5 +4.5 )/2=5.5 2 5.50 2.800 30.80

Where inclination to horizontal


36 i Sq.m 176.31 177.00
plane …….

( 6046 Centering and shuttering including


37
+ 6074) strutting proping etc. and removal
of form for sloping or battering
surface (slabs,beams, louvers etc. )
including folded plates:
Columns, pillars, posts and struts
iii etc. (circular or curved in plan)

a Stilt floor
for Circular column ,
p = 3.14 x 0.4 = 1.27
C42 to C44, 3 1.27 3.00 11.43
C51 1 1.27 3.00 3.81
C58 to C60 3 1.27 3.00 11.43
C68 1 1.27 3.00 3.81
C81 & C82 2 1.27 3.00 7.62
C85 1 1.27 3.00 3.81
C99 1 1.27 3.00 3.81
C110 1 1.27 3.00 3.81
C113 to C116 4 1.27 3.00 15.24

b Ground floor
for Circular column ,
p = 3.14 x 0.4 = 1.27
C42 to C44, 3 1.27 3.70 14.10
C51 1 1.27 3.70 4.70
C58 to C60 3 1.27 3.70 14.10
C68 1 1.27 3.70 4.70
C81 & C82 2 1.27 3.70 9.40
C85 1 1.27 3.70 4.70
C99 1 1.27 3.70 4.70
C110 1 1.27 3.70 4.70
C113 to C116 4 1.27 3.70 18.80

48 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

c First floor
for Circular column ,
p = 3.14 x 0.3 = 0.94
C42 to C44, 3 0.94 2.70 7.61
C51 1 0.94 2.70 2.54
C58 to C60 3 0.94 2.70 7.61
C68 1 0.94 2.70 2.54
C81 & C82 2 0.94 2.70 5.08
C85 1 0.94 2.70 2.54
C99 1 0.94 2.70 2.54
C110 1 0.94 2.70 2.54
C113 to C116 4 0.94 2.70 10.15

d Second floor
for Circular column ,
p = 3.14 x 0.3 = 0.94
C42 to C44, 3 0.94 4.57 12.89
C49- C51 3 0.94 4.57 12.89
C58 to C60 3 0.94 4.57 12.89
C68 1 0.94 4.70 4.42
C81 & C82 2 0.94 4.30 8.08
C85 1 0.94 4.30 4.04
C99 1 0.94 4.15 3.90
C110 1 0.94 3.90 3.67
C113 to C116 4 0.94 3.50 13.16

Columns, pillars, posts and struts


37 iii etc. (circular or curved in plan) Sq.m 263.73 264.00

Centering and shuttering including


strutting, proping etc. and removal
of form with adequate bracing,
proping etc., including cost of
6045 deshuttering and decentering at all
(iv) level for height of above 3.5m , for
38
+6047 / every additional height of 1m or
2 part , thereof . ( plan area to be
measured.).

49 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
Sides and Soffits of beams, Beam
Haunchings, Cantilever, Girders,
iv Bressumers and Lintels plinth
beams not exceeding 1m in depth

a Ground floor
Beam along longer side of the bldg.,
a1
P = 2 X0.45 +0.3 = 1.2
C1 - C13 1 37.99 1.20 45.59
C20 -C32 1 37.99 1.20 45.59
C39- C46 1 24.20 1.20 29.04
CF1 - C39 & C55 1 6.80 1.20 8.16
C47 - C46 & C63 1 6.80 1.20 8.16
Bet. C39 & C55 TO C57 & C41 2 7.60 1.20 18.24
C53 - C65 1 37.99 1.20 45.59
Wall 15 - C76 1 34.00 1.20 40.80
C87 - C7 1 33.00 1.20 39.60
C7 - C99 1 21.70 1.20 26.04
C76 - C82 1 18.20 1.20 21.84
C65 - C67 1 18.20 1.20 21.84
C47 - C48 1 20.00 1.20 24.00
C32- C33 1 12.00 1.20 14.40
Above wall 3 1 12.00 1.20 14.40
C33- C32, C47-C33 & C66 2 11.50 1.20 27.60
Above wall 4 1 24.23 1.20 29.08
C14 - C16 1 10.00 1.20 12.00
C33 - C36 1 12.00 1.20 14.40
C36 - C38 1 12.00 1.20 14.40
C48 - C52 1 16.25 1.20 19.50
C67 - C49 & C84 1 6.30 1.20 7.56
C82- C84 1 6.30 1.20 7.56
C110 - C112 1 6.30 1.20 7.56
C113 - C 115 1 6.30 1.20 7.56
C100 - C101 1 5.80 1.20 6.96
C112 TO C101 & C116 1 5.80 1.20 6.96
C15 - C16 1 5.80 1.20 6.96
C68 - C69, C85 - C86, C101 - C103,
4 6.30 1.20 30.24
C116 - C117

Bet. C101 & C116 TO C103 & C117 1 6.30 1.20 7.56

a2 Beam along shorter side of bldg.

50 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

C1 - C20, C2 -C21, C3-C22, C4-C23,


C5-C24, C6-C25, CF6 - C26, C8- C27,
13 5.70 1.20 88.92
C9- C28, C10 -C29, C111- C30, C12-
C31, C13- C32

C20 -C53,C54 -C21 2 6.60 1.20 15.84


beam above ramp 1 4.00 1.20 4.80

C39 -C55, C40- C56, C41 -C57, C45


6 4.50 1.20 32.40
-C61, C62-C45 & C46, C46 -C63

C65 -C47 3 3.80 1.20 13.68


Pergollas, p= 0.2 x 2 + 0.1= 0.5 20 1.80 0.50 18.00
C32 -C47 2 2.50 1.20 6.00
C53 -C87 1 4.80 1.20 5.76
Pergollas, p= 0.2 x 2 + 0.1= 0.5 9 1.80 0.50 8.10
C88 -C54, C55- C89, C56-C89 & C90,
C57 - C90, C58 - C91, C60 - C92, C61
10 4.70 1.20 56.40
- C93, C62 - C94, C63 - C95, C7 -
CF3,
C65 - C96 1 6.00 1.20 7.20
C77- C96 & C97, C78 - C87, C79 -
4 4.27 1.20 20.50
C97 & C98, C80 - C98
C14- C33 1 3.00 1.20 3.60
Above wall 2 1 3.00 1.20 3.60
C77 - wall 3, C78 - wall 3, C79 - wall
3 11.20 1.20 40.32
3
C33- C66 1 5.50 1.20 6.60
C66 - C80 1 1.60 1.20 1.92
C81- C33 & C34 1 8.20 1.20 9.84
C15 - Wall 4 1 1.80 1.20 2.16
C15 - C66 & C67 1 10.00 1.20 12.00
C46 -C35 1 6.40 1.20 7.68
C36 - C69 & C70 1 6.40 1.20 7.68
C17 - C36 & C37 1 6.40 1.20 7.68
C18 - C37 1 6.20 1.20 7.44
C19 - C38 1 6.40 1.20 7.68
C35 -C48, C36 -C49,CF7 -CF8, C37 -
5 1.80 1.20 10.80
C51, C38 -C52
C83 - C84, C84 -C49 2 5.60 1.20 13.44
C51 -C68, C52 - C69, C68 - C85, C69
6 2.77 1.20 19.94
- C86, C85 - C101, C86- 103
C102 - C37 & C38 1 10.80 1.20 12.96

C99- C110, C100- C112, C84 - C100 3 2.60 1.20 9.36

51 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

C110- C113, C111- C114, C112- C115 3 1.80 1.20 6.48

C101- C116,CF2- C111 2 4.50 1.20 10.80

C103 - C117, C102 - C116 & C117 2 2.50 1.20 6.00

6045 Total quantity of centering above


(iv) 3.5m height for beams etc …..
38 Sq.m 1094.76 1095.00
+6047 /
2

Centering and shuttering including


6045 strutting, proping etc. and removal
(xiii) of form with adequate bracing,
39
+6047 / proping etc., including cost of
2 deshuttering and decentering at all
level for height of above 3.5m , for
every additional height of 1m or
part , thereof . ( plan area to be
measured.).

xiii Suspended floors, roofs landings,


shelves & their supports

b Ground Floor slab


Area =1097.71 sq. 1097.71
i Deduction for staircases
North side staircase 1 5.80 4.70 -27.26
South side staircase 1 5.80 4.00 -23.20

ii Deduction for beams


Total length of beams=907.61 1 907.61 0.23 -208.75

6045 Total quantity of centering above


(xiii) 3.5m height for slabs etc …..
39 Sq.m 838.50 839.00
+6047 /
2

52 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

Providing TMT steel reinforcement


(Confirming to IS 1786 of 1986) for
RCC work (conforming to I.S. 1786
of 1986) including bending, binding
& placing in position in all the floors
6052
40 along with the factory made
b
precast concrete cover blocks of
specified sizes whose compressive
strength is not less than that of
surrounding concrete in the
structural member.

i footings 80.00 843.24 67458.94


ii columns 140.00 287.24 40213.80
iii beams 100.00 680.36 68036.22
iv staircase , lift & retaining wall 120.00 352.89 42346.80
v slab 80.00 415.53 33242.40
vi Water tank 140.00 20.68 2894.92

40 6052 Total steel quantity…. kg 254193.09 254193.00

Providing Pre-cast cement concrete


jali 1:2:4 (1 cement: 2 coarse sand: 4
stone aggreate 6mm nominal size)
reinforced with 1.6mm dia mild
steel wire including centering and
41 6057
shuttering, roughening, cleaning,
fixing and finishing in cement
mortar 1:3 (1 cement: 3 fine sand) all
complete excluding plastering of the
jambs, sills and soffits

i 50mm thick

a Toilet Ventilators
V 10 2.77 0.60 16.62

41 6057 Total Quantity Sq.m 16.62 17.00

53 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
Providing and laying in position
ready mixed concrete manufactured
in fully automatic batching plant and
transported to site if work in transit
mixer for a lead upto 10kms having
continious agitated mixer,
manufactured as per mix design of
specified grade fir reinforced cement
concrete work including pumping of
R.M.C., from the transit mixer to the
site of laying, excluding the cost of
centering, shuttering, finishing and
42 6069 reinforcement including the cost of
admixtures in recommended
porportions as per IS : 9103 to
accelerate/retard setting of concrete,
improve workability without imparing
strength and durability as per the
directions of the engineer-in-charge.

All works upto floor V level

v M-30grade of concrete

a For footing
a1 Column footing
F1 10 3.10 3.10 0.60 57.66
F2 13 2.80 2.80 0.60 61.15
F3 16 2.60 2.60 0.50 54.08
F4 22 2.40 2.40 0.50 63.36
F5 26 2.10 2.10 0.45 51.60
F6 35 1.90 1.90 0.40 50.54
F7 30 1.60 1.60 0.30 23.04

a2 Column Pedestals
F1, P= 0.6X4 = 2.4 10 0.60 0.60 1.15 4.14
F2, P=0.6X4 =2.4 13 0.60 0.60 1.15 5.38
F3, P= 0.6X4 =2.4 16 0.60 0.60 1.25 7.20
F4, P= 0.6X4 = 2.4 22 0.60 0.60 1.25 9.90
F5P= 0.4X4 =1.6 26 0.40 0.40 1.30 5.41
F6P= 0.4X4 =1.6 35 0.40 0.40 1.35 7.56
F7P= 0.4X4 =1.6 30 0.40 0.40 1.45 6.96

for lift footing 2 4.00 3.300 0.40 10.56

a3 Ramp retaining wall footing 2 75.40 1.300 0.35 68.61

54 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
base ment side wall footing,
L= 7.5+37.99+5 x2+11.77+24.23+2 1 93.49 1.000 0.30 28.05
= 93.49

a4 Retaining walls
Wall 1, L = 37.99-7 x 0.6-3 x0 .23 - 2x
2
0.12 =32.86 32.86 0.300 4.20 82.81
Wall 2 4 3.50 0.300 4.20 17.64
Wall 3 2 11.00 0.300 4.20 27.72
Wall 4 , L = 24.23 - 0.6 -2x 0.23
2
-0.23=22.94 22.94 0.300 4.20 57.81

Ramp retaining wall 2 73.99 0.300 3.20 142.06

a Total Footing Cu.m 843.24

b For columns
i Up to ground level
F1 10 0.60 0.300 0.15 0.27
F2 13 0.60 0.300 0.15 0.35
F3 16 0.50 0.300 0.15 0.36
F4 22 0.50 0.300 0.15 0.50
F5 26 0.40 0.300 0.15 0.47
F6 35 0.40 0.300 0.15 0.63
F7 30 0.40 0.300 0.15 0.54

Total quantity up to G.L . Cu.m.


3.11

ii From Ground level to stilt slab


F1 Ht. =3+ 0.3 =3.3 10 0.60 0.300 3.30 5.94
F2 13 0.60 0.300 3.30 7.72
F3 16 0.50 0.300 3.30 7.92
F4 22 0.50 0.300 3.30 10.89
F5 26 0.40 0.300 3.30 10.30
F6 35 0.40 0.300 3.30 13.86
F7 30 0.40 0.300 3.30 11.88

Total of Stilt floor Cu.m 68.51

ii Ground Floor
F1 Ht. =4.05 -0.6=3.45 10 0.60 0.300 3.45 6.21

55 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
F2 13 0.60 0.300 3.45 8.07
F3 16 0.50 0.300 3.45 8.28
F4 22 0.50 0.300 3.45 11.39
F5 26 0.40 0.300 3.45 10.76
F6 35 0.40 0.300 3.45 14.49
F7 30 0.40 0.300 3.45 12.42

Floating Column
CF1 10 0.50 0.300 3.45 5.18

ii Total Ground Floor Cu.m.


76.80

iii First Floor


F1 Ht. =3.5 -0.6=2.9 10 0.50 0.300 2.90 4.35
F2 13 0.50 0.300 2.90 5.66
F3 16 0.45 0.300 2.90 6.26
F4 22 0.45 0.300 2.90 8.61
F5 26 0.40 0.300 2.90 9.05
F6 35 0.40 0.300 2.90 12.18
F7 30 0.35 0.300 2.90 9.14

Floating Column
CF1 10 0.45 0.300 2.90 3.92

iii Total of First Floor Cu.m.


59.16

iv Second Floor
F1 10 0.45 0.300 3.50 4.73
F2 13 0.45 0.300 3.50 6.14
F3 16 0.40 0.300 4.57 8.77
F4 22 0.40 0.300 4.57 12.06
F5 26 0.35 0.300 4.70 12.83
F6 35 0.35 0.300 4.57 16.79
F7 30 0.30 0.300 4.70 12.69

Floating Column
CF1 10 0.40 0.300 4.70 5.64

v Second Floor 79.66

b Total Column Quantity of all floors Cu.m


287.24

c For Beams

56 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

i Plinth Beams

Beams along horizontal direction

Beams along A PB2 1 24.60 0.230 0.40 2.26


Beams along A PB2 1 37.30 0.230 0.40 3.43
Beams along A PB2 1 23.80 0.230 0.40 2.19
Beams along B PB2 1 14.60 0.230 0.40 1.34
Beams along B PB2 1 47.00 0.230 0.40 4.32
Beams along C PB2 1 5.20 0.230 0.40 0.48
Beams along D PB2 1 45.40 0.230 0.40 4.18
Beams along D PB2 1 16.20 0.230 0.40 1.49
Beams along E PB2 1 34.80 0.230 0.40 3.20
Beams along E PB1 1 5.30 0.230 0.40 0.49
Beams along F PB2 1 22.00 0.230 0.40 2.02
Beams along G PB2 1 39.90 0.230 0.40 3.67
Beams along H PB1 1 6.60 0.230 0.40 0.61
Beams along H PB1 1 9.10 0.230 0.40 0.84
Beams along H PB1 1 5.60 0.230 0.40 0.52
Beams along H &I PB1 1 15.60 0.230 0.40 1.44
Beams along J PB2 1 51.20 0.230 0.40 4.71
Beams along K PB2 1 64.00 0.230 0.40 5.89
Beams along L PB1 1 16.50 0.230 0.40 1.52
Beams along L PB2 1 14.80 0.230 0.40 1.36
Beams along L PB2 1 16.50 0.230 0.40 1.52
Beams along M PB2 1 46.90 0.230 0.40 4.31
Beams along N PB2 1 13.60 0.230 0.40 1.25
Beams along N PB2 1 10.70 0.230 0.40 0.98
Beams along O PB2 1 16.20 0.230 0.40 1.49
Beams along Vertical direction
Beams along 1 PB2 1 12.20 0.230 0.40 1.12
Beams along 1 PB1 1 6.50 0.230 0.40 0.60
Beams along 2 PB1 1 18.50 0.230 0.40 1.70
Beams along 3&4 PB2 1 18.50 0.230 0.40 1.70
Beams along 5 PB1 1 10.30 0.230 0.40 0.95
Beams along 7 PB1 1 8.00 0.230 0.40 0.74
Beams along 8 PB1 1 4.00 0.230 0.40 0.37
Beams along 9 PB1 1 4.40 0.230 0.40 0.40
Beams along 10 PB2 1 18.30 0.230 0.40 1.68
Beams along 11 PB2 1 18.00 0.230 0.40 1.66
Beams along 12 PB2 1 21.90 0.230 0.40 2.01
Beams along 13&14 PB1 1 21.80 0.230 0.40 2.01
Beams along 15 & 16 PB1 1 21.40 0.230 0.40 1.97
Beams along 18-22 PB2 5 22.80 0.230 0.40 10.49
Beams along 23 PB2 1 21.20 0.230 0.40 1.95

57 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
Beams along 24,25,28,29,30,32&33
7 20.60
PB2 0.230 0.40 13.27

i Total lower ground floor beam Cu.m 98.13

ii Lower Ground Floor


Beam along longer side of the
bldg.,
C1 - C13 1 37.99 0.30 0.60 6.84
C20 -C32 1 37.99 0.30 0.60 6.84
C39- C46 1 24.20 0.30 0.60 4.36
CF1 - C39 & C55 1 6.80 0.30 0.60 1.22
C47 - C46 & C63 1 6.80 0.30 0.60 1.22
Bet. C39 & C55 TO C57 & C41 2 7.60 0.30 0.60 2.74
C53 - C65 1 37.99 0.30 0.60 6.84
Wall 15 - C76 1 34.00 0.30 0.60 6.12
C87 - C7 1 33.00 0.30 0.60 5.94
C7 - C99 1 21.70 0.30 0.60 3.91
C76 - C82 1 18.20 0.30 0.60 3.28
C65 - C67 1 18.20 0.30 0.60 3.28
C47 - C48 1 20.00 0.30 0.60 3.60
C32- C33 1 12.00 0.30 0.60 2.16
Above wall 3 1 12.00 0.30 0.60 2.16
C33- C32, C47-C33 & C66 2 11.50 0.30 0.60 4.14
Above wall 4 1 24.23 0.30 0.60 4.36
C14 - C16 1 10.00 0.30 0.60 1.80
C33 - C36 1 12.00 0.30 0.60 2.16
C36 - C38 1 12.00 0.30 0.60 2.16
C48 - C52 1 16.25 0.30 0.60 2.93
C67 - C49 & C84 1 6.30 0.30 0.60 1.13
C82- C84 1 6.30 0.30 0.60 1.13
C110 - C112 1 6.30 0.30 0.60 1.13
C113 - C 115 1 6.30 0.30 0.60 1.13
C100 - C101 1 5.80 0.30 0.60 1.04
C112 TO C101 & C116 1 5.80 0.30 0.60 1.04
C15 - C16 1 5.80 0.30 0.60 1.04
C68 - C69, C85 - C86, C101 - C103,
4 6.30 0.30 0.60 4.54
C116 - C117

Bet. C101 & C116 TO C103 & C117 1 6.30 0.30 0.60 1.13

Beam along shorter side of bldg.

58 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

C1 - C20, C2 -C21, C3-C22, C4-C23,


C5-C24, C6-C25, CF6 - C26, C8- C27,
13 5.70 0.30 0.60 13.34
C9- C28, C10 -C29, C111- C30, C12-
C31, C13- C32

C20 -C53,C54 -C21 2 6.60 0.30 0.60 2.38


beam above ramp 1 4.00 0.30 0.60 0.72

C39 -C55, C40- C56, C41 -C57, C45


6 4.50 0.30 0.60 4.86
-C61, C62-C45 & C46, C46 -C63

C65 -C47 3 3.80 0.30 0.60 2.05


C32 -C47 2 2.50 0.30 0.60 0.90
C53 -C87 1 4.80 0.30 0.60 0.86
C88 -C54, C55- C89, C56-C89 & C90,
C57 - C90, C58 - C91, C60 - C92, C61
10 4.70 0.30 0.60 8.46
- C93, C62 - C94, C63 - C95, C7 -
CF3,
C65 - C96 1 6.00 0.30 0.60 1.08
C77- C96 & C97, C78 - C87, C79 -
4 4.27 0.30 0.60 3.07
C97 & C98, C80 - C98
C14- C33 1 3.00 0.30 0.60 0.54
Above wall 2 1 3.00 0.30 0.60 0.54
C77 - wall 3, C78 - wall 3, C79 - wall
3 11.20 0.30 0.60 6.05
3
C33- C66 1 5.50 0.30 0.60 0.99
C66 - C80 1 1.60 0.30 0.60 0.29
C81- C33 & C34 1 8.20 0.30 0.60 1.48
C15 - Wall 4 1 1.80 0.30 0.60 0.32
C15 - C66 & C67 1 10.00 0.30 0.60 1.80
C46 -C35 1 6.40 0.30 0.60 1.15
C36 - C69 & C70 1 6.40 0.30 0.60 1.15
C17 - C36 & C37 1 6.40 0.30 0.60 1.15
C18 - C37 1 6.20 0.30 0.60 1.12
C19 - C38 1 6.40 0.30 0.60 1.15
C35 -C48, C36 -C49,CF7 -CF8, C37 -
5 1.80 0.30 0.60 1.62
C51, C38 -C52
C83 - C84, C84 -C49 2 5.60 0.30 0.60 2.02
C51 -C68, C52 - C69, C68 - C85, C69
6 2.77 0.30 0.60 2.99
- C86, C85 - C101, C86- 103
C102 - C37 & C38 1 10.80 0.30 0.60 1.94

C99- C110, C100- C112, C84 - C100 3 2.60 0.30 0.60 1.40

C110- C113, C111- C114, C112- C115 3 1.80 0.30 0.60 0.97

C101- C116,CF2- C111 2 4.50 0.30 0.60 1.62

59 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

C103 - C117, C102 - C116 & C117 2 2.50 0.30 0.60 0.90

ii Total lower ground floor beam Cu.m 160.30

iii Ground floor


Beam along longer side of the
bldg.,
C1 - C13 1 37.99 0.30 0.60 6.84
C20 -C32 1 37.99 0.30 0.60 6.84
C39- C46 1 24.20 0.30 0.60 4.36
CF1 - C39 & C55 1 6.80 0.30 0.60 1.22
C47 - C46 & C63 1 6.80 0.30 0.60 1.22
Bet. C39 & C55 TO C57 & C41 2 7.60 0.30 0.60 2.74
C53 - C65 1 37.99 0.30 0.60 6.84
Wall 15 - C76 1 34.00 0.30 0.60 6.12
C87 - C7 1 33.00 0.30 0.60 5.94
C7 - C99 1 21.70 0.30 0.60 3.91
C76 - C82 1 18.20 0.30 0.60 3.28
C65 - C67 1 18.20 0.30 0.60 3.28
C47 - C48 1 20.00 0.30 0.60 3.60
C32- C33 1 12.00 0.30 0.60 2.16
Above wall 3 1 12.00 0.30 0.60 2.16
C33- C32, C47-C33 & C66 2 11.50 0.30 0.60 4.14
Above wall 4 1 24.23 0.30 0.60 4.36
C14 - C16 1 10.00 0.30 0.60 1.80
C33 - C36 1 12.00 0.30 0.60 2.16
C36 - C38 1 12.00 0.30 0.60 2.16
C48 - C52 1 16.25 0.30 0.60 2.93
C67 - C49 & C84 1 6.30 0.30 0.60 1.13
C82- C84 1 6.30 0.30 0.60 1.13
C110 - C112 1 6.30 0.30 0.60 1.13
C113 - C 115 1 6.30 0.30 0.60 1.13
C100 - C101 1 5.80 0.30 0.60 1.04
C112 TO C101 & C116 1 5.80 0.30 0.60 1.04
C15 - C16 1 5.80 0.30 0.60 1.04
C68 - C69, C85 - C86, C101 - C103,
4 6.30 0.30 0.60 4.54
C116 - C117

Bet. C101 & C116 TO C103 & C117 1 6.30 0.30 0.60 1.13

Beam along shorter side of bldg.

