BILL OF QUANTITIES OF RESIDENTIAL APARTMENT SITUATED IN PLOT NO 54, S.NO47/20 &48/19,NO-5.

GUDUVANCHERY
VILLAGE , NANDIVARAM, CHENGALPET,VANDALUR TALUK-603202 BELONGS TO Ms.RAJALAKSHMI. T

Sl.No Description No L (ft) B(ft) D(ft) Unit Quantity


1.0 FOUNDATION & EXCAVATION
Boring of cast-in-situ bore holes of specified diameter and length
below the existing ground level to carry a safe working load not
less than specified in design, excluding the cost of steel
reinforcement but including the cost of boring with bentonite slurry
and temporary casing of appropriate length for setting out and
removal of same and the length of the pile to be embedded in the
pile cap etc. by percussion drilling using Direct mud circulation
(DMC) or Bailer and chisel technique by Tripod and mechanical
Winch Machine all complete, including removal of excavated earth
with all its lifts,leads and desmantling of pile directed by engineer-in-
charge (length of pile for payment shall be measured up to bottom
of pile cap). Note: Truck Mounted rotary/TMR/Tubewell boring
machine shall not be used.
18 inch dia piles 16 ft basic length 10 16 Cu.ft 160.00
15 inch dia piles 16 ft basic length 7 16 Cu.ft 112.00
12 inch dia piles 8 ft basic length 5 16 Cu.ft 80.00
1.2 Exacavation for Under reamed bulbs
For 18 inch dia piles 3'-6" ft dia 20 3.50 Cu.ft 42.00
For 15 inch dia piles 3'-3" ft dia 14 3.25 Cu.ft 32.00
For 12 inch dia piles 3'-0"ft dia 5 3.00 Cu.ft 17.00
Cu.ft 443.00
2.0 EARTHWORK

Page 1 of 46
Sl.No Description No L (ft) B(ft) D(ft) Unit Quantity
2.1 Earth work in excavation by mechanical means (Hydraulic
excavator) / manual means for pile cap/ foundation for all works up
to the required depth including shoring strutting, bailing out
water/pumping off water if required for all kind of soils except rock
requiring blasting - including dressing of sides and ramming of
bottoms and refilling of excavated soil as directed within the
premises and complying with standard specifications and as per
direction of Engineer-in-Charge.
Pile cap -PC3 10 2.50 2.50 1.50 Cu.ft 93.75
Pile cap -PC2 7 2.50 2.50 1.25 Cu.ft 54.69
Pile cap -PC1 5 2.50 2.50 1.00 Cu.ft 31.25
Excavation of Top 1'-6" ft loose soil 57 32 1.50 Cu.ft 2736.00

Total 2915.69
2.2 Supplying and filling of approved imported Earth, including carriage,
loading, unloading - filled in layers (each layer should not exceed 8
inch depth), watering, ramming, compacting and levelling.
Compaction shall be done with mechanical / manual means by
ramming / rolling to the required density of each filled layer etc. in
complying with standard specifications and as per direction of the
Engineer-in-Charge.
Raising entire land including plinth & setback Areas of building by 4
feet 1 32.00 57.00 4.00 Cu.ft 7296.00

Building Inside plith raising by1 feet extra above parking level for
seapage protection 1 26.50 27.25 1.00 Cu.ft 722.13

fill Pile cap pits and excavated loose soil.. 1 2916.00

Page 2 of 46
Sl.No Description No L (ft) B(ft) D(ft) Unit Quantity

Total 10934.13
Add 5 % for pores filling 546.71
Total 11480.83

2.3 Supplying and filling with river sand/ quary dust of 3" thickness
under floors / for PCC base - including watering, ramming,
consolidating and dressing complete and complying with standard
specification and as per direction of Engineer-in-Charge.

