DAFTAR HARGA UPAH DAN BAHAN

SATUAN KERJA : DINAS KESEHATAN KAB. SIGI


PEKERJAAN : PEMBANGUNAN RUMAH GENSET PKM PANDERE
LOKASI : DESA PANDERE KEC. GUMBASA
TAHUN ANGGARAN : 2017

HARGA
NO URAIAN
(Rp.)
1 2 3 4
I UPAH KERJA DAN OVERHEAD
1. Pekerja OH 75,000.00
2. Tukang OH 90,000.00
3. Kepala Tukang OH 95,000.00
4. Mandor OH 100,000.00
5. Overhead LS 0.15
II HARGA BAHAN -
A. BAHAN BETON
1. Air Kerja ltr 15.00
2. Pasir Pasang M3 160,500.00
3. Pasir Beton M3 160,500.00
4. Pasir Urugan M3 160,000.00
5. Tanah Urug M3 95,000.00
6. Batu Kali M3 145,000.00
7. Batu Gunung M3 145,000.00
8. Batu Kerikil M3 204,000.00
9. Batu Pecah (Split 1" s/d 2") M3 306,000.00
10. Semen Portland (Netto 50 Kg) Zak/ 60000 kg 1,200.00
11. Semen Portland (Netto 40 Kg) Zak/ 48000 Kg 1,200.00
12. Semen Warna 25 zak/ 67500 Kg 2,700.00
13. UB 888/400 Compound Zak 220,000.00
14. Beton K-225 M3 1,115,000.00
15. Beton K-250 M3 1,115,000.00
16. Kansteen Beton M' 60,000.00
17. Buis Beton 1/2 dia 20 cm bh/m' 50,000.00
18. Buis Beton dia 20 cm bh/m' 100,000.00
19. Buis Beton dia 30 cm T10 cm bh/m' 120,000.00
20. Buis Beton dia 40 cm bh/m' 175,000.00
21. Paving Blok T 7 cm K 250 1 m2 36 bh bh 1,500.00
22. Paving Blok T 8 cm K 250 1 m2 36 bh bh 1,800.00
###
B. BAHAN DINDING DAN LANTAI
1. Batu Bata Bh 800.00
2. Batako H 10 Bh 1,650.00
3. Mortar Acian Kg 2,125.00
4. Tegel Happy Hous 60x60 cm bh 4 179000 Bh 44,750.00
5. Tegel Sekualitas oasis 40x40 cm bh 6 110000 Bh 18,333.33
6. Keramik Tile 20 x 40 cm Bh 7,333.33
7. Batu Tempel Hitam 10 x 20 cm bh 50 120000 Bh 2,400.00
40X40
C. BAHAN ALUMINIUM
1. Aluminium Composite Panel Tebal 0.4 mm M2 375,000.00
2. Aluminium Kosen Standar Warna Putih gadin 6 m 200000 M1 33,333.33
3. Aluminium Bingkai Pintu 8 cm putih gading 4 m 180000 M1 45,000.00
4. Aluminium Bingkai Jendela 6 cm putih gadin 6 m 140000 M1 23,333.33
5. Aluminium Les Bingkai 6 m 40000 M1 6,666.67
6. Aluminium pipe dia 3/4 Standar Warna Silper 6 m 40000 M1 6,666.67
7. Aluminium Rolling Door M2 855,855.86
8. Tiang Penyangga Tengah Rolling Door bh 750,000.00
9. Plat Aluminium L 45 cm m1 45,000.00
10. Plat Aluminium L 90 cm m1 80,000.00
11. alumunium foil HF 405 single side Roll 475,000.00
12. alumunium foil HF 405 single side ( 1 Roll = 50 m ) m1 15,000.00
13. Aluminium Foil doubel side (Safe foil premiar) L 1 m 25 m2 m2 20,000.00
14. Aluminium Foil doubel side (Shine foil) L 1,2 m 30 m2 m2 25,000.00
###
###
D. BAHAN BESI/BAJA ###
1. Besi Baja kg 11,900.00
2. Baja IWF 100.50.5.7. 12 m 112 kg kg/m 111,066.67
3. Besi Beton Ulir/polos Kg 11,900.00
4. Besi Plat /Strip/ Siku Kg 11,900.00
5. Besi Hollow 40.40.2 Zincalume m 4 25,000 M1 6,250.00
6. Besi Hollow 20.40.2 Zincalume m 4 16,000 M1 4,000.00
8. Besi Hollow 40.40.2 m 6 160,000 M1 26,666.67
9. Besi Hollow 30.30.2 m 6 140,000 M1 23,333.33
10. Besi Hollow 20.40.2 m 6 125,000 M1 20,833.33
11. Besi Hollow 15.35.2 m 6 100,000 M1 16,666.67
12. Besi Hollow 35.35.2 m 6 150,000 M1 25,000.00
13. Besi Beton Dia 6 MM 12 m 2,66 kg M' 2,637.83
14. Besi Beton Dia 8 MM 12 m 4,78 kg M' 4,740.17
15. Besi Beton Dia 10 MM 12 m 7,4 kg M' 7,338.33
16. Besi Beton Dia 12 MM 12 m 10,7 kg M' 10,610.83
17. Besi Beton Dia 14 MM 12 m 14,5 kg M' 14,379.17
18. Besi Beton Dia 16 MM 12 m 19 Kg M' 18,841.67
19. Besi Beton Dia 19 MM 12 m 26,76 Kg M' 26,537.00
20. Besi Siku 30.30.3 6 m 8,16 Kg M' 16,184.00
21. Besi Siku 40.40.4 6 m 14,3 Kg M' 28,361.67
22. Besi Siku 50.50.5 6 m 22,6 Kg M' 44,823.33
23. Besi Siku 60.60.6 6 m 32,52 Kg M' 64,498.00
24. Baja Ringan Sinkalum Profil C 75. 100 m 6 120000 M' 20,000.00
25. Baja Ringan Sinkalum Profil C 75. 80 m 6 84000 M' 14,000.00
26. Baja Ringan Sinkalum Profil C 75. 75 m 6 71000 M' 11,833.33
27. Baja Ringan Sinkalum Profil C 75. 65 m 6 61000 M' 10,166.67
28. Baja Ringan Sinkalum Profil U 40.45 m 6 46000 M' 7,666.67
29. Baja Ringan Sinkalum Profil U 32.45 m 6 33000 M' 5,500.00
30. Wairmes dia 6 1,22 x 2,44 m m2 -
31. Wairmes dia 8 ,22 x 2,44 m lbr 550,000.00
32. Screw Kuda-kuda 12-14x40 Bh 1,000.00
33. Screw Reng 10-16x16 Bh 1,000.00
34. Skrup fixer Bh 500.00
35. Skrup fixer 5 cm termasuk reng Bh 1,250.00
36. Stelan Tarikan Krostang Bh 20,000.00
37. Kawat Las Kg 50,000.00
38. Kawat Beton Kg 15,000.00
39. Kawat Harmonika 2x2 cm M2 15,500.00
40. Kawat Rang Putih 2x2 cm Lebar 1 M (Kawat Burung) M2 45,000.00
41. Listplank Zincalume Lbr 30,000.00
42. Sealean Tube 25,000.00
E. BAHAN ATAP
1. Bondek 7 Gelombang 6m m2 125,000.00
2. Paku Campur 5 Cm - 10 Cm Kg 20,000.00
3. Paku Seng Kg 27,000.00
4. Paku Anti Karat untuk Sakura Roof Kg 30,000.00
5. Paku Tripleks Kg 22,000.00
6. Paku Klem Kg 30,500.00
7. Skerup Spandek bh 450.00
8. Mur/Baut dia 16 mm Bh 7,500.00
9. Seng Plat BJLS 0.28 mm L.90 M1 18,000.00
10. Genteng Metal skualitas Elang Roof 80x70 56 1.78571 m bh 45,000.00
11. Nok Genteng Metal 80 1.25 m bh 18,000.00
12. Spandek 0,25 0,9x6 m m' 32,000.00
13. Spandek 0,3 0,9x6 m m' 37,000.00

