Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

CLIENT :

PT. SULFINDO ADIUSAHA

WO Number : All Instrumentation for SRS Project Quotation No. : 001-05/Q-DTT-SAU/V/2021


PR Number : 21000720 Date : Mei 4, 2021
Issued by : Bpk. Rangga / Bpk. Toto
Date : Attention : Bpk. Yuris
Rev. :

Dengan Hormat,

Bersama ini kami ajukan penawaran sesuai dengan WO diatas adalah sebagai berikut:

No Description Qty UNIT PRICE TOTAL PRICE Remarks

I Scope of work
PULLING CABLE
1 Pulling Cable + Termination and connect 1550 m Rp - Rp - Field to PLC. (40 I/O). By Contractor
2 Install Cable Tray FRP 200 + Support and Accessories 50 m Rp - Rp - By Contractor
3 Continuity and Loop Test 1 set Rp - Rp - By Contractor

FIELD INSTRUMENT INSTALLATION


1 Field Instrument Installation + Support and Accessories 46 ea Rp - Rp - Support tinggi 1,5m =12ea. By Contractor
2 Loop Test and Commissioning 1 set Rp - Rp - Memastikan sinyal masuk ke PLC. By Contractor
3 Tubing Installation + Connector & Support 1 set Rp - Rp - Material By SAU
4 All Documents Include Wiring Diagram & Hook Up Drawing 1 set Rp - Rp - By Contractor
5 Pulling FO Cable From SRS to DCS 72 m Rp - Rp - Material by SAU
SUB TOTAL I (Jasa) Rp - By Contractor

II Material
FIELD INSTRUMENT ACCESSORIES
1 Pipe Conduit 1/2" Metal + Support & U-Bolt 33 m Rp - Rp - From Main Tray
2 Threaded Flange, Male NPT, ANSI, 150# RF MAT'L: SS304 Size: 1/2" 11 ea Rp - Rp - By Contractor
3 Cable Gland, Size:1/2", (non Explosion Proof) 46 ea Rp - Rp - By Contractor
4 Schoen 1,5mm² 184 ea Rp - Rp - By Contractor
5 UNP, CS, 100x50x5x6000mm + Sandblast 5 btg Rp - Rp - For Support. By Contractor
6 Angel Equal 50x50x6x6000mm + Sandblast 27 ea Rp - Rp - For Support. By Contractor
7 U-Bolt 1/2" Galvanis 33 ea Rp - Rp - By Contractor
8 U-Bolt 2" Galvanis 24 ea Rp - Rp - By Contractor
9 Clamp Pyluck 40 ea Rp - Rp - By Contractor
10 Tubing 1/2" SS304 + Connector 48 m By SAU
11 Tubing 1/4" SS304 + Connector 36 m By SAU
12 Cable Tray W: 200mm x H: 100mm 50 m By SAU
13 Pipa 2" CS + Sandblast 4 btg Rp - Rp - By Contractor
14 Steel Plate + Sandblast 0,6 m² Rp - Rp - For baseplate. By Contractor
SUB TOTAL II (Material) Rp -

III Tools : sewa


1 Electrical Toolset 1 lot Rp - Rp - by Contractor.
2 Hart Communicator 1 ea Rp - Rp - by Contractor.
3 Bender Tubing 1/2" 2 ea Rp - Rp - by Contractor.
4 Bender Tubing 1/4" 2 ea Rp - Rp - by Contractor.
5 Cutter Tubing 2 ea Rp - Rp - by Contractor.
6 Welding Machine 1 ea Rp - Rp - by Contractor.
7 Gerinda Machine 2 ea Rp - Rp - by Contractor.
8 Wrench 1 lot Rp - Rp - by Contractor.
9 Kunci Pas / Ring 1 lot Rp - Rp - by Contractor.
10 Drilling Machine 1 lot Rp - Rp - by Contractor.
11 Body Harness 1 lot Rp - Rp - by Contractor.
12 Scaffolding 427 m³ Rp - Rp - by Contractor.
SUB TOTAL III (Sewa tool) Rp - by Contractor

IV Common Cost
1 Rapid test Antigen 20 orang x 6 kali 120 time Rp - Rp - by Contractor
2 BPJS 1 lot Rp - Rp - by Contractor
3 Safety equipment 20 set Rp - Rp - by Contractor
4 Air minum 60 galon Rp - Rp - by Contractor
SUB TOTAL IV (Common job) Rp -

RINCIAN BIAYA :
1. Jasa Rp -
2. Material Rp -
3. Sewa tool Rp -
4. Common cost Rp -
5. Total Cost Rp -
6. PPH 2% Rp -
GRAND TOTAL Rp -
KONDISI PENAWARAN:
1. Work Delivery : 90 Days or 3 months Calender days
2 Total worker : 20 Men
3 PPN 10% : Excluded
4 Payment : Down Payment 30%
70% one month after completion work

Semoga penawaran kami ini dapat memenuhi permintaan Bapak, dan tak lupa kami ucapkan terima kasih atas perhatiannya.

Hormat kami,

Hendro Budianto
Marketing Manager

You might also like