Entire Building area include parking 1 32.00 57.00 0.25 Cu.ft 456.00

Add 5% 22.80
Total 478.80

2.4 Providing pre-construction Anti termite treatment using


CHLOROPYRIPHOS / LINDANE 20% EC at various stages of
construction as per IS code-6313(part-III):1981 to create a chemical
barrier both inside & outside of the building, including execution and
submission of guarantee for a period of 10 years against any sub-
terranean pests infestation. etc complete in complying with
standard specification and as per directions of the Engineer-in-
Charge. [measurement shall be as per the area at plinth level of
building treated].
1) Just before placing the sand cushion layer in Footing /
Foundation trenches.
2) Just before placing the flooring PCC over flooring area.

Page 3 of 46
Sl.No Description No L (ft) B(ft) D(ft) Unit Quantity
3) After completion of building, for a width of 3'0" around the
perimeter of the building / just before placing the plinth protection
layer.
32.00 57.00 1824.00

3.0 PLAIN CEMENT CONCRETE (PCC)


3.1 Providing and laying in position Plain cement concrete of specified
grade including the cost of centering and shuttering and complying
with standard specifications and as per direction of Engineer-in-
Charge for the specified mix of 1:4:8 with 40mm down sized HBG
aggregate (1 Cement : 4 sand : 8 graded stone aggregate 40 mm
nominal size) - (For footing/pile cap/grade beam)

Below Pile caps 4 inch thk


Pile cap -PC3 10 2.50 2.50 0.33 Cu.ft 20.63
Pile cap -PC2 7 2.50 2.50 0.33 Cu.ft 14.44
Pile cap -PC1 5 2.50 2.50 0.33 Cu.ft 10.31
PCC Below plinth beams.12 inch wide 4" thk 1 289 1.00 0.33 Cu.ft 95.37
PCC in parking area 737 sq. ft below parking tiles 4" thk 243
PCC in Ground floor flat 578 sq.ft carpet area below floor tiles 4" 191
thk 575
Add 5% 28.73
Total 603.43

Page 4 of 46
Sl.No Description No L (ft) B(ft) D(ft) Unit Quantity
3.2 Providing and laying M 10 concrete in position with Ready mix Plain
Cement Concrete, using fly ash cement content as per approved
design mix and manufactured in fully automatic batching plant and
transported to site of work in transit mixer for all leads, having
continuous agitated mixer, manufactured as per mix design of
specified grade for plain cement concrete work, including pumping
of R.M.C. from transit mixer to site of laying and curing, including
the cost of centering, shuttering , finishing and cost of curing,
admixtures in recommended proportions as per IS : 9103 to
accelerate/ retard setting of concrete, improve workability without
impairing strength and durability as per direction of the Engineer -
in - charge.
Inside the building ie. Parking and Ground floor flat 1 56.00 30.50 0.33 563.64
Add 5% 28.18
Total 591.82
4.0 REINFORCED CEMENT CONCRETE

Page 5 of 46
Sl.No Description No L (ft) B(ft) D(ft) Unit Quantity
Providing and laying smooth Ply wood form finish / as-cast finish
approved Design Mix in position Ready Mixed Concrete for
reinforced cement concrete workof M25 grade , using fly ash and
cement content as per approved design mix, and manufactured in
fully automatic batching plant and transported to site of work in
transit mixer for all leads, having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
cement concrete work, including pumping of R.M.C. from transit
mixer to site of laying, and including the cost of centering and
shuttering including strutting,proping,finishing for all heights and
cost of admixtures in recommended proportions as per IS : 9103 to
accelerate / retard setting of concrete, improve workability without
impairing strength and durability as per direction of the Engineer -
in - charge. NOTE- (1) Cement content considered for M25 grade is
330 kg/cum and 360 kg /cum for M30 grade. Fly ash conforming to
grade I of IS 3812 (Part-1) only be used as part replacement of
OPC as per IS : 456. Uniform blending with cement to be ensured
in accordance with clauses 5.2 and 5.2.1 of IS:456 -2000 in the
items of BMC and RMC.
4.1 Pile & Pile cap
P1 5 16 1.50 1.50 Cu.ft 141.30
P2 7 16 1.25 1.25 Cu.ft 137.38
P3 10 16 1.00 1.00 Cu.ft 125.60
PC 1 5 2.50 2.50 1.00 Cu.ft 31.25
PC 2 7 2.50 2.50 1.25 Cu.ft 54.69
PC 3 10 2.50 2.50 1.50 Cu.ft 93.75

Page 6 of 46
Sl.No Description No L (ft) B(ft) D(ft) Unit Quantity
4.2 Plinth Beams at ground level connecting pile caps.

