Relay Settings For Line Differential / Distance Relay Type Micom P543 FOR 132 KV - METRO WPP ( E01)
Relay Settings For Line Differential / Distance Relay Type Micom P543 FOR 132 KV - METRO WPP ( E01)
Metro WPP
New Jhimpir
17.5 km
AAA Greely
132/22kV
2.5 km
31.5/40/50MVA
AAA Greely
Zone 1 85 % of Line
Zone 2 100 % of Line + 50 % of Shortest
Adjacent Line
Zone 3 100 % of Line + 120 % of
Longest Adjacent Line
Direction of Zones All Forward Direction
Time Delay for Zone 1 0 msec
Time Delay for Zone 2 350 msec
Time Delay for Zone 3 700 msec
Communication Scheme
For Distance Relay Permissive Over Reaching Transfer
Trip (POTT)
CRITERION DESCRIPTION
Both Line differential protection (87L) & distance protection (21) zone 1
are set as primary protections.
• Zone 2 set to overreaching and used with under reaching carrier signal
in permissive over reaching transfer trip (POTT) scheme. Without
carrier signal, zone 2 trips after zone 2 time delay of 350 ms.
• Zone 3 is set for normal operation after zone 3 time delay of 700 ms.
• Mutual Impedance is assumed zero.
RELAY DATA
EPESOL (PVT.) LTD., 71-B GARDEN BLOCK, NEW GARDEN TOWN, LAHORE Sheet: 2 / 26
Mutual Impedance 0
Adjacent Shortest Line Length (km) 17.5 km (Metro WPP – New Jhimpir)
Conductor AAA Greely
Adjacent Longest Line Length (km) 17.5 km (Metro WPP – New Jhimpir)
Conductor AAA Greely
Prepared By:
Line Diff/Dist Relay Type MiCOM P543 Issued: 07.03.2016
Project Ref.: EPE / MFK
50MW Gul Ahmed Checked By:
132 kV Gul Ahmed - Metro Circuit Rev.: 1 A-1
Wind Power Project EPE / NAH
EPESOL (PVT.) LTD., 71-B GARDEN BLOCK, NEW GARDEN TOWN, LAHORE Sheet: 3 / 26
RELAY SETTING CALCULATIONS 50MW GUL AHMED WIND POWER PROJECT
CALCULATIONS
Impedance Ratio:
Impedance Ratio, U = CT Ratio / PT Ratio
EPESOL (PVT.) LTD., 71-B GARDEN BLOCK, NEW GARDEN TOWN, LAHORE Sheet: 4 / 26
EPESOL (PVT.) LTD., 71-B GARDEN BLOCK, NEW GARDEN TOWN, LAHORE Sheet: 5 / 26
For Zone-1:
Resistive reach = [2.3 - 0.0045 x Line length (km)] x Zone 1 reach
Prepared By:
Line Diff/Dist Relay Type MiCOM P543 Issued: 07.03.2016
Project Ref.: EPE / MFK
50MW Gul Ahmed Checked By:
132 kV Gul Ahmed - Metro Circuit Rev.: 1 A-1
Wind Power Project EPE / NAH
EPESOL (PVT.) LTD., 71-B GARDEN BLOCK, NEW GARDEN TOWN, LAHORE Sheet: 6 / 26
RELAY SETTING CALCULATIONS 50MW GUL AHMED WIND POWER PROJECT
(Please refer Application Manual MiCOM P543, section 3.3.7, Page no. 8-22,
P543&5/EN/TM/M)
For Zone-2:
R2G = 2 × R1G = 7.52 Ω
R2Ph = 2 × R1Ph = 3.76 Ω
For Zone-3:
R3G = 1.5 × R2G = 11.28 Ω
R3Ph = 2 × R2Ph = 7.52 Ω
The charging current value for 132kV OHL has been taken from relay manual of P543
i.e. P543&5/EN/TM/M, Page No. 8-10, Table 1, Typical cable/line charging currents.
EPESOL (PVT.) LTD., 71-B GARDEN BLOCK, NEW GARDEN TOWN, LAHORE Sheet: 7 / 26
Where
Is1 The basic differential current setting which determines the minimum
pick- up level of relay. k1 The lower percentage bias setting used when
the bias current is below Ιs2.
