Download as pdf
Download as pdf
You are on page 1of 1
Consultants for Construction Supervisi NEW KHANKI BARRAGE AND AUXILIé & Ingarnations Pay i Sigg SMEC ESI Tc he) fre oomevte ATKINSYSEAtesinemsiomt, ESS Esler, ur Rat 50B5044/SMECIRO/o5% 2Yfayy 2014 18° September 2014 Descon Engineering Limited Site Office, Head Khanki Barrage, Village Khanki, Tehsil; Wazirabad, Distt, Gujranwala Punjab, Pakistan Tel: +92-4(0) 55-6400011,055-6400009 Mobile;+92 322 3607678 Email: nkb5015@descon.com Attention: Mr, Zaheer Uddin Babar — Contractor's Representative Subject: Construction of the New Khanki Barrage Project — Contract No NKB/ICB-01 Interim Determination of Extension of Time (EOT-1) for Civil, Mechanical & Electrical Works Dear Sir, This refers to the Contractor's letters Nos. DEL /NKB/ICB.01/SO/EN/ 896 dated 8" May 2014 and DEL INKB/ICB-01/SO/EN/1216 dated 21% July 2014. Pursuant to Sub-Clause 3.5 of General Conditions of contract, the Engineer has determined an interim extension of time (EOT-1) of 110 days for Civil, Mechanical & Electrical Works to which the Contractor is entitled and is reflected in the Impacted as Planned Schedule extending the Contract completion date up to 25" January 2017. Please note that the EOT has been determined using Impacted as Planned Method of schedule analysis incorporating delays encountered by the Contractor on various activities in the baseline schedule adding separate activities for the delays established. Yours faithfully, ae Ahsam Arshad Regional Manager SMEC International / Engineer’s Authorised Representative (Pursuent to Sub-Clauses SC 1.8 & 1.9 of the Consultancy Contract) [Altachment: Copy of Engineer's Datomninaton Report (28 Pages) Distribution: Mr. Syed Metimood:- uh Hassan - Project Dirctor (PMO) Mi Munammad Azam Ca, The EngneerActing Team Leader, SMEC Intemational Fle “address: 138, Saigo! Estate, Block G-1, Behind Doctor Hospital, Johar Town, Lahore

You might also like