Plinth beams of 9x12 inches cross section 1 270.90 0.75 1.00 Cu.ft 203.18

Plinth beams of 9x15" cross sections 1 43.75 0.75 1.25 Cu.ft 41.02

4.3 Raising of columns upto roof beam level in each floor.

ground floor from plinth beam top to roof slab bottom 13'
height upto beam botoom.
9x12 inches size columns 6 13.00 0.75 1.00 Cu.ft 58.50
9x15 inches size columns 7 13.00 0.75 1.25 Cu.ft 85.31
9x18 inches size columns 4 13.00 0.75 1.50 Cu.ft 58.50
Roof beams
9x12 inches size beams 1 175.00 0.75 1.00 Cu.ft 131.25
9x15 inches size beams 1 92.00 0.75 1.25 Cu.ft 86.25
9x18 inches size beams 1 39.60 0.75 1.50 Cu.ft 44.55
Roof slab 4.5" thk of 1552 sq.ft 1 0.37 Cu.ft 574.00

First floor
9x12 inches size columns 6 9.00 0.75 1.00 Cu.ft 40.50
9x15 inches size columns 7 9.00 0.75 1.25 Cu.ft 59.06
9x18 inches size columns 4 9.00 0.75 1.50 Cu.ft 40.50
Roof beams

Page 7 of 46
Sl.No Description No L (ft) B(ft) D(ft) Unit Quantity
9x12 inches size beams 1 141.00 0.75 1.00 Cu.ft 105.75
9x15 inches size beams 1 98.00 0.75 1.25 Cu.ft 91.88
9x18 inches size beams 1 39.60 0.75 1.50 Cu.ft 44.55
Roof slab 4.5" thk of 1560 sq.ft 1 0.37 Cu.ft 578.00

Second floor
9x12 inches size columns 6 9.00 0.75 1.00 Cu.ft 40.50
9x15 inches size columns 7 9.00 0.75 1.25 Cu.ft 59.06
9x18 inches size columns 4 9.00 0.75 1.50 Cu.ft 40.50
9x12 inches size beams 1 145.00 0.75 1.00 Cu.ft 108.75
9x15 inches size beams 1 112.00 0.75 1.25 Cu.ft 105.00
9x18 inches size beams 1 39.60 0.75 1.50 Cu.ft 44.55
Roof slab 4.5" thk of 1560 sq.ft 1 0.37 Cu.ft 578.00

Terrace Lift and staircase head room columns


9x12 inches size columns 2 9.00 0.75 1.00 Cu.ft 13.50
9x15 inches size columns 4 9.00 0.75 1.25 Cu.ft 33.75
Terrace Lift and staircase head room RCC slab 190 sq.ft 1 0.38 Cu.ft 71.25
Beams 9x12 size 1 38.00 0.75 1.00 Cu.ft 28.50

4.4 Lintle beams on all doors and windows 12" extra on either side
9"X4" /5"X4' SIZE
Ground First and second floor
Main Door MD 3'-6" wide 4 4.50 0.75 0.33 Cu.ft 4.46

Page 8 of 46
Sl.No Description No L (ft) B(ft) D(ft) Unit Quantity
Doors D1 3'-0" wide 9 4.00 0.42 0.33 Cu.ft 4.99
Doors D2 2'-6" wide 14 3.50 0.42 0.33 Cu.ft 6.79
windows W2 3'-6" wide 14 4.50 0.75 0.33 Cu.ft 15.59
windows W3 4'-6" wide 6 5.50 0.75 0.33 Cu.ft 8.17
Kitchen Window KW 4'-6" wide 4 5.50 0.75 0.33 Cu.ft 5.45
Ventilators V 2'-0" wide 10 3.00 0.75 0.33 Cu.ft 7.43

