MINUTES OF MRM Version Date : 01-Jul 2017
Achievement Status
Sr. IMS Objective Target
July 17 Aug 17 Sept 17 Oct 17 Nov 17
Remarks
To Achieve On-Time Delivery at
OTD Average
Manufacturing unit
Gonde 83 79 89 85 89 85.0 %
6 Dubai 85 % 89 88 79 82 81 83.8 %
Singapore 100 100 100 100 100 100 %
Hyderabad NA NA NA NA NA NA
To Reduce Electric Power Consumption Electricity Reduction/Consumption Average
M-9, Nashik U/ Month 5920 5821 6328 6420 6214 6138 Units
Gonde 6U/Hr 6.89 6.90 6.99 7.09 8.84 7.34
7
Dubai 3.0 U/Hr 4.32 2.65 2.88 2.11 2.54 2.90
Singapore 3.75 U/ Hr. 4.4 4.2 3.5 3.6 4.4 4.02
Hyderabad 25 U/Hr 29.7 28.4 26 25 29.8 27.78 Units
To Comply Applicable Legal Requirements % Compliance Average
M-9, NEC Nashik 94 %
Gonde 100 % 96 %
8
Dubai Compliance 100 % Average 98 %
Singapore 100 %
Hyderabad 100 %
To Prevent Environmental, Occupational Remarks
Near Miss and Accidents
Health & Safety Incidents
M-9, Nashik Nil Nil Nil Nil Nil
NEC, Nashik Nil Nil Nil Nil Nil
9 NIL Only one Near
Gonde Nil 01 Nil Nil Nil
miss found in
Dubai Nil Nil Nil Nil Nil Gonde plant.
Singapore Nil Nil Nil Nil Nil
Hyderabad Nil Nil Nil Nil Nil
To Enhance Environment & Safety
No of trainings conducted
Training
M-9, Nashik 02 01 01 01 01 07 Training
NEC, Nashik 1 Training 02 01 00 01 02 06 Training
10 05 Training
Gonde / Month 01 01 01 01 01
Dubai 00 02 02 01 01 06 Training
Singapore 00 00 02 02 02 06 Training
Hyderabad 03 03 02 02 00 10 Training
To Improve Safety Audit Score Average for all locations 85.72 % Average
M-9, Nashik 81.25 87.5 87.5 93.75 93.75 88.75 %
Gonde 85 80.68 82.95 86.36 86.36 84.27 %
11 Hyderabad 95 % 81.25 81.25 87.5 93.75 93.75 87.50 %
Dubai 80.68 81.81 82.95 82.95 86.36 82.95 %
NEC 75 81.25 81.25 87.5 87.5 82.50 %
Singapore 86.36 87.5 88.3 89.77 89.77 88.34 %
The management is asking to improve the performance where ever required with concrete action plan
c) Changes in:
1. External and internal issues those are relevant to the integrated management system. : -
Following internal and external issues are identified at following six locations in the organization and
discussed in MRM.
Location # 1:- M-9, MIDC, Ambad, Nashik
Sr. Process No of Risks High Risk Opportunities Remarks
1 Top Management 4 3 1 Action plan for mitigation is
2 System Coordinator 6 1 4 prepared
3 HR and ADMIN 7 0 1
4 Purchase 10 0 5
5 IA Sales 6 1 2
6 Project Management 4 0 1
Location # 2:- NEC, MIDC, Ambad, Nashik
Sr. Process No of Risks High Risk Opportunities Remarks
1 SERVICE 4 1 2 Action plan for mitigation is
2 HARD WARE ENGG (HW) 5 1 2 prepared
3 Project Management 4 1 2
4 E&C 6 2 1
Location # 3:- Gonde, Nashik
Sr. Process No of Risks High Risk Opportunities Remarks
1 MFG-Panel 10 3 3 Action plan for mitigation is
2 MFG-SPM 11 3 3 prepared
3 QA-Panel 3 2 0
4 QA-SPM 4 2 0
5 HR,ADMIN & Legal 5 2 1
6 STR, DSP& Waste Mgt. 4 1 1
Location # 4:- Hyderabad
Sr. Process No of Risks High Risk Opportunities Remarks
1 PES-SALES 5 1 5 Action plan for mitigation is
2 PES-EXECUTION 1 1 1 prepared
3 PES-QA 3 0 0
4 HR,ADMIN & Legal 5 2 1
5 IA-SALES 3 1 1
6 IT 5 0 1
Location # 5:- Singapore
Sr. Process No of Risks High Risk Opportunities Remarks
1 IA SLES 3 1 1 Action plan for mitigation is
2 E&C 5 1 1 prepared
3 MFG 6 2 2
4 ADMIN & Legal 5 2 1
Location # 6:- Dubai
Sr. Process No of Risks High Risk Opportunities Remarks
1 MFG 5 2 1 Action plan for mitigation is
2 HR, ADMIN & Legal 5 2 1 prepared
3 STR, DSP& Waste Mgt. 4 2 1
4 E&C 6 3 1
5 QA 4 1 1
Directorate of Registration of Follow all applicable factory Applicable acts and rules