14. Spandek 0,35 0,9x6 m m' 43,000.00


15. Spandek 0,4 0,9x6 m m' 47,000.00
16. Spandek 0,45 0,9x6 m m' 52,000.00
17. Bubungan Spandek m' 16,000.00
18. Ramsel Naiils bh 9,000.00
###
F. BAHAN KAYU ###
1. Kayu Balok Suri 3/8 Kls I 4 m 35,000 M3 3,465,000.00
2. Kayu Papan Suri Kls I M3 3,500,000.00
3. Kayu Papan Kls II Bekisting M3 2,800,000.00
4. Kayu Balok Kls II Bekisting 6/12 M3 3,000,000.00
5. Kayu Balok Kls II (Jenis Silea) Bekisting M3 3,000,000.00
6. Kayu Balok Kls III Bekisting M3 1,750,000.00
7. Kayu Papan Kls II (Jenis Silea) Bekisting M3 2,800,000.00
8. Kayu Balok Kls II (Jenis Pontoh/Meranti) Bekisting M3 3,000,000.00
9. Kayu Papan Kls II (Jenis Pontoh/Meranti) Bekisting M3 2,800,000.00
10. Kayu Papan Bekisting M3 2,800,000.00
11. Balok 5/7 kayu kls 2 4 m 20000 M' 5,000.00
12. Banbu lokal Btg 20,000.00
###
G. BAHAN PLAFON ###
1. Tripleks Tebal 6 mm Lbr 75,000.00
2. Multiplek 9 mm Lbr 105,000.00
3. Kalsi Board 3,5 mm Lbr 64,000.00
4. Kalsi Plan 8 mm L 20 cm P 3 m m 3 45000 M' 15,000.00
5. Kalsi Plan 8 mm L 30 cm P 3 m m 3 65000 M' 21,666.67
6. Gipsum boar 9 mm Lbr 65,000.00
7. List Plafon Profil 4 x 4 cm m 4 20000 M' 5,000.00
###
H. BAHAN FINISING ARSITEKTUR
1. Cat Sekualitas Dulux (besi) Kg 67,096.00
2. Cat Tembok Luar Ex. Dulux ltr 2.5 180000 Ltr 72,000.00
3. Cat Tembok Dalam Ex. Dulux ltr 2.5 102000 Ltr 40,800.00
4. Cat Tembok Dalam Metrolite Kg 56,250.00
5. Cat Anti karat/Zinc Chromate/ Meni Kg 21,879.00
6. Melamik - IMPRA Kg 50,000.00
7. Waterprofing membrane M2 55,000.00
8. Water Profing Tube Kg 45,000.00
9. Sending sealer - IMPRA Kg 50,000.00
10. Dempul jadi - IMPRA Kg 27,500.00
11. Plamur Tembok Kg 17,400.00
12. Dempul Kg 12,500.00
13. Amplas Lbr 7,000.00
14. Karet Kaca M' 5,000.00
15. Kuas Bh 10,500.00
16. Minyak Bekisting Ltr 15,000.00
17. Engsel Pintu (Kw I) Bh 15,000.00
18. Engsel Baja Bh 20,000.00
I. BAHAN ELEKTRIKAL
1. Pas. Instalasi Listrik Titik 160,000.00
2. Kabel 4x6 mm M' 66,000.00
3. Kabel 4x10 mm M' 76,410.00
4. Panel Listrik Utama Unit 1,950,000.00
5. Panel Listrik Pembagi Unit 1,950,000.00
6. Meteran Listrik PLN (2200 VA) Unit 7,000,000.00
7. Pas. Instalasi Titik Lampu + conduit dan accsesories Titik 220,000.00
8. Pas. Instalasi Stop Kontak Titik 220,000.00
9. Pas. Instalasi Exhaus Fan Titik 219,300.00
10. Pas. Instalasi Power AC Titik 750,000.00

11. Pas. Out Put AC Bh 6,500,000.00


12. Pas. Penangkal Petir + Accsessories Unit 10,000,000.00
13. Tongkat Tembaga + Pipa Gip dia 1,5" Bh 275,000.00
14. Arde / Pentanahan Titik 550,000.00

III SEWA ALAT


1. Alat Pancang Manual/Diesel Hammer Hari 2,000,000.00
2. Concrete Pump Hari 2,000,000.00
3. Concrete Mixer / Molen jam 44000 Hari 352,000.00
4. Mobil Kere Jam 600,000.00
5. Generator diesel 8 hri 150000 Jam 18,750.00
6. Vibratory Roller 5 - 8 ton Jam 450,000.00
7. Concrete Vibrator Jam 100,000.00
8. Stamper 8 Hri 75000 Jam 9,375.00
9. Gurinda Jam 10,000.00
10. Solar ltr 7,500.00
11. Oli ltr 35,000.00
12. Air Kerja bln 250,000.00
13. Listerik bln 400,000.00
ANALISA SATUAN PEKERJAAN

SATUAN KERJA : DINAS KESEHATAN KAB. SIGI


PEKERJAAN : PEMBANGUNAN RUMAH GENSET PKM PANDERE
LOKASI : DESA PANDERE KEC. GUMBASA
TAHUN ANGGARAN : 2017

I PEKERJAAN PERSIAPAN
1 Anl SNI Pembersihan Lapangan M2
0.1 Oh Pekerja Rp. 75,000.00 = Rp. 7,500.00
0.05 Oh Mandor Rp. 100,000.00 = Rp. 5,000.00
0.15 lsm overhead dan keuntungan Rp. 12,500.00 = Rp. 1,875.00
Rp. 14,375.00

2 Anl SNI Pembongkaran dinding pagar M3


13.334 Oh Pekerja Rp. 75,000.00 = Rp. 1,000,050.00
0.666 Oh Mandor Rp. 100,000.00 = Rp. 66,600.00
0.15 lsm overhead dan keuntungan Rp. 1,066,650.00 = Rp. 159,997.50
Bongkaran M3 Rp. 1,226,647.50
Bongkaran M2 = Rp. 122,664.75