60 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

C1 - C20, C2 -C21, C3-C22, C4-C23,


C5-C24, C6-C25, CF6 - C26, C8- C27,
13 5.70 0.30 0.60 13.34
C9- C28, C10 -C29, C111- C30, C12-
C31, C13- C32

C20 -C53,C54 -C21 2 6.60 0.30 0.60 2.38


beam above ramp 1 4.00 0.30 0.60 0.72

C39 -C55, C40- C56, C41 -C57, C45


6 4.50 0.30 0.60 4.86
-C61, C62-C45 & C46, C46 -C63

C65 -C47 3 3.80 0.30 0.60 2.05


Pergollas, p= 0.2 x 2 + 0.1= 0.5 20 1.80 0.30 0.60 6.48
C32 -C47 2 2.50 0.30 0.60 0.90
C53 -C87 1 4.80 0.30 0.60 0.86
Pergollas, p= 0.2 x 2 + 0.1= 0.5 9 1.80 0.30 0.60 2.92
C88 -C54, C55- C89, C56-C89 & C90,
C57 - C90, C58 - C91, C60 - C92, C61
10 4.70 0.30 0.60 8.46
- C93, C62 - C94, C63 - C95, C7 -
CF3,
C65 - C96 1 6.00 0.30 0.60 1.08
C77- C96 & C97, C78 - C87, C79 -
4 4.27 0.30 0.60 3.07
C97 & C98, C80 - C98
C14- C33 1 3.00 0.30 0.60 0.54
Above wall 2 1 3.00 0.30 0.60 0.54
C77 - wall 3, C78 - wall 3, C79 - wall
3 11.20 0.30 0.60 6.05
3
C33- C66 1 5.50 0.30 0.60 0.99
C66 - C80 1 1.60 0.30 0.60 0.29
C81- C33 & C34 1 8.20 0.30 0.60 1.48
C15 - Wall 4 1 1.80 0.30 0.60 0.32
C15 - C66 & C67 1 10.00 0.30 0.60 1.80
C46 -C35 1 6.40 0.30 0.60 1.15
C36 - C69 & C70 1 6.40 0.30 0.60 1.15
C17 - C36 & C37 1 6.40 0.30 0.60 1.15
C18 - C37 1 6.20 0.30 0.60 1.12
C19 - C38 1 6.40 0.30 0.60 1.15
C35 -C48, C36 -C49,CF7 -CF8, C37 -
5 1.80 0.30 0.60 1.62
C51, C38 -C52
C83 - C84, C84 -C49 2 5.60 0.30 0.60 2.02
C51 -C68, C52 - C69, C68 - C85, C69
6 2.77 0.30 0.60 2.99
- C86, C85 - C101, C86- 103
C102 - C37 & C38 1 10.80 0.30 0.60 1.94

C99- C110, C100- C112, C84 - C100 3 2.60 0.30 0.60 1.40

61 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

C110- C113, C111- C114, C112- C115 3 1.80 0.30 0.60 0.97

C101- C116,CF2- C111 2 4.50 0.30 0.60 1.62

C103 - C117, C102 - C116 & C117 2 2.50 0.30 0.60 0.90

iii Total Upper ground floor beam Cu.m. 169.70

iv First floor
Beam along longer side of the
bldg.,
C1 - C13 1 37.99 0.30 0.60 6.84
C20 -C32 1 37.99 0.30 0.60 6.84
C39- C46 1 24.20 0.30 0.60 4.36
CF1 - C39 & C55 1 6.80 0.30 0.60 1.22
C47 - C46 & C63 1 6.80 0.30 0.60 1.22
Bet. C39 & C55 TO C57 & C41 2 7.60 0.30 0.60 2.74
C53 - C65 1 37.99 0.30 0.60 6.84
Wall 15 - C76 1 34.00 0.30 0.60 6.12
C87 - C7 1 33.00 0.30 0.60 5.94
C7 - C99 1 21.70 0.30 0.60 3.91
C76 - C82 1 18.20 0.30 0.60 3.28
C65 - C67 1 18.20 0.30 0.60 3.28
C47 - C48 1 20.00 0.30 0.60 3.60
C32- C33 1 12.00 0.30 0.60 2.16
Above wall 3 1 12.00 0.30 0.60 2.16
C33- C32, C47-C33 & C66 2 11.50 0.30 0.60 4.14
Above wall 4 1 24.23 0.30 0.60 4.36
C14 - C16 1 10.00 0.30 0.60 1.80
C33 - C36 1 12.00 0.30 0.60 2.16
C36 - C38 1 12.00 0.30 0.60 2.16
C48 - C52 1 16.25 0.30 0.60 2.93
C67 - C49 & C84 1 6.30 0.30 0.60 1.13
C82- C84 1 6.30 0.30 0.60 1.13
C110 - C112 1 6.30 0.30 0.60 1.13
C113 - C 115 1 6.30 0.30 0.60 1.13
C100 - C101 1 5.80 0.30 0.60 1.04
C112 TO C101 & C116 1 5.80 0.30 0.60 1.04
C15 - C16 1 5.80 0.30 0.60 1.04
C68 - C69, C85 - C86, C101 - C103,
4 6.30 0.30 0.60 4.54
C116 - C117

Bet. C101 & C116 TO C103 & C117 1 6.30 0.30 0.60 1.13

62 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

Beam along shorter side of bldg.

C1 - C20, C2 -C21, C3-C22, C4-C23,


C5-C24, C6-C25, CF6 - C26, C8- C27,
13 5.70 0.30 0.60 13.34
C9- C28, C10 -C29, C111- C30, C12-
C31, C13- C32

C20 -C53,C54 -C21 2 6.60 0.30 0.60 2.38


beam above ramp 1 4.00 0.30 0.60 0.72

C39 -C55, C40- C56, C41 -C57, C45


6 4.50 0.30 0.60 4.86
-C61, C62-C45 & C46, C46 -C63

C65 -C47 3 3.80 0.30 0.60 2.05


C32 -C47 2 2.50 0.30 0.60 0.90
C53 -C87 1 4.80 0.30 0.60 0.86
C88 -C54, C55- C89, C56-C89 & C90,
C57 - C90, C58 - C91, C60 - C92, C61
10 4.70 0.30 0.60 8.46
- C93, C62 - C94, C63 - C95, C7 -
CF3,
C65 - C96 1 6.00 0.30 0.60 1.08
C77- C96 & C97, C78 - C87, C79 -
4 4.27 0.30 0.60 3.07
C97 & C98, C80 - C98
C14- C33 1 3.00 0.30 0.60 0.54
Above wall 2 1 3.00 0.30 0.60 0.54
C77 - wall 3, C78 - wall 3, C79 - wall
3 11.20 0.30 0.60 6.05
3
C33- C66 1 5.50 0.30 0.60 0.99
C66 - C80 1 1.60 0.30 0.60 0.29
C81- C33 & C34 1 8.20 0.30 0.60 1.48
C15 - Wall 4 1 1.80 0.30 0.60 0.32
C15 - C66 & C67 1 10.00 0.30 0.60 1.80
C46 -C35 1 6.40 0.30 0.60 1.15
C36 - C69 & C70 1 6.40 0.30 0.60 1.15
C17 - C36 & C37 1 6.40 0.30 0.60 1.15
C18 - C37 1 6.20 0.30 0.60 1.12
C19 - C38 1 6.40 0.30 0.60 1.15
C35 -C48, C36 -C49,CF7 -CF8, C37 -
5 1.80 0.30 0.60 1.62
C51, C38 -C52
C83 - C84, C84 -C49 2 5.60 0.30 0.60 2.02
C51 -C68, C52 - C69, C68 - C85, C69
6 2.77 0.30 0.60 2.99
- C86, C85 - C101, C86- 103
C102 - C37 & C38 1 10.80 0.30 0.60 1.94

C99- C110, C100- C112, C84 - C100 3 2.60 0.30 0.60 1.40

63 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

C110- C113, C111- C114, C112- C115 3 1.80 0.30 0.60 0.97

C101- C116,CF2- C111 2 4.50 0.30 0.60 1.62

C103 - C117, C102 - C116 & C117 2 2.50 0.30 0.60 0.90

iv Total First floor beam Cu.m 160.30

v Second Floor

C70 - C91, C73- C92, C93- C73 &


6 2.77 0.30 0.60 2.99
C74, C74 - C94, C75 - C95, CF3 - C7

C72- CF3 1 18.20 0.30 0.60 3.28


C91- C92 1 8.50 0.30 0.60 1.53
C92- C7 1 12.00 0.30 0.60 2.16

C100 -C115, CF5 - CF2, C101- C116 3 4.80 0.30 0.60 2.59

C100 - C101, C115- C116, C112-


3 6.00 0.30 0.60 3.24
C101 & C116
C110 - C112, C113- C115 2 6.00 0.30 0.60 2.16
C82 - C113 1 8.00 0.30 0.60 1.44

Pergolas ,
pergola-1 1 30.90 0.20 0.60 3.71
pergola-2 1 30.90 0.20 0.60 3.71
pergola-3 1 30.90 0.20 0.60 3.71
pergola-4 1 30.90 0.20 0.60 3.71
pergola-5 1 14.00 0.20 0.60 1.68
pergola-5 1 7.00 0.20 0.60 0.84
pergola-6 1 30.90 0.20 0.60 3.71
pergola-7 1 12.60 0.20 0.60 1.51
pergola-8 1 12.60 0.20 0.60 1.51
pergola-9 1 12.60 0.20 0.60 1.51
pergola-10,L=20.6-9x0.3=17.90 1 17.90 0.20 0.60 2.15
pergola-11 1 17.90 0.20 0.60 2.15
pergola-12 1 17.90 0.20 0.60 2.15
pergola-13 1 17.90 0.20 0.60 2.15
pergola-14 1 17.90 0.20 0.60 2.15
pergola-15 1 17.90 0.20 0.60 2.15
pergola-16 1 8.60 0.20 0.60 1.03
pergola-17 1 9.30 0.20 0.60 1.12
pergola-18 1 9.60 0.20 0.60 1.15
pergola-19 1 9.50 0.20 0.60 1.14
pergola-20 1 9.30 0.20 0.60 1.12
pergola-21 1 8.60 0.20 0.60 1.03

64 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
pergola-22 ,L=15-6x.0.3=13.20 1 13.20 0.20 0.60 1.58
pergola-23 1 13.20 0.20 0.60 1.58

v Total second floor beam Cu.m 67.63

c Total Beams of all floors 656.05

d For lintels
i upper ground Floor
Rolling Shutters , RS1, P =2x 0.2
64 3.00 0.23 0.20 8.83
+0.23 = 0.63
Rolling Shutters , RS2 12 2.10 0.23 0.20 1.16
Doors, D2 4 1.50 0.23 0.20 0.28
Doors, D3, p= 0.2 x2 +0.15=0.55 4 1.40 0.15 0.20 0.17
Doors, D4 4 1.30 0.15 0.20 0.16
Windows W1 10 2.10 0.23 0.20 0.97

ii First Floor
Rolling Shutters , RS1 21 3.00 0.23 0.20 2.90
Rolling Shutters , RS2 5 2.10 0.23 0.20 0.48
Doors, D1 4 2.40 0.23 0.20 0.44
Doors, D2 13 1.50 0.23 0.20 0.90
Doors, D3, p= 0.2 x2 +0.15=0.55 4 1.40 0.15 0.20 0.17
Doors, D4 4 1.30 0.15 0.20 0.16
Windows W1 38 2.10 0.23 0.20 3.67

iii second Floor


Doors, D1 10 2.40 0.23 0.20 1.10
Doors, D2 6 1.50 0.23 0.20 0.41
Doors, D3, p= 0.2 x2 +0.15=0.55 4 1.40 0.15 0.20 0.17
Doors, D4 4 1.30 0.15 0.20 0.16
Windows W1 6 2.10 0.23 0.20 0.58
Fixed Glass opening
C1-C5 1 13.00 0.23 0.20 0.60
C5- C9 1 9.20 0.23 0.20 0.42
C9 -C13 1 13.00 0.23 0.20 0.60

d Total Lintels Cu.m 24.31

e Staircases (except spiral


staircases) excluding landing ..

i North side staircase


Lower Ground Floor

65 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
Flight -1( waist slab ) 1 3.20 1.500 0.25 1.20
Steps( risers ), A= 0.5 x0.27x0.15 10
=0.02 1.50 0.02 0.30
Flight -3( waist slab ) 1 3.20 1.500 0.25 1.20
Steps( risers ) 10 1.50 0.02 0.30

Upper Ground Floor


Flight -1 1 3.20 1.500 0.25 1.20
Steps( risers ) 10 1.50 0.02 0.30
Flight -2 1 3.45 1.500 0.25 1.29
Steps( risers ) 11 1.50 0.02 0.33
Flight -3 1 3.20 1.500 0.25 1.20
Steps( risers ) 10 1.50 0.02 0.30

First Floor
Flight -1 1 3.20 1.500 0.25 1.20
Steps( risers ) 10 1.50 0.02 0.30
Flight -2 1 2.00 1.500 0.25 0.75
Steps( risers ) 5 1.50 0.02 0.15
Flight -3 1 3.20 1.500 0.23 1.10
Steps( risers ) 10 1.50 0.02 0.30

Second Floor
Flight -1 1 3.20 1.500 0.25 1.20
Steps( risers ) 10 1.50 0.02 0.30
Flight -2 1 2.00 1.500 0.25 0.75
Steps( risers ) 5 1.50 0.02 0.15
Flight -3 1 3.20 1.500 0.23 1.10
Steps( risers ) 10 1.50 0.02 0.30

ii South side Staircase


Lower Ground Floor
Flight -1 1 2.90 1.400 0.25 1.02
Steps( risers ) 9 1.40 0.02 0.25
Flight -3 1 2.90 1.400 0.25 1.02
Steps( risers ) 9 1.40 0.02 0.25

Upper Ground Floor


Flight -1 1 2.90 1.400 0.25 1.02
Steps( risers ) 9 1.40 0.02 0.25
Flight -2 1 3.20 1.400 0.25 1.12
Steps( risers ) 12 1.40 0.02 0.34
Flight -3 1 2.90 1.400 0.25 1.02
Steps( risers ) 9 1.40 0.02 0.25

66 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
First Floor
Flight -1 1 2.90 1.400 0.25 1.02
Steps( risers ) 9 1.40 0.02 0.25
Flight -2 1 2.00 1.400 0.25 0.70
Steps( risers ) 6 1.40 0.02 0.17
Flight -3 1 2.90 1.400 0.25 1.02
Steps( risers ) 9 1.40 0.02 0.25

Second Floor
Flight -1 1 2.90 1.400 0.25 1.02
Steps( risers ) 9 1.40 0.02 0.25
Flight -2 1 2.00 1.400 0.25 0.70
Steps( risers ) 6 1.40 0.02 0.17
Flight -3 1 2.90 1.400 0.25 1.02
Steps( risers ) 9 1.40 0.02 0.25

e Staircases (except spiral Cu.m


staircases) excluding landing .. 28.56

f Suspended floors, roofs landings,


shelves & their supports
i Lower Ground Floor slab
Area =1097.71 sq. 1 1097.71 0.15 164.66
Staircase landing for north side
staircase 1 5.80 1.50 0.25 2.18
Staircase landing for south side
staircase 1 5.80 1.40 0.25 2.03

Deduction for staircases


North side staircase 1 5.80 4.70 0.15 -4.09
South side staircase 1 5.80 4.00 0.15 -3.48

Deduction for beams


Total length of beams=890.54 1 890.54 0.23 0.15 -30.72

i Total of lower ground floor Cu.m 130.57

ii Upper Ground Floor slab


Area =1097.71 sq. 1 1097.71 0.15 164.66
Staircase landing for north side
staircase 2 1.50 1.50 0.25 1.13
Staircase landing for south side
staircase 2 1.40 1.40 0.25 0.98
Deduction for staircases
North side staircase 1 5.80 4.70 0.15 -4.09

67 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
South side staircase 1 5.80 4.00 0.15 -3.48

Deduction for beams


Total length of beams=907.61 1 907.61 0.23 0.15 -31.31

ii Total Upper Ground floor Cu.m 127.88

iii First Floor slab


Area =966.11 sq. 1 966.11 0.15 144.92
Staircase landing for north side
staircase 2 2.50 1.50 0.25 1.88
Staircase landing for south side
staircase 2 2.00 1.40 0.25 1.40
Deduction for staircases
North side staircase 1 5.80 4.70 0.15 -4.09
South side staircase 1 5.80 4.00 0.15 -3.48

Deduction for beams


Total length of beams=890.54 1 890.54 0.23 0.15 -30.72

iii Total of First floor slab Cu.m. 109.90

iv Second Floor slab


Slab above North side staircase 1 6.00 6.50 0.15 5.85
toilet slab 4 2.77 2.77 0.15 4.60
Slab above south side staircase 1 5.80 5.80 0.15 5.05
toilet slab 2 2.77 2.77 0.15 2.30
corridoor 1 12.00 1.80 0.15 3.24
Staircase landing for north side
staircase 2 2.50 1.50 0.25 1.88
Staircase landing for south side
staircase 2 2.00 1.40 0.25 1.40

iv Total Second floor slab Cu.m. 24.32

f Total Slab Quantity Cu.m. 392.66

g lift walls
North side lift wall 2 2.70 0.20 16.50 17.82
North side lift wall 2 1.90 0.20 16.50 12.54
South side lift wall 2 3.10 0.20 16.50 20.46
South side lift wall 2 1.90 0.20 16.50 12.54

68 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
g Total lift Concrete Cu.m 63.36

h Sloping slab & beams


i Upper Ground floor
Beams
C77- C96 & C97, C78- C97, C79 - 3
C97 & C98, 5.20 0.23 0.80 2.87
slab1 , L =(12 +7.5)/2=9.75 1 9.75 3.200 0.15 4.68
slab2 , L =(15.8 +7.5)/2=11.65 1 11.65 5.600 0.15 9.79

69 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
slab3 2 4.50 2.80 0.15 3.78
slab4, L =(6.5 +4.5 )/2=5.5 2 5.50 2.800 0.15 4.62

Total Quantity of sloping slab n


h Cu.m 25.74
beams

I Water tank
i water sump
base slab 1 6.90 3.900 0.20 5.38
side walls 2 6.40 0.200 3.20 8.19
2 3.00 0.200 3.20 3.84
top slab 1 6.40 3.400 0.15 3.26

I Total for water tank 20.68

Providing M-30 grade concrete by


42 6065 Cu.m. 2341.84 2342.00
using 420kgs of……

V DOORS AND WINDOWS

Providing woodwork in frames of


doors, windows, clerestory
43 7001 windows trusses & other frames
wrought framed and fixed in
positon.

b Second class Indian teak wood

i Ground Floor
D2 , P = 2x2.35+1.1=5.8 m 4 5.80 0.10 0.08 0.19

ii First Floor
D1 , P = 2x2.35+2.0=6.70 m 4 6.70 0.15 0.10 0.40
D2 , P = 2x2.35+1.1=5.80 m 13 5.80 0.10 0.08 0.57

70 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
iii Second Floor
D1 , P = 2x2.35+2.0=6.70 m 10 6.70 0.15 0.10 1.01
D2 , P = 2x2.35+1.1=5.80 m 6 5.80 0.10 0.08 0.26

43 7001 Total wood work in frames Cu.m. 2.42 2.50

cutting rebate in flush door shutter


44 7029 (total area of the door to be
measured)

i Ground Floor
D2 , 4 0.90 2.25 8.10

ii First Floor
D1 , 4 1.80 2.25 16.20
D2 , 13 0.90 2.25 26.33

iii Second Floor


D1 , 10 1.80 2.25 40.50
D2 , 6 0.90 2.25 12.15

44 7029 Total Flush Door shutters. Sq.m. 103.28 104.00

Providing and fixing first class


Indian teak wood moulded beading
45 7044 to door and window frames with
iron screws, plugs and priming coat
on unexposed surfaces etc.

a 50 x 12 mm
i Ground Floor
D2 , P = 2x2.25+0.9=5.4 m 4 5.40 21.60

ii First Floor
D1 , P = 2x2.25+1.8=6.30 m 4 6.30 25.20
D2 , P = 2x2.25+0.9=5.40 m 13 5.40 70.20

iii Second Floor


D1 , P = 2x2.25+1.8=6.30 m 10 6.30 63.00
D2 , P = 2x2.25+0.9=5.40 m 6 5.40 32.40
Total 212.40

45 7044 Total beeding work in frames R.M. 212.40 213.00

71 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

Providing flat iron holdfast 40 cms


long including fixing to frame with
10 mm dia bolt, nuts and wooden
46 7050 b plugs embedded in cement concrete
block 30 x 10 x 15 cms 1:3:6 mix(1
cement :3 coarse sand: 6 stone
aggregate 20 mm nominal size )

40x3 mm flat iron holdfast, 15 cm


46 7050 b Each 6.00 37.00 222.00 222.00
long

Providing and fixing M.S. grill of


required pattern in Wooden frames
of Windows,or in masonry walls etc.
47 7054 b with M.S. flats square or round bars
with round headed bolts and nuts or
by screws.or necessary holdfast
complete.

i Ground floor windows W1 10 1.50 1.25 18.75


ii First floor windows W1 38 1.50 1.25 71.25
iii Second floor W1 6 1.50 1.25 11.25
Sub total 101.25
Grills @ 20 kg/m2 = 1 101.25 20.00 2025.00

47 7054 b Ornamental grill kg 2025.00 2025.00

Providing and fixing bright


48 7066 a finished brass sliding door bolts
with nuts and screws etc complete.

for doors 1 each


a 300 x 16 mm Each 37.00 37.00

48 7066 a Total Providing and fixing ….. Each 37.00 37.00

72 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

Providing and fixing bright


49 7067 finished brass tower bolts (barrel
type) with screws etc. complete

a 250 x 10 mm
doors ( for top)
i Ground Floor
D2 Single leaf shutter 4 2.00 8.00

ii First Floor
D1 double leaf shutter 4 2.00 8.00
D2 single leaf shutter 13 1.00 13.00

iii Second Floor


D1 double leaf shutter 10 2.00 20.00
D2 single leaf shutter 6 1.00 6.00

Total 55.00

49 a Total tower bolt of 250 x 10 mm Each 55.00 55.00

Providing and fixing bright


50 7067 finished brass tower bolts (barrel
type) with screws etc. complete

b 200 x 10 mm
doors ( for bottom)
i Ground Floor
D2 Single leaf shutter 4 1.00 4.00

ii First Floor
D1 double leaf shutter 4 2.00 8.00
D2 single leaf shutter 13 1.00 13.00

iii Second Floor


D1 double leaf shutter 10 2.00 20.00
D2 single leaf shutter 6 1.00 6.00

Total 51.00

50 b Total tower bolt of 200 x 10 mm Each 51.00 51.00

73 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
Providing and fixing bright finished
51 7069 brass handles with necessary screws
etc complete
a 125 mm
one for each door shutter on inner
& outer side
i Ground Floor
D2 Single leaf shutter 4 2.00 8.00

ii First Floor
D1 double leaf shutter 4 4.00 16.00
D2 single leaf shutter 13 2.00 26.00

iii Second Floor


D1 double leaf shutter 10 4.00 40.00
D2 single leaf shutter 6 2.00 12.00

51 a Total handles of 125 mm Each 102.00 102.00

Providing and fixing bright finished


52 7069 brass handles with necessary screws
etc complete

b 100 mm

i Ground floor
D3 4 2.00 8.00
D4 4 2.00 8.00
ii First floor
D3 4 2.00 8.00
D4 4 2.00 8.00
iii Second Floor
D3 4 2.00 8.00
D4 4 2.00 8.00

52 b total handles of 100mm Each 48.00 48.00

Providing and fixing bright finished


53 7070 brass door latch with necessary
screws etc complete
a 250 x 16 x 5 mm
i Ground Floor
D2 Single leaf shutter 4 4.00

ii First Floor

74 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
D1 double leaf shutter 4 4.00
D2 single leaf shutter 13 13.00

iii Second Floor


D1 double leaf shutter 10 10.00
D2 single leaf shutter 6 6.00

53 a total brass door latch Each 37.00 37.00

Providing & fixing bright finished


brass 100 mm. rim latch & lock & a
54 7072 pair of knob, with necessary screws
etc. complete (Indian make of
approved quality).

i Ground Floor
D2 Single leaf shutter 4 4.00

ii First Floor
D1 double leaf shutter 4 4.00
D2 single leaf shutter 13 13.00

iii Second Floor


D1 double leaf shutter 10 10.00
D2 single leaf shutter 6 6.00

Providing & fixing bright finished


54 7072 Each 37.00 37.00
brass 100 mm.

Providing and fixing 150 mm. bright


finished brass floor door stopper
55 7074
with rubber cushion screws etc. to
suit shutter thickness complete.

i Ground Floor
D2 Single leaf shutter 4 1.00 4.00

ii First Floor
D1 double leaf shutter 4 2.00 8.00
D2 single leaf shutter 13 1.00 13.00

iii Second Floor

75 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
D1 double leaf shutter 10 2.00 20.00
D2 single leaf shutter 6 1.00 6.00
Total 51.00

Total Providing and fixing 150


55 7074 Each 51.00 51.00
mm. …..

Providing and fixing brass hydraulic


door closure of approved make with
56 7083
necessary screws & fittings etc.
complete

i Ground Floor
D2 Single leaf shutter 4 4.00

ii First Floor
D2 single leaf shutter 13 13.00

iii Second Floor


D2 single leaf shutter 6 6.00

56 7083 Total Hydraulic door closure Each 23.00 23.00

Providing FRP door shutters 35mm


thick with frame size in clear
57 7157
opening of 0.75x2.10m hinges and
screws complete.,

i Ground floor
D3 4 0.80 2.10 6.72
D4 4 1.00 2.10 8.40
ii First floor
D3 4 0.80 2.10 6.72
D4 4 1.00 2.10 8.40
iii Second Floor
D3 2 0.80 2.10 3.36
D4 2 1.00 2.10 4.20
total 37.80

57 7157 Total FRP Shutters Sq.m 37.80 38.00

76 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

Providing and fixing flush door


shutters, core of block board
construction with frame of first class
hard wood and well matched first
class Indian teak ply venerring with
58 7018
vertical grains or cross band and
face venners on one face and
commercial ply venerring with
vertical grains or cross bands and
face veneer on other face of shutters.