Is2 A bias current threshold setting, above which the higher percentage bias
K2 is used. k2 The higher percentage bias setting used to improve relay stability
under heavy through fault current conditions.
Parameter Proposed Setting
Is1 0.2 p.u
k1 30%
Is2 2 p.u
k2 150%
Prepared By:
Line Diff/Dist Relay Type MiCOM P543 Issued: 07.03.2016
Project Ref.: EPE / MFK
50MW Gul Ahmed Checked By:
132 kV Gul Ahmed - Metro Circuit Rev.: 1 A-1
Wind Power Project EPE / NAH
EPESOL (PVT.) LTD., 71-B GARDEN BLOCK, NEW GARDEN TOWN, LAHORE Sheet: 8 / 26
RELAY SETTING CALCULATIONS 50MW GUL AHMED WIND POWER PROJECT
6
5.5
5
4.5
4
Slope k2
3.5
I diff
3
2.5
2 Slope k1
1.5
1
0.5
0
Prepared By:
Line Diff/Dist Relay Type MiCOM P543 Project Ref.: Issued: 07.03.2016
EPE / MFK
50MW Gul Ahmed Checked By:
132 kV Gul Ahmed - Metro Circuit Rev.: 1 A-1
Wind Power Project EPE / NAH
EPESOL (PVT.) LTD., 71-B GARDEN BLOCK, NEW GARDEN TOWN, LAHORE Sheet: 9 / 26
RELAY SETTING CALCULATIONS 50MW GUL AHMED WIND POWER PROJECT
EPESOL (PVT.) LTD., 71-B GARDEN BLOCK, NEW GARDEN TOWN, LAHORE Sheet: 10 / 26
EPESOL (PVT.) LTD., 71-B GARDEN BLOCK, NEW GARDEN TOWN, LAHORE Sheet: 11 / 26
Prepared By:
Line Diff/Dist Relay Type MiCOM P543 Issued: 07.03.2016
Project Ref.: EPE / MFK
50MW Gul Ahmed Checked By:
132 kV Gul Ahmed - Metro Circuit Rev.: 1 A-1
Wind Power Project EPE / NAH
EPESOL (PVT.) LTD., 71-B GARDEN BLOCK, NEW GARDEN TOWN, LAHORE Sheet: 12 / 26
RELAY SETTING CALCULATIONS 50MW GUL AHMED WIND POWER PROJECT
EPESOL (PVT.) LTD., 71-B GARDEN BLOCK, NEW GARDEN TOWN, LAHORE Sheet: 13 / 26
EPESOL (PVT.) LTD., 71-B GARDEN BLOCK, NEW GARDEN TOWN, LAHORE Sheet: 14 / 26
Prepared By:
Line Diff/Dist Relay Type MiCOM P543 Issued: 07.03.2016
Project Ref.: EPE / MFK
50MW Gul Ahmed Checked By:
132 kV Gul Ahmed - Metro Circuit Rev.: 1 A-1
Wind Power Project EPE / NAH
EPESOL (PVT.) LTD., 71-B GARDEN BLOCK, NEW GARDEN TOWN, LAHORE Sheet: 15 / 26
RELAY SETTING CALCULATIONS 50MW GUL AHMED WIND POWER PROJECT
EPESOL (PVT.) LTD., 71-B GARDEN BLOCK, NEW GARDEN TOWN, LAHORE Sheet: 16 / 26
EPESOL (PVT.) LTD., 71-B GARDEN BLOCK, NEW GARDEN TOWN, LAHORE Sheet: 17 / 26
EPESOL (PVT.) LTD., 71-B GARDEN BLOCK, NEW GARDEN TOWN, LAHORE Sheet: 18 / 26
RELAY SETTING CALCULATIONS 50MW GUL AHMED WIND POWER PROJECT
EPESOL (PVT.) LTD., 71-B GARDEN BLOCK, NEW GARDEN TOWN, LAHORE Sheet: 19 / 26
Prepared By:
Line Diff/Dist Relay Type MiCOM P543 Issued: 07.03.2016
Project Ref.: EPE / MFK