3 Anl.SNI. Pasangan Bouwplank M'


0.007 M3 Kayu balok 5/7 Rp. 3,000,000.00 = Rp. 21,000.00
0.006 M3 Papan Rp. 2,800,000.00 = Rp. 16,800.00
0.020 Kg Paku 2 - 3 inc Rp. 20,000.00 = Rp. 400.00
0.100 Oh Pekerja Rp. 75,000.00 = Rp. 7,500.00
0.100 Oh Tukang Rp. 90,000.00 = Rp. 9,000.00
0.010 Oh Kepala Tukang Rp. 95,000.00 = Rp. 950.00
0.005 Oh Mandor Rp. 100,000.00 = Rp. 500.00
0.15 lsm overhead dan keuntungan Rp. 56,150.00 = Rp. 8,422.50
Rp. 64,572.50

II PEKERJAAN GALIAN
1 Anl.SNI. 1 M3 Galian Tanah Biasa
0.750 Oh Pekerja Rp. 75,000.00 = Rp. 56,250.00
0.025 Oh Mandor Rp. 100,000.00 = Rp. 2,500.00
0.15 lsm overhead dan keuntungan Rp. 58,750.00 = Rp. 8,812.50
Termasuk Overhd Rp. 67,562.50
Belum Overhed Rp. 58,750.00

III PEKERJAAN URUGAN


1 Anl.SNI. 1 M3 Timbunan Kembali
0.500 Oh Pekerja Rp. 75,000.00 = Rp. 37,500.00
0.050 Oh Mandor Rp. 100,000.00 = Rp. 5,000.00
0.15 lsm overhead dan keuntungan Rp. 42,500.00 = Rp. 6,375.00
Rp. 48,875.00

PEKERJAAN URUGAN PASIR


2 Anl.SNI. 1 M3 Urugan Pasir
KodM.14b 1.2 M3 Pasir Urugan Rp. 160,000.00 = Rp. 192,000.00
L.01 0.300 Oh Pekerja Rp. 75,000.00 = Rp. 22,500.00
L.04 0.010 Oh Mandor Rp. 100,000.00 = Rp. 1,000.00
0.15 lsm overhead dan keuntungan Rp. 215,500.00 = Rp. 32,325.00
Rp. 247,825.00

PEKERJAAN URUGAN TANAH


3 Anl.SNI. 1 M3 Urugan Tanah
KodM.14b 1.2 M3 Tanah Urugan Rp. 95,000.00 = Rp. 114,000.00
L.01 0.300 Oh Pekerja Rp. 75,000.00 = Rp. 22,500.00
L.04 0.010 Oh Mandor Rp. 100,000.00 = Rp. 1,000.00
0.15 lsm overhead dan keuntungan Rp. 137,500.00 = Rp. 20,625.00
Rp. 158,125.00

IV PEKERJAAN PONDASI BT GUNUNG


1. Anl.SNI. 1 M3 Pasangan Batu Kosong

Analisa SNI Page 4


1.200 M3 Batu Gunung Rp. 145,000.00 = Rp. 174,000.00
0.432 M3 Pasir Pasangan Rp. 160,500.00 = Rp. 69,336.00
0.780 Oh Pekerja Rp. 75,000.00 = Rp. 58,500.00
0.390 Oh Tukang Rp. 90,000.00 = Rp. 35,100.00
0.039 Oh Kepala Tukang Rp. 95,000.00 = Rp. 3,705.00
0.039 Oh Mandor Rp. 100,000.00 = Rp. 3,900.00
0.15 lsm overhead dan keuntungan Rp. 344,541.00 = Rp. 51,681.15
Rp. 396,222.15

2. Anl.SNI. 1 M3 Pasangan Pondasi BT. Gunung 1 PC : 3 PP


1.200 M3 Batu Gunung Rp. 145,000.00 = Rp. 174,000.00
0.485 M3 Pasir Pasangan Rp. 160,500.00 = Rp. 77,842.50
202.000 kg Semen PC Rp. 1,200.00 = Rp. 242,400.00
1.500 Oh Pekerja Rp. 75,000.00 = Rp. 112,500.00
0.750 Oh Tukang Rp. 90,000.00 = Rp. 67,500.00
0.075 Oh Kepala Tukang Rp. 95,000.00 = Rp. 7,125.00
0.075 Oh Mandor Rp. 100,000.00 = Rp. 7,500.00
0.15 lsm overhead dan keuntungan Rp. 688,867.50 = Rp. 103,330.13
Rp. 792,197.63

3. Anl.SNI. 1 M3 Pasangan Pondasi BT. Gunung 1 PC : 4 PP


1.200 M3 Batu Gunung Rp. 145,000.00 = Rp. 174,000.00
0.520 M3 Pasir Pasangan Rp. 160,500.00 = Rp. 83,460.00
163.000 kg Semen PC Rp. 1,200.00 = Rp. 195,600.00
1.500 Oh Pekerja Rp. 75,000.00 = Rp. 112,500.00
0.750 Oh Tukang Rp. 90,000.00 = Rp. 67,500.00
0.075 Oh Kepala Tukang Rp. 95,000.00 = Rp. 7,125.00
0.075 Oh Mandor Rp. 100,000.00 = Rp. 7,500.00
0.15 lsm overhead dan keuntungan Rp. 647,685.00 = Rp. 97,152.75
Rp. 744,837.75

4. Anl.SNI. 1 M2 Pasangan Dinding tebal 1/2 BT Merah (5x11x22)cm 1 PC : 3 PP


M.04.C 70.000 Bh Bata Merah Rp. 800.00 = Rp. 56,000.00
M.04.b 0.040 M3 Pasir Pasangan Rp. 160,500.00 = Rp. 6,420.00
M.15 14.370 kg Semen PC Rp. 1,200.00 = Rp. 17,244.00
L.01 0.300 Oh Pekerja Rp. 75,000.00 = Rp. 22,500.00
L.02 0.100 Oh Tukang Rp. 90,000.00 = Rp. 9,000.00
L.03 0.010 Oh Kepala Tukang Rp. 95,000.00 = Rp. 950.00
L.04 0.015 Oh Mandor Rp. 100,000.00 = Rp. 1,500.00
0.075 lsm overhead dan keuntungan Rp. 113,614.00 = Rp. 8,521.05
Trasram 1/2 BT M2 Rp. 122,135.05
Trasram 1 BT M2 Rp. 244,270.10

5. Anl.SNI. 1 M2 Pasangan Dinding tebal 1/2 BT Merah (5x11x22)cm 1 PC : 5 PP


M.04.C 70.000 Bh Bata Merah Rp. 800.00 = Rp. 56,000.00
M.04.b 0.045 M3 Pasir Pasangan Rp. 160,500.00 = Rp. 7,222.50
M.15 9.680 kg Semen PC Rp. 1,200.00 = Rp. 11,616.00
L.01 0.300 Oh Pekerja Rp. 75,000.00 = Rp. 22,500.00
L.02 0.100 Oh Tukang Rp. 90,000.00 = Rp. 9,000.00
L.03 0.010 Oh Kepala Tukang Rp. 95,000.00 = Rp. 950.00
L.04 0.015 Oh Mandor Rp. 100,000.00 = Rp. 1,500.00
0.075 lsm overhead dan keuntungan Rp. 108,788.50 = Rp. 8,159.14
M2 Rp. 116,947.64

