The document is a budget listing materials and quantities needed for a construction project. It includes 26 items ranging from cement, sand, wood, paint and other building materials. The total cost for all materials is RM 7227.00. Major expenses include 50 bags of kerikil batu kali at RM 35.00 per bag for a total of RM 1750.00 and 2 pasu bunga besar at RM 220.00 each for a total of RM 440.00.
The document is a budget listing materials and quantities needed for a construction project. It includes 26 items ranging from cement, sand, wood, paint and other building materials. The total cost for all materials is RM 7227.00. Major expenses include 50 bags of kerikil batu kali at RM 35.00 per bag for a total of RM 1750.00 and 2 pasu bunga besar at RM 220.00 each for a total of RM 440.00.
The document is a budget listing materials and quantities needed for a construction project. It includes 26 items ranging from cement, sand, wood, paint and other building materials. The total cost for all materials is RM 7227.00. Major expenses include 50 bags of kerikil batu kali at RM 35.00 per bag for a total of RM 1750.00 and 2 pasu bunga besar at RM 220.00 each for a total of RM 440.00.