DATE :
DRG.NO.: PH10-1B-43-35-1107
DATE :
DRG.NO.: PH10-1B-43-35-1107
1 K9430 Pickup Short F811 (R1-R3) with S811 Stage-1A Load Shedding Picked up OK
in Service & Put SW S9430 in 1A
Position
Short F811 (R3-R2) with S811 Stage-1 Load Shedding Picked up OK
in Service & Put SW S9430 in 1
Position
Short F811 (R4-R5) with S811 Stage-2 Load Shedding Picked up OK
in Service & Put SW S9430 in 2
Position
Short F811 (R5-R6) with S811 Stage-3 Load Shedding Picked up OK
in Service & Put SW S9430 in 3
Position
Short F811 (F8-F9) with S811 Stage-4 Load Shedding Picked up OK
in Service & Put SW S9430 in 4
Position
Check Continuity at X511: 7-8 Spare Checked OK
Check Continuity at X511: 9-10 Spare Checked OK
Check Continuity at X511: 12-14 Load Shedding Trip to A30 Checked OK
2 K9450 Pickup Short F811 (R1-R3) with S811 Stage-1A Load Shedding Picked up OK
in Service & Put SW S9450 in 1A
Position
Short F811 (R3-R2) with S811 Stage-1 Load Shedding Picked up OK
in Service & Put SW S9450 in 1
Position
Short F811 (R4-R5) with S811 Stage-2 Load Shedding Picked up OK
in Service & Put SW S9450 in 2
Position
Short F811 (R5-R6) with S811 Stage-3 Load Shedding Picked up OK
in Service & Put SW S9450 in 3
Position
Short F811 (F8-F9) with S811 Stage-4 Load Shedding Picked up OK
in Service & Put SW S9450 in 4
Position
Check Continuity at X511: 15-16 Spare Checked OK
Check Continuity at X511: 17-18 Spare Checked OK
Check Continuity at X511: 20-22 Load Shedding Trip to A50 Checked OK
DATE :
DRG.NO.: PH10-1B-43-35-1107
3 K9470 Pickup Short F811 (R1-R3) with S811 Stage-1A Load Shedding Picked up OK
in Service & Put SW S9470 in 1A
Position
Short F811 (R3-R2) with S811 Stage-1 Load Shedding Picked up OK
in Service & Put SW S9470 in 1
Position
Short F811 (R4-R5) with S811 Stage-2 Load Shedding Picked up OK
in Service & Put SW S9470 in 2
Position
Short F811 (R5-R6) with S811 Stage-3 Load Shedding Picked up OK
in Service & Put SW S9470 in 3
Position
Short F811 (F8-F9) with S811 Stage-4 Load Shedding Picked up OK
in Service & Put SW S9470 in 4
Position
Check Continuity at X511: 23-24 Spare Checked OK
Check Continuity at X511: 25-26 Spare Checked OK
Check Continuity at X511: 28-30 Load Shedding Trip to A70 Checked OK
4 K9490 Pickup Short F811 (R1-R3) with S811 Stage-1A Load Shedding Picked up OK
in Service & Put SW S9490 in 1A
Position
Short F811 (R3-R2) with S811 Stage-1 Load Shedding Picked up OK
in Service & Put SW S9490 in 1A
Position
Short F811 (R4-R5) with S811 Stage-2 Load Shedding Picked up OK
in Service & Put SW S9490 in 2
Position
Short F811 (R5-R6) with S811 Stage-3 Load Shedding Picked up OK
in Service & Put SW S9490 in 3
Position
Short F811 (F8-F9) with S811 Stage-4 Load Shedding Picked up OK
in Service & Put SW S9490 in 4
Position
Check Continuity at X511: 31-32 Spare Checked OK
Check Continuity at X511: 33-34 Spare Checked OK
Check Continuity at X511: 36-38 Load Shedding Trip to A90 Checked OK
DATE :
DRG.NO.: PH10-1B-43-35-1107
5 K94110 Pickup Short F811 (R1-R3) with S811 Stage-1A Load Shedding Picked up OK