4.5 RCC Kitchen counter slabs 3" thk


Ground floor flat G1 1 14.50 2.00 0.25 Cu.ft 7.25
First floor flat F1 1 15.25 2.00 0.25 Cu.ft 7.63
Second floor flat S1 1 11.61 2.00 0.25 Cu.ft 5.81
S2 1 14.25 2.00 0.25 Cu.ft 7.13
4.6 RCC sump,septic tank and over head water tank with 4" wall
thickness
Sump 9'0 X 7'0 X 60' deep 1 9.00 7.00 6.00 Cu.ft 380.16
Septic tank 9'0 X 7'0 X 60' deep 1 9.00 7.00 6.00 Cu.ft 380.16
OHD water tank in terrace 10'0 X 8'0 X 4'0 deep 1 10.00 8.00 4.00 Cu.ft 190.08

4.7 Compound wall


All around site with pile foundation of 12" dia pile upto 10 ' below
ground and columns raised upto 4'6" above parking level with 10
feet intervals and a tie beam of 9"x12" all areound

piles 12 " dia 18 10.00 Cu.ft 141.30


Tie beam 9"x12" dia 1 177.00 0.75 1.00 Cu.ft 132.00

Page 9 of 46
Sl.No Description No L (ft) B(ft) D(ft) Unit Quantity
Columns 9"x9" size 7'6" feet above tie beam 18 7.50 0.75 0.75 Cu.ft 132.00

5386.49
Add 5% extra for Miscellenious Items Cu.ft 269.32
Total 5655.81

5.0 STEEL REINFORCEMENT

Supplying and fixing in position of Steel reinforcement of all dia for


R.C.C. work at all levels as per drawings with Fe500 grade HYSD
bars conforming to IS: 1786-1985, - including straightening, cutting,
bending, placing in position and binding with two strands of
annealed steel wire 0.9 to 1.6 mm thickness, twisted tight at every
intersection of bars / Welding if necessary etc. complete, at all
levels in complying with standard specifications and as per direction
of Engineer-in-Charge.

a) RCC under reamed piles 1% of concrete volume 1 404.28 Kg 897.76


b) RCC pile cap 2% of concrete volume 1 179.69 Kg 399.03
c) Columns 2.5% concrete volume 1 529.68 Kg 2940.59
d) Plinth beam 1.5% of concrete volume 1 244.2 Kg 813.42
e) Lintel beams 1.0% of concrete volume 1 54.24 Kg 120.45
f) Roof slabs 1.5% of concrete volume 1 1801 Kg 5999.09
g) Roof Beams 2% of concrete volume 1 791.03 Kg 3513.20
h) water tank,Sump,Septic tanks 1.5% of concrete volume 1 950 Kg 3164.43
i) Compound wall 1.5% of concrete volumne 1 405.3 Kg 1350.04

Page 10 of 46
Sl.No Description No L (ft) B(ft) D(ft) Unit Quantity

19198.01
Add 5 % extra for wastage and laps 959.90
Total 20157.91
6.0 BRICK MASONRY
Brick work in 230mm (9") thick with well burnt clay bricks of
approved manufacturer, class designation 10 average compressive
strength in Cement mortar 1:6 (1cement : 6 Seived sand) with true
line level and plumb with necessary scaffolding, curing, raking of
joints and all materials and measures to complete the job with
standard specification and as per direction of Engineer-in-Charge.

Below plinth level 1 314.65 0.75 1.00 Cu.ft 235.99


Above plinth level upto parking level

1 314.65 0.75 3.00 Cu.ft 707.96

Ground floor Flat G1 1 87.11 0.75 11.00 Cu.ft 718.66

First floor Flat F1 1 120.25 0.75 9.00 Cu.ft 811.69

Second floor Flat 1 98.25 0.75 9.00 Cu.ft 663.19

Terrace Head room and Lift room 1 42.17 0.75 7.00 Cu.ft 221.39

Page 11 of 46
Sl.No Description No L (ft) B(ft) D(ft) Unit Quantity
Parapet 1 170.12 0.75 4.00 Cu.ft 510.36
Total 3869.24
Dedcutions for Doors and Windows
Main door MD 4 3.50 3.50 0.75 Cu.ft -36.75
Window W3 5 4.50 4.50 0.75 Cu.ft -75.94
Window W2 6 3.50 4.50 0.75 Cu.ft -70.88
Window KW 2 4.50 3.00 0.75 Cu.ft -20.25
Ventilator V 5 2.00 2.00 0.75 Cu.ft -15.00