35 mm thick shutters including


b anodised aluminium butt hinges
with necessary screws:
i Ground Floor
D2 , 4 0.90 2.25 8.10

ii First Floor
D1 , 4 1.80 2.25 16.20
D2 , 13 0.90 2.25 26.33

iii Second Floor


D1 , 10 1.80 2.25 40.50
D2 , 6 0.90 2.25 12.15

Total 103.28

58 7018 Total Flush Door shutters. Sq.m. 103.28 104.00

VI STEEL AND ALUMINIUM


WORKS

Steel work welded in buildup


sections trusses and framed works
0 8003 including, hoisting, fixing in
position and applying coat of red
lead paint

b In tees, angles, flats and channels

Quantity taken from Item of roofing


i
= 479 sq.m
Total Roofing Quantity = 479.00
sq.m

77 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
Assuming steel quantity as 45
1 479.00 45.00 21555.00
kg/Sq.m
Total qty. 21555.00

Quantity in Quintal=21555.00/100 =
215.55
215.55 quintal

0 8003 Total steel quantity……. Qtl. 215.55 216.00

Supplying & fixing rolling shutters


of approved make of 80 x 1.25mm
M.S laths interlocked togather
through their entire length and
jointed togather at the end by end
locks mounted on specially
designed pipe shaft with bracketc,
0 8007
side guides and arrangement for
inside and outside locking with
push and pull operations complete.
including the cost of providing and
fixing necessary 27.5 cm long wire
springs grade no.2 and M.S top
cover of 1.25 mm thick for folling .

i Ground Floor
Rolling shutter RS1 64 2.40 2.10 322.56
Rolling shutter RS2 12 1.50 2.10 37.80

ii First Floor
Rolling shutter RS1 21 2.50 2.25 118.13
Rolling shutter RS2 5 1.60 2.25 18.00

0 8007 Total Quantity Sq.m 496.49 497.00

Providing and fixing ballbearing for


0 8010
rolling shutters
i Upper ground Floor
Rolling shutter RS1 64 2.00 128.00
Rolling shutter RS2 12 2.00 24.00

ii First Floor

78 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
Rolling shutter RS1 21 2.00 42.00
Rolling shutter RS2 5 2.00 10.00

0 8010 Total Quantity Nos 204.00 204.00

Providing and fixing M.S. fan clamp


type 1or II of 16 mm dia M.S. bar
bent to shape with hooke ends in
0 8016 R.C.C. slabs, beams during laying
including painting the exposed
portion of loop, all as per standard
design complete.

a Stilt Floor 45.00 45.00


b Ground Floor 56.00 56.00
c First Floor 52.00 52.00
d Second Floor 45.00 45.00

Providing and fixing M.S. fan


0 8016 Each 198.00 198.00
clamp …

Providing and fixing anodized


aluminium shutters in accordance
with the specification annexed with
Goa schedule of Rates (2004) Vol &
II including all taxes, transportation,
0 8032
scaffolding and handling etc.
complete as per direction of the
Engineer-in-charge: windows with
three sliding shutters using 18 mm
series shutters section.

c Figured glass

i Ground floor windows W1 10 1.50 1.25 18.75


ii First floor windows W1 38 1.50 1.25 71.25
iii Second floor W1 6 1.50 1.25 11.25

Providing and fixing anodized


0 8032 Sq.m 101.25 102.00
aluminium shutters …..

79 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
Extra for powder coating with pure
polyester powder of shade of
0 8042
required colour on the aluminium
section
Quantity of Item No. 63 101.25
Quantity of Item No. 65 291.42

0 8042 Total extra for powder coating……. Sq.m 392.67 393.00

Providing supplying and fixing


aluminium structural glazing using
approved make verticals 115.90mm
x 57mm and horizontals (as
structurally required for a
maximum horizontal span of
1200mm) double loop multiwall
holding sections with graphite grey
powder coating sections, 2.8mm
R.A.
0 thick openable shutter section 18mm
06
x 40mm tied to RCC wall and
column surfaces. G.I. L brackets,
anchor fasteners, bolts, nuts, screws
and fixing 6mm one way reflective
glass with 6mmx6mm double sided
tape and approved structural
sealant as per Architect's
specifications and drawing etc.
complete.

i Front side in office & second floor 1 14.50 6.40 92.80

1 4.89 6.40 31.30


ii Second floor hall 1 20.86 2.60 54.24
1 12.88 2.60 33.49
1 9.50 4.00 38.00
iii terrace side in second floor 1 16.00 2.60 41.60

R.A. Total aluminium structural


0 Sq.m 291.42 292.00
06 glazing………..

80 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
VII FLOORING AND FLOOR
FINISHES

52mm thick cement concrete


flooring with metallic concrete
hardener topping , under layer of
40mm thick cement concrete 1:2:4
( 1cement : 2 coarse :4 graded stone
1 9010 aggregate 20mm nominal size) and
top layers 12mm thick metallic
cement hardner constituting of mix
1:2 ( 1 cement : 2 graded stone
aggregate 6 mm nominal size by
volume with which metallic quality
is mixed in ratio 4:1 ( 4 parts of
cement :1 part of metallic )
hardening compound of approved
floor hardening compound of
approved quality) by weight,
including finishing complete.

i Stilt Floor
Portion 1 1 12.60 4.00 50.40
Portion 2 1 33.50 19.80 663.30
Portion 3 1 20.10 17.80 357.78
Portion 4 1 22.80 19.80 451.44
Extra for Front ramp 1 83.30 4.00 333.20
wheel chair ramp 1 40.50 1.00 40.50
Deduction for portion 5 1 11.77 3.50 -41.20

1 9010 Total Quantity Sq.m 1855.43 1856.00

Kotah stone slab flooring over 20


mm (average) thick base of cement
0 9042 mortar 1:4 (1cement :4 coarse sand)
laid over & jointed with grey cement
slurry mixed with pigment to match
the shade of the slab including
rubbing & polishing complete.
a 25 mm thick

81 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
I Ground Floor
i Front pathway 2 16.11 1.50 48.33
1 5.77 2.75 15.87
1 7.00 1.50 10.50
1 22.00 1.50 33.00
ii South side pathway 1 23.26 1.00 23.26
iii Backside pathway 1 5.20 0.80 4.16
1 8.00 2.80 22.40
1 6.00 2.00 12.00
1 6.00 2.00 12.00
1 4.52 1.50 6.78
1 13.70 1.50 20.55
1 6.20 1.50 9.30
1 14.00 1.50 21.00
1 13.50 1.50 20.25
iv Internal passage north side 2 27.70 1.80 99.72
2 5.30 1.80 19.08
v Passage 1 5.00 1.80 9.00
vi North side entrance 1 4.80 3.00 14.40

vii main entrance 1 11.80 2.77 32.69


main entrance passage
Front lobby 1 9.00 6.00 54.00
viii Ramp ( Inner) 1 12.00 2.80 33.60
South side internal passage 1 8.70 1.20 10.44
1 13.70 1.80 24.66
1 14.20 1.80 25.56
1 6.20 1.80 11.16
1 12.00 1.80 21.60

b First floor
i North side internal passage 1 3.40 1.80 6.12
1 26.00 1.80 46.80
1 29.60 1.80 53.28
1 5.30 1.80 9.54
1 10.20 1.80 18.36
ii South side internal passage 2 14.00 1.80 50.40
1 10.00 1.80 18.00

c Second Floor
i North side Passage 2 9.50 1.80 34.20
1 8.80 7.00 61.60
1 3.00 1.80 5.40

ii South side passage 1 11.00 1.80 19.80

82 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
1 10.00 1.80 18.00
1 5.80 4.80 27.84
1 6.00 1.80 10.80

0 9042 Kotah stone slab flooring over 20 Sq.m 995.44 996.00


mm (average) thick ………….

Providing and fixing 32cms x 48cms


x0.8 cms thick, 1st quality vitrified
antibacterial tiles for dado as per
1 9066
approved design and colour on a
12mm thick bed of cement 1:3
including filling joints with neat
coloured cement slurry mixed with
the pigment of matching shade,
curing and cleaning etc. complete.
a Ground Floor
i Ladies Toilet, p=2.77 x2 +1.15 x2 =7.8 2 7.84 1.80 28.22
W.c hand.P=1.52 x2 +1.5x2 =6.04 2 6.04 1.80 21.74
W.c .P=1.50 x2 +1.13x2 =5.26 2 5.26 1.80 18.94

ii Gents Toilet, p=2.77 x2 +1.15 x2 =7.84 2 7.84 1.80 28.22


W.c hand.P=1.52 x2 +1.5x2 =6.04 2 6.04 1.80 21.74
W.c .P=1.50 x2 +1.13x2 =5.26 2 5.26 1.80 18.94

iii Deduction for doors


D2 2 0.90 1.80 -3.24
D3 4 0.80 1.80 -5.76
D4 4 1.00 1.80 -7.20

a Total Quantity ground floor 121.61

b First Floor
i Ladies Toilet, p=2.77 x2 +1.15 x2 =7.8 2 7.84 1.80 28.22
W.c hand.P=1.52 x2 +1.5x2 =6.04 2 6.04 1.80 21.74
W.c .P=1.50 x2 +1.13x2 =5.26 2 5.26 1.80 18.94

ii Gents Toilet, p=2.77 x2 +1.15 x2 =7.84 2 7.84 1.80 28.22


W.c hand.P=1.52 x2 +1.5x2 =6.04 2 6.04 1.80 21.74
W.c .P=1.50 x2 +1.13x2 =5.26 2 5.26 1.80 18.94

iii Deduction for doors


D2 2 0.90 1.80 -3.24

83 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
D3 4 0.80 1.80 -5.76
D4 4 1.00 1.80 -7.20

b Total Quantity First floor Sq.m 121.61

c Second Floor

i Ladies & Gents Toilet, p=2.77 x2 2 7.84 1.80 28.22


+1.15 x2 =7.84
W.c hand.P=1.52 x2 +1.5x2 =6.04 2 6.04 1.80 21.74
W.c .P=1.50 x2 +1.13x2 =5.26 2 5.26 1.80 18.94

Deduction for doors


D2 1 0.90 1.80 -1.62
D3 2 0.80 1.80 -2.88
D4 2 1.00 1.80 -3.60

c Total Quantity Second floor Sq.m 60.80

1 9066 Total Quantity ……… Sq.m 304.02 304.00

Providing and fixing vitrified


2 9069 glossy finished (600 x 600) and 10
mm thick tiles in floor, treads of
steps, landing on 25 mm thick bed
of cement mortar 1:3 and jointed
with cement slurry complete.

a Ground Floor
Room 1 2 3.65 5.77 42.12
Room 2 8 2.77 5.77 127.86
Room 3 1 4.37 2.77 12.10
1 3.00 1.60 4.80
Room 4 1 2.77 2.75 7.62
Room 5 2 4.62 2.77 25.59
Room 6 4 2.19 3.74 32.76
Room 7 8 3.46 2.24 62.00
Room 8 6 2.77 2.77 46.04
Room 9 4 4.27 2.77 47.31
Room 10 1 3.90 2.61 10.18
Room 11 1 3.73 2.20 8.21
Room 12 1 4.61 2.20 10.14
Room 13 5 3.61 2.77 50.00

84 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
Room 14 4 2.84 2.77 31.47
Room 15 2 3.74 2.77 20.72
Room 16 2 3.79 1.80 13.64
Room 17 4 3.79 2.77 41.99

Total Skirting 1 976.15 0.10 97.62

b First Floor
Room 1 1 4.62 2.77 12.80
Room 2 2 5.77 2.77 31.97
Room 3 2 5.77 2.77 31.97
Room 4 2 2.77 4.37 24.21
Room 5 2 4.62 3.25 30.03
Room 6 8 3.46 2.24 62.00
Room 7 2 4.35 2.77 24.10
Room 8 1 4.35 3.74 16.27
Room 9 6 2.77 2.77 46.04
Room 10 1 5.17 5.25 27.14
Room 11 1 3.74 5.25 19.64
Room 12 1 3.74 4.99 18.66
Room 13 2 2.77 2.77 15.35
Room 14 2 3.74 2.77 20.72
Room 15 1 3.74 5.77 21.58
Room 16 1 3.74 4.80 17.95
Technical section room( work area) , 1 205.00 205.00
A =205 m2
Total Skirtingin work area,
L= 1 58.00 0.10 5.80
6+19+12+12+6+2+1=58
Total Skirting 1 476.62 0.10 47.66

c Second Floor
i Flooring
games room 1 5.77 5.77 33.29
meeting room 1 43.24 43.24
library 1 70.64 70.64
conference room 1 60.96 60.96
store 1 3.74 2.77 10.36

ii Skirting
games room 1 23.08 0.10 2.31
meeting room 1 27.70 0.10 2.77
library 1 26.80 0.10 2.68
conference hall 1 38.00 0.10 3.80
store 1 13.02 0.10 1.30

85 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

2 9069 Total Quantity of Flooring Sq.m 1602.41 1603.00

Providing and fixing vitrified


3 9070 antiskid tiles (320 x 320) and 10 mm
thick tiles in floor, treads of steps,
landing on 25 mm thick bed of
cement mortar 1:3 and jointed with
cement slurry complete.

a Ground Floor
Toilets 4 2.77 1.15 12.74
4 1.50 1.13 6.78
4 1.52 1.50 9.12
Extra for Door opening 8 1.00 0.15 1.20

b First Floor
Toilets 4 2.77 1.15 12.74
4 1.50 1.13 6.78
4 1.52 1.50 9.12
8 1.00 0.15 1.20
Terrace 2 12.50 2.80 70.00
Terrace skirting 4 12.50 0.10 5.00
4 2.80 0.10 1.12

c Second Floor
Hall 1 20.23 14.03 283.83
Hall portion 1 8.50 1.50 12.75
Hall portion 1 17.77 9.00 159.93
Partion 1 20.00 2.00 40.00
1 7.20 5.30 38.16

Toilets 2 2.77 1.15 6.37


2 1.50 1.13 3.39
2 1.52 1.50 4.56
2 1.00 0.15 0.30

Toilets 2 2.77 2.77 15.35


2 3.00 1.15 6.90
2 1.50 1.13 3.39
2 1.52 1.50 4.56
2 1.00 0.15 0.30
Terrace 1 1 91.31 91.31

86 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
Terrace skirting 2 16.00 0.10 3.20
2 6.00 0.10 1.20
Terrace 2 1 84.77 84.77
Terrace skirting 2 12.80 0.10 2.56
2 6.60 0.10 1.32

3 9070 Total Quantity Sq.m 899.95 900.00

Precast plain Cement Tacktiles


32mm thk of required shade in
floors, treads of steps and landing
0 9071
laid on 25mm bed of cement mortar
1:4(1cement:4coarse sand)
jointed………..

i Front main ramp 1 84.00 0.30 25.20


Wheel chair ramp 1 32.50 0.30 9.75

i Ramp 1 13.00 0.30 3.90

ii Tiles on all floors 3 17.00 0.30 15.30


3 8.00 0.30 7.20
3 10.00 0.30 9.00
3 5.00 0.30 4.50
3 11.00 0.30 9.90
3 3.00 0.30 2.70
3 35.00 0.30 31.50

Precast plain Cement Tacktiles


0 9071 Sq.m 118.95 119.00
32mm thk …..

Providinfg & fixing jointless kotah


stone slab ( 20mm average
R.A.
thickness) treads to steps of
0 07/W
staircases including rounding /
A
nosing exposed edges of kotah stone
slab treads lead on 20mm thick base
of cement mortar 1:3( 1 cement : 3
sand) including rubbing and
polishing etc. complete

a Stilt Floor
87 of 203 Consultant EAS Panaji
Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
a1 North side staircase
Flight 1 steps treads 9 1.50 0.27 3.65
Flight 2 steps treads 4 1.50 0.27 1.62
Flight 3 steps treads 9 1.50 0.27 3.65
Landing 2 2.30 1.50 6.90

a2 South side staircase


Flight 1 steps treads 8 1.50 0.27 3.24
Flight 2 steps treads 5 1.50 0.27 2.03
Flight 3 steps treads 8 1.50 0.27 3.24
Landing 2 2.10 1.50 6.30

b Ground Floor
b1 North side staircase
Flight 1 steps treads 9 1.50 0.27 3.65
Flight 2 steps treads 9 1.50 0.27 3.65
Flight 3 steps treads 9 1.50 0.27 3.65
Landing 2 1.50 1.50 4.50

b2 South side staircase


Flight 1 steps treads 8 1.50 0.27 3.24
Flight 2 steps treads 7 1.50 0.27 2.84
Flight 3 steps treads 8 1.50 0.27 3.24
Landing 2 1.50 2.00 6.00

c First Floor
c1 North side staircase
Flight 1 steps treads 9 1.50 0.27 3.65
Flight 2 steps treads 4 1.50 0.27 1.62
Flight 3 steps treads 9 1.50 0.27 3.65
Landing 2 2.30 1.50 6.90

c2 South side staircase


Flight 1 steps treads 8 1.50 0.27 3.24
Flight 2 steps treads 5 1.50 0.27 2.03
Flight 3 steps treads 8 1.50 0.27 3.24
Landing 2 2.10 1.50 6.30

d For steps
Front Steps 8 9.00 2.27 163.44
landing 1 9.00 1.80 16.20
Side steps 16 1.50 0.27 6.48
landing 2 1.50 0.80 2.40
landing 1 3.00 1.50 4.50
North side steps 9 4.80 0.27 11.66

88 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
back side 9 4.40 0.27 10.69

R.A. Providinfg & fixing jointless kotah


0 Sq.m 307.36 308.00
07/WA stone slab …..

R.A.
0
8/WA

Risers
a Stilt Floor
a1 North side staircase
Flight 1 steps risers 10 1.50 0.15 2.25
Flight 2 steps risers 5 1.50 0.15 1.13
Flight 3 steps risers 10 1.50 0.15 2.25

a2 South side staircase


Flight 1 steps risers 9 1.50 0.15 2.03
Flight 2 steps risers 6 1.50 0.15 1.35
Flight 3 steps risers 9 1.50 0.15 2.03

b Ground Floor
b1 North side staircase
Flight 1 steps risers 10 1.50 0.15 2.25
Flight 2 steps risers 10 1.50 0.15 2.25
Flight 3 steps risers 10 1.50 0.15 2.25

b2 South side staircase


Flight 1 steps risers 9 1.50 0.15 2.03
Flight 2 steps risers 8 1.50 0.15 1.80
Flight 3 steps risers 9 1.50 0.15 2.03

c First Floor
c1 North side staircase
Flight 1 steps risers 10 1.50 0.15 2.25
Flight 2 steps risers 5 1.50 0.15 1.13
Flight 3 steps risers 10 1.50 0.15 2.25

c2 South side staircase

89 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
Flight 1 steps risers 9 1.50 0.15 2.03
Flight 2 steps risers 6 1.50 0.15 1.35
Flight 3 steps risers 9 1.50 0.15 2.03

d Fof steps
Front Steps risers 9 9.00 0.15 12.15
Side steps 18 1.50 0.15 4.05
North side steps 10 4.80 0.15 7.20
back side 10 4.40 0.15 6.60

e Skirting for staircase


North side all floors
Flight 1& Flight 3 12 3.93 0.10 4.72
Flight2 3 9.45 0.10 2.84
Flight2 3 2.45 0.10 0.74
South side all floors
Flight 1& Flight 3 12 3.51 0.10 4.21
Flight2 3 10.35 0.10 3.11
Flight2 3 4.35 0.10 1.31

Skirtings
a Ground Floor
Skirting 2 295.26 0.10 59.05

b First floor
Skirting 2 98.50 0.10 19.70

c Second Floor
skirting 2 54.10 0.10 10.82

R.A. Providinfg & fixing kotah stone


0 171.13 172.00
8/WA slab risers, …. Sq.m

VIII ROOFING

Providing and laying 1st class


mangalore tile roof covering with
0 10049 25x50 mm (1"x2") jamba wood or
similar batten including nails etc.
but excluding rafters.

i Sloping slab
slab1 , L =(12 +7.5)/2=9.75 1 9.75 3.200 31.20

90 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
slab2 , L =(15.8 +7.5)/2=11.65 1 11.65 5.600 65.24
slab3 2 4.50 2.80 25.20
slab4, L =(6.5 +4.5 )/2=5.5 2 5.50 2.800 30.80

0 10049 Total mangalore tiles roofing…. Sq.m 152.44 153.00

Providing and laying ridge tiles laid


0 10053 dry & pointed with lime mortar 1:2
(1 lime : 2 surkhi )

i Back side sloping slab 1 7.50 7.50


2 7.10 14.20
2 4.20 8.40

0 10053 Total ridge tiles….. R.Mts 30.10 31.00

Providing water proofing treatment


over the new R.C.C. roofs terrace by
spreading cement slurry over the
R.C.C. slab and laying of 10cms.
0 10082 Average laterite stone ballast
coba with the necessary gradient
for easy flow of rain water and the
coba in covered with
damp ...................

a Gound Floor level

Open to sky courtyard south side 1 9.00 6.00 54.00

Open to sky courtyard north side 1 9.00 4.80 43.20

Toilet 4 2.77 2.77 30.69

b First Floor level


terrace 2 12.60 2.80 70.56
Sloping slab
slab1 , L =(12 +7.5)/2=9.75 1 9.75 3.200 31.20
slab2 , L =(15.8 +7.5)/2=11.65 1 11.65 5.600 65.24
slab3 2 4.50 2.80 25.20
slab4, L =(6.5 +4.5 )/2=5.5 2 5.50 2.800 30.80
Toilets 4 2.77 2.770 30.69
Flat slab over entrance lobby 1 12.00 12.00 144.00
1 12.00 8.00 96.00

91 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

c Second Floor level


Hall 1 20.23 14.03 283.83
Hall portion 1 8.50 1.50 12.75
Hall portion 1 17.77 9.00 159.93
Partion 1 20.00 2.00 40.00
1 7.20 5.30 38.16
Toilet block 2 2.77 2.77 15.35
Terrace 1, A= 91.31 sq.m 1 91.31 91.31
Terrace 2, A= 84.77 sq.m 1 84.77 84.77
Staircase slab
North Side 1 6.00 7.00 42.00
South side 1 6.00 6.00 36.00

0 10082 Total quantity Sq.m 1425.68 1426.00

Providing and fixing colour coated


Galvulium roofing sheetsof 0.5 mm
thickness including all the acessories
0 10091
but excluding the cost of purling,
rafters, trusses, etc. complete as per
direction of Enginreer in charge.

i Roofing Quantity
Roof above the south side Part 1 26.00 15.50 403.00
Roof above the south side Part 1 9.50 8.00 76.00

0 10091 Total Quantity Sq.m 479.00 479.00

Providing and fixing brick masonry


lining as rafters over RCC sloping
slab with single line brick masonry
R.A. of bricks of class designation of 40
0
9 kg. / cm2 in cement mortar 1:3 (1
cement : 3 fine sand) with water
proofing material to the sides of the
brick

Brick rafters over slab 16 5.10 81.60


16 2.80 44.80
72 3.40 244.80

92 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
R.A. Providing and fixing brick
0 R.m 371.20 372.00
9 masonry ………..

Providing and laying of 4mm thick


polymer modified bitumen water
proofing membrane of approved
make for sloping roof , open terrace
R.A.
0 and toilet drops with necessary
10
gradient for drainage with non
woven polymer reinforcement (160
gm) minimum over vermiculate
concrete / RCC etc. complete

i Sloping slab
slab1 , L =(12 +7.5)/2=9.75 1 9.75 3.200 31.20
slab2 , L =(15.8 +7.5)/2=11.65 1 11.65 5.600 65.24
slab3 2 4.50 2.80 25.20
slab4, L =(6.5 +4.5 )/2=5.5 2 5.50 2.800 30.80

R.A.
0 Total Quantity ……….. Sq.m 152.44 153.00
10

IX PLASTERING AND
FINISHING WORKS

12mm cement plaster 1:4 (1


1 11004 cement: 4 fine sand) internal
plaster at all heights

A Ground Floor

Room 1, P= 5.77 x 2+3.65 X2 = 18.84


4 18.84 4.35 327.82

Room 2, P=5.77 x2 +2.77 x2 =17.08


18 17.08 4.35 1337.36
Room 3, P=4.37 x2 +2.77 x 2 +3x2
= 20.28 4 20.28 4.35 352.87

Room 4, p= 2.77 x2+2.75 x2=11.04


4 11.04 4.35 192.10

Room 5, p=4.62 x2+2.77 x2=14.78


4 14.78 4.35 257.17

Room 6, p=2.19 x2 +3.74 x2=11.86


8 11.86 4.35 412.73

93 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

Room 7, p=3.46 x2 +2.24 x2 =11.4


16 11.40 4.35 793.44
Room 8, p=2.77 x4 =11.08 12 11.08 4.35 578.38
Passage walls
Wall 1 4 27.70 4.35 481.98
Wall 2 6 7.00 4.35 182.70
Wall 3 4 5.30 4.35 92.22
Wall 4 8 7.60 4.35 264.48
Wall 5 4 5.20 4.35 90.48
Wall 6 2 15.40 4.35 133.98
Wall 7 2 12.20 4.35 106.14
Staircase block
short Wall 4 4.10 4.35 71.34
long Wall 2 6.50 4.35 56.55

Toilet block

Ladies & gents , p=2.77 x4 =11.08


4 11.08 4.35 192.79
W/c, p= 1.13 x2 + 1.5 x2 = 5.26 4 5.26 2.50 52.60
w/c for handicapped , p=1.52 x2
+1.5 x2 = 6.04 4 6.04 2.50 60.40
External partition wall 4 2.77 2.50 27.70

Room 9, p= 2.77 x2 +4.27 x2 =14.08


4 14.08 4.35 244.99

Room 10, p= 3.9 +1.9 +4.1+3.2 =13.1


2 13.10 4.35 113.97

Room 11, p=3.4 +2.3+4+2.2=11.9


3 11.90 4.35 155.30

Room 12, p=4.2 +2.2+4.9 +2.2 =13.5


2 13.50 4.35 117.45

Room 13, p=2.77 x2+3.61 x2 =12.76


2 12.76 4.35 111.01

Room 14, P=2.77 x2+ 2.84 x2= 11.22


1 11.22 4.35 48.81

Room 15, p= 2.77 x2 +3.74 x2 =13.02


1 13.02 4.35 56.64

Room 16, p= 3.79 x2 + 1.8 x2=11.18


1 11.18 4.35 48.63

Room 17, p= 3.79 x2+2.77 x2 =13.12


1 13.12 4.35 57.07
Wall 9 1 6.50 4.35 28.28
Wall 10, L= 8.6 +1.5 x2 = 11.6 1 11.60 4.35 50.46
Wall 11 1 11.00 4.35 47.85
Wall 12 1 4.20 4.35 18.27

94 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
Wall 13 1 6.30 4.35 27.41
Wall 14 1 6.40 4.35 27.84
Wall 15 1 16.10 4.35 70.04
Wall 16 1 3.40 4.35 14.79
Wall 17 1 10.25 4.35 44.59
Staircase
Short wall 2 4.00 4.35 34.80
long wall 1 5.80 4.35 25.23