in Service & Put SW S94110 in 1A
Position
Short F811 (R3-R2) with S811 Stage-1 Load Shedding Picked up OK
in Service & Put SW S94110 in 1
Position
Short F811 (R4-R5) with S811 Stage-2 Load Shedding Picked up OK
in Service & Put SW S94110 in 2
Position
Short F811 (R5-R6) with S811 Stage-3 Load Shedding Picked up OK
in Service & Put SW S94110 in 3
Position
Short F811 (F8-F9) with S811 Stage-4 Load Shedding Picked up OK
in Service & Put SW S94110 in 4
Position
Check Continuity at X511: 39-40 Spare Checked OK
Check Continuity at X511: 41-42 Spare Checked OK
Check Continuity at X511: 44-46 Load Shedding Trip to A110 Checked OK
6 K94130 Pickup Short F811 (R1-R3) with S811 Stage-1A Load Shedding Picked up OK
in Service & Put SW S94130 in 1A
Position
Short F811 (R3-R2) with S811 Stage-1 Load Shedding Picked up OK
in Service & Put SW S94130 in 1
Position
Short F811 (R4-R5) with S811 Stage-2 Load Shedding Picked up OK
in Service & Put SW S94130 in 2
Position
Short F811 (R5-R6) with S811 Stage-3 Load Shedding Picked up OK
in Service & Put SW S94130 in 3
Position
Short F811 (F8-F9) with S811 Stage-4 Load Shedding Picked up OK
in Service & Put SW S94130 in 4
Position
Check Continuity at X511: 47-48 Spare Checked OK
Check Continuity at X511: 49-50 Spare Checked OK
Check Continuity at X511: 52-54 Load Shedding Trip to A130 Checked OK
DATE :
DRG.NO.: PH10-1B-43-35-1107
7 K94150 Pickup Short F811 (R1-R3) with S811 Stage-1A Load Shedding Picked up OK
in Service & Put SW S94150 in 1A
Position
Short F811 (R3-R2) with S811 Stage-1 Load Shedding Picked up OK
in Service & Put SW S94150 in 1
Position
Short F811 (R4-R5) with S811 Stage-2 Load Shedding Picked up OK
in Service & Put SW S94150 in 2
Position
Short F811 (R5-R6) with S811 Stage-3 Load Shedding Picked up OK
in Service & Put SW S94150 in 3
Position
Short F811 (F8-F9) with S811 Stage-4 Load Shedding Picked up OK
in Service & Put SW S94150 in 4
Position
Check Continuity at X511: 55-56 Spare Checked OK
Check Continuity at X511: 57-58 Spare Checked OK
Check Continuity at X511: 60-62 Load Shedding Trip to A150 Checked OK
8 K94170 Pickup Short F811 (R1-R3) with S811 Stage-1A Load Shedding Picked up OK
in Service & Put SW S94170 in 1A
Position
Short F811 (R3-R2) with S811 Stage-1 Load Shedding Picked up OK
in Service & Put SW S94170 in 1
Position
Short F811 (R4-R5) with S811 Stage-2 Load Shedding Picked up OK
in Service & Put SW S94170 in 2
Position
Short F811 (R5-R6) with S811 Stage-3 Load Shedding Picked up OK
in Service & Put SW S94170 in 3
Position
Short F811 (F8-F9) with S811 Stage-4 Load Shedding Picked up OK
in Service & Put SW S94170 in 4
Position
Check Continuity at X511: 63-64 Spare Checked OK
Check Continuity at X511: 65-66 Spare Checked OK
Check Continuity at X511: 68-70 Load Shedding Trip to A170 Checked OK
DATE :
DRG.NO.: PH10-1B-43-35-1107
9 K94190 Pickup Short F811 (R1-R3) with S811 Stage-1A Load Shedding Picked up OK
in Service & Put SW S94190 in 1A
Position
Short F811 (R3-R2) with S811 Stage-1 Load Shedding Picked up OK