6. Anl.SNI. 1 M2 Pasangan Dinding tebal 1/2 BT Merah (5x11x22)cm 1 PC : 6 PP


M.04.C 70.000 Bh Bata Merah Rp. 800.00 = Rp. 56,000.00
M.04.b 0.045 M3 Pasir Pasangan Rp. 160,500.00 = Rp. 7,222.50
M.15 8.320 kg Semen PC Rp. 1,200.00 = Rp. 9,984.00
L.01 0.300 Oh Pekerja Rp. 75,000.00 = Rp. 22,500.00
L.02 0.100 Oh Tukang Rp. 90,000.00 = Rp. 9,000.00
L.03 0.010 Oh Kepala Tukang Rp. 95,000.00 = Rp. 950.00
L.04 0.015 Oh Mandor Rp. 100,000.00 = Rp. 1,500.00
0.075 lsm overhead dan keuntungan Rp. 107,156.50 = Rp. 8,036.74
M2 Rp. 115,193.24

V PEKERJAAN DINDING

PEKERJAAN PLASTERAN

Analisa SNI Page 5


1 Anl.SNI. 1 M2 Plasteran 1PC : 4 PP 15mm
6.240 kg Semen PC Rp. 1,200.00 = Rp. 7,488.00
0.024 m3 Pasir Pasanagan Rp. 160,500.00 = Rp. 3,852.00
0.300 Oh Pekerja Rp. 75,000.00 = Rp. 22,500.00
0.100 Oh Tukang Rp. 90,000.00 = Rp. 9,000.00
0.010 Oh Kepala Tukang Rp. 95,000.00 = Rp. 950.00
0.015 Oh Mandor Rp. 100,000.00 = Rp. 1,500.00
0.15 lsm overhead dan keuntungan Rp. 45,290.00 = Rp. 6,793.50
Plasteran 1:4 Rp. 52,083.50

2 Anl.SNI. 1 M2 Plasteran 1PC : 5 PP Tebal 1,5cm


5.184 kg Semen PC Rp. 1,200.00 = Rp. 6,220.80
0.026 m3 Pasir Pasanagan Rp. 160,500.00 = Rp. 4,173.00
0.300 Oh Pekerja Rp. 75,000.00 = Rp. 22,500.00
0.100 Oh Tukang Rp. 90,000.00 = Rp. 9,000.00
0.010 Oh Kepala Tukang Rp. 95,000.00 = Rp. 950.00
0.015 Oh Mandor Rp. 100,000.00 = Rp. 1,500.00
0.15 lsm overhead dan keuntungan Rp. 44,343.80 = Rp. 6,651.57
Rp. 50,995.37
3 Anl.SNI. 1 M1 Plasteran Profil 1PC : 4 PP 15mm
0.936 kg Semen PC Rp. 1,200.00 = Rp. 1,123.20
0.004 m3 Pasir Pasanagan Rp. 160,500.00 = Rp. 577.80
0.045 Oh Pekerja Rp. 75,000.00 = Rp. 3,375.00
0.090 Oh Tukang Rp. 90,000.00 = Rp. 8,100.00
0.009 Oh Kepala Tukang Rp. 95,000.00 = Rp. 855.00
0.002 Oh Mandor Rp. 100,000.00 = Rp. 225.00
0.15 lsm overhead dan keuntungan Rp. 14,256.00 = Rp. 2,138.40
Plasteran 1:4 Rp. 16,394.40
4 Anl.Tambahan 1 M2 acian Plasteran
3.2500 kg Semen PC Rp. 1,200.00 = Rp. 3,900.00
0.2500 lbr Amplas Rp. 7,000.00 = Rp. 1,750.00
0.2000 org/hPekerja Rp. 75,000.00 = Rp. 15,000.00
0.1000 org/hTukang Rp. 90,000.00 = Rp. 9,000.00
0.0100 org/hKepala Tukang Rp. 95,000.00 = Rp. 950.00
0.0100 org/hMandor Rp. 100,000.00 = Rp. 1,000.00
0.15 lsm overhead dan keuntungan Rp. 31,600.00 = Rp. 4,740.00
Rp. 36,340.00

5 Anl.SNI. 1 M' Pemasangan Rangka Listplan Hollow 1.20.40.2 mm modul 40 x 60 Rp. 129,783.25
8.330 m' Besi hollow 20.40.2 Rp. 4,000.00 = Rp. 33,320.00
0.500 lsm Srews/ Skrup/ Penggantung Rp. 33,320.00 = Rp. 16,660.00
0.350 Oh Pekerja Rp. 75,000.00 = Rp. 26,250.00
0.350 Oh Tukang Besi Rp. 90,000.00 = Rp. 31,500.00
0.035 Oh Kepala Tukang Rp. 95,000.00 = Rp. 3,325.00
0.018 Oh Mandor Rp. 100,000.00 = Rp. 1,800.00
0.15 lsm overhead dan keuntungan Rp. 112,855.00 = Rp. 16,928.25

6 Anl.SNI 1 M' Memasang Listplant Calsiboard L30


1.100 M' Calsiboard L30 Rp. 21,666.67 = Rp. 23,833.33
0.050 Kg Paku Klem Rp. 30,500.00 = Rp. 1,525.00
0.015 Oh Pekerja Rp. 75,000.00 = Rp. 1,125.00
0.070 Oh Tukang Kayu Rp. 90,000.00 = Rp. 6,300.00
0.008 Oh Kepala Tukang Rp. 95,000.00 = Rp. 760.00
0.006 Oh Mandor Rp. 100,000.00 = Rp. 600.00
0.15 lsm overhead dan keuntungan Rp. 34,143.33 = Rp. 5,121.50
M' Rp. 39,264.83

VI PEKERJAAN BETON
1 Anl.SNI. 1 M3 Membuat Beton Tak Bertulang, K175
326.000 Kg Semen Portland (PC) Rp. 1,200.00 = Rp. 391,200.00
kg 760 0.760 M3 Pasir Beton Rp. 160,500.00 = Rp. 121,980.00
kg 1029 1.029 M3 Batu Pecah 2/1 Rp. 306,000.00 = Rp. 314,874.00
215.000 ltr Air Kerja Rp. 15.00 = Rp. 3,225.00
1.650 Oh Pekerja Rp. 75,000.00 = Rp. 123,750.00
0.275 Oh Tukang batu Rp. 90,000.00 = Rp. 24,750.00
0.028 Oh Kepala Tukang Rp. 95,000.00 = Rp. 2,660.00
0.083 Oh Mandor Rp. 100,000.00 = Rp. 8,300.00
0.250 hr Sewa Molen Rp. - = Rp. -
0.15 lsm overhead dan keuntungan Rp. 990,739.00 = Rp. 148,610.85
Hrga M3 = Rp. 1,139,349.85
Hrg M2 T 10 cm = Rp. 113,934.99
Hrg M2 T 8 cm = Rp. 91,147.99
Hrg M2 T 6 cm = Rp. 68,635.53