Toilet block

Ladies & gents , p=2.77 x4 =11.08


2 11.08 4.35 96.40
W/c, p= 1.13 x2 + 1.5 x2 = 5.26 2 5.26 2.50 26.30
w/c for handicapped , p=1.52 x2
+1.5 x2 = 6.04 2 6.04 2.50 30.20
External partition wall 2 2.77 2.50 13.85

i Deduction s
Rolling shutters, RS1 64 2.40 2.10 -322.56
Rolling shutters, RS2 12 1.50 2.10 -37.80
Door D2 ( half deduction) 4 0.90 2.25 -8.10
Door D3 4 0.80 2.10 -6.72
Door D4 4 1.00 2.10 -8.40

Extra for soffits & jambs


Rolling shutters, RS1 43 6.60 0.23 65.27
Rolling shutters, RS2 14 5.70 0.23 18.35

Deduction for walls in revised plan


ii
in Ground Floor
wall-1 4 5.40 3.90 -84.24
wall-2 4 3.74 3.90 -58.34
wall-3 8 3.46 3.90 -107.95
wall-4 2 4.62 3.90 -36.04
wall-5 2 3.74 3.90 -29.17
wall-6 2 3.00 3.90 -23.40
wall-7 2 4.00 3.90 -31.20
wall-8 4 2.84 3.90 -44.30
wall-9 10 3.79 3.90 -147.81
wall-10 2 3.74 3.90 -29.17

Total internal plaster for Ground


A
Floor Sq.m 6683.80

B Plaster for First Floor

95 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

Room 1,p = 4.62 x 2 +2.77 x2 =14.78


1 14.78 3.35 49.51

Room 2, p=5.77 x2 +2.77 x2 =17.08


2 17.08 3.35 114.44

Room 3, p=2.77 x2 +5.77 x2 =17.08


2 17.08 3.35 114.44

Room 4, p=2.77 x2 +4.37 x2 =14.28


2 14.28 3.35 95.68

Room 5, p= 4.62 x2 + 3.25 x2 =15.74


2 15.74 3.35 105.46

Room 6, p=3.46 x2 +2.24 x2 =11.4


8 11.40 3.35 305.52

Room 7, p= 4.35 x2 +2.77 x2 =14.24


2 14.24 3.35 95.41

Room 8, p=4.35 x2 +3.74 x2 =16.18


1 16.18 3.35 54.20
Room 9, p=2.77 x4= 11.08 6 11.08 3.35 222.71
wall 1 1 24.20 3.35 81.07
wall 2 1 10.3 3.35 34.51
wall 3 2 3.30 3.35 22.11
wall 4 2 5.30 3.35 35.51
wall 5 1 10.4 3.35 34.84
wall 6 4 7.60 3.35 101.84
wall 7 2 12.20 3.35 81.74
Staircase block
short Wall 2 4.10 3.35 27.47
long Wall 1 6.50 3.35 21.78

Toilet block

Ladies & gents , p=2.77 x4 =11.08


2 11.08 3.35 74.24
W/c, p= 1.13 x2 + 1.5 x2 = 5.26 2 5.26 2.50 26.30
w/c for handicapped , p=1.52 x2
+1.5 x2 = 6.04 2 6.04 2.50 30.20
External partition wall 2 2.77 2.50 13.85
Room 10, p=4+5.8+1.6=11.4 1 11.40 3.35 38.19

Room 11, p =5.25 x2 +3.74 x2 =17.98


1 17.98 3.35 60.23

Room 12, p= 3.74 x2 +4.99 x2 =17.46


1 17.46 3.35 58.49
Room 13, p=2,77 x4 = 11.08 2 11.08 3.35 74.24

Room 14, p=3.74 x2 + 2.77 x2=13.02


2 13.02 3.35 87.23

Room 15, p=3.74 x2+5.77 x2= 19.02


1 19.02 3.35 63.72

96 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

Room 16, p=3.74 x2 +4.8 x2 =17.08


1 17.08 3.35 57.22
wall 8 1 10.80 3.35 36.18
wall 9 1 4.40 3.35 14.74
wall 10 1 2.00 3.35 6.70
wall 11 1 21.60 3.35 72.36
wall 12 1 3.40 3.35 11.39
wall 13 1 10.20 3.35 34.17
wall 14 1 6.40 3.35 21.44
wall 15 1 4.30 3.35 14.41
wall 16 1 4.30 3.35 14.41
wall 17 1 7.00 3.35 23.45
wall 18 1 6.50 3.35 21.78

Staircase
Short wall 2 4.00 3.35 26.80
long wall 1 5.80 3.35 19.43

Toilet block

Ladies & gents , p=2.77 x4 =11.08


2 11.08 3.35 74.24
W/c, p= 1.13 x2 + 1.5 x2 = 5.26 2 5.26 2.50 26.30
w/c for handicapped , p=1.52 x2
+1.5 x2 = 6.04 2 6.04 2.50 30.20
External partition wall 2 2.77 2.50 13.85

i Deductions for openings


Rolling shutters, RS1 21 2.40 2.10 -105.84
Rolling shutters, RS2 5 1.50 2.10 -15.75
Door D1 4 1.80 2.25 -16.20
Door D2 ( half deduction) 13 0.90 2.25 -26.33
Door D3 4 0.80 2.10 -6.72
Door D4 4 1.00 2.10 -8.40

Extra for soffits & jambs


Rolling shutters, RS1 21 6.60 0.23 31.88
Rolling shutters, RS2 5 5.70 0.23 6.56

ii Deduction for walls in revised plan

wall 3 4 3.46 0.23 2.90 -9.23


wall 10 1 3.74 0.23 2.90 -2.49

B Total of first floor Plaster Sq.m 2491.43

97 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
C Second Floor
Wall 1 2 12.60 3.50 88.20
Wall 2 1 20.40 4.30 87.72
Wall 3 3 6.00 3.80 68.40
Wall 4 1 13.50 3.50 47.25
Wall 5 1 6.00 3.50 21.00
Wall 6 2 18.00 3.75 135.00
Wall 7 2 5.60 4.60 51.52
Wall 8 1 5.60 3.20 17.92
Pantry 4 2.77 3.70 41.00
Wall 9 1 7.20 4.80 34.56
Wall 10 1 3.40 3.70 12.58
Wall 11 1 12.00 3.70 44.40
Wall 12 1 7.00 3.80 26.60
Staircase block
short Wall 2 4.10 3.35 27.47
long Wall 1 6.50 3.35 21.78

Toilet block

Ladies & gents , p=2.77 x4 =11.08


4 11.08 3.35 148.47
W/c, p= 1.13 x2 + 1.5 x2 = 5.26 2 5.26 2.50 26.30
w/c for handicapped , p=1.52 x2
+1.5 x2 = 6.04 2 6.04 2.50 30.20
External partition wall 2 2.77 2.50 13.85
meeting room, p=3.5 +9.5+6.3+8.8
=28.1 1 28.10 3.70 103.97

Library, p =6.4 +6+8.4 +5.8 =26.6 1 26.60 3.70 98.42


Conference room,
p=8.4+9.2+11.5+8.7 =37.8 1 37.80 3.60 136.08
Games room, p =5.77 x4=23.08 1 23.08 3.75 86.55
wall 13 1 12.00 3.60 43.20
Wall 14 1 6.00 3.75 22.50
Wall 15 1 4.00 3.75 15.00
Wall 16 1 3.40 3.80 12.92
Wall 17 1 10.20 3.50 35.70
Staircase
Short wall 2 4.00 3.35 26.80
long wall 1 5.80 3.35 19.43

Toilet block

Ladies & gents , p=2.77 x4 =11.08


2 11.08 3.35 74.24
W/c, p= 1.13 x2 + 1.5 x2 = 5.26 2 5.26 2.50 26.30

98 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
w/c for handicapped , p=1.52 x2
+1.5 x2 = 6.04 2 6.04 2.50 30.20
External partition wall 2 2.77 2.50 13.85

i Deduction s
Door D1 10 1.80 2.25 -40.50
Door D2 ( half deduction) 6 0.90 2.25 -12.15
Door D3 4 0.80 2.10 -6.72
Door D4 4 1.00 2.10 -8.40
Window W1 3 1.50 1.25 -5.63
Fixed glass 2 13.00 2.60 -67.60
Fixed glass 1 20.86 2.60 -54.24
Fixed glass 1 9.00 2.60 -23.40
Fixed glass 1 5.00 2.60 -13.00
Fixed glass 1 14.00 2.60 -36.40
Fixed glass 1 5.00 2.60 -13.00

C Total of Second floor plaster Sq,m 1408.34

12mm cement plaster 1:4 (1


1 11004 10583.56 7588.00
cement: 4 fine sand) ….. Sq,m

15mm cement plaster 1: 3 (1


cement : 3 fine sand) on the rough
2 11007 side of single or half brick wall.

a Plaster to water tank, septic tank…


i Water storage sump 2 6.00 3.20 38.40
2 3.00 3.20 19.20
2 6.00 3.00 36.00

15mm cement plaster 1: 3 (1


93.60 94.00
2 11007 cement : 3 fine sand) …. Sq,m

3 11015 6mm cement plaster to ceiling 1: 3


(1 cement: 3 fine sand)

a Stilt Floor slab


Area =1097.71 sq. 1097.71

99 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
Staircase landing for north side
staircase 1 5.80 1.50 8.70
Staircase landing for south side
staircase 1 5.80 1.40 8.12
Extra for beams, p=0.65 x2+ 0.23 =
1.53 1 890.54 1.53 1362.53

i Deduction for staircases


North side staircase 1 5.80 4.70 -27.26
South side staircase 1 5.80 4.00 -23.20

ii Deduction for beams


Total length of beams=890.54 1 890.54 0.23 -204.82

a Total of Stilt floor………. Sq.m 2221.77

b Ground Floor slab


Area =1097.71 sq. 1097.71
Staircase landing for north side
staircase 2 1.50 1.50 4.50
Staircase landing for south side
staircase 2 1.40 1.40 3.92

i Deduction for staircases


North side staircase 1 5.80 4.70 -27.26
South side staircase 1 5.80 4.00 -23.20

ii Deduction for beams


Total length of beams=907.61 1 907.61 0.23 -208.75

b Total Ground floor…………. Sq.m 846.92

c First Floor slab


Area =966.11 sq. 966.11
Staircase landing for north side
staircase 2 2.50 1.50 7.50
Staircase landing for south side
staircase 2 2.00 1.40 5.60
i Deduction for staircases
North side staircase 1 5.80 4.70 -27.26
South side staircase 1 5.80 4.00 -23.20

ii Deduction for beams


Total length of beams=890.54 1 890.54 0.23 -204.82

100 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
c Total of First floor slab Sq.m 723.93

d Second Floor slab


Slab above North side staircase 1 6.00 6.50 39.00
toilet slab 4 2.77 2.77 30.69
Slab above south side staircase 1 5.80 5.80 33.64
toilet slab 2 2.77 2.77 15.35
corridoor 1 12.00 1.80 21.60
Staircase landing for north side
staircase 2 2.50 1.50 7.50
Staircase landing for south side
staircase 2 2.00 1.40 5.60

d Total Second floor slab Sq.m 153.38

6mm cement plaster to ceiling 1: 3


3 11015 Sq.m 3945.99 3946.00
(1 cement: 3 fine sand)

4 11018 Neat Cement punning

Cement punning to water tank,


a septic tank…
i Water storage sump 2 6.00 3.20 38.40
2 3.00 3.20 19.20
1 6.00 3.00 18.00

Neat Cement punning Sq.m 75.60 76.00


4 11018

18mm cement plaster in two coats


under layer 12mm thick cement
plaster 1:5( 1 cement:5 coarse sand)
11036+ and top layer 6mm thick with
cement plaster 1:3 ( 1 cement:3
5
11035/ coarse sand) including mixing
2 waterproofing material for the top
layer in proportion recommended
by the manufacture, finished with
sponge complete. in one coat

a Stilt Floor
Wall 1, L = 37.99-7 x 0.6-3 x0 .23 - 2x
1
0.12 =32.86 32.86 4.05 133.08

101 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
Wall 2 2 3.50 4.05 28.35
Wall 3 1 11.00 4.05 44.55
Wall 4 , L = 24.23 - 0.6 -2x 0.23
1
-0.23=22.94 22.94 4.05 92.91

For Columns, p=1.66sq.m 63 1.66 3.40 355.57

a Total Stilt Floor Sq.m 654.46

b Gound Floor
b1 Ramp front side 1 23.20 3.80 44.08
Inner side of ramp 1 23.20 0.40 9.28
Top portion of ramp wall 1 23.20 0.23 5.34
ramp wall 1 16.50 3.80 62.70
Inner side of ramp 1 16.50 0.40 6.60
Top portion of ramp wall 1 16.50 0.23 3.80
Ramp front side 1 30.88 3.80 58.67
Inner side of ramp 1 30.88 0.40 12.35
Top portion of ramp wall 1 30.88 0.23 7.10
For pathway side wall 1 23.20 3.60 41.76
1 30.88 3.60 55.58
b2 External walls Front side 1 16.11 4.50 72.50
2 1.30 4.50 11.70
1 5.77 4.50 25.97
1 16.11 4.50 72.50
1 13.40 4.50 60.30
1 10.00 4.50 45.00
1 10.50 4.50 47.25
1 14.38 4.50 64.71
1 23.26 4.50 104.67
1 4.50 4.50 20.25
2 4.52 4.50 40.68
1 12.23 4.50 55.04
1 3.40 4.50 15.30
1 12.00 4.50 54.00
1 8.50 4.50 38.25
1 12.00 4.50 54.00
1 3.30 4.50 14.85
1 13.30 4.50 59.85

b3 Open to sky courtyard north side 2 4.70 4.50 42.30

4 9.00 1.00 36.00

b4 Open to sky courtyard south side 1 9.00 4.50 40.50

1 5.70 4.50 25.65

102 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
1 9.00 1.00 9.00
1 5.70 1.00 5.70
b5 Rectangular columns 7 1.66 5.20 60.42

b6 Deductions
Rolling shutters RS1 32 2.40 2.10 -161.28
Rolling shutters RS2 5 1.50 2.10 -15.75
Windows W1( half deduc.) 5 1.50 1.25 -9.38

b Total Gound Floor Sq.m 1197.23

c First Floor Level


c1 Front side wall 2 16.11 3.50 112.77
2 1.25 3.50 8.75
1 5.80 3.50 20.30
1 13.40 3.50 46.90
1 4.00 3.50 14.00
1 5.00 3.50 17.50
1 25.60 3.50 89.60
c2 South side wall 1 4.89 3.50 17.12
1 23.26 3.50 81.41
c3 Back side wall 1 4.00 3.50 14.00
2 14.00 1.00 28.00
2 8.00 3.50 56.00
2 6.00 1.00 12.00
4 9.80 3.50 137.20
2 5.70 3.50 39.90
2 8.30 3.50 58.10
3 13.20 3.50 138.60
2 2.00 3.50 14.00
1 10.00 3.50 35.00
1 11.90 3.50 41.65
1 8.50 3.50 29.75
1 12.00 3.50 42.00
c4 North side wall 1 5.03 3.50 17.61
1 13.20 3.50 46.20

c5 open to sky court yard north side 2 3.50 35.00


5
4 9.00 1.00 36.00

c6 open to sky court yard south side 1 9.00 3.50 31.50

1 6.00 3.50 21.00


2 9.00 1.00 18.00
2 6.00 1.00 12.00
c7 Pergollas 29 1.80 1.00 52.20

103 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
c8 Rectangular columns 7 1.66 5.20 60.42

c9 Deductions for windows


W1 ( half deduc. ) 19 1.50 1.25 -35.63

c Total First Floor Level Sq.m 1348.85

d Second Floor
d1 Front side wall 2 12.88 3.50 90.16
1 14.50 3.50 50.75
1 13.20 3.75 49.50
1 4.00 3.80 15.20
1 5.00 3.75 18.75
1 10.00 3.75 37.50
1 6.00 3.80 22.80
2 10.00 1.00 20.00
1 25.50 3.60 91.80
d2 South side wall 1 4.89 3.60 17.60
1 7.00 3.80 26.60
2 16.00 1.00 32.00
1 6.00 3.75 22.50
d3 Back side wall 2 18.23 1.00 36.46
1 3.00 3.60 10.80
1 12.00 3.50 42.00
1 8.50 3.50 29.75
1 2.77 3.75 10.39
1 3.00 3.75 11.25
1 14.20 3.50 49.70
d4 North side wall 1 20.86 3.70 77.18

d5 Open to sky court yard north side 2 5.00 3.80 38.00

4 9.00 1.00 36.00

d6 Open to sky court yard north side 2 3.00 1.00 6.00

2 6.00 1.00 12.00


2 9.00 1.00 18.00
1 6.00 3.80 22.80
1 5.80 3.60 20.88
d7 Rectangular columns 9 1.66 3.50 52.29

d8 Staircase on roof
North side 2 6.00 4.00 48.00
1 8.50 4.00 34.00
1 6.20 4.00 24.80
South 2 6.20 4.00 49.60

104 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
2 6.30 4.00 50.40

d9 Deductions
Windows W1 6 1.50 1.25 -11.25
FD north side 1 20.00 2.60 -52.00
FD front side 2 12.88 2.60 -66.98
1 9.20 2.60 -23.92
1 14.60 3.00 -43.80
FD south side 1 4.89 3.00 -14.67
FD back side 1 11.00 2.60 -28.60

d Second Floor Sq.m 934.25

e Compound wall

e1 compound wall above ground level 2


4.43 0.21 1.86
2 1.00 0.21 0.42
2 6.72 0.21 2.82
2 17.46 0.21 7.33
2 42.80 0.21 17.98
2 4.60 0.21 1.93
2 41.92 0.21 17.61
2 8.38 0.21 3.52
2 1.00 0.21 0.42
2 23.14 0.21 9.72
2 6.34 0.21 2.66
2 4.27 0.21 1.79
2 9.02 0.21 3.79
e2 Columns , p= 0.3 x4 = 1.2 49 1.20 1.45 85.26
span = 48 x2 =96 96 3.19 1.47 450.17
Deduction for span joining to
e3 98 0.23 1.35 -30.43
column= 49 x 2=98

e Total of compound wall 576.86

18mm cement plaster in two coats


5 11036 4711.65 4712.00
under …. Sq.m

105 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

18mm cement plaster in two coats


under layer 12mm thick cement
11036+ plaster 1:5( 1 cement:5 coarse sand)
11035/ and top layer 6mm thick with
6
2 + cement plaster 1:3 ( 1 cement:3
11038 coarse sand) including mixing
waterproofing material for the top
layer in proportion recommended
by the manufacture, finished with
sponge complete. for plastering on
circular works not exceeding 6m in
radius
a In one coat

Circular columns at stilt floor 9 1.57 3.40 48.04


Circular columns at first floor 19 1.57 3.70 110.37
Circular columns at second floor 19 1.57 3.70 110.37
Circular columns at third floor 20 1.57 3.50 109.90

11036+
6 11035/2 plastering on circular works not
+ 11038
exceeding 6m in radius Sq.m 378.68 379.00

Distempering two or more coats


with oil bound washable distemper
7 11062 of approved brand and manufacture
and of required shade on new work
over and including a priming coat
with distemper primer of approved
brand and manufacture to give an
even shade.

Qty. same as ceiling plaster 3945.99


Distempering two or more coats
7 11062
with oil bound …. Sq.m 3945.99 3946.00

Applying one coat of cement


8 11064 primer of approved brand and
manufacture on wall surface.
Quantity same as Item no H2 =
7587.93 sq.m 7587.93

106 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

Deduct qty. of dado= 304.05sq.m -304.05


Applying one coat of cement
8 11064
primer … Sq.m 7283.88 7284.00

Wall painting (two or more coats)


9 11099
with plastic emulsion paint of
approved brand and manufacture
on new work to give an even shade.
Quantity same as Item No. 80 7283.88

9 11099 Walll painting….. Sq.m 7283.88 7284.00

Applying priming coat with ready


10 11076 mixed primer of approved brand
and manufacture on wood work
complete.

i Ground Floor
D2 , P = 2x2.35+1.1=5.8 m 4 5.80 0.26 6.03

ii First Floor
D1 , P = 2x2.35+2.0=6.70 m 4 6.70 0.35 9.38
D2 , P = 2x2.35+1.1=5.80 m 13 5.80 0.26 19.60

iii Second Floor


D1 , P = 2x2.35+2.0=6.70 m 10 6.70 0.35 23.45
D2 , P = 2x2.35+1.1=5.80 m 6 5.80 0.26 9.05

10 11076 Applying priming coat…. Sq.m 67.51 68.00

Applying priming coat with ready


11 11077 mixed primer of approved brand
and manufacture on steel work
complete.

i Total grill quantity =101.25 Sq.m 1 101.25 101.25


ii Rollig shutters
RS1 of all the floors = 85 x2 x1.2
=204 204 2.40 2.10 1028.16

RS2 of all the floors= 17x2 x1.2 =40.8 41 1.50 2.10 128.52

107 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
Top covers for RS1 85 2.60 0.80 176.80
Top covers for RS2 17 1.90 0.80 25.84

11 11077 Applying priming coat …. Sq.m 1460.57 1461.00

Painting two or more coats


0 11083 (excluding priming coat) with
superior quality ready mixed paint
for steel work of approved brand &
manufacture in all shades on new
work to give an even shade.
a Quantity same as Item no. 90 1 1460.57
b Painting to trusses
i Total Roofing Area = 479.00
ii Truss area = 60% of roof Area
truss area =0.6 x 479 =287.40 287.40

Total quantity of steel work


0 11083
painting Sq.m 1747.97 1748.00

Painting two or more coats


1 11085 (excluding priming coat) with
superior quality ready mixed paint
for wood work of approved brand &
manufacture in all shades on new
work to give an even shade.

1 11085 Quantity same as Item No.89 Sq.m 67.51 68.00

Painting three or more coats with


acryllic exterior paint of approved
2 11119 brand and manufacture (such as
weather shield,APEX) including
applying one coat of cement primer
and one coat of surface treatment
etc. complete.

Same as Item No. 84 of 18mm


cement plaster 4711.65

108 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
Painting three or more coats with
2 11119
acryllic exterior paint …. Sq.m 4711.65 4712.00

R.A.
Finishing fine with ready made
3 11/
putty over plaster at all heights
WA

ceiling qty+ internal plaster qty -


dado qty
Qty. =3945.99 +7587.93
-304.05=11229.87 Sq.m 11229.87

R.A.
Finishing fine with ready made
11/
putty over plaster at all heights
3 WA Sq.m 11229.87 11230.00

X WATER SUPPLY,
SEWERAGE,PLUMBING AND
SANITATION WORKS

4 0

Single plate with 5 litres C.I


automatic Flushing cisterns Each

a Second Floor
Gents toilet 6 6.00

109 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

4 0 Total urinals…… Each 6.00 6.00

Providing & fixing c.p. brass towel


5 15634 rail complete with C.P. brass
brackets fixed to wooden cleats with
C. P. brass screws
600 x 20 mm size
i Upper Ground Floor
Gents Toilet 20 20.00
Ladies toilet 20 20.00

ii First Floor
Gents toilet 8 8.00
Ladies toilet 8 8.00

iii Second Floor


Gents toilet 8 8.00
Ladies toilet 8 8.00

5 15634 Total brass towel rails Each 72.00 72.00

0 15635 Providing and fixing toilet paper


holder :

i Upper Ground Floor


Gents Toilet 4 4.00
Ladies toilet 4 4.00

ii First Floor
Gents toilet 4 4.00
Ladies toilet 4 4.00

iii Second Floor


Gents toilet 4 4.00
Ladies toilet 4 4.00

0 15635 Total paper holder Each 24.00 24.00

Providing & fixing liquid soap


8 15636 container with C. P. brass lid and
brackets fixed to wooden cleats with
C. P. brass screws
a Glass container

110 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

i Upper Ground Floor


Gents Toilet 4 4.00
Ladies toilet 4 4.00

ii First Floor
Gents toilet 4 4.00
Ladies toilet 4 4.00

iii Second Floor


Gents toilet 4 4.00
Ladies toilet 4 4.00

8 15636 Total liquid soap container Each 24.00 24.00

Providing & fixing soap dish


0 15637 chromium plated with brackets
fixed to wooden cleats with CP
brass screw

i Upper Ground Floor


Gents Toilet 4 4.00
Ladies toilet 4 4.00

ii First Floor
Gents toilet 4 4.00
Ladies toilet 4 4.00

iii Second Floor


Gents toilet 4 4.00
Ladies toilet 4 4.00

0 15637 Total brass towel rails Each 24.00 24.00

Providing and fixing European W.C


R.A. with seat lid flushing Cistern etc.
0 wall mount in " STAR WHITE"
12
colour of approved make and brand
including all necessary
accessories/hardware kits, P trap,
bracket etc. complete as per drawing
and as directed by Engineer.

111 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
i Upper Ground Floor
Gents Toilet 4 4.00
Ladies toilet 4 4.00

ii First Floor
Gents toilet 4 4.00
Ladies toilet 4 4.00

iii Second Floor


Gents toilet 4 4.00
Ladies toilet 4 4.00

R.A.
0 Total European w.c Each 24.00 24.00
12

Providing and fixing white virtreous


china water closet squating pan
(Indian type w.c. pan) size 580 mm
with 100 mm sand cast iron P or S
trap 10 litres high level P.V.C.
1 15601 flushing cistern ( of approved make)
with fittings, rack bolts 32 mm
diameter P.V.C. telescopic flush
pipe with fittings and clamps 25 mm
P.V.C. overflow pipe with specials
& mosquito proof coupling of
approved municipal design and
nylon pull complete cutting and
making good the walls and floors
where required.
b Orissa pattern w.c. pan
i Upper Ground Floor
Gents Toilet 1 1.00
Ladies toilet 1 1.00

ii First Floor
Gents toilet 1 1.00
Ladies toilet 1 1.00

1 15601 Total w.c orrisa pattern….. Each 4.00 4.00

Providing and fixing P.V.C.


2 15683 connection pipe with brass unions
15 mm nominal bore:

112 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
c 45 cm (18”) length .

i Upper Ground Floor


Gents Toilet 4 4.00
Ladies toilet 4 4.00

ii First Floor
Gents toilet 4 4.00
Ladies toilet 4 4.00

iii Second Floor


Gents toilet 4 4.00
Ladies toilet 4 4.00

Providing and fixing P.V.C.