in Service & Put SW S94190 in 1
Position
Short F811 (R4-R5) with S811 Stage-2 Load Shedding Picked up OK
in Service & Put SW S94190 in 2
Position
Short F811 (R5-R6) with S811 Stage-3 Load Shedding Picked up OK
in Service & Put SW S94190 in 3
Position
Short F811 (F8-F9) with S811 Stage-4 Load Shedding Picked up OK
in Service & Put SW S94190 in 4
Position
Check Continuity at X511: 71-72 Spare Checked OK
Check Continuity at X511: 73-74 Spare Checked OK
Check Continuity at X511: 76-78 Load Shedding Trip to A190 Checked OK
10 K94210 Pickup Short F811 (R1-R3) with S811 Stage-1A Load Shedding Picked up OK
in Service & Put SW S94210 in 1A
Position
Short F811 (R3-R2) with S811 Stage-1 Load Shedding Picked up OK
in Service & Put SW S94210 in 1
Position
Short F811 (R4-R5) with S811 Stage-2 Load Shedding Picked up OK
in Service & Put SW S94210 in 2
Position
Short F811 (R5-R6) with S811 Stage-3 Load Shedding Picked up OK
in Service & Put SW S94210 in 3
Position
Short F811 (F8-F9) with S811 Stage-4 Load Shedding Picked up OK
in Service & Put SW S94210 in 4
Position
Check Continuity at X511: 163-164 Spare Checked OK
Check Continuity at X511: 165-166 Spare Checked OK
Check Continuity at X511: 168-170 Load Shedding Trip to A210 Checked OK
DATE :
DRG.NO.: PH10-1B-43-35-1107
11 K9440 Pickup Short F811 (R1-R3) with S811 Stage-1A Load Shedding Picked up OK
in Service & Put SW S9440 in 1A
Position
Short F811 (R3-R2) with S811 Stage-1 Load Shedding Picked up OK
in Service & Put SW S9440 in 1
Position
Short F811 (R4-R5) with S811 Stage-2 Load Shedding Picked up OK
in Service & Put SW S9440 in 2
Position
Short F811 (R5-R6) with S811 Stage-3 Load Shedding Picked up OK
in Service & Put SW S9440 in 3
Position
Short F811 (F8-F9) with S811 Stage-4 Load Shedding Picked up OK
in Service & Put SW S9440 in 4
Position
Check Continuity at X511: 79-80 Spare Checked OK
Check Continuity at X511: 81-82 Spare Checked OK
Check Continuity at X511: 84-86 Load Shedding Trip to A40 Checked OK
12 K9460 Pickup Short F811 (R1-R3) with S811 Stage-1A Load Shedding Picked up OK
in Service & Put SW S9460 in 1A
Position
Short F811 (R3-R2) with S811 Stage-1 Load Shedding Picked up OK
in Service & Put SW S9460 in 1
Position
Short F811 (R4-R5) with S811 Stage-2 Load Shedding Picked up OK
in Service & Put SW S9460 in 2
Position
Short F811 (R5-R6) with S811 Stage-3 Load Shedding Picked up OK
in Service & Put SW S9460 in 3
Position
Short F811 (F8-F9) with S811 Stage-4 Load Shedding Picked up OK
in Service & Put SW S9460 in 4
Position
Check Continuity at X511: 87-88 Spare Checked OK
Check Continuity at X511: 89-90 Spare Checked OK
Check Continuity at X511: 92-94 Load Shedding Trip to A60 Checked OK
DATE :
DRG.NO.: PH10-1B-43-35-1107
13 K9480 Pickup Short F811 (R1-R3) with S811 Stage-1A Load Shedding Picked up OK
in Service & Put SW S9480 in 1A
Position
Short F811 (R3-R2) with S811 Stage-1 Load Shedding Picked up OK
in Service & Put SW S9480 in 1
Position
Short F811 (R4-R5) with S811 Stage-2 Load Shedding Picked up OK