1 Kg. Pembesian

Analisa SNI Page 6


2 Upah Kerja / 1 kgr Besi, untuk memotong dan memasang di pakai 3/4 x :
### 1.1300 Kgr Besi Beton Rp. 11,900.00 Rp. 13,447.00
### 0.0200 Kgr Kawat Beton Rp. 15,000.00 Rp. 300.00
### 0.0600 org/hPekerja Rp. 75,000.00 Rp. 4,500.00
### 0.0600 org/hTukang Besi Rp. 90,000.00 Rp. 5,400.00
### 0.0060 org/hKepala Tukang Rp. 95,000.00 Rp. 570.00
0.0030 org/hMandor Rp. 100,000.00 Rp. 300.00
0.15 lsm overhead dan keuntungan Rp. 24,517.00 = Rp. 3,677.55
Jumlah Harga Satuan Rp. 28,194.55

3 1 m2 Bekisting pondasi
### 0.0400 m3 Papan Kls. III Rp. 1,750,000.00 Rp. 70,000.00
### 0.3000 kg Paku Rp. 20,000.00 Rp. 6,000.00
### 0.1000 lt. Minyak bekisting Rp. 15,000.00 Rp. 1,500.00
### 0.5200 org/hPekerja Rp. 75,000.00 Rp. 22,500.00
### 0.2600 org/hTukang Kayu Rp. 90,000.00 Rp. 23,400.00
### 0.0260 org/hKepala Tukang Rp. 95,000.00 Rp. 2,470.00
### 0.0260 org/hMandor Rp. 100,000.00 Rp. 500.00
0.15 lsm overhead dan keuntungan Rp. 126,370.00 = Rp. 18,955.50
Jumlah Harga Satuan Upah Rp. 145,325.50

4 1 m2 Bekisting Sloof
### 0.0450 m3 Papan Kls. II Rp. 2,800,000.00 Rp. 126,000.00
### 0.3000 kg Paku 5 - 10 Rp. 20,000.00 Rp. 6,000.00
### 0.1000 lt. Minyak bekisting Rp. 15,000.00 Rp. 1,500.00
### 0.5200 org/hPekerja Rp. 75,000.00 Rp. 22,500.00
### 0.2600 org/hTukang Kayu Rp. 90,000.00 Rp. 23,400.00
### 0.0260 org/hKepala Tukang Rp. 95,000.00 Rp. 2,470.00
### 0.0260 org/hMandor Rp. 100,000.00 Rp. 500.00
0.15 lsm overhead dan keuntungan Rp. 182,370.00 = Rp. 27,355.50
Jumlah Harga Satuan Upah Rp. 209,725.50
5 1 m2 Bekisting Kolom
### 0.0150 m3 Kayu terentang KLS II Rp. 2,800,000.00 Rp. 112,000.00
0.0400 m3 Kayu Kls 3 Rp. 1,750,000.00 Rp. 70,000.00
### 0.4000 kg Paku Rp. 20,000.00 Rp. 8,000.00
### 0.2000 Ltr Minyak bekisting Rp. 15,000.00 Rp. 3,000.00
### 0.3500 lbr Multipleks 6mm Rp. 75,000.00 Rp. 26,250.00
### 0.6600 org/hPekerja Rp. 75,000.00 Rp. 22,500.00
### 0.3300 org/hTukang Kayu Rp. 90,000.00 Rp. 29,700.00
### 0.0330 org/hKepala Tukang Rp. 95,000.00 Rp. 3,135.00
### 0.3300 org/hMandor Rp. 100,000.00 Rp. 500.00
0.15 lsm overhead dan keuntungan Rp. 275,085.00 = Rp. 41,262.75
Jumlah Harga Satuan Upah Rp. 316,347.75

6 1 m2 Bekisting Balok/Ringbalk
### 0.0400 m3 Klas 3 Balok Rp. 1,750,000.00 Rp. 17,500.00
0.0180 m3 Kayu Balok Klas II Rp. 2,800,000.00 Rp. 50,400.00
### 0.4000 kg Paku 5 - 12 cm Rp. 20,000.00 Rp. 8,000.00
### 0.2000 lt. Minyak bekisting Rp. 15,000.00 Rp. 3,000.00
### 1.0000 bt Bambu lokal Rp. 20,000.00 Rp. 360.00
### 0.3500 lbr Multipleks 6mm Rp. 75,000.00 Rp. 26,250.00
0.6600 org/hPekerja Rp. 75,000.00 Rp. 49,500.00
### 0.3300 org/hTukang Kayu Rp. 90,000.00 Rp. 29,700.00
### 0.0330 org/hKepala Tukang Rp. 95,000.00 Rp. 3,135.00
### 0.0330 org/hMandor Rp. 100,000.00 Rp. 500.00
0.15 lsm overhead dan keuntungan Rp. 188,345.00 = Rp. 28,251.75
Jumlah Harga Satuan Upah Rp. 216,596.75

7 1 m2 Bekisting Plat Lantai Multipleks 6 mm T maksimum 12cm


### 0.0150 m3 Balok Kayu kls 2 Rp. 3,000,000.00 Rp. 45,000.00
0.0400 m3 Balok Kayu kls 3 Rp. 1,750,000.00 Rp. 70,000.00
### 1.0000 bt Bambu lokal Rp. 20,000.00 Rp. 20,000.00
### 0.4000 kg Paku Rp. 20,000.00 Rp. 8,000.00
### 0.3500 Lbr Multiplek 6 mm Rp. 75,000.00 Rp. 26,250.00
0.2000 ltr Minyak bekesting Rp. 15,000.00 Rp. 3,000.00
0.6600 org/hPekerja Rp. 75,000.00 Rp. 49,500.00
### 0.3300 org/hTukang Kayu Rp. 90,000.00 Rp. 29,700.00
### 0.0330 org/hKepala Tukang Rp. 95,000.00 Rp. 3,135.00
0.0330 org/hMandor Rp. 100,000.00 Rp. 3,300.00

Analisa SNI Page 7


0.15 lsm overhead dan keuntungan Rp. 257,885.00 = Rp. 38,682.75
Jumlah Harga Bekesting Rp. 296,567.75

8 Anl.SNI. 1 M2 Membuat Plat Lantai Beton Bertulang T 8 K175 besi dia 10


0.600 M2 Papan Bekesti Rp. 296,567.75 = Rp. 177,940.65
8.633 Kg Besi Beton Rp. 28,194.55 = Rp. 243,412.95
1.000 M2 Beton Plat K175 T.8 Rp. 91,147.99 = Rp. 91,147.99
Plat T 8 cm Rp. 512,501.59

9 Anl.SNI. 1 M' Membuat Kolom Penguat Beton Bertulang (Kolom Praktis 15/15) K175 begel dia 6
0.600 M2 Papan Bekesti Rp. 316,347.75 = Rp. 189,808.65
4.232 Kg Besi Beton Rp. 28,194.55 = Rp. 119,309.94
0.023 M3 Beton K175 Rp. 1,139,349.85 = Rp. 25,635.37
Rp. 334,753.96