Total quantity 3650.42

6.2 BRICK MASONRY 4.5" thk wall


Brick work in 115mm(4.5") thick partition walls in cement mortar 1:4
(One cement and Four seived river sand) with fly ash bricks of
class designation 10, conforming to IS : 12894, including necessary
scaffolding, curing, raking of joints and all materials and measures
with nominal hoop reinforcement of 2 Nos 8mm dia. Tor steel at
every third course of half brick masonry in complying with standard
specifications and as per direction of Engineer-in-Charge. at all
levels
Ground floor Flat G1 1 75.00 0.37 11.00 Cu.ft 305.25

First floor Flat F1 1 131.00 0.37 9.00 Cu.ft 436.23

Page 12 of 46
Sl.No Description No L (ft) B(ft) D(ft) Unit Quantity
Second floor Flat 1 98.25 0.37 9.00 Cu.ft 327.17

Total 4719.08
Dedcutions for Doors and Windows
Internal doorD1 9 3.50 3.50 0.37 Cu.ft -40.79
Internal doorD2 13 3.50 3.50 0.37 Cu.ft -58.92
Window W3 1 4.50 4.50 0.37 Cu.ft -7.49
Window W2 4 3.50 4.50 0.37 Cu.ft -23.31
Window KW 2 4.50 3.00 0.37 Cu.ft -9.99
Ventilator V 3 2.00 2.00 0.37 Cu.ft -4.44
4574.13
Add 5% for wastage 228.71
Total 4802.83

7.0 JOINERIES
Providing & fixing Wooden solid core, with 4.5" x 3 " section
frame of first quality teakwood.Rate to include necessary
hardware like Ball bearing hinges,towerbolts,mortice locks with
handle,door closers,floor stopper,bottom seal etc .All samples to be
approved by Engineer-in-Charge.
Main Door MD (5"x3") section 4 3.50 7.00 Cu.ft 8.75
InternaL Door D1 (4"x2.5") section 9 3.00 7.00 Cu.ft 15.00
Terrace lift machine room and staircase rooms 2 3.00 7.00 Cu.ft 3.33
Internal Door D2 14 2.50 7.00 Cu.ft 22.17
Window W3 6 4.50 4.50 Cu.ft 9.00

Page 13 of 46
Sl.No Description No L (ft) B(ft) D(ft) Unit Quantity
Window W2 14 3.50 4.50 Cu.ft 18.67
Window KW 4 4.50 2.00 Cu.ft 4.33
Window FD 1 6.00 7.00 Cu.ft 2.17
Ventilator V 10 2.00 2.00 Cu.ft 6.67
Add 40% extra for window shutters & wastage Cu.ft 36.03
Total Cu.ft 126.12

8.0 Providing and fixing in position 50MM thk profiled doors of factory
made for All Internal doors and Toilet,Balcony doors with water
proof paint both sides and SS hinges and tower bolts including
cutting to the required size, edge beading,fixing complete.

MD Main door in First quality Teak wood 3'6"X7'0" 4 LS


D1 Internal door 3'0"x7'0" profiled doors 9 LS
D2 Internal door 2'6"x7'0" profiled doors 14 LS
D1 For Lift Motor room and terraceStair case 3'0"x7'0" 2 LS
8.1 Providing and fixing of Window glass panes for all window shutters
of 5mm thick opaque texture with UV ray reflection made of
standard manufacturer with cutting to exact sizes griding edges
fixing in shutters by skilled labour complete.( take 80% of window
size for fixing).
Window W3 6 4.50 4.50 sq.ft 108.00
Window W2 14 3.50 4.50 sq.ft 224.00
Window KW 4 4.50 2.00 sq.ft 52.00
Window FD 1 6.00 7.00 sq.ft 26.00
Ventilator V 10 2.00 2.00 sq.ft 40.00

