Page 48

Karnataka State Highway Improvement Project -II, Stage 1


Name of the Project :
Contract No :KSHIP-II/STG 1/ICB/

CLIENT: KSHIP
CONSULTANT: Egis International in J.V with Egis India consulting Engineers Pvt ltd and Aarvee associates
CONTRACTOR:

TEST : SEMI DENSE BITUMINOUS CONCRETE - GRADATION


(MOSRTH - Sec.500 - Table - 500 - 15)
Lab Ref No :_________________ Date of Sampling :____________

Type of Material :_________________ Date of Testing :____________

Source :_________________ Oven / Air dried :___________

LIMITS
SIEVE WEIGHT OF THE SAMPLE = ( W1 ) = PERCENTAGE
Grading - 2
SIZE PASSING
WEIGHT RETAINED CUM.Wt. RETAINED CUM. % RETAINED 10mm
( mm ) ( 100 - Col.4 )
( gms ) - W2 ( gms ) - W3 ( W3 /W1 X 100 ) (25-40mm)
1 2 3 4 5 MAX. MIN.
13.2 mm 100 100
9.5 mm 100 90
4.75 mm 51 35
2.36 mm 39 24
1.18 mm 30 15
0.300 mm 19 9
0.075 mm 8 3

SDBC-2 - Graph.

100

90

80

70

60
% Passing

50

40

30

20

10

0
0.01 0.1 1 10
Sieve Size

Remarks :

Authorised Representative Authorised Representative


(For Contractor) (For Consultant)