10 Anl.SNI. 1 M' Membuat Kolom (Kolom 20/25) K175 6 bt besi 14 begel dia 8-15
0.900 M2 Papan Bekesting Rp. 316,347.75 = Rp. 284,712.98
9.383 Kg Besi Beton polos Rp. 28,194.55 = Rp. 264,549.46
0.050 M3 Beton K175 Rp. 1,139,349.85 = Rp. 56,967.49
Rp. 606,229.93

11 Anl.SNI. 1 M' Membuat Sloof ( 20/25) K175. 5 bt besi 14 begel dia 8-15
0.500 M2 Papan Bekesring Rp. 209,725.50 = Rp. 104,862.75
8.175 kg Besi Beton Rp. 28,194.55 = Rp. 230,481.05
0.050 M3 Beton K175 Rp. 1,139,349.85 = Rp. 56,967.49
Rp. 392,311.29

12 Anl.SNI. 1 M' Membuat Balok ( 20/25) K175 Besi 4 bt dia 14 begel dia 8 - 20
0.700 M2 Papan Bekesring Rp. 216,596.75 = Rp. 151,617.73
5.831 kg Besi Beton Rp. 28,194.55 = Rp. 164,397.72
0.050 M3 Beton K175 Rp. 1,139,349.85 = Rp. 56,967.49
Rp. 372,982.94

13 Anl.SNI. 1 M' Balok Late ( 15/20) K175. 4 Bt besi 12


0.450 M2 Papan Bekesring Rp. 216,596.75 = Rp. 97,468.54
4.931 kg Besi Beton Rp. 28,194.55 = Rp. 139,024.98
0.030 M3 Beton K175 Rp. 1,139,349.85 = Rp. 34,180.50
Rp. 270,674.01

VII PEKERJAAN BESI


1 Anl.SNI. 1 Kg Besi Profil
1.1 Kg Besi Profil WF Rp. 11,900.00 = Rp. 13,090.00
0.08 Kg Meni Besi Rp. 21,879.00 = Rp. 1,750.32
0.06 oh Pekerja Rp. 75,000.00 = Rp. 4,500.00
0.006 oh Tukang Besi Rp. 90,000.00 = Rp. 540.00
0.006 Oh Kepala Tukang Rp. 95,000.00 = Rp. 570.00
0.0003 Oh Mandor Rp. 100,000.00 = Rp. 30.00
0.15 lsm overhead dan keuntungan Rp. 20,480.32 = Rp. 3,072.05
23,552.37

2 Anl.SNI. 100 Kg Perakitan Baja


1 ltr Bahan Bakar Solar Rp. 7,500.00 = Rp. 7,500.00
. 0.1 m' Minyak Pelumas Rp. 35,000.00 = Rp. 3,500.00
0.8 Jam Sewa Alat Rp. 600,000.00 = Rp. 480,000.00
0.1 oh Pekerja Rp. 75,000.00 = Rp. 7,500.00
0.1 oh Tukang Besi Rp. 90,000.00 = Rp. 9,000.00
0.001 Oh Kepala Tukang Rp. 95,000.00 = Rp. 95.00
0.005 Oh Mandor Rp. 100,000.00 = Rp. 500.00
0.15 lsm overhead dan keuntungan Rp. 508,095.00 = Rp. 76,214.25
Jumlah = Rp. 584,309.25
Upah 1kg Besi = Rp. 5,843.09

3 Anl.SNI. 1 M2 Perakitan besi Hollow hitam (upah Tukang) tidak termasuk keuntungan
0.04 oh Pekerja Rp. 75,000.00 = Rp. 3,000.00
0.02 oh Tukang Besi Rp. 90,000.00 = Rp. 1,800.00
0.002 Oh Kepala Tukang Rp. 95,000.00 = Rp. 190.00
0.002 Oh Mandor Rp. 100,000.00 = Rp. 200.00
Rp. 5,190.00

4 Anl.SNI. 10 Cm Pengelasan dgn las listrik


0.4 kg kawat las listrik Rp. 50,000.00 = Rp. 20,000.00
0.3 ltr Solar Rp. 7,500.00 = Rp. 2,250.00
0.04 ltr Minyak Plumas Rp. 35,000.00 = Rp. 1,400.00

Analisa SNI Page 8


0.17 Jam Sewa Alat Rp. 18,750.00 = Rp. 3,187.50
0.04 oh Pekerja Rp. 75,000.00 = Rp. 3,000.00
0.02 oh Tukang Besi Rp. 90,000.00 = Rp. 1,800.00
0.002 Oh Kepala Tukang Rp. 95,000.00 = Rp. 190.00
0.002 Oh Mandor Rp. 100,000.00 = Rp. 200.00
0.15 lsm overhead dan keuntungan Rp. 32,027.50 = Rp. 4,804.13
Jumlah = Rp. 36,831.63
Hrg 1 cm Pengelasan= Rp. 3,683.16

5 Anl.SNI. 1 Unit Pemasangan Besi Hollow 3,5x3,5 Tralis Ventilasi Parkir


10.89 M' Besi Hollow 3,5 x 3,5 Rp. 25,000.00 = Rp. 272,250.00
16.22 M' Besi Hollow 1,5 x 3,5 Rp. 16,666.67 = Rp. 270,333.33

610 cm Pengelasan Rp. 3,683.16 = Rp. 2,246,729.13


2 M' Kayu Penyangga 5/7 Rp. 5,000.00 = Rp. 10,000.00
3.32 M2 Upah Tukang, termasuk mandor Rp. 5,190.00 = Rp. 17,230.80
0.15 lsm overhead dan keuntungan Rp. 2,816,543.26 = Rp. 422,481.49
Rp. 3,239,024.75

VIII PEKERJAAN ALUMINIUM


1 Anl.SNI. 1 M2 Rolling Door Aluminium
1 M2 Rolling Door Aluminium Rp. 855,855.86 = Rp. 855,855.86
1.1 M' List Aluminium Rp. 6,666.67 = Rp. 7,333.33
2 bh Skrup fixer Rp. 500.00 = Rp. 1,000.00
1 Oh Pekerja Rp. 75,000.00 = Rp. 75,000.00
1 Oh Tukang Khusus Aluminium Rp. 90,000.00 = Rp. 90,000.00
0.1 Oh Kepala Tukang Rp. 95,000.00 = Rp. 9,500.00
0.05 Oh Mandor Rp. 100,000.00 = Rp. 5,000.00
0.15 lsm overhead dan keuntungan Rp. 1,043,689.19 = Rp. 156,553.38
Rp. 1,200,242.57