Page 14 of 46
Sl.No Description No L (ft) B(ft) D(ft) Unit Quantity
Take 5% extra for breakage 22.50
Total 472.50

FLOORING
9.0 Providing and laying Vitrified floor tiles in sizes 600x600 mm
(thickness to be specified by the manufacturer) with water
absorption less than 0.08% and conforming to IS : 15622, of
approved make, in all colours and shades, laid on 20mm thick
cement mortar 1:4 (1 cement : 4 coarse sand) and free from
cracks,fissures & flakes with straight edges and perfect corners laid
flush at right angles with hairline joints as per approved pattern ,
pointed all around neatly with epoxy grout of Laticrete/Bal Endura
make including Transport ,curing, and finishing in all respects, all
Ground floor Flat 1 590.00 590.00
First floor Flat 1 1152.00 1152.00
Second floor Flat 1 1150.00 1150.00
Add 5% extra 144.60
Total 3036.60

9.1 Providing and laying 12"x24" mm size Vitrified tiles for Toilets
approved brand, quality and colour, free from cracks,fissures &
flakes with straight edges and perfect corners laid flush at right
angles with hairline joints as per approved pattern and as directed
over a bed mortar of 20mm thick average in CM 1:4 pointed all
around neatly with epoxy grout of Laticrete/Bal Endura make
including curing, and finishing in all respects, all material and labour
complete.

Page 15 of 46
Sl.No Description No L (ft) B(ft) D(ft) Unit Quantity
Ground ,First & Second floor 1 323.25 sq.ft 323.25
Toilet walls all around upto 7 feet 1 1511.30 sq.ft 1511.30
Add 5% extra for wastage sq.ft 91.73
Total sq.ft 1603.03

9.2 Providing and laying 12"x24" mm height Vitrified tiles for Kitchen
Dado 2 feet height above counter top granite of approved brand,
quality and colour, free from cracks,fissures & flakes with straight
edges and perfect corners laid flush at right angles with hairline
joints as per approved pattern and as directed over a bed mortar of
20mm thick average in CM 1:4 pointed all around neatly with epoxy
grout of Laticrete/Bal Endura make including curing, and finishing in
all respects, all material and labour complete.
Ground floor 1 35.00 sq.ft 35.00
First floor 1 36.00 sq.ft 36.00
Second floor 2 72.00 sq.ft 72.00
Add 5% extra for wastege sq.ft 7.15
Total sq.ft 150.15

STAIR CASES TREADS RISERS AND LANDING WITH GRANITE


10.0 Supplying and laying 20mm thick single piece machine cut and
Leather finished Sadarhalli granite slab tread over a cement mortar
bed 20mm thick average in CM 1:4 and with 3 anti-slip grooves
finished in all respects, all materials and labour complete.Rate to
include nosing as per design.
Treads 54 3.00 1.00 sq.ft 162.00

Page 16 of 46
Sl.No Description No L (ft) B(ft) D(ft) Unit Quantity
Raisers 54 3.00 0.50 sq.ft 81.00
Mid Landings 3 3.50 6.00 sq.ft 63.00
Passages 3 12.00 5.00 sq.ft 180.00
Add 5% extra for wastege sq.ft 24.30
Total sq.ft 510.30
10.1 Supplying and fixing 20mm thick machine cut and smooth finished
Galaxy granite stone over Kitchen RCC counter slab with mortar of
50mm thick average in CM 1:4 finished in all respects, all materials
and labour complete.
Ground floor flat G1 1 14.50 2.00 sq.ft 29.00
First floor flat F1 1 15.25 2.00 sq.ft 30.50
Second floor flat S1 1 11.61 2.00 sq.ft 23.22
S2 1 14.25 2.00 sq.ft 28.50
Add 10% extra for wastege sq.ft 11.12
Total sq.ft 122.34

