CLIENT: KSHIP
CONSULTANT: Egis International in J.V with Egis India consulting Engineers Pvt ltd and Aarvee associates
CONTRACTOR:
LIMITS
SIEVE WEIGHT OF THE SAMPLE = ( W1 ) = PERCENTAGE
Grading - 2
SIZE PASSING
WEIGHT RETAINED CUM.Wt. RETAINED CUM. % RETAINED 10mm
( mm ) ( 100 - Col.4 )
( gms ) - W2 ( gms ) - W3 ( W3 /W1 X 100 ) (25-40mm)
1 2 3 4 5 MAX. MIN.
13.2 mm 100 100
9.5 mm 100 90
4.75 mm 51 35
2.36 mm 39 24
1.18 mm 30 15
0.300 mm 19 9
0.075 mm 8 3
SDBC-2 - Graph.
100
90
80
70
60
% Passing
50
40
30
20
10
0
0.01 0.1 1 10
Sieve Size