Audit Notification Form
Audit Notification Form
CP N-05 : Building and Civil Engineering Work for Depot Building Including
Actual
Project Plan
Control Actual
SAMPLE
Plan
HSE
Actual
Construction Plan
Site Construction
Team Actual
Plan
EEI
Actual
Plan
HILMARC'S
Actual
Prepared By:
Approved By:
Date
7-Jun-2021 8-Jun-2021 9-Jun-2021
REMARKS
Audit Activity AM PM AM PM AM PM
Pre- Audit Meeting Pre-Audit meeting at 9am for 30mins
HR/Finance/Materials 9:30 am Start
General/Admin 10:30 am Start
HSE 2:00 pm Start
Civil-Earthworks 9:00 am Start
Structural Works 10:30 am Start
Architectural 2:00 pm Start
Mechanical & Electrical 3:00 pm Start
PJT Control (External) 9:00 am Start
PJT Control (Internal) 10:30 am Start
Interface & Design 2:00 pm Start
Post Audit Meeting Post Audit meeting at 4 pm
Prepared By:
Approved By:
10
11
12
13
14
15
16
17
18
19
20
North-South Commuter Railway Extension Project
CP N-05 : Building and Civil Engineering Work for Depot Building Including
Related Infrastructure and Track Work Ballast (Contract No : NSCREX-03-N05)
Audit Checklist
Implementation Evidence/
N/A
Yes
No
No. Reference Documents Task Items/ Document to check Implementation of Conformance Remarks
10
11
12
13
14
15
North-South Commuter Railway Extension Project
CP N-05 : Building and Civil Engineering Work for Depot Building Including
Related Infrastructure and Track Work Ballast (Contract No : NSCREX-03-N05)
Prepared By: Mr. Laureano G. Tinio Approved By: Mr. Sang Yeob Lee
Quality Assurance Manager Project Manager
✘
Detailed Project Audit Schedule
Distribution:
Project Manager : Mr. Sang Yeob Lee
Date of Issue:
To Mr.:
Project Manager
Project QA Manager
Date of Audit :
Audit Place :
Scope of Audit :
Audit Objectives :
Audit Criteria :
Auditor :
Audit Observer :
Auditee :
Audit Results:
2. Audit Findings
Previous Audit
Audited Audit Date and
Auditee (s) Audit Objective Audit Scope Open Item Remarks
Organization Time
Status
References Documents:
10
11
12
13
14
15
16
17
18
19
20
North-South Commuter Railway Extension Project
CP N-05 : Building and Civil Engineering Work for Depot Building Including
Related Infrastructure and Track Work Ballast (Contract No : NSCREX-03-N05)
Audit Notification
North-South Commuter Railway Extension
Project Name: Contract No. :
Project
Client: Audit Location :
Project Quality Audit NSCRP-PSC-N05-CRKDPT-PRO-QA-
Activity / Discipline :
Procedure No. 00006
Date:
Issued By: Quality Assurance Department
To: Copied to:
Audit Scope
Auditors:
Audit Location:
Date of Audit:
Requested Time:
Expected Duration:
Audit References: Identified Resources to be Made Available:
Closing Meeting:
Notes:
The schedules of the audits are flexible depending on the audit achievements which may also be extended or shortened depending on the progress
of the audits.