2 15683 Each 24.00 24.00
connection pipe……..

Making connection of G. I.
3 15675 Distribution branch with G. I. Main
50 mm to 80 mm nominal bore by
providing and fixing tee including
treading the pipe etc. complete 4 1.00

3 15675 Making connection of G. I.


Distribution Each 1.00 1.00

4 15678 Providing and fixing brass stop cock


(heavy) of approved quality :
a 15 mm nominal bore 24 12.00

4 15678 brass stop cock Each 12.00 12.00

113 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

Providing and placing on terrace


roof of floor two ( 1st floor roof)
15687+
5 single piece rotational moulded
15688
polythene water storage tank having
ISI mark and conforming to IS
12701: 1996 including placing
polythene water tank on roof of
floor three ( 2nd floor roof )
c 1000 litres capacity 4 4.00

5 15678 Total tank….. Each 4.00 4.00

Providing and fixing Brass full way


6 15679 valve ( heavy) duty with wheel of
approved quality and make etc.
complete .
b 20 mm nominal bore 25 25.00 25.00

Providing and fixing Brass full way


7 15679 valve ( heavy) duty with wheel of
approved quality and make etc.
complete .
c 25 mm nominal bore . 17 17.00 17.00

Providing and fixing Brass full way


8 15679 valve ( heavy) duty with wheel of
approved quality and make etc.
complete .
d 32 mm nominal bore 12 12.00 12.00

Providing and fixing Brass full way


9 15679 valve ( heavy) duty with wheel of
approved quality and make etc.
complete .
f 50 mm nominal bore . 4 4.00 4.00

10 15680 Providing and fixing ball valve


( brass) of approved quality:
a High pressure with P.V.C floats:
2) 20 mm nominal bore 4 4.00 4.00

114 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

Providing and fixing square-mouth


S.W. gully trap grade ‘A’ complete
with c.i. grating brick masonry
11 15692 chamber and water tight C.I. cover
with frame of 300 x 300 mm size
(inside the weight of cover to be not
less than 4.53 kg). And frame to be
not less than 2.72 kg as per standard
design :
b 150x100 mm Size P or S type 6 6.00

Providing and fixing square-mouth


11 15692
S.W. gully trap ….. Each 6.00 6.00

Constructing brick masonry


manhole or inspection chamber with
second class bricks in cement mortar
1:5 (1 cement :5 fine sand) R.C.C.
top slab with 1:2:4 mix (1 cement: 2
coarse sand ;4 graded stone
12 15694 aggregate 20mm nominal size
foundation concrete 1:2:4 mix (1
cement ;2 coarse sand :4 graded
stone agrregate 40mm nominal size)
inside plastering 12 mm thick with
cement mortar 1:3 (1 cement :3
coarse sand) finished with a floating
coat of neat cemetn and making
channels in cement concrete 1:2:4
mix (1 cement :2 coarse sand :4
graded stone aggregate 20 mm
nominal size) neatly finished
complete as per standard design.

Inside size 60 x 60cm and 60cm


d deep including C.I. cover with
frame (light duty) 455x610mm
internal diameter total weight of
cover and frame to be not less than
38 kg. (weight of cover 23 kg). 6 6.00 6.00

115 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

Constructing brick masonry


manhole or inspection chamber with
second class bricks in cement mortar
1:5 (1 cement :5 fine sand) R.C.C.
top slab with 1:2:4 mix (1 cement: 2
13 15694 coarse sand ;4 graded stone
aggregate 20mm nominal size
foundation concrete 1:2:4 mix (1
cement ;2 coarse sand :4 graded
stone agrregate 40mm nominal size)
inside plastering 12 mm thick with
cement mortar 1:3 (1 cement :3
coarse sand) finished with a floating
coat of neat cemetn and making
channels in cement concrete 1:2:4
mix (1 cement :2 coarse sand :4
graded stone aggregate 20 mm
nominal size) neatly finished
complete as per standard design.

Inside size 90 x80 cm and 60 cm


b deep including C.I. cover with
frame (light duty) 455 x 610 mm
internal dimensions total weight of
cover and frame to be not less than
38 kg. (weight of cover 23 kg.) 5 5.00 5.00

Providing and fixing rigid PVC


14 15707 S.W.W. (soil, waste & rain water
drainage pipes of approved
including lubricant etc. complete
(single/double) socketed: Minimum
pressure capacity(4 kg/cm2)
a 110 mm dia
Sewage lines from toilets
North side toilet block second floor
to ground level 2 12.50 25.00
South side toilet block second floor
to ground level 2 12.50 25.00
From manholes to septic tank 1 22.00 22.00

116 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
1 4.00 4.00
1 3.00 3.00
2 2.00 4.00
1 5.00 5.00
14 a Total 110 mm dia R.m 88.00 88.00

Providing and fixing rigid PVC


15 15707 S.W.W. (soil, waste & rain water
drainage pipes of approved
including lubricant etc. complete
(single/double) socketed: Minimum
pressure capacity(4 kg/cm2)
b 75 mm dia
North side toilet block second floor
to ground level 2 12.50 25.00
South side toilet block second floor
to ground level 2 12.50 25.00
from gally trap to manholes 4 5.00 20.00

15 b 75 mm dia R.m 70.00 70.00

Providing and fixing rigid PVC


16 15708 S.W.W. (soil, waste & rain water
drainage pipes of approved
including lubricant etc. complete
(single/double) socketed: Minimum
pressure capacity(4 kg/cm2)
c 160mm outer diameter
For Rain water down pipes
to gutter 8 11.50 92.00
Ground level to gutters 8 5.00 40.00
sewage line 1 10.00 10.00
16 c 160mm outer diameter R.m 142.00 142.00

Providing and fixing rigid PVC


17 15708 bend of required degree (of
approved make) for S.W.R. drainage
pipes & rainwater pipes of
approved make and procedure
including lubricating etc complete.
a 110 mm dia 10 10.00 10.00

117 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

Providing and fixing rigid PVC


18 15708 bend of required degree (of
approved make) for S.W.R. drainage
pipes & rainwater pipes of
approved make and procedure
including lubricating etc complete.
b 75 mm dia 8 12.00 12.00

Providing and fixing rigid PVC


19 0 bend of required degree (of
approved make) for S.W.R. drainage
pipes & rainwater pipes of
approved make and procedure
including lubricating etc complete.
c 160mm dia 10 16.00 16.00
for rainwater pipes

Providing and fixing rigid PVC


20 15709
bend (approved make ) for S.W.R.
pipes including lubricating etc
complete bend with door :
a 110 mm dia 10 10.00 10.00

Providing and fixing rigid PVC


21 15709
bend (approved make ) for S.W.R.
pipes including lubricating etc
complete bend with door :
b 75 mm dia 4 4.00 4.00

Providing and fixing rigid PVC


22 15711 bend (approved make ) for S.W.R.
pipes including lubricating etc
complete bend with door :
c 160mm diameter. 10 10.00 10.00

118 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

Providing and fixing single tee of


0 15710
rigid PVC (approved make) for
S.W.R. pipes including lubricating
etc. complete, without door:
a 110 mm dia. 6 6.00 6.00

Providing and fixing single tee of


0 15710
rigid PVC (approved make) for
S.W.R. pipes including lubricating
etc. complete, without door:
b 75 mm dia. 6 6.00 6.00

Providing and fixing single Tee of


0 15711
rigid PVC (approved make ) for
S.W.R. pipes including lubricating
etc complete, with door :
110 mm dia 12 12.00 12.00

Providing and fixing single Tee of


0 15711
rigid PVC (approved make ) for
S.W.R. pipes including lubricating
etc complete, with door :
75 mm dia 12 12.00 12.00

Providing and fixing single “Y” of


0 15712
rigid PVC (approved make ) for
S.W.R. pipes including lubricating
etc complete, without door :
a 110 mm dia 12 12.00 12.00

Providing and fixing single “Y” of


0 15712
rigid PVC (approved make ) for
S.W.R. pipes including lubricating
etc complete, without door :
b 75 mm dia 12 12.00 12.00

119 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

Providing and fixing single “Y” of


0 15713 rigid PVC (approved make ) for
S.W.R. pipes including lubricating
etc complete, with door :
a 110 mm dia 12 12.00 12.00

0 15713 Providing and fixing single “Y” of


rigid PVC (approved make ) for
S.W.R. pipes including lubricating
etc complete, with door :
b 75 mm dia 12 12.00 12.00

Providing and fixing nahani trap of


0 15716
rigid PVC (approved make ) for
S.W.R. pipes including lubricating
etc complete, without door :
a 110 mm dia 38 38.00 38.00

Providing and fixing U.P.V.C. pipe


clips (approved make ) for S.W.R.
33 15717
pipes including all required
accessories etc complete at all
heights :
a 110 mm dia 30 30.00 30.00

Providing and fixing U.P.V.C. pipe


34 15717 clips (approved make ) for S.W.R.
pipes including all required
accessories etc complete at all
heights :
b 75 mm dia 30 30.00 30.00

Providing and fixing U.P.V.C. pipe


clips (approved make ) for S.W.R.
35 15743
pipes including all required
accessories etc complete at all
heights :
c 160mm diameter. 50 50.00 50.00

37 15718 Providing and fixing R.P.V.C. vent


cowl:

120 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
110 mm dia 4 4.00 4.00

38 15718 Providing and fixing R.P.V.C. vent


cowl:
75 mm dia 4 4.00 4.00

Providing and fixing NICKEL


0 15739 chrome plated copper alloy Fancy
BIB Cock Short Body Jaquar make or
equivalent. Confirming to IS
8931;1993 24 24.00 24.00

Providing and fixing NICKEL


chrome plated copper alloy Fancy
0 15740 LONG BODY BIB Cock WITH
WALL FLANCE Jaquar make or
equivalent. Confirming to IS
8931;1993 8 8.00 8.00

Providing and fixing NICKEL


0 15741 chrome plated copper alloy Fancy
TWO WAY LONG BODY BIB Cock
WITH WALL FLANCE Jaquar make
or equivalent. Confirming to IS
8931;1993 8 8.00 8.00

Providing and fixing NICKEL


0 15743 chrome plated copper alloy Fancy
CONCEALED STOP COCK WITH
SLINDING FLANCE 15MM Jaquar
make or equivalent. Confirming to
IS 8931;1993 24 24.00 24.00

Providing and fixing NICKEL


0 15749 chrome plated copper alloy Fancy
BOTTLE TRAP ECONOMY TYPE
32MM Jaquar make or equivalent.
Confirming to IS 8931;1993 12 12.00 12.00

121 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

Providing and fixing chlorinated


ployvinyl chloride (CPVC) pipes
confirming to IS:15778, having
thermal stability for hot and cold
water supply including all CPVC
0 15752 plain and brass threaded fittings
including fixing the pipes with
clamps at 1 mt. spacing. This
includes jointing of pipes and
fittings with one step CPVC solvent
cement and testing of joints
complete as per direction of the
Engineer-in-charge. Concealed work
(medium duty SDR 13.5 pipe)
including cutting chases and
making good the walls etc.

a
15 mm dia nominal outer dia pipes
For internal work concealed

i Ladies Toilet north & south side on


all the floors 6 3.00 18.00
6 1.50 9.00
6 1.80 10.80
6 0.80 4.80
6 0.50 3.00

ii Gents Toilet north & south side on


all the floors 6 3.00 18.00
6 1.50 9.00
6 1.80 10.80
6 0.80 4.80
6 0.50 3.00
iii For Gardening tap 4 25.00 100.00
Other miscellaneous works 1 30.00 30.00

0 15752 Total Quantity R.M 221.20 222.00

122 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

0 0

b
20 mm dia nominal outer dia pipes

For internal work concealed

i Ladies Toilet north & south side on


all the floors 4 4.60 18.40
2 2.90 5.80
3 2.30 6.90
8 0.80 6.40

ii Gents Toilet north & south side on


all the floors 4 4.60 18.40
3 3.10 9.30
3 2.30 6.90
4 0.60 2.40
2 4.20 8.40
iii For Gardening tap 1 65.00 65.00
Other miscellaneous works 1 45.00 45.00

0 15752 Total Quantity R.M 192.90 193.00

123 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

45 0

c
25 mm dia nominal outer dia pipes

For internal work concealed

i Ladies Toilet north & south side on


all the floors 2 12.80 25.60
1 8.50 8.50
3 6.80 20.40

ii Gents Toilet north & south side on


all the floors 2 12.80 25.60
2 8.80 17.60
1 26.00 26.00
iii For Gardening tap 1 40.00 40.00
Other miscellaneous works 1 25.00 25.00

45 15752 Total Quantity R.M 188.70 189.00

124 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

Providing and fixing chlorinated


polyvinyl chloride (CPVC) pipes
confirming to IS: 15778 having
thermal stability for hot and cold
46 15753 water supply includng all CPVC
plain and brass threaded fittings
CPVC solvent cement, trenching,
refilling and testing of joints
complete as per direction of the
Engineer in charge.(External work
(heavy duty SDR 11 pipe)

d
32 mm dia nominal outer dia pipes

i Outer side of Ladies & Gents Toilet


for all the floors 6 5.80 34.80

ii
From water tank to toilet connection 2 13.00 26.00
1 35.00 35.00

iii From 50mm line over head water


tank 1 6.00 6.00
1 13.00 13.00
1 6.00 6.00
1 40.00 40.00
iv For gardening work 1 60.00 60.00

d
46 32 mm dia nominal outer dia pipes R.M 220.80 221.00

Providing and fixing chlorinated


polyvinyl chloride (CPVC) pipes
confirming to IS: 15778 having
thermal stability for hot and cold
47 15753 water supply includng all CPVC
plain and brass threaded fittings
CPVC solvent cement, trenching,
refilling and testing of joints
complete as per direction of the
Engineer in charge.(External work
(heavy duty SDR 11 pipe)

f
50 mm dia nominal outer dia pipes
From 80mm to meter box 1 10.00 10.00

From meter box to 50mm dia. Line 1 25.00 25.00

125 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
1 20.00 20.00
1 15.00 15.00

Total 50 mm dia nominal outer dia


f
47 pipes R.m 70.00 70.00

Providing and fixing vitreous china


wash basin with RS or C.I. brackets
painted white, 15 mm C.P. brass
48 15606
pillar taps C.P. brass chain with
rubber plug 32 mm C.P. brass waste
of pattern, 32 mm diameter M.I. or
C.P. brass trap and union complete,
including cutting and making good
the walls where required.

Flat back wash basin size 630mm


b x450 mm with single 15mm C.P
brass pillar taps. 10 10.00 10.00

Providing , fixing and fabricating


mirror in toilet with 12 mm thick
plywood (marine) backing to 6 mm
R.A. thick mirror of approved make.
49
17 Wooden moulding of 36mm x19mm
(teak wood curved moulding) an
edges and french polishing to all
exposed surfaces moulding
including all accesories etc
complete. 10 10.00 10.00

Providing and fixing Cockroach


R.A. Trap "Square" with Square CP jalli
50
18 Square of Size 6"x6"(Approved
brand and make) including sealing
of edges with white cement and
accessories etc complete 10 10.00 10.00

126 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

Providing and fixing normal gauge


polythene pipes of approved quality
51 15685 complete with special flange
compression type fitting (of
approved make) including
trenching and refilling etc.(external
work) (high density)
From Wash basin to Nahni Trap 6 8.00 48.00
Vertical 6 6.00 36.00
From Nahani traps to gully traps 6 3.00 18.00

51 15685 Total Quantity R.m 102.00 102.00

Providing and fixing G. I. Inlet


52 15620 connection for flush pipes
connecting with W. C. pan 22 22.00 22.00

Providing and laying cement


53 15691 concrete 1:5:10 ( 1cement : 5 fine
sand : 10 graded stone aggregate 40
mm nominal size up to haunches of
S.W. pipes including bed concrete
15 cm thick as per standard design:
a 100 mm diameter S.W. pipes
1 55.00 55.00
1 35.00 35.00

53 15691 Total Quantity R.m 90.00 90.00

Providing and laying cement


54 15691 concrete 1:5:10 ( 1cement : 5 fine
sand : 10 graded stone aggregate 40
mm nominal size up to haunches of
S.W. pipes including bed concrete
15 cm thick as per standard design:
b 150 mm diameter S.W. pipes
4 8.00 32.00
2 60.00 120.00

54 15691 Total Quantity R.m 152.00 152.00

127 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

R.A. Providing and fixing 6" (150mm) dia


55
19 stainless steel grating for Nahni trap
of approved make and brand
including all accessories complete 36 36.00 36.00

Supply & installation of pump as


per following specification:-
1 pump set, comprising of 2 pumps
(1 working, 1 standby). no pump
R.A. capacity of 3 LPS @ 3 bars & to have
56
20 isolation valve at suction &
discharge. NRV at discharge.
Pressure gauge at suction &
discharge. Suction & discharge
manifold. Control panel with auto
changeover dry run. And over flow
protection. All mounted on common
base frame. etc complete as per the
direction of engineer. 1 1.00

R.A.
56
20 Total quantity Each 1.00 1.00

Fixing of domestic commercial type


57 15148 water meter. (water meter is free
supply from Govt) 1 1.00

57 15148 Total quantity Each 1.00 1.00

Providing and fixing air admittance


R.A.
58 valves for installation in all the
21
drainage risers complete as per the
direction of engineer. 4 4.00

R.A.
58 Total quantity Each 4.00 4.00
21

XI MISCELLANEOUS

128 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

Providing and fixing in position S.S.


hand rail in main stair case, and
0 8027 landing as per approved design
shown in the drawing including
bending handrail pipe to proper
shape in curves with specials, etc.
complete.
a ramp railing 2 12.23 24.46

Railing for passage along the


pheriphery of the building,
b
L =36+9.85
+14.38+3+23.26+6+8+6+13.5+6+15+
15.5 =156.49 3 156.49 469.47

c Staircase railing
North side staircase
Flight 1 3 3.40 10.20
Flight 2 3 3.10 9.30
Flight 3 3 3.40 10.20

d South side staircase


Flight 1 3 2.80 8.40
Flight 2 3 3.50 10.50
Flight 3 3 2.80 8.40

0 8027 Total Quantity R.M 550.93 551.00

1 0

129 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
12.5 mm tapered edge Gypboard
(confirming to IS: 2095-1982) is then
fixed to channel section with 25 mm
drywall screws at 230 mm centre.
Screw fixing is done mechanically
with drill machine & suitable
attachment. Finally square &
tapered edges joints of the boards
are jointed & finished so as to have
flush look which includes filling
finishing with jointing compound,
joint paper tape and two coats of
Drywall top coat suitable for
Gypboard (as per recommended
practices of India Gypsum Limited )

a Second Floor
Club House 1 30.60 4.00 122.40
Hall 1 16.40 14.00 229.60
Pump room 1 2.70 2.70 7.29
passage 1 9.80 2.00 19.60
passage 1 9.80 3.70 36.26
open space 1 10.50 7.20 75.60
generator room 1 2.77 5.77 15.98
cctv equipment 1 2.77 5.77 15.98
room 1 3.20 1.80 5.76
lobby area 1 5.85 7.83 45.81
muncipal office store 1 5.77 5.77 33.29
conference 1 8.77 5.21 45.69
library 1 5.77 7.41 42.76
gymnesium 1 10.56 5.77 60.93

1 0 Total false ceiling Sq.m 756.95 757.00

130 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

Providing preconstruction anti –


termite treatment to the buildings
conforming to I.S.S. 6313 part II 1971
(revised) including adopting the
precautions for health hazards and
2 18016 safety measures as mentioned
therein with the cost of all materials
chemicals, plants, equipments etc.
required for the treatment and
furnishing a guaranty for a
minimum period of 10 years from
the date of completion including
eradicating any infestation of
termite free of cost during the
guaranty period complete. The
payment will be made on plinth of
the building.

a total floor area 1 1097.71 1097.71


Surounding area of building 1.2m
wide

L=16.11+5.77+16.11+11.77+9.85+14.
38+4.89+23.26+18.23+4.5+6+12.23+6
.65+9+6.5+15+4= 184.25m 1 184.25 1.20 221.10

2 18016 Total quantity Sq.m 1318.81 1319.00

Providing and fixing Fiber mesh of


approved quality joints portion of
R.A. RCC structures and masonry
3
22 portion after filling the gaps with
appropriate materials like katka,
waterproofing chemicals U nails
etc.including necessary scaffolding
etc. complete so as to have crack free
cement plaster surface.
col
no of col = 125 x 4 sides 3 floors =
1500
Upper Ground floor( 4 sides of the
col.) 500 0.10 4.35 217.50

131 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
First Floor 500 0.10 3.35 167.50
Second Floor 264 0.10 3.75 99.00

R.A.
3
22 Total Quantity SQ.m 484.00 484.00

Providing and installing Koster's


alkaline cement based crystalline
NB system to the cleaned surface
free of dust, paint curing agents,
loose plaster debris etc. The
waterproofing system is then Brush
applied in 3 coats on a pre-
R.A.
4 dampened surface including the
23
sunken areas. The coverage is 0.70
kg per sqs.metre per coat. For
bathrooms the treatment should
extend unto the shower spout level
in the shower areas and extend 900
cms from the finished floor level.
The waterproofing system shall
include treatment of all construction
joints & pipes insertions with
Koster's NB elastic system having
elasticity of 80%. Testing by
ponding water to be done for 48 hrs.
(Horizontal / Vertical)
A Horizontal Surfaces
a Gound Floor level

Open to sky courtyard south side 1 9.00 6.00 54.00

Open to sky courtyard north side 1 9.00 4.80 43.20

Toilet 4 2.77 2.77 30.69

b First Floor level


terrace 2 12.60 2.80 70.56
Toilets 4 2.77 2.770 30.69
Flat slab over entrance lobby 1 12.00 12.00 144.00
1 12.00 8.00 96.00

c Second Floor level


Open Hall 1 20.23 14.03 283.83
Hall portion 1 8.50 1.50 12.75

132 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
Hall portion 1 17.77 9.00 159.93
Partion 1 20.00 2.00 40.00
1 7.20 5.30 38.16
Toilet block 2 2.77 2.77 15.35
Terrace 1, A= 91.31 sq.m 1 91.31 91.31
Terrace 2, A= 84.77 sq.m 1 84.77 84.77
Staircase slab
North Side 1 6.00 7.00 42.00
South side 1 6.00 6.00 36.00

d Water tank 1 6.00 3.00 18.00


A Horizontal Surfaces 1291.24

B Vertical surfaces.
a Gound Floor level

Open to sky courtyard south side 2 9.00 0.30 5.40

2 6.00 0.30 3.60

Open to sky courtyard north side 2 9.00 0.30 5.40

2 4.80 0.30 2.88


Toilet 8 2.77 1.20 26.59
8 2.77 1.20 26.59

b First Floor level


terrace 8 12.60 0.30 30.24
8 2.80 0.30 6.72
Toilets 16 2.77 1.20 53.18
16 2.77 1.20 53.18

c Second Floor level


Open Hall 4 20.23 0.30 24.28
4 14.03 0.30 16.84
Hall portion 4 8.50 0.30 10.20
4 1.50 0.30 1.80
Hall portion 4 17.77 0.30 21.32
4 9.00 0.30 10.80
Toilet block 8 2.77 1.20 26.59
8 2.77 1.20 26.59

d Water Tanks 4 6.00 3.00 72.00


4 3.00 3.00 36.00

B Vertical surfaces. 460.21

133 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity
R.A.
4 Total water proofing ………. Sq.m 1751.45 1557.00
23

XII ROADWORK

Supplying and fixing of Factory


made Precast RCC slabs at site in
concrete Grade of M-25 with 20 mm
nominal size Granitic or basaltic
0 6106 aggregate, consolidated by means of
mechanical platform, vibration etc.
with lifting hooks of M.s. 10mm
bars and PVC cups including cost of
reincforcement, Certificate from
manufacturer shall be produced
indicating grade of concret and
minimum content of steel, in the
product along with 5 year free
replacement warranty in case
of breakage complete and as
directed by Engineer -in -charge,,

Size 900 x 400 x 100 mm with steel


b reinforcement not less than 5.0 kgs
per unit -12 T capacity

i cross drainage 16 8.00 128.00


0.00
ii Gutter to road 2 45.00 90.00
2 100.00 200.00
1 70.50 70.50
1 45.00 45.00
1 49.00 49.00
1 20.00 20.00
1 36.40 36.40
1 56.00 56.00
1 45.90 45.90
1 56.00 56.00
2 120.00 240.00

Total Quantity 1036.80


Total stone =303.8/ 0.4 =759.5 say 760 nos

134 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

0 6106 Total Quantity each 760.00 760.00

Providing and laying 60 mm thick


factory made cement concrete
interlocking paver block of M30
0 14151 grade made by heavy duty block
making machine with strong
vibratory compaction and of
approved size and design /shape
laid in 50 mm thick compacted bed
of course sand , filling the joints
with coarse sand etc all complete as
per the direction of Engineer

i Roads
North side road 1 56.00 3.500 196.00
West side road 1 56.70 3.000 170.10
West side road 1 37.00 7.780 287.86
West side road 1 46.50 3.000 139.50
South side road 1 33.90 3.000 101.70
South side road 1 34.00 3.000 102.00
External 4 wheeler parking 1 45.50 5.100 232.05
External 2 wheeler parking 1 69.00 3.000 207.00
Front side 1 67.99 4.000 271.96
Front side 1 56.62 4.000 226.48
Front side 1 14.38 6.400 92.03

Total 2026.68

0 a Red Sq.m 0.30 957.13 287.14 288.00

135 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

Providing and laying 60 mm thick


factory made cement concrete
interlocking paver block of M30
0 14151 grade made by heavy duty block
making machine with strong
vibratory compaction and of
approved size and design /shape
laid in 50 mm thick compacted bed
of course sand , filling the joints
with coarse sand etc all complete as
per the direction of Engineer
0 b Yellow Sq.m 0.70 2026.68 1418.68 670.00