11.0 WEATHERING COURSE ON TERRACE


Weathering course concrete with broken brick jelly 20mm gauge in
pure slaked shell lime (no sand to be used) over the RCC roof slab.
The proportion of brick jelly to lime being 32:12½, well beaten with
wooden beaters ,treating the surface with water proof chemicles,
mixed with heat reducing chemicales with required slope and
thickness, etc. complete and as directed by the Engineer/Expert.
Terrace area of 1560 sq.ft 1 sq.ft 1560.00
Add 5 % extra for chamfered corners and wastage . sq.ft 78.00

Page 17 of 46
Sl.No Description No L (ft) B(ft) D(ft) Unit Quantity
Total sq.ft 1638.00

12.0 PLASTERING
12.1 Providing & applying 25 mm thk Cement plaster in CM 1:5 to walls
internally in single coat at all levels to correct line & level including
scaffolding, if any, and rounding off or champhering of corners,
cleaning of surface, raking out joints, roughening of surface,
chiselling the undulated surface and provide steel wire mesh for all
construction joints and curing, etc. all material and labour complete
in all respects.

Ground floor
Walls 1 228.00 10.00 sq.ft 2280.00
Ceilings 1 sq.ft 598.00
First floor
Walls 1 470.00 10.00 sq.ft 4700.00
Ceilings 1 sq.ft 1320.00
Second floor
Wall 1 521.00 10.00 sq.ft 5210.00
Ceilings 1 sq.ft 1652.00

Add 10% extra for unforeseen. sq.ft 1576.00


Total sq.ft 17336.00

Page 18 of 46
Sl.No Description No L (ft) B(ft) D(ft) Unit Quantity
12.2 Providing & applying 20 mm thk Cement plaster in two coats for
external walls, first base coat 12mm thk in CM 1:5 with rough finish
and a top layer with waterproof compound 6 mm thk in CM 1:3
finished with steel trowel at all levels to correct line & level including
scaffolding, if any, and rounding off or champhering of corners,
cleaning of surface, raking out joints, roughening of surface,
chiselling the undulated surface and provide steel mesh for all
construction joints wherever necessary and curing, etc. all material
and labour complete in all respects.

Ground floor
Walls 1 121.00 11.00 sq.ft 1331.00
Parking ceiling + stair and lift 1 sq.ft 1674.00
First floor
Walls 1 169.00 10.33 sq.ft 1745.77
Passage stair and lift 1 sq.ft 1650.00
Second floor
Wall 1 178.00 10.00 sq.ft 1780.00
Passage stair and lift 1 sq.ft 1652.00
Parapet wall 1 231.00 4.00 sq.ft 924.00
Compound wall both sides 2 241.00 7.00 sq.ft 3374.00
Add 10% extra for unforeseen. sq.ft 1413.08
Total sq.ft 15543.85

13.0 PUTTY AND PAINTING

Page 19 of 46
Sl.No Description No L (ft) B(ft) D(ft) Unit Quantity
13.1 Providing and applying two coats (pre final coats with brush and
final coat with roller) Internal Wall painting with premium acrylic
emulsion paint of interior grade of approved brand and
manufacture,including applying additional coatswherever required
to achieve even shade and colour for all heights including a priming
coat with alkali resistant primer and two coats of putty after
thoroughly brushing the surface free from mortar dropping and
other foreign matter and also including preparing the surface even
and sand papered smooth etc. all materials and labour complete for
all Internal walls.
Area same as Internal Plastering.. sq.ft 17336.00

13.2 Providing and applying two coats (pre final coats with brush and
final coat with roller) Exteranl Wall painting with ACE APEX
ULTIMA water based emulsion paint of superior grade of approved
brand and manufacture,including applying additional coatswherever
required to achieve even shade and colour for all heights including
a priming coat with sulphate resistant primer after thoroughly
brushing the surface free from mortar dropping and other foreign
matter and also including preparing the surface even and sand
papered smooth etc. all materials and labour complete for all
External
Area same walls.
as External Plastering.. sq.ft 40242.92