50MW Gul Ahmed Checked By:
132 kV Gul Ahmed - Metro Circuit Rev.: 1 A-1
Wind Power Project EPE / NAH
EPESOL (PVT.) LTD., 71-B GARDEN BLOCK, NEW GARDEN TOWN, LAHORE Sheet: 20 / 26
RELAY SETTING CALCULATIONS 50MW GUL AHMED WIND POWER PROJECT
Measured +
VTS Mode Measured + MCB, Measured Only or MCB Only
MCB
VTS Status Blocking Blocking, Indication
VTS Reset Mode Auto Manual, Auto
VTS Time Delay 1s 1s 10s 0.1s
EPESOL (PVT.) LTD., 71-B GARDEN BLOCK, NEW GARDEN TOWN, LAHORE Sheet: 21 / 26
EPESOL (PVT.) LTD., 71-B GARDEN BLOCK, NEW GARDEN TOWN, LAHORE Sheet: 22 / 26
SYSTEM CHECKS
CS1 Close Enable Enabled Enabled or Disabled N/A
CS2 Close Enable Disabled Enabled or Disabled N/A
LiveLine/Dead Bus Enabled Enabled or Disabled N/A
DeadLine/LiveBus Enabled Enabled or Disabled N/A
DeadLine/Dead Bus Enabled Enabled or Disabled N/A
C/S AR Immediate Disabled Enabled or Disabled N/A
Sys. Chk. on Shot 1 Enabled Enabled or Disabled N/A
*NOTE: AR will block in case of 2 or 3 phase fault only.
Prepared By:
Line Diff/Dist Relay Type MiCOM P543 Issued: 07.03.2016
Project Ref.: EPE / MFK
50MW Gul Ahmed Checked By:
132 kV Gul Ahmed - Metro Circuit Rev.: 1 A-1
Wind Power Project EPE / NAH
EPESOL (PVT.) LTD., 71-B GARDEN BLOCK, NEW GARDEN TOWN, LAHORE Sheet: 23 / 26
RELAY SETTING CALCULATIONS 50MW GUL AHMED WIND POWER PROJECT
VOLTAGE MONITORING
Live Voltage 88V / 51.5V* 1V 132V 0.5V
Dead Voltage 22V / 12.5V* 1V 132V 0.5V
CHECK SYNC.
Stage 1 Enabled Enabled or Disabled
CS1 Phase Angle 15° 0° 90° 1°
CS1 Slip Control Frequency Frequency/Both/Timer/None
CS1 Slip Freq. 100mHz 10mHz 1Hz 10mHz
CS1 Slip Timer 0.1s 0s 99s 0.01s
CS2 Status Disabled Enabled or Disabled
CS2 Phase Angle - 0° 90° 1°
CS2 Slip Control - Frequency/Both/Timer/None
CS2 Slip Freq. - 10mHz 1Hz 10mHz
CS2 Slip Timer - 0s 99s 0.01s
CS Undervoltage 66V / 38V* 10V 132V 0.5V
CS Overvoltage 144V / 83* 60V 185V 0.5V
CS Diff. Voltage 11V / 6.5* 1V 132V 0.5V
V</V>/Vdiff.>/V< and V>/V< and
CS Voltage Block V< Vdiff>/ V> and Vdiff>/V< V> and
Vdiff>/None
*NOTE: If line to neutral voltages are selected then * values should be used.
EPESOL (PVT.) LTD., 71-B GARDEN BLOCK, NEW GARDEN TOWN, LAHORE Sheet: 24 / 26
EPESOL (PVT.) LTD., 71-B GARDEN BLOCK, NEW GARDEN TOWN, LAHORE Sheet: 25 / 26
Prepared By:
Line Diff/Dist Relay Type MiCOM P543 Issued: 07.03.2016
Project Ref.: EPE / MFK
50MW Gul Ahmed Checked By:
132 kV Gul Ahmed - Metro Circuit Rev.: 1 A-1
Wind Power Project EPE / NAH