Professional Documents
Culture Documents
Backup: Jordan Atomic Energy Commission
Backup: Jordan Atomic Energy Commission
Backup: Jordan Atomic Energy Commission
###-PRC-###
#.# ##
Backup
Title
Revision #.#
###-PRC-###
Revision Sheet
Revision Description Prepared/Revised Technical Review QA Review
2. Responsibilities:
2.1. Laboratories Directors
Assign the personnel responsible for Backup (Assignee) from their Laboratories for
the purpose of this procedure
Communicate with the IT directory for the purpose of this procedure.
Ensure the imp limitation of the backup process
2.2. Assignee
Perform the backup process for the computers under his responsibility.
Report any issue to Laboratories Directors and Quality directory.
Safely store the backup media
Notify Laboratories Directors and Quality directory for any problem could appear
concerning backup process in any computer in his laboratory.
2.3. Quality Directorate.
Ensure the proper implementation of this procedure.
Keep a record of the assigned personnel.
Communicate with the IT directory for the purpose of this procedure
2.4. IT Specialist; shall:
Perform the backup process for the computers under his responsibility.
Note:
For first time it’s recommended to select (Create a new backup
archive).
4. Records:
o Assignee List (QA-L-####).
o Computer Back-up List (Labs-L-####)
o Backup Form (LABS-F-***)
5. References:
N/A
6. Attachments:
N/A