R.A.
0
24 0
6 6.00 36.00

R.A.
0
24 Total Quantity R.mts 36.00 36.00

XIII LANDSCAPING AND HORTICULTURE WORKS

Supplying and stacking of good


earth at site including royalty and
0 13001
carriage upto 20 km. (earth
measured in stacks will be reduced
by 20% for payment). Cu.m 360.00 360.00

Spreading of sludge, dung manure


0 13004 or/and good earth in required
thickness (cost of sludge, dung
manure or/and good earth to be
paid separately). Cu.m 349.00 349.00

136 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

Turfing lawns with fine grassing


including ploughing , dressing
including breaking of clods ,
0 13105
removal of rubbish, dressing and
supplying doob grass roots at 10 cm
apart including supplying and
spreading of farmyard manure at
rate of 0.6 cum per 100 sqm as per
MORTH specification 307
lawn 2 90.50 3.20 579.20
2 56.80 3.00 340.80
2 90.00 1.20 216.00
2 45.00 8.00 720.00

0 13105 total turfing Sq.m 1856.00 171.00

Maintenance of lawns with fine


0 13106 grassing for the first year including
watering, etc.as per MORTH
Specification 307

0 13106 Quantity same as Item No.I3 Sq.m 170.20 171.00

Planting and Maintaing of


0 13108 Flowering Plants and] shrubs as per
MORTH Specification 307

Planting flowering plants and


a
shrubs in central verge K.M 0.89 0.89

Planting and Maintaing of


0 13108 Flowering Plants and] shrubs as per
MORTH Specification 307

Maintenance of flowering plants


b and shrubs in central verge for one
year
K.M 1.00 1.00

Supply at site of work/store-deoiled


neem cake duly packed in used
0 13111 gunny bags as per MORTH
Specification 308.2
Qtl. 80.00 80.00

Supplying of sludge duly stacked at


0 13112 site/store as per MORTH
specification 308.2
Cu.m 90.00 90.00

137 of 203 Consultant EAS Panaji


Construction of Sanquelim commercial cum office building
GSUDA Measurement Sheet
for Sanquelim Municipal Council at Sanquelim – Goa

Measurements
Item GSR.
Description Nos Quantity Rounded
No. No. Length Breadth Height
Quantity

138 of 203 Consultant EAS Panaji


Detailed Estimate For Ground And First Floor Construction Of Sardar Vallabh Bhai Patel Smarak
Trust , East Of Central Jail ,Near Housing Board Colony Kripalpur ,Satna (M.P.)
Totle Construction Ground And First Floor 60440 SQ.F

SR. NO. WORK ITEMS PROJECT COST

1 I DISMANTLING - SUB TOTAL

2 II EARTHWORKS - SUB TOTAL 529,709.75

3 III MASONRY WORKS- SUB TOTAL 979,104.00

IV PLAIN AND REINFORCED CONCRETE


4 1,592,024.50
WORKS - SUB TOTAL

5 V DOORS AND WINDOWS - SUB TOTAL 300,000.00

6 VI STEEL AND ALUMINIUM WORKS 0.00

VII FLOORING AND FLOOR FINISHES - SUB


7 854,950.00
TOTAL

8 VIII ROOFING - SUB TOTAL 0.00

IX PLASTERING AND FINISHING WORKS - SUB


9 933,060.50
TOTAL

X WATER SUPPLY,SEWERAGE,PLUMBING AND


10 625,496.00
SANITATION WORKS - SUB TOTAL

11 XI MISCELLANEOUS - SUB TOTAL 0.00

12 XII ROADWORK SUB TOTAL 0.00

XIII LANDSCAPING AND HORTICULTURE WORKS


13 SUB TOTAL 0.00

14 XIV ELECTRICAL 4,219,016.71

SUBTOTAL 10,033,361.46

Say Rs. 6,84,94,153.00

139 of 203
Rupees: - Six Crores Eighty Four Lakhs Ninety Four Thousand One Hundred Fifty Three
only

140 of 203
Construction of Santh Shri Ravidas Ashram Devi Ji Road Nagar Paalika Maihaar District-Satna
Maihaar Satna M.P.
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount

I DISMANTLING

Demolishing cement concrete 1:3:6


or richer mix including disposal of
1 12028 material within 50 m lead. 250.00 398.00 Cu.m. 99,500.00

Demolishing R.C.C work including


stacking of steel bars and disposal of
2 12030 unserviceable material within 287.00 564.00 Cu.m 161,868.00
50R.mt. Lead.

Scrapping ,cleaning and


3 12033 straightening reinforcement from 50.00 155.00 qtl. 7,750.00
R.C.C or Reinforced brick work.

Demolishing laterite stone masonry


in cement mortar including stacking
of serviceable material & disposal of
4 12038 unserviceable material within 50 650.00 402.00 Cu.m. 261,300.00
R.mt. lead.

Dismantling wood work of sectional


area 40 sq.cm. and above wrought
framed and fixed in frames, other
frames and trusses including
5 12040 stacking of material within 50 mts. 9.50 678.00 Cu.m. 6,441.00
lead (span upto 10 mtrs.)

Taking out doors, windows and


clerestory windows shutters (steel
6 12043 or wood) including stacking within
50 R.mt. lead

a) Of area 3 sq.m. and below 69.00 56.00 Each 3,864.00

Dismantling steel work in built up


sections in angles, tees, flats
&channels including all gazzate
7 12048 plats , bolts, nuts,cutting, 265.00 115.00 qtl. 30,475.00
dismembering and stacking within
50 R.mt. Lead.

Dismantling asbestos sheet roofing


including ridges, hips, valleys &
8 12056 gutters and stacking the material 350.00 15.00 Sq.m 5,250.00
50R.mt. Lead.

141 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount

Dismantaling tiled roofing


(mangalore or pot or country tiles)
with battens etc. complete including
stacking of serviceable material &
9 12058 disposal of unserviceable material 250.00 26.00 Sq.m 6,500.00
with in 50 mts. Lead.

Dismantaling rolling shutters, top


covers and shafts etc. and stacking
10 12070 the serviceable material with in lead 262.00 65.00 Sq.m 17,030.00
of 50 mts.

Dismantling False ceiling including


supporting members , frame works
etc.for all height & stacking of
RA-
11 materials within 50R.mt. Lead as 469.00 37.75 Sq.m 17,704.75
01/WA
directed by Eingineer- in - charge at
site

Carriage of unserviceable
dismentelled material such as
moorum, lime, stones, sands etc. by
12 3001-8 tipper truck including loading, 700.00 89.64 Cu.m. 62,748.00
unloading and staking up to a lead
of 5.00 kms.

GSR 2012 662,726.00


FMR 17,704.75
I DISMANTLING 680,430.75

142 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount

II EARTHWORKS

Earth work in excavation by mechanical


means over areas in all types of stratas
comprising of any type of materials such
as soil, silt clay, sand , gravel,murrum of
all types of conglomerates, laterite rock,
soft rock ordinay rock disintegrated rock
fissured/ shattered rock, decomposed
rocks weathered rock, bituminous road
layers and all such other materials either
in full or part as the case may be
adopting any method / methods as may
be convenient or permitted including
RA chisseling, wedging etc. in all conditions
such as dry moist, foul, saturated,
14 02/W 314.00 163.75 Cu.m. 51,417.50
submerged etc. as directed by Engineer
A etc. all complete including dressing of
sides ramming of bottom including all
lead and lift , including gettting out the
excavated soil as directed including
pumping and bailing out water,
barricading danger, lightening, guarding
as directed by engineer upto depth of
1.5m (Blasting Prohibited)

Earth work in excavation by mechanical


means over areas in all types of stratas
comprising of any type of materials such
as soil, silt clay, sand , gravel,murrum of
all types of conglomerates, laterite rock,
soft rock ordinay rock disintegrated rock
fissured/ shattered rock, decomposed
rocks weathered rock, bituminous road
layers and all such other materials either
in full or part as the case may be
adopting any method / methods as may
be convenient or permitted including
chisseling, wedging etc. in all conditions
RA such as dry moist, foul, saturated,
15 03/W submerged etc. as directed by Engineer 180.00 179.00 Cu.m. 32,220.00
etc. all complete including dressing of
A
sides ramming of bottom including all
lead and lift , including gettting out the
excavated soil as directed including
pumping and bailing out water,
barricading danger, lightening, guarding
as directed by engineer for depth above
1.5m (Blasting Prohibited)

143 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount
Earth work in foundation, pipeline
trenches, drain in all types of stratas
comprising of any type of materials such
as soil, silt clay, sand , gravel,murrum of
all types of conglomerates, laterite rock,
soft rock ordinay rock disintegrated rock
fissured/ shattered rock, decomposed
rocks weathered rock, and all such other
materials either in full or part as the case
may be adopting any method /
methods as may be convenient or
permitted including chisseling, wedging
etc. in all conditions such as dry moist,
RA foul, saturated, submerged etc. as
16 04/W directed by Engineer etc. all complete 1,589.00 165.25 Cu.m. 262,582.25
A including dressing of sides ramming of
bottom including all lead and lift ,
including gettting out the excavated soil
as directed including pumping and
bailing out water, barricading danger,
lightening, guarding as directed by
engineer upto depth of 1.5m (Blasting
Prohibited)

Earth work by mechninal means in


foundation, pipeline trenches, drain in
all types of stratas comprising of any
type of materials such as soil, silt clay,
sand , gravel,murrum of all types of
conglomerates, laterite rock, soft rock
ordinay rock disintegrated rock
fissured/ shattered rock, decomposed
rocks weathered rock, and all such other
materials either in full or part as the case
may be adopting any method /
methods as may be convenient or
permitted including chisseling, wedging
RA etc. in all conditions such as dry moist,
17 05/W foul, saturated, submerged etc. as 86.30 450.00 Cu.m. 38,835.00
A directed by Engineer etc. all complete
including dressing of sides ramming of
bottom including all lead and lift ,
including gettting out the excavated soil
as directed including pumping and
bailing out water, barricading danger,
lightening, guarding as directed by
engineer for depth above 1.5m (Blasting
Prohibited)

144 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount
Refilling of pipeline/ foundation
trenches , plinth sides, foundation
etc. with available excavated earth
in layers not exceeding 20 cm depth
consolidating each layer ramming
and watering lead upto 50 m and all
18 4012 lifts and disposal of surplus earth as 1,837.00 75.00 Cu.m. 137,775.00
directed by Engineer in charge

Supplying and filling in plinth


under floors, trenches including
watering, ramming, consolidating,
19 4017
dressing ,complete.

b Moorum 86.00 80.00 Cu.m. 6,880.00

GSR 2012COST 144,655.00


FMR 385,054.75
II EARTHWORKS - SUB TOTAL
529,709.75

145 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount

III MASONRY WORKS

Brick work using common burnt clay


building bricks in cement mortar 1:6
(1 cement cement : 6coarse sand) in
20 5008
superstructure upto floor five level.

with bricks of class designation 40


b 120.00 2,609.50 Cu.m. 313,140.00
kg/cm2

Half brick masonry in cement mortar


1:3 (1 cement : 3 coarse sand) with
hoop iron 25 mm x 1.6 mm or
equivalent reinforcement at every
third course embedded in cement
21 5021 mortar.,with bricks of class
designation (40 kg/sqcm) in
superstructure above plinth.

with bricks of class designation 40


b 130.00 394.00 Sq m 51,220.00
kg/cm2

Providing supplying and laying


Rubble packing with hard laterite
stone under floors including
watering ramming and consolidating
22 5027 etc. in pipeline trenches and other 260.00 424.00 Cu.m. 110,240.00
foundations complete.

Laterite masonry in neatly dressed


stones of size as specified in cement
mortar 1:5 (1 cement :5 coarse
23 5031 136.00 1,989.00 Cu.m. 270,504.00
sand)in foundation and basement.

Laterite masonry in neatly dressed


stones for 23 cms thick masonry
5036+ walls in cement mortar 1:5 (1
24 130.00 1,800.00 Cu.m 234,000.00
5039 cement :5 coarse sand)in
superstrucrure upto floor V level

GSR 2012 COST 979,104.00


FMR 0.00
III MASONRY WORKS- SUB
979,104.00
TOTAL

146 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount

IV PLAIN AND REINFORCED


CONCRETE WORKS

Providing & laying cement concrete


1: 2: 4 (1 cement: 2 coarse sand:
4 graded granitic or basaltic stone
aggrt. 20 mm. nominal size)
25 6010 excluding cost of centering and
shuttering in:

a all works upto plinth level 620.00 56.00 Cu.m. 34,720.00

Providing & laying cement concrete


1: 2: 4 (1 cement: 2 coarse sand:
4 graded granitic or basaltic stone
aggrt. 20 mm. nominal size)
26 6010 excluding cost of centering and
shuttering in:

a All works up to plinth level 200.00 388.00 Cu.m. 77,600.00

Providing and laying upto floor five


level cement concrete 1:2:4 (1
cement: 2 coarse sand: 4 graded
granitic or basaltic stone aggregate
20 mm nominal size) including
smooth finishing to exposed
27 6015
surfaces, with cement mortar 1:3 (1
cement: 3 fine sand) including
centering and shuttering etc.

kerbs , steps and like at or near gr.


a Level. 100.00 610.00 Cu.m. 61,000.00

Providing and laying upto floor five


level cement concrete 1:2:4 (1
cement: 2 coarse sand: 4 graded
granitic or basaltic stone aggregate
20 mm nominal size) including
smooth finishing to exposed
28 6015 surfaces, with cement mortar 1:3 (1
cement: 3 fine sand) including
centering and shuttering etc.

String courses, copings, bed plates,


b anchor blocks, plain window sills 4.00 3,500.50 Cu.m. 14,002.00
and the like.

147 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount
Making plinth protection 50mm
thick of cement concrete 1:3:6 (1
cement : 3 coarse sand : 6graded
stone aggregate 20mm nominal size)
over 75mm bed of dry laterite
aggregate 40mm nominal size well
29 6027 20.00 3,258.00 Sq m 65,160.00
rammed and consolidated and
grouted with fine sand including
finishing the top smooth.

Centering and shuttering including


30 6045 strutting, proping etc. and removal
of form for :

Foundation, footings, bases of


i 30.00 3,258.00 Sq m 97,740.00
columns, etc and mass concrete

Centering and shuttering including


31 6045 strutting, proping etc. and removal
of form for :

Vertical surfaces such as retaing


walls, return walls, Partitions, walls
(any thickness) including attached
ii Pilasters, Buttresses, Plinth and 45.00 3,866.00 Sq m 173,970.00
string courses, Fillets and the like

Centering and shuttering including


32 6045 strutting, proping etc. and removal
of form for :

Columns, Piers, Pillars, Aburments,


Posts and struts (square rectangle
iii polygon in plan) 120.00 4,526.00 Sq m 543,120.00

Centering and shuttering including


33 6045 strutting, proping etc. and removal
of form for :

Sides and Soffits of beams, Beam


Haunchings, Cantilever, Girders,
Bressumers and Lintels plinth beams
iv 120.00 150.00 Sq m 18,000.00
not exceeding 1m in depth

Centering and shuttering including


34 6045 strutting, proping etc. and removal
of form for :

Staircases (except spiral


vi staircases) excluding landing .. 20.00 285.00 Sq m 5,700.00

148 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount
Centering and shuttering including
35 6045 strutting, proping etc. and removal
of form for :

Suspended floors, roofs landings,


xiii shelves & their supports 600.00 269.00 Sq m 161,400.00

Centering and shuttering including


36 6046 strutting proping etc. and removal of
form for sloping or battering
surface (slabs,beams, louvers etc. )
including folded plates:

Where inclination to horizontal


i 165.00 325.50 Sq m 53,707.50
plane does not exceed 30 degrees
requiring shuttering only on the
under side.

Centering and shuttering including


strutting proping etc. and removal of
form for sloping or battering
37 surface (slabs,beams, louvers etc. )
including folded plates:
( 6046
+
6074)
Columns, pillars, posts and struts
iii etc. (circular or curved in plan) 120.00 384.00 Sq m 46,080.00

Centering and shuttering including


strutting, proping etc. and removal
of form with adequate bracing,
proping etc., including cost of
6045 deshuttering and decentering at all
(iv) level for height of above 3.5m , for
38
+6047 every additional height of 1m or part
/2 , thereof . ( plan area to be
measured.).

Sides and Soffits of beams, Beam


Haunchings, Cantilever, Girders,
Bressumers and Lintels plinth beams
iv not exceeding 1m in depth 100.00 256.50 Sq m 25,650.00

149 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount
Centering and shuttering including
strutting, proping etc. and removal
of form with adequate bracing,
proping etc., including cost of
6045 deshuttering and decentering at all
(xiii) level for height of above 3.5m , for
39
+6047 every additional height of 1m or part
/2 , thereof . ( plan area to be
measured.).

Suspended floors, roofs landings,


xiii shelves & their supports 650.00 329.50 Sq m 214,175.00

Providing TMT steel reinforcement


(Confirming to IS 1786 of 1986) for
RCC work (conforming to I.S. 1786
of 1986) including bending, binding
& placing in position in all the floors
along with the factory made precast
concrete cover blocks of specified
sizes whose compressive strength is
40 6052 b 65,000.00 45.00 kg
not less than that of surrounding
concrete in the structural member.

41

150 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount
Providing and laying in position
ready mixed concrete manufactured
in fully automatic batching plant and
transported to site if work in transit
mixer for a lead upto 10kms having
continious agitated mixer,
manufactured as per mix design of
specified grade fir reinforced cement
concrete work including pumping of
R.M.C., from the transit mixer to the
site of laying, excluding the cost of
centering, shuttering, finishing and
reinforcement including the cost of
admixtures in recommended
42 6069 porportions as per IS : 9103 to
accelerate/retard setting of concrete,
improve workability without
imparing strength and durability as
per the directions of the engineer-in-
charge.
All works upto floor V level

GSR 2012COST 1,592,024.50


FMR 0.00
IV PLAIN AND REINFORCED
CONCRETE WORKS - SUB 1,592,024.50
TOTAL

151 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount

V DOORS AND WINDOWS

Providing woodwork in frames of


doors, windows, clerestory windows
trusses & other frames wrought
43 7001 2.50 10,860.00 Cum 27,150.00
framed and fixed in positon.

b Second class Indian teak wood

Cutting rebate in flush door shutter


44 7029 (total area of the door to be 15.00 42.00 Sq m 630.00
measured)

Providing and fixing first class


Indian teak wood moulded beading
to door and window frames with
iron screws, plugs and priming coat
on unexposed surfaces etc.
45 7044
a 50 x 12 mm 110.00 129.00 R.m 14,190.00

Providing flat iron holdfast 40 cms


long including fixing to frame with
10 mm dia bolt, nuts and wooden
plugs embedded in cement concrete
46 7050 block 30 x 10 x 15 cms 1:3:6 mix(1
cement :3 coarse sand: 6 stone
aggregate 20 mm nominal size )

40x3 mm flat iron holdfast, 15 cm


b long 80.00 52.00 Each 4,160.00

Providing and fixing M.S. grill of


required pattern in Wooden frames
of Windows,or in masonry walls etc.
with M.S. flats square or round bars
47 7054 with round headed bolts and nuts or
by screws.or necessary holdfast
complete.

b Ornamental grill 2,025.00 68.00 Kg. 137,700.00

Providing and fixing bright


finished brass sliding door bolts
48 7066 with nuts and screws etc complete.

a 300 x 16 mm 37.00 1,058.00 Each 39,146.00

152 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount
Providing and fixing bright
finished brass tower bolts (barrel
49 7067 type) with screws etc. complete

a 250 x 10 mm 55.00 377.50 Each 20,762.50

Providing and fixing bright


finished brass tower bolts (barrel
50 7067 type) with screws etc. complete

b 200 x 10 mm 12.00 198.00 Each 2,376.00

Providing and fixing bright finished


51 7069 brass handles with necessary screws
etc complete

a 125 mm 18.00 158.50 Each 2,853.00

Providing and fixing bright finished


52 7069 brass handles with necessary screws
etc complete

b 100 mm 15.00 118.00 Each 1,770.00

Providing and fixing bright finished


53 7070 brass door latch with necessary
screws etc complete

b 250 x 16 x 5 mm 12.00 334.50 Each 4,014.00

Providing & fixing bright finished


brass 100 mm. rim latch & lock & a
pair of knob, with necessary screws
54 7072 etc. complete (Indian make of 11.00 938.00 Each 10,318.00
approved quality).

Providing and fixing 150 mm. bright


finished brass floor door stopper
with rubber cushion screws etc. to
55 7074 24.00 171.00 Each 4,104.00
suit shutter thickness complete.

Providing and fixing brass hydraulic


door closer of approved make with
56 7083 necessary screws and fittings 12.00 780.00 Each 9,360.00
complete.

Providing FRP door shutters 35mm


thick with frame size in clear
57 7157 opening of 0.75x2.10m hinges and 11.00 1,806.00 Sq m 19,866.00
screws complete.,

153 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount
Providing and fixing flush door
shutters, core of block board
construction with frame of first class
hard wood and well matched first
class Indian teak ply venerring with
vertical grains or cross band and face
venners on one face and commercial
58 7018 ply venerring with vertical grains or
cross bands and face veneer on other
face of shutters.

35 mm thick shutters including


anodised aluminium butt hinges
b 104.00 1,836.00 Sq m 190,944.00
with necessary screws:

GSR 2012 COST 298,399.50


FMR
V DOORS AND WINDOWS-
300,000.00
SUB TOTAL

154 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount

155 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount

VII FLOORING AND FLOOR


FINISHES

52mm thick cement concrete flooring


with metallic concrete hardener
topping , under layer of 40mm thick
cement concrete 1:2:4 ( 1cement : 2
coarse :4 graded stone aggregate
20mm nominal size) and top layers
12mm thick metallic cement hardner
constituting of mix 1:2 ( 1 cement : 2
graded stone aggregate 6 mm
nominal size by volume with which
metallic quality is mixed in ratio 4:1 (
1 9010 4 parts of cement :1 part of metallic ) 450.00 281.00 Sq m 126,450.00
hardening compound of approved
floor hardening compound of
approved quality) by weight,
including finishing complete.

Providing and fixing 32cms x 48cms


x0.8 cms thick, 1st quality vitrified
antibacterial tiles for dado as per
approved design and colour on a
12mm thick bed of cement 1:3
including filling joints with neat
1 9066 coloured cement slurry mixed with 260.00 500.00 Sq m 130,000.00
the pigment of matching shade,
curing and cleaning etc. complete.

156 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount
Providing and fixing vitrified glossy
finished (600 x 600) and 10 mm thick
tiles in floor, treads of steps, landing
on 25 mm thick bed of cement
2 9069 mortar 1:3 and jointed with cement 2,500.00 180.00 Sq m 450,000.00
slurry complete.

Providing and fixing vitrified


antiskid tiles (320 x 320) and 10 mm
thick tiles in floor, treads of steps,
landing on 25 mm thick bed of
3 9070 cement mortar 1:3 and jointed with 300.00 495.00 Sq m 148,500.00
cement slurry complete.

GSR 2012COST 854,950.00


FMR 0.00
VII FLOORING AND FLOOR
FINISHES - SUB TOTAL 854,950.00

157 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount

158 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount
IX PLASTERING AND
FINISHING WORKS

12mm cement plaster 1:4 (1 cement:


1 11004 4 fine sand) internal plaster at all 1,756.00 80.50 Sq.m 141,358.00
heights

15mm cement plaster 1: 3 (1 cement : 3


2 11007 fine sand) on the rough side of single or 94.00 102.00 Sq.m 9,588.00
half brick wall.

6mm cement plaster to ceiling 1: 3 (1


3 11015 cement: 3 fine sand) 1,200.00 76.00 Sq.m 91,200.00

Neat Cement punning


4 11018 76.00 29.00 Sq.m 2,204.00

18mm cement plaster in two coats


under layer 12mm thick cement
plaster 1:5( 1 cement:5 coarse sand)
and top layer 6mm thick with
cement plaster 1:3 ( 1 cement:3
11036 coarse sand) including mixing
+ waterproofing material for the top
5 1,249.00 147.00 Sq.m 183,603.00
11035/ layer in proportion recommended by
2 the manufacture, finished with
sponge complete. in one coat

18mm cement plaster in two coats


under layer 12mm thick cement
plaster 1:5( 1 cement:5 coarse sand)
and top layer 6mm thick with
cement plaster 1:3 ( 1 cement:3
coarse sand) including mixing
11036
+ waterproofing material for the top
layer in proportion recommended by
6 11035/ 379.00 108.00 Sq.m 40,932.00
the manufacture, finished with
2+
sponge complete. for plastering on
11038
circular works not exceeding 6m in
radius

Distempering two or more coats


with oil bound washable distemper
of approved brand and manufacture
and of required shade on new work
over and including a priming coat
with distemper primer of approved
7 11062 1,206.00 76.50 Sq.m 92,259.00
brand and manufacture to give an
even shade.

159 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount

Applying one coat of cement primer


8 11064 of approved brand and manufacture 2,500.00 22.00 Sq.m 55,000.00
on wall surface.

Wall painting (two or more coats)


with plastic emulsion paint of
approved brand and manufacture on
9 11099 2,109.00 73.50 Sq.m 155,011.50
new work to give an even shade.

Applying priming coat with ready


mixed primer of approved brand
10 11076 and manufacture on wood work 68.00 35.00 Sq.m 2,380.00
complete.(shutter )

Applying priming coat with ready


mixed primer of approved brand
11 11077 and manufacture on steel work 454.00 21.50 Sq.m 9,761.00
complete.

Painting two or more coats


(excluding priming coat) with
superior quality ready mixed paint
for wood work of approved brand &
1 11085 manufacture in all shades on new 68.00 35.50 Sq.m 2,414.00
work to give an even shade.

Painting three or more coats with


acryllic exterior paint of approved
brand and manufacture (such as
weather shield,APEX) including
2 11119 applying one coat of cement primer 1,600.00 80.00 Sq.m 128,000.00
and one coat of surface treatment
etc. complete.