2 Anl.Tambahan 1 M2 Pek. Rangka Atap Baja Ringan Zincalume sekualitas Taso


1.100 M' Profil C 75. 80 Rp. 14,000.00 = Rp. 15,400.00
1.500 M' Profil C 75. 75 Rp. 11,833.33 = Rp. 17,750.00
1.700 M' Profil C 75. 65 Rp. 10,166.67 = Rp. 17,283.33
2.100 M' Profil U 40.45 Kasoh Rp. 7,666.67 = Rp. 16,100.00
1.500 M' Profil U 32.45 Reng Rp. 5,500.00 = Rp. 8,250.00
9.000 Bh Screw Kuda-kuda 12-14x40 Rp. 1,000.00 = Rp. 9,000.00
4.000 Bh Screw Reng 10-16x16 Rp. 1,000.00 = Rp. 4,000.00
0.350 Oh Pekerja Rp. 75,000.00 = Rp. 26,250.00
0.350 Oh Tukang Besi Rp. 90,000.00 = Rp. 31,500.00
0.035 Oh Kepala Tukang Rp. 95,000.00 = Rp. 3,325.00
0.018 Oh Mandor Rp. 100,000.00 = Rp. 1,800.00
0.15 lsm overhead dan keuntungan Rp. 150,658.33 = Rp. 22,598.75
Rp. 173,257.08

3 Anl.Atap Renovasi 1 M2 Pek. Rangka Atap Baja Ringan Zincalume sekualitas


3.000 M' Profil U 40.45 Kasoh Rp. 7,666.67 = Rp. 23,000.00
3.000 M' Profil U 32.45 Reng Rp. 5,500.00 = Rp. 16,500.00
6.000 Bh Screw Kuda-kuda 12-14x40 Rp. 1,000.00 = Rp. 6,000.00
4.000 Bh Screw Reng 10-16x16 Rp. 1,000.00 = Rp. 4,000.00
0.350 Oh Pekerja Rp. 75,000.00 = Rp. 26,250.00
0.018 Oh Mandor Rp. 100,000.00 = Rp. 1,800.00
0.15 lsm overhead dan keuntungan Rp. 77,550.00 = Rp. 11,632.50
Rp. 89,182.50

4 Anl.Tambahan 1M2 Pasang atap Genteng Metal


1.8 m2 Genteng Metal Rp. 45,000.00 = Rp. 80,357.14
4 bh Sekrup Rp. 450.00 = Rp. 1,800.00
0.2 Oh Pekerja Rp. 75,000.00 = Rp. 15,000.00
0.1 Oh Tukang Besi Rp. 90,000.00 = Rp. 9,000.00
0.01 Oh Kepala Tukang Rp. 95,000.00 = Rp. 950.00
0.001 Oh Mandor Rp. 100,000.00 = Rp. 100.00
0.15 lsm overhead dan keuntungan Rp. 107,207.14 = Rp. 16,081.07
Ps Atap Genteng Metal Rp. 123,288.21

5 Anl.Tambahan 1 M1 Pek. Bubungan Genteng Metal


1.250 M1 Bubungan Genteng Metal Rp. 18,000.00 = Rp. 22,500.00
3.000 bh Skrup Rp. 450.00 = Rp. 1,350.00
0.250 Oh Pekerja Rp. 75,000.00 = Rp. 18,750.00
0.150 Oh Tukang Besi Rp. 90,000.00 = Rp. 13,500.00
0.015 Oh Kepala Tukang Rp. 95,000.00 = Rp. 1,425.00
0.013 Oh Mandor Rp. 100,000.00 = Rp. 1,300.00
0.15 lsm overhead dan keuntungan Rp. 58,825.00 = Rp. 8,823.75
Rp. 67,648.75

Analisa SNI Page 9


IX PEKERJAAN PENGECATAN
1 Anl.SNI. 1 M2 Pengecetan Tembok/Lantai Anti Lumut (1 Lapis Cat Dasar, 1 Lapis Cat Penutup )
0.300 Kg Cat Anti Lumut Rp. 45,000.00 = Rp. 13,500.00
0.010 Bh Kuas Rp. 10,500.00 = Rp. 105.00
0.160 Oh Pekerja Rp. 75,000.00 = Rp. 12,000.00
0.160 Oh Tukang Cat Rp. 90,000.00 = Rp. 14,400.00
0.0160 Oh Kepala Tukang Rp. 95,000.00 = Rp. 1,520.00
0.0025 Oh Mandor Rp. 100,000.00 = Rp. 250.00
0.15 lsm overhead dan keuntungan Plaster Rp. 41,775.00 = Rp. 6,266.25
Rp. 48,041.25

2 Anl.SNI. 1 M2 Pengecetan Tembok Baru dalam ( 1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
0.100 Kg Plamur Rp. 17,400.00 = Rp. 1,740.00
0.100 Kg Cat Dasar ( Cat Tembok ) Rp. 67,096.00 = Rp. 6,709.60
0.260 Kg Cat Tembok In 2 Kali ( Cat Tembok ) Rp. 40,800.00 = Rp. 10,608.00
0.260 Kg Cat Luar 2 Kali ( Cat Tembok ) Rp. 72,000.00 = Rp. 18,720.00
0.0200 Oh Pekerja Rp. 75,000.00 = Rp. 1,500.00
0.0630 Oh Tukang Cat Rp. 90,000.00 = Rp. 5,670.00
0.0063 Oh Kepala Tukang Rp. 95,000.00 = Rp. 598.50
0.0025 Oh Mandor Rp. 100,000.00 = Rp. 250.00
0.15 lsm overhead dan keuntungan Cat dlm Rp. 27,076.10 = Rp. 4,061.42
0.15 lsm overhead dan keuntungan Cat Luar Rp. 35,188.10 = Rp. 5,278.22
Cat Dalam Rp. 31,137.52
Cat Luar Rp. 35,188.10

3 Anl.SNI. 1 M2 Pengecetan Besi


0.070 Kg Cat Zinc Chromate Rp. 67,096.00 = Rp. 4,696.72
0.049 Kg Cat Mini Rp. 21,879.00 = Rp. 1,072.07
0.100 lbr Amplas Rp. 50,000.00 = Rp. 5,000.00
0.001 Kg Kuas Rp. 55,000.00 = Rp. 55.00
0.0200 Oh Pekerja Rp. 75,000.00 = Rp. 1,500.00
0.2000 Oh Tukang Cat Rp. 90,000.00 = Rp. 18,000.00
0.0200 Oh Kepala Tukang Rp. 95,000.00 = Rp. 1,900.00
0.0250 Oh Mandor Rp. 100,000.00 = Rp. 2,500.00
0.15 lsm overhead dan keuntungan Rp. 34,723.79 = Rp. 5,208.57
Rp. 39,932.36

4 Anl.Tambahan 1M2 Pasang Alumunium Foil


1.050 M' Alumunium Foil Rp. 15,000.00 = Rp. 15,750.00
0.150 Oh Pekerja Rp. 75,000.00 = Rp. 11,250.00
0.050 Oh Tukang Kayu Rp. 90,000.00 = Rp. 4,500.00
0.005 Oh Kepala Tukang Rp. 95,000.00 = Rp. 475.00
0.008 Oh Mandor Rp. 100,000.00 = Rp. 800.00
0.15 lsm overhead dan keuntungan Rp. 32,775.00 = Rp. 4,916.25
Rp. 37,691.25