in Service & Put SW S9480 in 2
Position
Short F811 (R5-R6) with S811 Stage-3 Load Shedding Picked up OK
in Service & Put SW S9480 in 3
Position
Short F811 (F8-F9) with S811 Stage-4 Load Shedding Picked up OK
in Service & Put SW S9480 in 4
Position
Check Continuity at X511: 95-96 Spare Checked OK
Check Continuity at X511: 97-98 Spare Checked OK
Check Continuity at X511: 100-102 Load Shedding Trip to A80 Checked OK
14 K94100 Pickup Short F811 (R1-R3) with S811 Stage-1A Load Shedding Picked up OK
in Service & Put SW S94100 in 1A
Position
Short F811 (R3-R2) with S811 Stage-1 Load Shedding Picked up OK
in Service & Put SW S94100 in 1
Position
Short F811 (R4-R5) with S811 Stage-2 Load Shedding Picked up OK
in Service & Put SW S94100 in 2
Position
Short F811 (R5-R6) with S811 Stage-3 Load Shedding Picked up OK
in Service & Put SW S94100 in 3
Position
Short F811 (F8-F9) with S811 Stage-4 Load Shedding Picked up OK
in Service & Put SW S94100 in 4
Position
Check Continuity at X511: 103-104 Spare Checked OK
Check Continuity at X511: 105-106 Spare Checked OK
Check Continuity at X511: 108-110 Load Shedding Trip to A100 Checked OK
DATE :
DRG.NO.: PH10-1B-43-35-1107
15 K94120 Pickup Short F811 (R1-R3) with S811 Stage-1A Load Shedding Picked up OK
in Service & Put SW S94120 in 1A
Position
Short F811 (R3-R2) with S811 Stage-1 Load Shedding Picked up OK
in Service & Put SW S94120 in 1
Position
Short F811 (R4-R5) with S811 Stage-2 Load Shedding Picked up OK
in Service & Put SW S94120 in 2
Position
Short F811 (R5-R6) with S811 Stage-3 Load Shedding Picked up OK
in Service & Put SW S94120 in 3
Position
Short F811 (F8-F9) with S811 Stage-4 Load Shedding Picked up OK
in Service & Put SW S94120 in 4
Position
Check Continuity at X511: 111-112 Spare Checked OK
Check Continuity at X511: 113-114 Spare Checked OK
Check Continuity at X511: 116-118 Load Shedding Trip to A120 Checked OK
16 K94140 Pickup Short F811 (R1-R3) with S811 Stage-1A Load Shedding Picked up OK
in Service & Put SW S94140 in 1A
Position
Short F811 (R3-R2) with S811 Stage-1 Load Shedding Picked up OK
in Service & Put SW S94140 in 1
Position
Short F811 (R4-R5) with S811 Stage-2 Load Shedding Picked up OK
in Service & Put SW S94140 in 2
Position
Short F811 (R5-R6) with S811 Stage-3 Load Shedding Picked up OK
in Service & Put SW S94140 in 3
Position
Short F811 (F8-F9) with S811 Stage-4 Load Shedding Picked up OK
in Service & Put SW S94140 in 4
Position
Check Continuity at X511: 119-120 Spare Checked OK
Check Continuity at X511: 121-122 Spare Checked OK
Check Continuity at X511: 124-126 Load Shedding Trip to A140 Checked OK
DATE :
DRG.NO.: PH10-1B-43-35-1107
17 K94160 Pickup Short F811 (R1-R3) with S811 Stage-1A Load Shedding Picked up OK
in Service & Put SW S94160 in 1A
Position
Short F811 (R3-R2) with S811 Stage-1 Load Shedding Picked up OK
in Service & Put SW S94160 in 1
Position
Short F811 (R4-R5) with S811 Stage-2 Load Shedding Picked up OK
in Service & Put SW S94160 in 2
Position
Short F811 (R5-R6) with S811 Stage-3 Load Shedding Picked up OK
