CLIENT :

PT. SULFINDO ADIUSAHA

WO Number : All Instrumentation for CDU Project Quotation No. : 002-05/Q-DTT-SAU/V/2021


PR Number : 21000718 Date : Mei 4, 2021
Issued by : Bpk. Rangga / Bpk. Toto
Date : Attention : Bpk. Yuris
Rev. :

Dengan Hormat,

Bersama ini kami ajukan penawaran sesuai dengan WO diatas adalah sebagai berikut:

No Description Qty UNIT PRICE TOTAL PRICE Remarks

I Scope of work
PULLING CABLE
1 Pulling Cable + Termination and connect 327 m Rp - Rp - Field CDU to DCS Marshalling. 300m Control & 27m External Device Power. By Contractor.
2 Install Cable Tray FRP 200 + Support and Accessories 17 m Rp - Rp - By Contractor
3 Continuity and Loop Test 1 set Rp - Rp - By Contractor

FIELD INSTRUMENT INSTALLATION


1 Field Instrument Installation + Support and Accessories 7 ea Rp - Rp - Support tinggi 1,5m =4ea. By Contractor
2 Loop Test and Commissioning 1 set Rp - Rp - Memastikan sinyal masuk ke PLC. By Contractor
3 Tubing Installation + Connector & Support 1 set Rp - Rp - Material By SAU
4 All Documents Include Wiring Diagram & Hook Up Drawing 1 set Rp - Rp - By Contractor
5 Pulling FO Cable From CDU to DCS 72 m Rp - Rp - Material by SAU
SUB TOTAL I (Jasa) Rp -

II Material
FIELD INSTRUMENT ACCESSORIES
1 Pipe Conduit 1/2" Metal + Support & U-Bolt 48 m Rp - Rp - From Main Tray
2 Pipe Siphon F/Pressure Gauge Con. Size: 1/2" NPT ANSI 150lb 1/2" SS 304 650 mm Rp - Rp - By Contractor
3 Threaded Flange, Male NPT, ANSI, 150# RF MAT'L: SS304 Size: 1/2" 5 ea Rp - Rp - By Contractor
4 UNP, CS, 100x50x5x6000mm + Sandblast 4 btg Rp - Rp - For Support. By Contractor
5 Angel Equal 50x50x6x6000mm + Sandblast 30 ea Rp - Rp - For Support. By Contractor
6 U-Bolt 1/2" Galvanis 48 ea Rp - Rp - By Contractor
7 U-Bolt 2" Galvanis 8 ea Rp - Rp - By Contractor
8 Clamp Pyluck 50 ea Rp - Rp - By Contractor
9 Tubing 1/2" SS304 + Connector 42 m By SAU
10 Tubing 1/4" SS304 + Connector 54 m By SAU
11 Cable Tray W: 200mm x H: 100mm 17 m By SAU
12 Pipa 2" CS + Sandblast 2 btg Rp - Rp - By Contractor
13 Steel Plate + Sandblast 0,5 m² Rp - Rp - For baseplate. By Contractor
SUB TOTAL II (Material) Rp -

III Tools : sewa


1 Electrical Toolset 1 lot Rp - Rp - by Contractor.
2 Hart Communicator 1 ea Rp - Rp - by Contractor.
3 Bender Tubing 1/2" 2 ea Rp - Rp - by Contractor.
4 Bender Tubing 1/4" 2 ea Rp - Rp - by Contractor.
5 Cutter Tubing 2 ea Rp - Rp - by Contractor.
6 Welding Machine 1 ea Rp - Rp - by Contractor.
7 Gerinda Machine 2 ea Rp - Rp - by Contractor.
8 Wrench 1 lot Rp - Rp - by Contractor.
9 Kunci Pas / Ring 1 lot Rp - Rp - by Contractor.
10 Drilling Machine 1 lot Rp - Rp - by Contractor.
11 Body Harness 1 lot Rp - Rp - by Contractor.
12 Scaffolding 427 m³ Rp - Rp - by Contractor.
SUB TOTAL III (Sewa tool) Rp -

IV Common Cost
1 Rapid test Antigen 20 orang x 4 kali 80 time Rp - Rp - by Contractor
2 BPJS 1 lot Rp - Rp - by Contractor
3 Safety equipment 20 set Rp - Rp - by Contractor
4 Air minum 40 galon Rp - Rp - by Contractor
SUB TOTAL IV (Common job) Rp -

RINCIAN BIAYA :
1. Jasa Rp -
2. Material Rp -
3. Sewa tool Rp -
4. Common cost Rp -
5. Total Cost Rp -
6. PPH 2% Rp -
GRAND TOTAL Rp -
KONDISI PENAWARAN:
1. Work Delivery : 60 Days or 2 months Calender days
2 Total worker : 20 Men
3 PPN 10% : Excluded
4 Payment : Down Payment 30%
70% one month after completion work

Semoga penawaran kami ini dapat memenuhi permintaan Bapak, dan tak lupa kami ucapkan terima kasih atas perhatiannya.

Hormat kami,

Hendro Budianto
Marketing Manager