Page 20 of 46
Sl.No Description No L (ft) B(ft) D(ft) Unit Quantity
14.0 Supply and fixing of window grills for all windows and ventilators
and balconies and safety grills for main doors in MILD STEEL (MS)
painting with two coats of anamel based paint of superior grade of
approved brand and manufacture,including applying additional
coatswherever required to achieve even shade and colour for all
heights including a priming coat thoroughly sand blasting the
surface free from all droppings ,welds remains and other foreign
matter and also including preparing the surface even and smooth
etc. all materials and labour complete .
Calculate at 2 Kg per sq.ft of Item area.
MD Main door in Teak wood 3'6"X7'0" 4 3.50 7.00 sq.ft 196.00
D1 Internal door 3'0"x7'0" 9 3.00 7.00 sq.ft 378.00
D2 Internal door 2'6"x7'0" 14 2.50 7.00 sq.ft 490.00
KW Kitchen Window 4'6"x3'0" 4 4.50 3.00 sq.ft 108.00
W3 Window 3 panel 4'6"x4'6" 6 4.50 4.50 sq.ft 243.00
W2 Window 3 panel 3'6"x4'6" 14 3.50 4.50 sq.ft 441.00
V Ventilator 2'0"x2'0" 10 2.00 2.00 sq.ft 80.00
Balonies first floor 1 15.00 7.00 sq.ft 210.00
Balonies Second floor 1 7.00 7.00 sq.ft 98.00
Terrace stair room 1 3.00 7.00 sq.ft 42.00
Main Gate in stilt parking 1 28.00 5.00 sq.ft 280.00
Add 5% extra for waste and Miscellenious Items sq.ft 99.60
Total sq.ft 2091.60

Page 21 of 46
Sl.No Description No L (ft) B(ft) D(ft) Unit Quantity
15.0 Supply and fixing of hand rails for staircase and balconies and in
STAINLESS STEEL of grade 304 ,including cutting, shaping,
bending, welding and buffing, thoroughly cleaning the surface free
from all droppings ,welds remains and other foreign matter and
also including preparing the surface smooth and polishing etc. all
materials and labour complete.
Total running feet of the stair case.. 1 54.00 3.00 sq.ft 162.00

16.0 Supply ,Errection and installation of 6 passenger lift from stilt floor
to terrace floor of standard make ISI specifications provided with
telescopic doors and cabinet made of SS sheet with safety
precations and power backups including all material,Electrical and
Electronic installations and labour.
1 LS
17.0 PLUMBING and SANITORY
Providing & Fixing of All plumbing and sanitory Items Like Western
Closets in Toilets ,Health fausets, Taps,Hand wash ,ss Traps,
CPVC water pipes (I.S:4985-1981) of 10Kg / cm2 including all
fittings e.g bends, junctions, elbow, f-tee, m-tee, offsets, access
pieces etc. jointing with solvent cement including cutting holes in
1 LS
walls, floors excavation, refilling & disposal of surplus earth
wherever required & making .Diverting Kitchen & bath waste water
into seperate tank and Septic waste into disposable tank with all
RCC chambers and collecting pits complete.

Total
18.0 ELECTRICAL

Page 22 of 46
Sl.No Description No L (ft) B(ft) D(ft) Unit Quantity
Providing & Fixing of All Electrical Items right from obtaining
permissions to cutting walls for laying of concealed pipes and
metalic switch boxes,wiring with ISI standard branded electrical
wires and switches. With proper earthing.Installation of Fans ,Lights
grading and seperationg with MCP regulators and fuses connected 1 LS
to fase meteres within the flats in Distribution boxes and finally
establishing a common control panel box in the ground floor with
Electricity consumption meters including material and labour for
complete finsih.
19.0 DECORATION OF ROAD FRONT ELEVATION.
Decoration of Building road front view with extra stone cladding and
wooden cladding where ever necessary as per Achitect design. 1 LS

20.0 CONTRACTOR & SUPERVISION CHARGES.


Paying of Material contractors /Super visor/Architects fee for
providing all services and material organizing and executing, 1 LS
finshing stage wise activities with skilled works till hand over.

Page 23 of 46