R.A. Finishing fine with ready made


3 11/ putty over plaster at all heights 1,290.00 15.00 Sq.m 19,350.00
WA

GSR 2012 COST 913,710.50


FMR 19,350.00
IX PLASTERING AND
FINISHING WORKS - SUB 933,060.50
TOTAL

160 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount
X WATER SUPPLY,
SEWERAGE,PLUMBING AND
SANITATION WORKS
Single plate with 5 litres C.I
automatic Flushing cisterns

4 a 0.00 3,078.00 Each 0.00

Providing & fixing c.p. brass towel


rail complete with C.P. brass
5 15634 brackets fixed to wooden cleats with
C. P. brass screws

b 600 x 20 mm size 10.00 493.00 Each 4,930.00


Providing and fixing toilet paper
6 15635
holder :
a C.P. brass 15.00 467.00 Each 7,005.00
Providing & fixing liquid soap
container with C. P. brass lid and
7 15636 brackets fixed to wooden cleats with 9.00 369.00 Each 3,321.00
C. P. brass screws

a Glass container
Providing & fixing soap dish
chromium plated with brackets fixed
8 15637 to wooden cleats with CP brass 6.00 340.00 Each 2,040.00
screw

161 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount

Providing and fixing white virtreous


china water closet squating pan
(Indian type w.c. pan) size 580 mm
with 100 mm sand cast iron P or S
trap 10 litres high level P.V.C.
flushing cistern ( of approved make)
with fittings, rack bolts 32 mm
diameter P.V.C. telescopic flush pipe
with fittings and clamps 25 mm
1 15601 P.V.C. overflow pipe with specials &
mosquito proof coupling of
approved municipal design and
nylon pull complete cutting and
making good the walls and floors
where required.

b) Orissa pattern w.c. pan 15.00 1,511.00 Each 22,665.00

Providing and fixing P.V.C.


connection pipe with brass unions 15
2 15683
mm nominal bore:

c 45 cm (18”) length . 24.00 163.00 Each 3,912.00

Making connection of G. I.
Distribution branch with G. I. Main
50 mm to 80 mm nominal bore by
3 15675 providing and fixing tee including 1.00 280.00 Each 280.00
treading the pipe etc. complete

Providing and fixing brass stop cock


4 15678 (heavy) of approved quality :

a 15 mm nominal bore 12.00 383.00 Each 4,596.00

162 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount
Providing and placing on terrace
roof of floor two ( 1st floor roof)
single piece rotational moulded
polythene water storage tank having
15687 ISI mark and conforming to IS 12701:
5 + 1996 including placing polythene
15688 water tank on roof of floor three
( 2nd floor roof )

c 1000 litres capacity 4.00 4,468.00 Each 17,872.00

Providing and fixing Brass full way


valve ( heavy) duty with wheel of
6 15679 approved quality and make etc.
complete .

b 20 mm nominal bore 12.00 558.00 Each 6,696.00

Providing and fixing Brass full way


valve ( heavy) duty with wheel of
7 15679 approved quality and make etc.
complete .

c 25 mm nominal bore . 12.00 819.00 Each 9,828.00

Providing and fixing Brass full way


valve ( heavy) duty with wheel of
8 15679 approved quality and make etc.
complete .

d 32 mm nominal bore 8.00 1,223.00 Each 9,784.00

Providing and fixing Brass full way


valve ( heavy) duty with wheel of
9 15679 approved quality and make etc.
complete .

f 50 mm nominal bore . 4.00 1,399.00 Each 5,596.00

Providing and fixing ball valve


10 ( brass) of approved quality:
15680
a High pressure with P.V.C floats:
2) 20 mm nominal bore 4.00 360.00 Each 1,440.00

Providing and fixing square-mouth


S.W. gully trap grade ‘A’ complete
with c.i. grating brick masonry
chamber and water tight C.I. cover
with frame of 300 x 300 mm size
(inside the weight of cover to be not
11 15692
less than 4.53 kg). And frame to be
not less than 2.72 kg as per standard
design :

b 150x100 mm Size P or S type 6.00 1,232.00 Each 7,392.00

163 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount

Providing and fixing rigid PVC


S.W.W. (soil, waste & rain water
drainage pipes of approved
including lubricant etc. complete
(single/double) socketed: Minimum
pressure capacity(4 kg/cm2)

12 15707

a 110 mm dia 25.00 268.00 Rm 6,700.00

Providing and fixing rigid PVC


S.W.W. (soil, waste & rain water
drainage pipes of approved
including lubricant etc. complete
(single/double) socketed: Minimum
pressure capacity(4 kg/cm2)

13 15707

b 75 mm dia 0.00 188.00 Rm 0.00

Providing and fixing rigid PVC


S.W.W. (soil, waste & rain water
drainage pipes of approved
including lubricant etc. complete
14 0 (single/double) socketed: Minimum
pressure capacity(4 kg/cm2)

164 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount
c 160mm outer diameter 0.00 360.00 Rm 0.00

Providing and fixing rigid PVC


bend of required degree (of
approved make) for S.W.R. drainage
pipes & rainwater pipes of
15 15708 approved make and procedure
including lubricating etc complete.

a 110 mm dia 92.00 278.00 Each 25,576.00

Providing and fixing rigid PVC


bend of required degree (of
approved make) for S.W.R. drainage
pipes & rainwater pipes of
16 15708 approved make and procedure
including lubricating etc complete.

b 75 mm dia 142.00 167.00 Each 23,714.00

Providing and fixing rigid PVC bend


(approved make ) for S.W.R. pipes
including lubricating etc complete
17 15709
bend with door :

a 110 mm dia 10.00 164.00 Each 1,640.00

Providing and fixing rigid PVC bend


(approved make ) for S.W.R. pipes
including lubricating etc complete
bend with door :
18 15709

b 75 mm dia 4.00 108.00 Each 432.00

Providing and fixing rigid PVC bend


(approved make ) for S.W.R. pipes
including lubricating etc complete
bend with door :
19 0

c 160mm diameter 10.00 447.00 Each 4,470.00

Providing and fixing single tee of


rigid PVC (approved make) for
S.W.R. pipes including lubricating
20 15710
etc. complete, without door:

a 110 mm dia. 10.00 157.00 Each 1,570.00

165 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount

Providing and fixing single tee of


rigid PVC (approved make) for
S.W.R. pipes including lubricating
21 15710
etc. complete, without door:

b 75 mm dia. 4.00 128.00 Each 512.00

Providing and fixing single Tee of


rigid PVC (approved make ) for
S.W.R. pipes including lubricating
22 15711
etc complete, with door :

a 110 mm dia 10.00 178.00 Each 1,780.00


Providing and fixing single “Y” of
rigid PVC (approved make ) for
S.W.R. pipes including lubricating
23 15712
etc complete, without door :

a 110 mm dia 0.00 140.00 Each 0.00

Providing and fixing single “Y” of


rigid PVC (approved make ) for
S.W.R. pipes including lubricating
24 15712
etc complete, without door :

75 mm dia

b 0.00 82.00 Each 0.00

Providing and fixing single “Y” of


rigid PVC (approved make ) for
S.W.R. pipes including lubricating
25 15713
etc complete, with door :

a 110 mm dia 0.00 166.00 Each 0.00

Providing and fixing single “Y” of


rigid PVC (approved make ) for
S.W.R. pipes including lubricating
26 15713
etc complete, with door :

75 mm dia

b 0.00 96.00 Each 0.00

166 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount
Providing and fixing nahani trap of
rigid PVC (approved make ) for
S.W.R. pipes including lubricating
27 15716
etc complete, without door :

a 110 mm dia 16.00 99.00 Each 1,584.00

Providing and fixing U.P.V.C. pipe


clips (approved make ) for S.W.R.
pipes including all required
28 15717
accessories etc complete at all
heights :

110 mm dia

a 20.00 35.00 Each 700.00

29 0 0
c 160 mm diameter 0.00 0.00 Each 0.00

Providing and fixing R.P.V.C. vent


30 15718 cowl:
a 110 mm dia 0.00 59.00 Each 0.00

Providing and fixing R.P.V.C. vent


31 15718 cowl:
b 75 mm dia 0.00 51.00 Each 0.00

Providing and fixing NICKEL


chrome plated copper alloy Fancy
BIB Cock Short Body Jaquar make or
32 15739 38.00 548.00 Each 20,824.00
equivalent. Confirming to IS
8931;1993

Providing and fixing NICKEL


chrome plated copper alloy Fancy
LONG BODY BIB Cock WITH
33 15740 WALL FLANCE Jaquar make or 0.00 671.00 Each 0.00
equivalent. Confirming to IS
8931;1993

a 15mm nominal bore

Providing and fixing NICKEL


chrome plated copper alloy Fancy
TWO WAY LONG BODY BIB Cock
34 15741 WITH WALL FLANCE Jaquar make 4.00 1,035.00 Each 4,140.00
or equivalent. Confirming to IS
8931;1993

167 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount
a 15mm nominal bore

Providing and fixing NICKEL


chrome plated copper alloy Fancy
CONCEALED STOP COCK WITH
35 15743 12.00 721.00 Each 8,652.00
SLINDING FLANCE 15MM Jaquar
make or equivalent. Confirming to IS
8931;1993
Providing and fixing NICKEL
chrome plated copper alloy Fancy
BOTTLE TRAP ECONOMY TYPE
36 15749 32MM Jaquar make or equivalent. 0.00 258.00 Each 0.00
Confirming to IS 8931;1993

Providing and fixing chlorinated


ployvinyl chloride (CPVC) pipes
confirming to IS:15778, having
thermal stability for hot and cold
water supply including all CPVC
plain and brass threaded fittings
including fixing the pipes with
clamps at 1 mt. spacing. This
includes jointing of pipes and
fittings with one step CPVC solvent
37 15752 cement and testing of joints
complete as per direction of the
Engineer-in-charge. Concealed work
(medium duty SDR 13.5 pipe)
including cutting chases and
making good the walls etc.

15 mm dia nominal outer dia pipes


a 0.00 176.00 Rm 0.00

Providing and fixing chlorinated


38 15752 ployvinyl chloride (CPVC) pipes
confirming to IS:15778, having
20 mm dia nominal outer dia pipes
b thermal stability for hot and cold 222.00 213.00 R.mts. 47,286.00
water supply including all CPVC
plain and brass
Providing threaded
and fixing fittings
NICKEL
including
chrome fixingcopper
plated the pipes
alloywith
Fancy
clamps
BOTTLEatTRAP
1 mt. spacing.
ECONOMY ThisTYPE
39 15749 includes jointing
32MM Jaquar makeof pipes and
or equivalent. 4.00 258.00 Each 1,032.00
fittings withto
Confirming one
IS step CPVC solvent
8931;1993
cement and testing of joints
complete as per direction of the
Engineer-in-charge. Concealed work
(medium duty SDR 13.5 pipe)
including cutting chases and making
good the walls etc.

168 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount
Providing and fixing chlorinated
ployvinyl chloride (CPVC) pipes
confirming to IS:15778, having
thermal stability for hot and cold
water supply including all CPVC
plain and brass threaded fittings
including fixing the pipes with
clamps at 1 mt. spacing. This
includes jointing of pipes and
fittings with one step CPVC solvent
40 15752 cement and testing of joints
complete as per direction of the
Engineer-in-charge. Concealed work
(medium duty SDR 13.5 pipe)
including cutting chases and
making good the walls etc.

15 mm dia nominal outer dia pipes


a 0.00 176.00 Rm 0.00

Providing and fixing chlorinated


ployvinyl chloride (CPVC) pipes
confirming to IS:15778, having
thermal stability for hot and cold
water supply including all CPVC
plain and brass threaded fittings
including fixing the pipes with
clamps at 1 mt. spacing. This
includes jointing of pipes and
fittings with one step CPVC solvent
41 15752 cement and testing of joints
complete as per direction of the
Engineer-in-charge. Concealed work
(medium duty SDR 13.5 pipe)
including cutting chases and making
good the walls etc.

20 mm dia nominal outer dia pipes


b 0.00 213.00 R.mts. 0.00

169 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount
Providing and fixing chlorinated
ployvinyl chloride (CPVC) pipes
confirming to IS:15778, having
thermal stability for hot and cold
water supply including all CPVC
plain and brass threaded fittings
including fixing the pipes with
clamps at 1 mt. spacing. This
includes jointing of pipes and
fittings with one step CPVC solvent
42 15752 cement and testing of joints
complete as per direction of the
Engineer-in-charge. Concealed work
(medium duty SDR 13.5 pipe)
including cutting chases and making
good the walls etc.

25 mm dia nominal outer dia pipes


c 0.00 267.00 R.mts. 0.00

Providing and fixing chlorinated


polyvinyl chloride (CPVC) pipes
confirming to IS: 15778 having
thermal stability for hot and cold
water supply includng all CPVC
plain and brass threaded fittings
43 15753 CPVC solvent cement, trenching,
refilling and testing of joints
complete as per direction of the
Engineer in charge.(External work
(heavy duty SDR 11 pipe)

32 mm dia nominal outer dia pipes


d 0.00 315.00 R.mts. 0.00

Providing and fixing chlorinated


polyvinyl chloride (CPVC) pipes
confirming to IS: 15778 having
thermal stability for hot and cold
water supply includng all CPVC
plain and brass threaded fittings
44 15753 CPVC solvent cement, trenching,
refilling and testing of joints
complete as per direction of the
Engineer in charge.(External work
(heavy duty SDR 11 pipe)

50 mm dia nominal outer dia pipes


f 6.00 713.00 Rm 4,278.00

170 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount

20 mm dia nominal outer dia pipes


b 193.00 213.00 R.mts. 41,109.00

45 0

25 mm dia nominal outer dia pipes


c 189.00 267.00 R.mts. 50,463.00

Providing and fixing chlorinated


polyvinyl chloride (CPVC) pipes
confirming to IS: 15778 having
thermal stability for hot and cold
water supply includng all CPVC
plain and brass threaded fittings
46 15753 CPVC solvent cement, trenching,
refilling and testing of joints
complete as per direction of the
Engineer in charge.(External work
(heavy duty SDR 11 pipe)

171 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount
32 mm dia nominal outer dia pipes
d 221.00 315.00 R.mts. 69,615.00

Providing and fixing chlorinated


polyvinyl chloride (CPVC) pipes
confirming to IS: 15778 having
thermal stability for hot and cold
water supply includng all CPVC
plain and brass threaded fittings
CPVC solvent cement, trenching,
47 15753 refilling and testing of joints
complete as per direction of the
Engineer in charge.(External work
(heavy duty SDR 11 pipe)

50 mm dia nominal outer dia pipes


f 70.00 713.00 Rm 49,910.00

Providing and fixing vitreous china


wash basin with RS or C.I. brackets
painted white, 15 mm C.P. brass
pillar taps C.P. brass chain with
rubber plug 32 mm C.P. brass waste
of pattern, 32 mm diameter M.I. or
48 15606
C.P. brass trap and union complete,
including c

Flat back wash basin size 630mm


b x450 mm with single 15mm C.P 10.00 3,525.00 Each 35,250.00
brass pillar taps.

Providing , fixing and fabricating


mirror in toilet with 12 mm thick
plywood (marine) backing to 6 mm
thick mirror of approved make.
Wooden moulding of 36mm x19mm
R.A. (teak wood curved moulding) an
49 10.00 2,000.00 sq.m 20,000.00
17 edges and french polishing to all
exposed surfaces moulding
including all accesories etc complete.

Providing and fixing Cockroach


Trap "Square" with Square CP jalli
Square of Size 6"x6"(Approved
R.A. brand and make) including sealing
50 of edges with white cement and 10.00 1,335.43 Each 13,354.30
18
accessories etc complete

172 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount
Providing and fixing normal gauge
polythene pipes of approved quality
complete with special flange
compression type fitting (of
51 15685 approved make) including trenching
and refilling etc.(external work)
(high density)

d 50mm nominal bore 102.00 182.00 Rm 18,564.00

Providing and fixing G. I. Inlet


52 15620 connection for flush pipes 22.00 80.00 Each 1,760.00
connecting with W. C. pan

Providing and laying cement


concrete 1:5:10 ( 1cement : 5 fine
sand : 10 graded stone aggregate 40
mm nominal size up to haunches of
53 15691 S.W. pipes including bed concrete
15 cm thick as per standard design:

a 100 mm diameter S.W. pipes 90.00 360.00 R.m 32,400.00

Providing and laying cement


concrete 1:5:10 ( 1cement : 5 fine
sand : 10 graded stone aggregate 40
mm nominal size up to haunches of
54 15691 S.W. pipes including bed concrete
15 cm thick as per standard design:

b 150 mm diameter S.W. pipes 34.00 256.00 R.m 8,704.00

R.A. Providing and fixing 6" (150mm) dia


55 12.00 34.80 Each 417.60
19 stainless steel grating for Nahni trap
of approved make and brand
including all accessories complete

173 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount
Supply & installation of pump as per
following specification:-
1 pump set, comprising of 2 pumps
(1 working, 1 standby). no pump
capacity of 3 LPS @ 3 bars & to have
isolation valve at suction &
discharge. NRV at discharge.
Pressure gauge at suction &
R.A. discharge. Suction & discharge
56 manifold. Control panel with auto
20
changeover dry run. And over flow
protection. All mounted on common
base frame. etc complete as per the
direction of engineer.

Fixing of domestic commercial type


57 15148 water meter. (water meter is free 1.00 176.00 set 176.00
supply from Govt)

Providing and fixing air admittance


valves for installation in all the
R.A. drainage risers complete as per the
58 2.00 1,256.00 Each 2,512.00
21 direction of engineer.

GSR 2012 18,739.00


FMR

X WATER SUPPLY,
SEWERAGE,PLUMBING AND
SANITATION WORKS - SUB 625,496.00
TOTAL

174 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount

XI MISCELLANEOUS

12.5 mm tapered edge Gypboard


(confirming to IS: 2095-1982) is then
fixed to channel section with 25 mm
drywall screws at 230 mm centre.
Screw fixing is done mechanically
with drill machine & suitable
attachment. Finally square & tapered
edges joints of the boards are jointed
& finished so as to have flush look
which includes filling finishing with 250.00 650.00 Sq.m 162,500.00
jointing compound, joint paper tape
and two coats of Drywall top coat
suitable for Gypboard (as per
recommended practices of India
Gypsum Limited )

Providing preconstruction anti –


termite treatment to the buildings
conforming to I.S.S. 6313 part II 1971
(revised) including adopting the
precautions for health hazards and
safety measures as mentioned
therein with the cost of all materials
chemicals, plants, equipments etc.
required for the treatment and
furnishing a guaranty for a
2 18016 minimum period of 10 years from
the date of completion including
eradicating any infestation of
termite free of cost during the
guaranty period complete. The
payment will be made on plinth of
the building.

a Preconstruction 400.00 90.00 Sq.m 36,000.00

175 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount
Providing and fixing Fiber mesh of
approved quality joints portion of
RCC structures and masonry portion
after filling the gaps with
appropriate materials like katka,
R.A. waterproofing chemicals U nails
3 250.00 34.67 Sq.m 8,667.50
22 etc.including necessary scaffolding
etc. complete so as to have crack free
cement plaster surface.

Providing and installing Koster's


alkaline cement based crystalline NB
system to the cleaned surface free of
dust, paint curing agents, loose
plaster debris etc. The waterproofing
system is then Brush applied in 3
coats on a pre-dampened surface
including the sunken areas. The
coverage is 0.70 kg per sqs.metre per
coat. For bathrooms the treatment
should extend unto the shower
spout level in the shower areas and
extend 900 cms from the finished
R.A.
4 floor level. The waterproofing 680.00 443.56 Sq.m 301,620.80
23
system shall include treatment of all
construction joints & pipes insertions
with Koster's NB elastic system
having elasticity of 80%. Testing by
ponding water to be done for 48 hrs.
(Horizontal / Vertical)

36,000.00
FMR 472,788.30

176 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount

177 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount
0

178 of 203
Item GSR. Estimated
Description Quantity Rate Unit Grand Total
No. No. Amount

GRAND TOTAL 6,494,775.50

179 of 203
Rate Analysis

RATE ANALYSIS
Sr Item
Ref. No. Description % Unit Qty Rate Amount
No no.

Rate analysis for item No 11 of DISMANTELING FALSE CEILING WORKS

Dismantling False ceiling including supporting


RA- members , frame works etc.for all height & stacking of
1
01/WA materials within 50mts. Lead as directed by Eingineer-
in - charge at site

Particulars Unit Qty Rate Amount


Considering 10.00 sq.m. area of dismanteling work
1 Labour
a Carpenter - 1st class ( skilled ) Per day 0.500 300.00 150.00
b semi-skilled Mazdoor, Bandhani Per day 1.000 175.00 175.00
Sub total amount for 10 sq.m. area 325.00

Water Charges @ 1% 1% 3.25


Sub Total 328.25
Contractor's profit & O.H @ 15% 15% 49.24
Sub Total 377.49

Rate per Sq.m. = 377.49 /10 =Rs. 37.75

TOTAL RATE FOR DISMENTELING FALSE CEILING m2 37.75

180 of 203
Rate Analysis

Sr Item
Ref. No. Description % Unit Qty Rate Amount
No no.

Rate analysis of item no 14 for EARTH WORKS

Earth work in excavation by mechanical means over areas in


all types of stratas comprising of any type of materials such
as soil, silt clay, sand , gravel,murrum of all types of
conglomerates, laterite rock, soft rock ordinay rock
disintegrated rock fissured/ shattered rock, decomposed
rocks weathered rock, bituminous road layers and all such
other materials either in full or part as the case may be
RA adopting any method / methods as may be convenient or
2
02/WA permitted including chisseling, wedging etc. in all conditions
such as dry moist, foul, saturated, submerged etc. as directed
by Engineer etc. all complete including dressing of sides
ramming of bottom including all lead and lift , including
gettting out the excavated soil as directed including pumping
and bailing out water, barricading danger, lightening,
guarding as directed by engineer upto depth of 1.5m
(Blasting Prohibited)

Particulars Unit Qty Rate Amount

4005 a) All kinds of soil 75% Cum. 0.750 122.00 91.50

Earth work in excavation in saturated soil up to depth of


0.60 m including pumping or bailing out water and banking
4029 25% Cum. 0.250 289.00 72.25
in layer for the purpose of making embankments or filling up
of ground depressions, lead up to 20 m. and lift up to 1.5 m.

Total rate for 1 Cum. Cum. 163.75

181 of 203
Rate Analysis

Sr Item
Ref. No. Description % Unit Qty Rate Amount
No no.

Rate analysis for item no 15 of EARTH WORKS

Earth work in excavation by mechanical means over areas in


all types of stratas comprising of any type of materials such
as soil, silt clay, sand , gravel,murrum of all types of
conglomerates, laterite rock, soft rock ordinay rock
disintegrated rock fissured/ shattered rock, decomposed
rocks weathered rock, bituminous road layers and all such
other materials either in full or part as the case may be
RA adopting any method / methods as may be convenient or
3
03/WA permitted including chisseling, wedging etc. in all conditions
such as dry moist, foul, saturated, submerged etc. as directed
by Engineer etc. all complete including dressing of sides
ramming of bottom including all lead and lift , including
gettting out the excavated soil as directed including pumping
and bailing out water, barricading danger, lightening,
guarding as directed by engineer for depth above 1.5m
(Blasting Prohibited)

Particulars Unit Qty Rate Amount


A up to 1.5 m depth

4005 a) All kinds of soil 75% Cum. 0.750 122.00 91.50

Earth work in excavation in saturated soil up to depth of


0.60 m including pumping or bailing out water and banking
4029 25% Cum. 0.250 289.00 72.25
in layer for the purpose of making embankments or filling up
of ground depressions, lead up to 20 m. and lift up to 1.5 m.

A Total rate for 1 Cum. Cum. 163.75

B Above 1.5 m depth.


4010 a) All Types of soil 75% Cum. 0.750 13.00 9.75
4010 b) Saturated Soil 25% Cum. 0.250 22.00 5.50

B Total rate for 1 Cum. Cum. 15.25

Total cost for 1 Cu.m. ( A+B ) Cum. 179.00

182 of 203
Rate Analysis

Sr Item
Ref. No. Description % Unit Qty Rate Amount
No no.

Rate analysis of item no 16 for EARTH WORKS

Earth work by mechanical means in foundation, pipeline


trenches, drain in all types of stratas comprising of any type
of materials such as soil, silt clay, sand , gravel,murrum of all
types of conglomerates, laterite rock, soft rock ordinay rock
disintegrated rock fissured/ shattered rock, decomposed
rocks weathered rock, and all such other materials either in
full or part as the case may be adopting any method /
RA
4 methods as may be convenient or permitted including
04/WA
chisseling, wedging etc. in all conditions such as dry moist,
foul, saturated, submerged etc. as directed by Engineer etc.
all complete including dressing of sides ramming of bottom
including all lead and lift , including gettting out the
excavated soil as directed including pumping and bailing out
water, barricading danger, lightening, guarding as directed
by engineer upto depth of 1.5m (Blasting Prohibited)

Particulars % Unit Qty Rate Amount

4006 a) All kinds of soil 75% Cum. 0.750 124.00 93.00

Earth work in excavation in saturated soil up to depth of


0.60 m including pumping or bailing out water and banking
4029 25% Cum. 0.250 289.00 72.25
in layer for the purpose of making embankments or filling up
of ground depressions, lead up to 20 m. and lift up to 1.5 m.

Total rate for 1 Cum. Cum. 165.25

183 of 203
Rate Analysis

Sr Item
Ref. No. Description % Unit Qty Rate Amount
No no.

Rate analysis of item no 17 for EARTH WORKS

Earth work by mechninal means in foundation, pipeline


trenches, drain in all types of stratas comprising of any type
of materials such as soil, silt clay, sand , gravel,murrum of all
types of conglomerates, laterite rock, soft rock ordinay rock
disintegrated rock fissured/ shattered rock, decomposed
rocks weathered rock, and all such other materials either in
full or part as the case may be adopting any method /
RA
5 methods as may be convenient or permitted including
05/WA
chisseling, wedging etc. in all conditions such as dry moist,
foul, saturated, submerged etc. as directed by Engineer etc.
all complete including dressing of sides ramming of bottom
including all lead and lift , including gettting out the
excavated soil as directed including pumping and bailing out
water, barricading danger, lightening, guarding as directed
by engineer for depth above 1.5m (Blasting Prohibited)

Particulars % Unit Qty Rate Amount


A up to 1.5 m depth
4006 a) All kinds of soil 75% Cum. 0.750 124.00 93.00

Earth work in excavation in saturated soil up to depth of


0.60 m including pumping or bailing out water and banking
4029 25% Cum. 0.250 289.00 72.25
in layer for the purpose of making embankments or filling up
of ground depressions, lead up to 20 m. and lift up to 1.5 m.