Analisa SNI Page 10


DAFTAR KUANTITAS DAN HARGA
SATUAN KERJA : DINAS KESEHATAN KAB. SIGI
PEKERJAAN : PEMBANGUNAN RUMAH GENSET PKM PANDERE
LOKASI : DESA PANDERE KEC. GUMBASA
TAHUN ANGGARAN : 2017

URAIAN PEKERJAAN Spesifikasi


Ukuran Volume HARGA SATUAN JUMLAH

PRELIMINARIES JUMLAH Rp. 3,154,660.00


1 Pembersihan 20.00 M2 Rp. 14,375.00 Rp. 287,500.00
2 Pemasangan Bouwplank 16.00 M' Rp. 64,572.50 Rp. 1,033,160.00
3 Air kerja 2.00 bln Rp. 250,000.00 Rp. 500,000.00
4 MobIlisasi demobilisasi 1.00 ls Rp. 534,000.00 Rp. 534,000.00
5 Listrik kerja 2.00 bln Rp. 400,000.00 Rp. 800,000.00

PEKERJAAN GALIAN JUMLAH Rp. 431,724.38


1 Galian Pondasi Bt Gunung 5.85 M3 Rp. 67,562.50 Rp. 395,240.63
2 Galian Pondasi Trasram 0.54 M3 Rp. 67,562.50 Rp. 36,483.75

PEKERJAAN URUGAN JUMLAH Rp. 1,726,575.00


1. Urugan Kembali Rp. 239,625.00
Galian Pondasi Bt Gunung 5.85 M3 Rp. 37,500.00 Rp. 219,375.00
Galian Pondasi Trasram 0.54 M3 Rp. 37,500.00 Rp. 20,250.00

2. Urugan Pasir Rp. 1,486,950.00


Urugan Pasir dibawa lantai 6.00 M3 Rp. 247,825.00 Rp. 1,486,950.00

PEKERJAAN PONDASI JUMLAH Rp. 5,240,944.46


1. Pondasi Bt Kali Rp. 3,921,600.25
1.1. Pasangan BT Kosong Type A 1.80 M3 Rp. 396,222.15 Rp. 713,199.87
1.2. Pondasi Batu Gunung A 4.05 M3 Rp. 792,197.63 Rp. 3,208,400.38

2. Pondasi Trasran Rp. 1,319,344.21


1.1. Pondasi Trasram Ram 1/2 Bt 1.40 M2 Rp. 122,135.05 Rp. 170,989.07
1.2. Pondasi Trasram T Pondasi Genset 5.61 M2 Rp. 122,135.05 Rp. 685,177.63
1.3. Plasteran Ps Trasram T.Podasi Genset 5.61 M2 Rp. 52,083.50 Rp. 292,188.44
1.4. Plasteran Ps Trasram dinding Ram 1.40 M2 Rp. 122,135.05 Rp. 170,989.07

PEKERJAAN BETON JUMLAH Rp. 28,038,664.62

1. Sloof Rp. 7,061,603.23


1.1. Sloof 20/25 pemb. 5 dia 14 bgl dia 8-15 18.00 M' Rp. 392,311.29 Rp. 7,061,603.23

2. Kolom Rp. 11,038,694.72


Kolom 20/25 Pemb 6 dia 14 - bgl dia 8 - 15 16.00 M1 Rp. 606,229.93 Rp. 9,699,678.88
Kolom 15/15 Pemb 4 dia 12 - bgl dia 6 - 15 4.00 M1 Rp. 334,753.96 Rp. 1,339,015.84

3. Ringbalk dan Balok Late Rp. 7,796,388.95


Ringbalk 20/25 Pemb. 4 dia 14 bgl dia 8- 20 18.00 M1 Rp. 372,982.94 Rp. 6,713,692.91
Balok Late 15/20 pemb. 4 dia12 begel dia 6-15 4.00 M1 Rp. 270,674.01 Rp. 1,082,696.04

4. Lantai Beton Rp. 2,141,977.72


4.1. Lantai Ruangan T08 20.00 M2 Rp. 91,147.99 Rp. 1,822,959.76
4.3. Ram beton T 08 3.50 M2 Rp. 91,147.99 Rp. 319,017.96

PEKERJAAN ARSITEKTUR Rp. 13,370,265.96

1. Pasangan dinding BT Bata 1/2 BT. 1:5 28 M2 Rp. 116,947.64 Rp. 3,274,533.85
2. Plasteran dinding 1:4 56 M2 Rp. 52,083.50 Rp. 2,916,676.00
3. Plasteran Kolom 12.24 M2 Rp. 52,083.50 Rp. 637,502.04
4. Plasteran Ringbalk 16.2 M2 Rp. 52,083.50 Rp. 843,752.70
5. Acian Plasteran 84.44 M2 Rp. 36,340.00 Rp. 3,068,549.60
6. Pengecatan 84.44 M2 Rp. 31,137.52 Rp. 2,629,251.77

PEKERJAAN ATAP JUMLAH Rp. 17,573,739.32

1. Rangka Atap Baja Ringan 51.35 M2 Rp. 173,257.08 Rp. 8,896,751.23


2. Atap Genteng Metal 51.35 M2 Rp. 123,288.21 Rp. 6,330,849.80
3. Bubungan Atap 16.00 M' Rp. 67,648.75 Rp. 1,082,380.00
4. Listplan Calsiboard L 30 cm 26.00 M' Rp. 39,264.83 Rp. 1,020,885.67
5. Cat Listplan Calsiboard L 30 cm 7.80 M' Rp. 31,137.52 Rp. 242,872.62
RENCANA ANGGARAN BIAYA
HARGA PERKIRAAN SENDIRI (HPS)
SATUAN KERJA : DINAS KESEHATAN KAB. SIGI
PEKERJAAN : PEMBANGUNAN RUMAH GENSET PKM PANDERE
LOKASI : DESA PANDERE KEC. GUMBASA
TAHUN ANGGARAN : 2017

No. ITEM PEKERJAAN JUMLAH HARGA

A PRELIMINARIES Rp. 3,154,660.00

B PEKERJAAN GALIAN Rp. 431,724.38

C PEKERJAAN URUGAN Rp. 1,726,575.00

D PEKERJAAN PONDASI Rp. 5,240,944.46

E PEKERJAAN BETON Rp. 28,038,664.62

F PEKERJAAN ARSITEKTUR Rp. 13,370,265.96

G PEKERJAAN ATAP Rp. 17,573,739.32


Jumlah Rp. 69,536,573.72
PPN 10% Rp. 6,953,657.37
TOTAL JUMLAH Rp. 76,490,231.09
DIBULATKAN Rp. 76,490,000.00
TERBILANG : Tujuh Puluh Enam Juta Empat Ratus Sembilan Puluh Ribu Rupiah

Sigi Biromaru, 4 Juli 2017


PENGGUNA ANGGARAN
DINAS KESEHATAN

dr. SOFYAN MAILILI, M.Kes


NIP. 19650906 199703 1 002