in Service & Put SW S94160 in 3
Position
Short F811 (F8-F9) with S811 Stage-4 Load Shedding Picked up OK
in Service & Put SW S94160 in 4
Position
Check Continuity at X511: 127-128 Spare Checked OK
Check Continuity at X511: 129-130 Spare Checked OK
Check Continuity at X511: 132-134 Load Shedding Trip to A160 Checked OK
18 K94180 Pickup Short F811 (R1-R3) with S811 Stage-1A Load Shedding Picked up OK
in Service & Put SW S94180 in 1A
Position
Short F811 (R3-R2) with S811 Stage-1 Load Shedding Picked up OK
in Service & Put SW S94180 in 1
Position
Short F811 (R4-R5) with S811 Stage-2 Load Shedding Picked up OK
in Service & Put SW S94180 in 2
Position
Short F811 (R5-R6) with S811 Stage-3 Load Shedding Picked up OK
in Service & Put SW S94180 in 3
Position
Short F811 (F8-F9) with S811 Stage-4 Load Shedding Picked up OK
in Service & Put SW S94180 in 4
Position
Check Continuity at X511: 135-136 Spare Checked OK
Check Continuity at X511: 137-138 Spare Checked OK
Check Continuity at X511: 140-142 Load Shedding Trip to A180 Checked OK
DATE :
DRG.NO.: PH10-1B-43-35-1107
19 K94200 Pickup Short F811 (R1-R3) with S811 Stage-1A Load Shedding Picked up OK
in Service & Put SW S94200 in 1A
Position
Short F811 (R3-R2) with S811 Stage-1 Load Shedding Picked up OK
in Service & Put SW S94200 in 1
Position
Short F811 (R4-R5) with S811 Stage-2 Load Shedding Picked up OK
in Service & Put SW S94200 in 2
Position
Short F811 (R5-R6) with S811 Stage-3 Load Shedding Picked up OK
in Service & Put SW S94200 in 3
Position
Short F811 (F8-F9) with S811 Stage-4 Load Shedding Picked up OK
in Service & Put SW S94200 in 4
Position
Check Continuity at X511: 143-144 Spare Checked OK
Check Continuity at X511: 145-146 Spare Checked OK
Check Continuity at X511: 148-150 Load Shedding Trip to A200 Checked OK
20 K94220 Pickup Short F811 (R1-R3) with S811 Stage-1A Load Shedding Picked up OK
in Service & Put SW S94220 in 1A
Position
Short F811 (R3-R2) with S811 Stage-1 Load Shedding Picked up OK
in Service & Put SW S94220 in 1
Position
Short F811 (R4-R5) with S811 Stage-2 Load Shedding Picked up OK
in Service & Put SW S94220 in 2
Position
Short F811 (R5-R6) with S811 Stage-3 Load Shedding Picked up OK
in Service & Put SW S94220 in 3
Position
Short F811 (F8-F9) with S811 Stage-4 Load Shedding Picked up OK
in Service & Put SW S94220 in 4
Position
Check Continuity at X511: 171-172 Spare Checked OK
Check Continuity at X511: 173-174 Spare Checked OK
Check Continuity at X511: 176-178 Load Shedding Trip to A220 Checked OK
DATE :
DRG.NO.: PH10-1B-43-35-1107
DATE :
DRG.NO.: PH10-1B-43-35-1107
DATE :
DRG.NO.: PH10-1B-43-35-1107
DATE :
DRG.NO.: PH10-1B-43-35-1107
DATE :
DRG.NO.: PH10-1B-43-35-1107
DATE :
DRG.NO.: PH10-1B-43-35-1107
DATE :
DRG.NO.: PH10-1B-43-35-1107
DATE :
DRG.NO.: PH10-1B-43-35-1107
DATE :
DRG.NO.: PH10-1B-43-35-1107
DATE :
DRG.NO.: PH10-1B-43-35-1107
1 Relay : F811
7SJ621 Binary Outputs Operate BO from DIGSI & Check at
BO 1 Check Continuity at X511 : 5-6 Spare Checked OK
BO 2 Put all Switch in Stage-4 Local Stage-4 Load Shed Checked OK