A Total rate for 1 Cum. Cum. 165.25

B Above 1.5 m depth.


4010 a) All Types of soil 75% Cum. 0.750 13.00 9.75
4010 b) Saturated Soil 25% Cum. 0.250 22.00 5.50
B Total rate for 1 Cum. Cum. 15.25

Total cost for 1 Cu.m. ( A+B ) Cum. 180.50

184 of 203
Rate Analysis

Sr Item
Ref. No. Description % Unit Qty Rate Amount
No no.

Rate analysis of item no 65 for STRUCTURAL GLAZING


Providing supplying and fixing aluminium structural
glazing using approved make verticals 115.90mm x
57mm and horizontals (as structurally required for a
maximum horizontal span of 1200mm) double loop
multiwall holding sections with graphite grey powder
coating sections, 2.8mm thick openable shutter section
6
R.A. 18mm x 40mm tied to RCC wall and column surfaces.
06 G.I. L brackets, anchor fasteners, bolts, nuts, screws and
fixing 6mm one way reflective glass with 6mmx6mm
double sided tape and approved structural sealant as
per Architect's specifications and drawing etc. complete.

Cost per sq.m.


Particulars % Unit Qty Rate Amount

quotatio
n As per Quotation, rate of Johnson Alu Fab=Rs.=415*10.76 m2 1.000 4465.40 4465.40
attached

Add 10% wastage 10% 4465.40 446.54


Sub total 4911.940
Add 12.5% VAT (88935+13692+18000+15492) 12.50% 4911.94 613.99
Labour
CPWD
21.10/1 Glazier Day 0.230 300.00 69.00
196
Beldar Day 0.460 175.00 80.50
Sundries and carriage of gasket L.S 6.890 1.00 6.89
Sub total 5682.323

Add 1.5% for water & Electricity Charges 1.5% 5682.32 85.23
Sub total 5767.56
Add 15% for CP & OH 15% 5767.56 865.13

Rate per sqm. sqm. 6632.69

185 of 203
Rate Analysis

Sr Item
Ref. No. Description % Unit Qty Rate Amount
No no.

Rate analysis for item no 72 of KOTA STONE (TREADS)

Providing and fixing jointless Kotah stone slab (20 mm thick


average thickness) treads to steps of staircase including
R.A.
7 rouding / nosing exposed edges of Kotah stone slab treads
07/WA
laid on 20 mm (average)thick base of cement mortar 1:3 (1
cement: 3 sand ) including rubbing polishing etc. complete.

Rate Analysis for 10 Sq.m


Particulars % Unit Qty Rate Amount
GSR Materials
2008
item no. 20mm thick Kota stone slabs polished including 15%
Sq.m. 11.500 350 4025.00
1044 d. wastages
basic
rate Add 15 % wastage, total
area =11.5 m2
CPWD Carriage of slabs (GSR 2008 3369-70 a ) upto 100m
tonne 0.670 62.22 41.69
11.26.1 (31.11x100/50)
Cement motar 1:3 (GSR 2008 item no. 1061) cum 0.224 3666.00 821.18
Cement for slurry (i) for bedding =44kg +(ii) for joints =
20Kg. Total = 64Kg. Or 0.064 tonne (GSR 2008 1011 (a) basic tonne 0.064 5480.00 350.72
rate of cement.
Carriage of cement (GSR 2008 3371-72b ) upto 100m tonne 0.064 49.36 3.16

Dark shade pigment (GSR 1033 (a)) kilogram 4.500 110.00 495.00

Labour
Mason 2nd clas Day 1.200 300.00 360.00
Beldar Day 1.000 175.00 175.00
Coolie Day 1.000 175.00 175.00
Beldar for rubbing and polishing Day 5.000 175.00 875.00
Machine Day 4.000 200.00 800.00
Sundries L.S 208.130 1.00 208.13
Total 8329.88
Add 1.5% for Water charges & Electricity 1.5% 8329.880 124.948
Sub total 8454.83

Add 15% for CP & OH 15% 8454.829 1268.224


Sub total 9723.05
CPWD
Extra for pre finished nosing in treads of steps of Kota slab
11.31
Labour
Stone mason (ornamental) Day 1.500 300.000 450.00
Add 1.5% for Watercharges & Electricity 1.5% 450.000 6.750
Sub total 456.75

Add 15% for CP & OH 15% 456.750 68.513


Sub total 525.26

Cost for 10Sq.m (9723.05+525.26)=10248.31 10248.31

Cost for 1 Sq.m 1024.83

186 of 203
Rate Analysis

Sr Item
Ref. No. Description % Unit Qty Rate Amount
No no.

Rate analysis for item no 73 of KOTA STONE ( Risers / Skirting )

Providing and fixing Kotah stone slab Risers / Skirting


20mm thick to the steps of stair cases/ Skirting over 20 mm
R.A.
8 thick base of cement plaster 1:3 and jointed with cement
8/WA
slurry / pigment including rubbing and polishing etc.
complete.

Rate Analysis for 10 Sq.m


Particulars % Unit Qty Rate Amount
Materials

GSR
2008
item no. 20mm thick Kota stone slabs polished including 15%
Sq.m. 11.500 350 4025.00
1044 d. wastages
basic
rate

Add 15 % wastage, total


area =11.5 m2
CPWD
11.27 / Carriage of slabs (GSR 2008 3369-70 a ) upto 100m tonne 0.670 62.22 41.69
504
Cement motar 1:3 (GSR 2008 item no. 1061) cum 0.224 3666.00 821.18
Cement for slurry (i) for bedding =44kg +(ii) for joints =
20Kg. Total = 64Kg. Or 0.064 tonne (GSR 2008 1011 (a) basic tonne 0.064 5480.00 350.72
rate of cement.
Carriage of cement (GSR 2008 3371-72b ) upto 100m tonne 0.064 49.36 3.16

Dark shade pigment (GSR 1033 (a)) kilogram 4.500 110.00 495.00

Labour
Mason 2nd clas Day 3.000 300.00 900.00
Beldar Day 3.000 175.00 525.00
Coolie Day 1.000 175.00 175.00
Beldar for rubbing and polishing Day 7.000 175.00 1225.00

Sundries L.S 174.980 1.00 174.98


Total 8736.73
Add 1.5% for Watercharges & Electricity 1.5% 8736.730 131.051
Sub total 8867.78

Add 15% for CP & OH 15% 8867.781 1330.167


Sub total 10197.95

Cost for 1 Sq.m 1019.80

187 of 203
Rate Analysis

Sr Item
Ref. No. Description % Unit Qty Rate Amount
No no.

Rate analysis of item no 78 for BRICK RAFTERS

Providing and fixing brick masonry lining as rafters over


RCC sloping slab with single line brick masonry of bricks of
R.A.
9 class designation of 40 kg. / cm2 in cement mortar 1:3 (1
9
cement : 3 fine sand) with water proofing material to the
sides of the brick

Particulars % Unit Qty Rate Amount


Consider one side of the RCC sloping roof slab of area 16.43
(L) X 9.83 (B) mtrs. = 161.51 m2
Length rafter = 9.83
No. of brick rafter @ 0.50mtr C/C = 33 nos.
Total length of brick rafter = 33 X 9.83 = 324.39.
GSR 08 Providing brick masonry in cm. 1:3 , 10 cm thick as per item
Rmt. 324.390 45.60 14792.18
5020 no. 5020 rate of brick masonry = Rs. 45.60

GSR 08
11003 + 12 mm thick cement palster 1:3 (1 cement : 3 fine sand) with
Sq.m. 103.800 126.00 13078.80
11035 water proofing material. 324.39 X 0.32 = 103.80
(a)

total 27870.98

Cost of brick rafter = 27870.98 ÷ 324.39 = 85.92 /- RM. Rmt. 85.92

188 of 203
Rate Analysis

Sr Item
Ref. No. Description % Unit Qty Rate Amount
No no.

Rate analysis for item no 79 of POLYMER BITUMEN MEMBRANE

Providing and laying of 4mm thick polymer modified


bitumen water proofing membrane of approved make for
R.A. sloping roof , open terrace and toilet drops with necessary
10
10 gradient for drainage with non woven polymer
reinforcement (160 gm) minimum over vermiculate
concrete / RCC etc. complete

Particulars % Unit Qty Rate Amount

Quotati
on As per Quotation sq.m 1.000 450.00 450.00
attached

Scaffolding sq.m 1.000 200.00 200.00


Sub total 650.00
Transportation and handling. 5% 5% 650.00 32.50
Sundries and contengencies 3 % 3% 650.00 19.50
Add for electricity and water charges @ 1.5 % 1.5% 650.00 9.75
Sub total 711.75

Add CP & OH 15% 15% 711.75 106.7625


Sub total 818.51

Total Rate per Sq.m. Sqm 818.51

189 of 203
Rate Analysis

Sr Item
Ref. No. Description % Unit Qty Rate Amount
No no.
Rate analysis for item no 94 for Finishing fine with neeru over plaster

R.A. Finishing fine with ready made putty over plaster at all
11 11/ WA heights

Rate per 10Sq.m


GSR
2008 finishing fine with neeru over plaster at all heights Sq.m 10.000 16.00 160.00
11002
GSR
2008 Ded basic rate of Neeru ( 2kg for 10sq.m area) Kg 2.000 6.00 (12.00)
1025
Ded 1.5% of water & electricity 1.5% -12.00 (0.18)
Ded 15% CP & OH 15% -12.00 (1.80)
Sub total 146.02
quotati
Ready made putty ( As per Quot. From Krishna
on
Hardware. Dt. 18/03/10) (coverage : 10Sq.m/Kg) = rate
attache
per Kg. = 350/25=14.00
d
Add 12.5% Vat= 1.75
Total Rate i/c Vat. =14+1.75=15.75 Kg 2.000 15.75 31.50
Sub total 177.52
Add 1.5% for water charges & Electricity 1.5% 177.52 2.66

Sub total Sq.m 180.18


Add 15% for CP and OH 15% 180.18 27.03

Rate per 10Sq.m 10Sq.m 207.21

Rate Per Sq.m Sq.m 20.72

190 of 203
Rate Analysis

Sr Item
Ref. No. Description % Unit Qty Rate Amount
No no.
Rate analysis for item no 100 of EWC WALL MOUNTED

Providing and fixing European W.C with seat lid flushing


Cistern etc. wall mount in " STAR WHITE" colour of
R.A.
12 approved make and brand including all necessary
12
accessories/hardware kits, P trap, bracket etc. complete as
per drawing and as directed by Engineer.

Particulars . Unit Qty Rate Amount


Rate Analysis for 1 No

Basic cost of material including transport as per Invoice No:


Invoice
NA / 10/3303 . Dated 21/07/2009. M/s National No 1.000 8947.33 8947.33
attached
Agencies.Hindware make,Model 92016 Blamont;

As per
Price list Cost of CI bracket No 1.000 1412.00 1412.00
attached

As per
Price list Cost of P Trap (As per price list of Prince) No 1.000 365.00 365.00
attached

Material for fixing bracket


Plugs screw etc L.S 13.520 1.00 13.52
Red lead, white lead and gasket L.S 16.120 1.00 16.12
Cement sand and grit etc. L.S 26.910 1.00 26.91
Carriage of materials L.S 26.910 1.00 26.91
CPWD
2007
Labour
17.3.1 /
823
Fitter 1st Class Day 1.000 300.00 300.00
Mason 1st class Day 1.000 300.00 300.00
Beldar Day 1.000 175.00 175.00

Sub Total 11582.79

Add 1.5% Water and Electrical charges 1.5% 173.74


Sub Total 11756.53

Add 15% Contractors Profit and Overheads 15.0% 1763.48


Total 13520.01

Rate per No Each 13520.01

191 of 203
Rate Analysis

Sr Item
Ref. No. Description % Unit Qty Rate Amount
No no.
Rate analysis for item no 116 for PVC pipe 160mm dia
Providing and fixing rigid PVC S.W.W. (soil, waste & rain
R.A. water drainage pipes of approved including lubricant etc.
13
13 complete (single/double) socketed:Minimum pressure
capacity(4 kg/cm2)
c 160mm outer diameter
Particulars % Unit Qty Rate Amount
Rate per Rmt.
15065 Supply at site of work P.V.C pipes for using underground
Rmt. 3.000 547.00 1641.00
(b) drainage pipe RM

15209
Jointing of rigid P.V.C pipes by cleaning the pipes and joining Each 1.000 21.40 21.40
(f)
Sub total for 3 rm 1662.40

Rate per RM = Rmt. 554.13

192 of 203
Rate Analysis

Sr Item
Ref. No. Description % Unit Qty Rate Amount
No no.
Rate analysis for item no 119 of PVC bend 160mm dia
Providing and fixing rigid PVC bend of required degree (of
R.A. approved make) for S.W.R. drainage pipes & rainwater pipes
14
14 of approved make and procedure including lubricating etc
complete.
C 160mm outer diameter.
Particulars . Unit Qty Rate Amount

GSR
2008 P/F PVC bend for SWR pipes without door 110dia Each 1.000 278.00 278.00
15708(a)

GSR
2008 Deduct rate of PVC bend SWR 110dia -51.00
1158 (1)

1.5% water and electricity 1.5% -51.00 -0.77


Deduct 15 % CP & OH 15% -51.00 -7.65

PHE
15016 Add cost of PVC bend 160dia Each 1.000 306.00 306.00
(k)

Sub Total 524.59

Add 1.5% for water charges and electricity 1.5% 524.59 7.87
Sub Total 532.45

Add 15% for CP & OH 15% 532.45 79.87


Sub Total 612.32

Rate per No. Each 612.32

193 of 203
Rate Analysis

Sr Item
Ref. No. Description % Unit Qty Rate Amount
No no.
Rate analysis for item no 122 of PVC bend with door 160mm dia
Providing and fixing single tee of rigid PVC (approved
R.A.
15 make) for S.W.R. pipes including lubricating etc. complete,
15
without door:
c 160mm diameter.
Particulars . Unit Qty Rate Amount

GSR
2008 P/F PVC bend for SWR pipes with door 110dia Each 1.000 164.00 164.00
15709(a)

GSR
2008 Deduct rate of PVC bend SWR 110dia -63.00
1158 (a)

1.5% water and electricity 1.5% -63.00 -0.95


As per GSR 2008 deduct 15 % CP & OH 15% -63.00 -9.45

As per
Add cost of PVC bend 160dia with door each 1.000 316.00 316.00
price list

Sub Total 406.61

Add 1.5% for water charges 1.5% 406.61 6.10


Sub Total 412.70

Add 15% Contractors Profit and Overheads 15% 412.70 61.91


Sub Total 474.61

Rate per No Each 474.61

194 of 203
Rate Analysis

Sr Item
Ref. No. Description % Unit Qty Rate Amount
No no.
Rate analysis for item no 134 of UPVC clips
Providing and fixing U.P.V.C. pipe clips (approved make )
R.A.
16 for S.W.R. pipes including all required accessories etc
16
complete at all heights :
a 160mm diameter.
Particulars . Unit Qty Rate Amount

GSR
2008 P/F UPVC clips 110dia Each 1.000 35.00 35.00
15717(a)

GSR
2008 Deduct rate of UPVC -12.00
1163 (a)

1.5% water and electricity 1.5% -12.00 -0.18


As per GSR 2008 deduct 15 % CP & OH 15% -12.00 -1.80

As per
Add cost of UPVC clips 160mm dia each 1.000 45.00 45.00
price list

Sub total 66.02

Sub Total 67.01

Add 15% for CP & OH 15% 67.01 10.05


Sub total 77.06

Rate per No. Each 77.06

195 of 203
Rate Analysis

Sr Item
Ref. No. Description % Unit Qty Rate Amount
No no.
Rate analysis for item no 148 of MIRROR IN TOILET

Providing , fixing and fabricating mirror in toilet with 12 mm


thick plywood (marine) backing to 6 mm thick mirror of
R.A. approved make. Wooden moulding of 36mm x19mm (teak
17
17 wood curved moulding) an edges and french polishing to all
exposed surfaces moulding including all accesories etc
complete.

Consider mirror of 1 X 1 =1 m2 Unit Qty Rate Amount


Mirror 1 x 1.00 =1.0
Add wastage 10% = 0.1
=1.1 sq.m.

Quotati
Cost of mirror 6 mm thick (M/s. Krishna glasses )dtd.
on Sq.m. 1.100 699.40 769.34
06.04.2009) 10.76 X 65 = 699.40
attached

12 mm thick plywood (marine) 10.76 X 58/-(as per Navelkar


Sq.m. 1.100 624.08 686.49
quotation dt 22/7/09
Adhesive fevicol 1 kg / sq.m. kg. 1.100 134.00 147.40
Moulding 11/2" X 3/4" alround = 4.0 RM. (M/s. Damodar
Plywood) 18/-x3.28=59.04
Add 10% wastage = 0.4
= 4.4 RM 4.400 59.04 259.78
CPWD
Carriage of Material L.S 4.160 1.00 4.16
17.31
Sundries L.S 1.430 1.00 1.43
Labour
carpenter II class Day 0.330 300.00 99.00
Beldar Day 0.330 175.00 57.75
GSR
2008 Painting with Black Japan Paint Sq.m 1.000 39.00 39.00
11098
Sub total 2064.34

Fixtures like Screws etc. L.s 50.00


Tools & Plant 2.5% 2064.34 51.61
Sub total 2165.95

Add 1.5% for water and electricity charges except for


1.5% 2126.95 31.90
Painting with Black Japan paint
Sub total 2197.86

Add CP & OH 15% except for Painting with Black Japan paint 15% 2158.86 323.83

Sub total 2521.69

Rate for 1 Sq.m. Sq.m. 2521.69

196 of 203
Rate Analysis

Sr Item
Ref. No. Description % Unit Qty Rate Amount
No no.
Rate analysis for item no 149 of COCKROACH TRAP
Providing and fixing Cockroach Trap "Square" with Square
R.A. CP jalli Square of Size 6"x6"(Approved brand and make)
18
18 including sealing of edges with white cement and accessories
etc complete
Particulars % Unit Qty Rate Amount

GSR
2008 P/F of Nahni Trap 110mm dia Each 99.00
15716 a)

GSR
2008 Deduct rate of Nahni Trap 110 mm OD Each -55.00
1162 1)
1.5% water and electricity 1.5% -55.00 -0.83
Ded CP&OH @ 15% on 15716 (a) 15% -55.00 -8.25

Price list
Cost of Square Cockroach Trap (As per Price list) Each 1.000 715.00 715.00
attached

Price list
CP Jalli square size 6"x6" (As per Price list) Each 1.000 390.00 390.00
attached

Sub total 1139.93


Labour for fixing
CPWD
Fixing Charges of Grating for Nahni trap L.S 4.160 1.00 4.16
17.29
Sub total 1144.09

Add 1.5% for water and electricity charges (715+390)=1105 1.5% 1144.09 17.16

Sub total 1161.25

Add CP & OH 15% (715+390)=1105 15% 1161.25 174.19


Sub total 1335.43

Rate per no. Each 1335.43

197 of 203
Rate Analysis

Sr Item
Ref. No. Description % Unit Qty Rate Amount
No no.
Rate analysis for item no 154 of GRATING FOR NAHANI TRAP
Providing and fixing 6" (150mm) dia stainless steel grating
R.A.
19 for Nahni trap of approved make and brand including all
19
accessories complete
Particulars % Unit Qty Rate Amount

Price list
Cost of grating for Nahni Trap (As per price list of Maxwell) Each 1.000 21.75 21.75
attached

CPWD
18.15.1 Carriage of material and fixing charges L.S 8.060 1.00 8.06
/ 941
Sub total 29.81

Add 1.5% for water and electricity charges 1.5% 29.81 0.45
Sub Total 30.26

Add 15% for CP & OH 15% 30.26 4.54


Sub Total 34.80

Rate per no. Each 34.80

198 of 203
Rate Analysis

Sr Item
Ref. No. Description % Unit Qty Rate Amount
No no.
Rate analysis for item no 155 of PUMP SET.

Supply & installation of pump as per following


specification:-
R.A. 1 pump set, comprising of 2 pumps (1 working, 1 standby).
20
20 no pump capacity of 3 LPS @ 3 bars & to have isolation valve
at suction & discharge. NRV at discharge. Pressure gauge at
suction & discharge. Suction & discharge manifold. Control
panel with auto changeover dry run. And over flow
protection. All mounted on common base frame. etc
complete as per the direction of engineer.
Description % Unit Qty Rate Amount
Basic cost of Pump as per the attached quatation of
Texmo-Aquatex pump. by M/s Be Yes Enterprises
dated 32-02-2010.
Quotati
on
` No 1 32600.00 32,600.00
attache
d Supply & installation of pump
VAT 4.0% 4.00% 1,304.00
Subtotal 33,904.00
Quotati
on
No 1 36000.00 36,000.00
attache
d Auto Control panel
VAT 12.5% 12.50% 4,500.00
Subtotal 40,500.00
Quotati
on
No 1 28000.00 28,000.00
attache
d Individual suction & common discharge
VAT 12.5% 12.50% 3,500.00
Subtotal 31,500.00

Total (33904+40500+31500)=105904 105,904.00


carriage charges 2% 2.00% 2,118.08
Subtotal 108,022.08

Supervision & installation charges 5.00% 108022.08 5,401.10


Subtotal 113,423.18

1.5% towards water and electricity charges. 1.50% 1,701.35


Subtotal 115,124.53

15% overheads and profit 15.00% 17,268.68

Total cost…….. Each 132,393.21

199 of 203
Rate Analysis

Sr Item
Ref. No. Description % Unit Qty Rate Amount
No no.
Rate analysis for item no 157 of air admittance valves.
Providing and fixing air admittance valves for
R.A. installation in all the drainage risers complete as per the
21
21 direction of engineer.

Description % Unit Qty Rate Amount


Basic cost of Air admittance Valve as per the attached
quotation of Studor. by M/s V. K. Kare Enterprises
dated 23-03-2010.
Quotati
on
No 1 3500.00 3,500.00
attache
d Air admittance Valve
VAT 4% 4.00% 140.00
Subtotal 3,640.00

carriage and fixing charges 1.00% 3640.00 36.40


Subtotal 3,676.40

1.5% towards water and electricity charges. 1.50% 55.15


Subtotal 3,731.55

15% overheads and profit 559.73


Total 4,291.28

200 of 203
Rate Analysis

Sr Item
Ref. No. Description % Unit Qty Rate Amount
No no.
Rate analysis for item no 161 for Fibre mesh

Providing and fixing Fiber mesh of approved quality


joints portion of RCC structures and masonry portion
R.A. after filling the gaps with appropriate materials like
22
22 katka, waterproofing chemicals U nails etc.including
necessary scaffolding etc. complete so as to have crack
free cement plaster surface.

Particulars % Unit Qty Rate Amount


Quotati
Fiber mesh (Krishna Hardwares dtd. 18.03.2010 Rate
on
for 21 m roll= 450 , Rate per 1 m
attache
length=21.43
d
Add 12.5% Vat=2.68
Total Cost= 21.43+2.68=24.11 Sq.m 1.000 24.11 24.11
Add wastage 10% 10% 2.41
Sub total 26.52
Fitting charges 10 % 10% 26.52 2.65
add transport 2% 2% 26.52 0.53
Sub total 29.70
Add 1.5% for water charges & Electricity 1.5% 29.70 0.45
Sub total 30.15

Add 15% for CP and OH 15% 30.15 4.52


Total Rate per Sq.m. Sq.m. 34.67

201 of 203
Rate Analysis

Sr Item
Ref. No. Description % Unit Qty Rate Amount
No no.
Rate analysis for item no 162 of KOSTER ALKALINE (HORIZONTAL / VERTICAL)

Providing and installing Koster's alkaline cement based


crystalline NB system to the cleaned surface free of dust,
paint curing agents, loose plaster debris etc. The
waterproofing system is then Brush applied in 3 coats
on a pre-dampened surface including the sunken areas.
The coverage is 0.70 kg per sqs.metre per coat. For
R.A.
23 bathrooms the treatment should extend unto the shower Sq.m
23
spout level in the shower areas and extend 900 cms from
the finished floor level. The waterproofing system shall
include treatment of all construction joints & pipes
insertions with Koster's NB elastic system having
elasticity of 80%. Testing by ponding water to be done
for 48 hrs. (Horizontal / Vertical)

Particulars Unit Qty Rate Amount


Rate as per the quotation submitted by M/S. Chowgule
380.00
industries ltd.

Add 1.5% for water and electricity charges 1.5% 380.00 5.70
Sub total 385.70

Add 15% for CP & OH 15.0% 385.70 57.86


Sub total 443.56

Total rate for 1 Sq.m Sq.m 443.56

202 of 203
Rate Analysis

Sr Item
Ref. No. Description % Unit Qty Rate Amount
No no.
Rate analysis for item no 166 of HEAVY DUTY NP3 RCC PIPE
Providing, laying and fixing with heavy duty non
R.A. pressure NP3 class RCC pipe 600mm dia with cement
24
24 mortar 1:2 (1 cement: : 2 fine sand) in joints including
cost of joining material etc.

Particulars Unit Qty Rate Amount


15060 II
Rate of RCC pipe 600mm dia Rmt. 1.000 2916.00 2,916.00
(l)

Transportation of RCC pipes 5 km GSR 08 I.No 3301-


Rmt. 1.000 32.92 32.92
08

Sub total 2,948.92

GSR Item no. 14117 laying of 600 Ø NP 3 pipe Rmt. 65.00


Sub total 3,013.92

Add 15% for CP and OH 15% 3013.92 452.09


Rate Per Metre Rmt. 3,466.01

203 of 203