Ehab Aly - Sr. Project Controls Scheduler
Ehab Aly - Sr. Project Controls Scheduler
1
InfoTran Engineers, P.C, NJ – January 2019 – December 2019
Senior Project Scheduler
NYCHA Morris Housing Developments
The scope of work involves brick repairs, window lintel replacement, concrete structure
repairs, asbestos abatement and water proofing; and/or repairs of the existing parapet walls;
repairs to spalled and cracked concrete. Duties include reviewing the project baseline
schedule Phase #2, maintaining submittal log, shop drawings in conformance to approved
plans and specifications, performing cost estimation, RFI, RFC, claims and change order
processing for efficient contract management. Construction Cost: $27M
Projacs International, Jeddah, KSA – January 2015 – December 2018
Managed program phases starting with Pre-design including finalizing the budget,
contract strategy, and design procedure manual.
Developed and implemented schedule, cost and scope control measures such as
Value Engineering, a budget that met the Owner’s goals and constructibility.
Prepared and established Master schedule for the Procurement and Construction
Phase.
Established the procedures in line with control forms as required for construction and
post construction phase.
Reviewed, analyzed and negotiated program claims. Construction Cost: $600 Million
Dar Al Qibla Hotel with 5B+G+11 Floors, Madina, KSA – July 2009 – January 2015
Senior Project Controls Manager
Developed and implemented schedule, cost and scope control measures such as
Value Engineering and budget that met the Owner’s goals and constructibility.
Prepared and established Master schedule for the Procurement and Construction
Phase.
Collected metric data such as baseline, actual values for cost, schedule, work in
progress and work completed.
Prepared reports for corrective action in case of variance.
Directed processes and procedures in coordination with construction managers,
supervisors, planners and schedulers. Construction Cost $600M
2
ALROSTAMANI PEGEL, Dubai, UAE – December 2007 – July 2009
JEBEL ALI INDUSTRIAL BUS DEPOT (Substation -Accommodation- Administration) Buildings
Supply, Fabrication, Erection / Installation, Maintenance and all Structural Metal Work
And sub and super structures for all buildings including MEP systems.
Planning Engineer
Prepared and established Master Baseline Schedule.
Prepared weekly and monthly project status reports.
Analyzed problems (4d) and anticipated project need.
Provided weekly updates and KPI to management
Prepared delays and EOT.
Assisted Project Management in decision making through evaluation of project time, cost and
resource. Construction Cost $65 M.
GIBCA GROUP, Sharjah, UAE – July 2005 – December 2007
Planning Engineer
Prepared and established Master Baseline Schedule
Prepared weekly and monthly project status reports and KPI to management.
Reviewed project reports and schedule status and compared to baseline.
Assisted Project Management in decision making through evaluation of project
time, cost and resources.
Ensured proper design mix, cost control and developed new products (Poly
stone and dry cast)