Position with S811 in Service
and Check Pickup of all Relays/
BO 3 & 4 Spare
BO 5 Put all Switch in Stage-1A Local Stage-1A Load Shed Checked OK
Position with S811 in Service
and Check Pickup of all Relays/
BO 6 Put all Switch in Stage-1 Local Stage-1 Load Shed Checked OK
Position with S811 in Service
and Check Pickup of all Relays/
BO 7 Put all Switch in Stage-2 Local Stage-2 Load Shed Checked OK
Position with S811 in Service
and Check Pickup of all Relays/
BO 8 Put all Switch in Stage-3 Local Stage-3 Load Shed Checked OK
Position with S811 in Service
and Check Pickup of all Relays/
2 Relay : A201
6MD613 Binary Outputs Operate BO from DIGSI & Check at
BO 1 to 53 Spare
3 Relay : A202
6MD613 Binary Outputs Operate BO from DIGSI & Check at
BO 1 to 53 Spare
DATE :
DRG.NO.: PH10-1B-43-35-1107
1 Relay : F811
7SJ621 BI Power up the relay & Inject variable DC voltage to relay BI terminal
BI 2 F15-F16 Threshold voltage >= 65V Checked OK
BI 3 F17-F18 Threshold voltage >= 65V Checked OK
BI 6 R11-R13 Threshold voltage >= 65V Checked OK
BI 8 R7-R8 Threshold voltage >= 65V Checked OK
2 Relay : A201
6MD613 BI Power up the relay & Inject variable DC voltage to relay BI terminal
BI 1 F10-F14 Threshold voltage >= 65V Checked OK
BI 10 H17-G12 Threshold voltage >= 65V Checked OK
BI 20 G9-G12 Threshold voltage >= 65V Checked OK
BI 30 J4-J12 Threshold voltage >= 65V Checked OK
BI 40 M17-L12 Threshold voltage >= 65V Checked OK
BI 50 L9-L12 Threshold voltage >= 65V Checked OK
BI 60 N4-N12 Threshold voltage >= 65V Checked OK
BI 70 R17-Q12 Threshold voltage >= 65V Checked OK
BI 80 Q9-Q12 Threshold voltage >= 65V Checked OK
3 Relay : A202
6MD613 BI Power up the relay & Inject variable DC voltage to relay BI terminal
BI 1 F10-F14 Threshold voltage >= 65V Checked OK
BI 10 H17-G12 Threshold voltage >= 65V Checked OK
BI 20 G9-G12 Threshold voltage >= 65V Checked OK
BI 30 J4-J12 Threshold voltage >= 65V Checked OK
BI 40 M17-L12 Threshold voltage >= 65V Checked OK
BI 50 L9-L12 Threshold voltage >= 65V Checked OK
BI 60 N4-N12 Threshold voltage >= 65V Checked OK
BI 70 R17-Q12 Threshold voltage >= 65V Checked OK
BI 80 Q9-Q12 Threshold voltage >= 65V Checked OK
DATE :
DRG.NO.: PH10-1B-43-35-1107
Sr.
Test carried out for Test Description Test Result /Remark
No.
DATE :
DRG.NO.: PH10-1B-43-35-1107
Sr.
Test carried out for Test Description Test Result /Remark
No.
1 Operation test for F811(7SJ621) Stage FSET (Hz) TSET (sec) TOPTD (sec)
Inject 3 ph 110VAC, Change
frequency and Operate different 1A 49.80 10.0
stages Only feeders on Stage 1A were tripped Checked OK
1 49.60 5.0
Only feeders on Stage 1 were tripped Checked OK
2 49.40 3.0
Only feeders on Stage 2 were tripped Checked OK
3 49.20 2.0
Only feeders on Stage 3 were tripped Checked OK
4 49.0 0.0
Only feeders on Stage 4 were tripped Checked OK
DATE :
DRG.NO.: PH10-1B-43-35-1107
1 DC-1/2 Supply Fail /BCU unhealthy Short A201(F3-F4) / X239: 1,2-3,4 Checked OK
I/O BOX DC-1/2 MCB trip Short A202(F3-F4) /
Switch OFF MCB F133 /
Switch OFF MCB F134