Industrial Health Factory. act and rules. are identified in Legal
and Safety (DISH) Register and compliance
5 Maintain factory as No any non compliance to status monitored.
per factory act requirement.
requirement.
4. Risks and opportunities and the effectiveness of actions taken to address risks and
opportunities. :- The risk analysis is carried out in every department by department head along with
his team. The following risks are identified and analysed, corrective action is taken to eliminate or
reduce the risks
Location # 1:- M-9, MIDC, Ambad, Nashik
Sr. Process No of Risks High Risk Opportunities Remarks
1 Top Management 4 3 1 Action plan for mitigation is
2 System Coordinator 6 1 4 prepared
3 HR and ADMIN 7 0 1
4 Purchase 10 0 5
5 IA Sales 6 1 2
6 Project Management 4 0 1
Location # 2:- NEC, MIDC, Ambad, Nashik
Sr. Process No of Risks High Risk Opportunities Remarks
1 SERVICE 4 1 2 Action plan for mitigation is
2 HARD WARE ENGG (HW) 5 1 2 prepared
3 Project Management 4 1 2
4 E&C 6 2 1
Location # 3:- Gonde, Nashik
Sr. Process No of Risks High Risk Opportunities Remarks
1 MFG-Panel 10 3 3 Action plan for mitigation is
2 MFG-SPM 11 3 3 prepared
3 QA-Panel 3 2 0
4 QA-SPM 4 2 0
5 HR,ADMIN & Legal 5 2 1
6 STR, DSP& Waste Mgt. 4 1 1
Location # 4:- Hyderabad
Sr. Process No of Risks High Risk Opportunities Remarks
1 PES-SALES 5 1 5 Action plan for mitigation is
2 PES-EXECUTION 1 1 1 prepared
3 PES-QA 3 0 0
4 HR,ADMIN & Legal 5 2 1
5 IA-SALES 3 1 1
6 IT 5 0 1
Location # 5:- Singapore
Sr. Process No of Risks High Risk Opportunities Remarks
1 IA SLES 3 1 1 Action plan for mitigation is
2 E&C 5 1 1 prepared
3 MFG 6 2 2
4 ADMIN & Legal 5 2 1
Location # 6:- Dubai
Sr. Process No of Risks High Risk Opportunities Remarks
1 MFG 5 2 1 Action plan for mitigation is
2 HR, ADMIN & Legal 5 2 1 prepared
3 STR, DSP& Waste Mgt. 4 2 1
4 E&C 6 3 1
5 QA 4 1 1
Customer Complaints: - Director has taken action on four complaints against zero complaints
Achievement Status
Sr. IMS Objective Target Remarks
July 17 Aug 17 Sept 17 Oct 17 Nov 17
To Reduce Customer Complaints Total 03 complaints received. Total
M-9, Nashik 0 0 0 0 0 00
Gonde 0 1 0 0 0 01
Dubai 0 0 0 0 0 00
1 Nil
Singapore 0 0 0 0 0 00
Hyderabad - PES 0 0 0 0 1 01
Hyderabad - IA 0 0 1 0 0 01
Hyderabad - GETS 0 0 0 0 0 00
Human Recourse: The training has been given to participants at all locations as per plan. All records
of trainings imparted are maintained properly. Training Effectiveness is verified and recorded in
training effectiveness review report. Training plan is prepared considering the organizations as well
as Customers need for continual improvement of organization as well as to increase effectiveness of
Integrated Management System. The objective set for training activities is “To Enhance Training
Activities” with the target set of at least Twelve Trainings per Year and to review this objective the
monitoring indicator is: a) No. of Trainings Imparted. Data maintained adequately.
Details of Training imparted for this review period July 2017 to December 2017 is as below :-
Achievement Status
Sr. IMS Objective Target Remarks
July 17 Aug 17 Sept 17 Oct 17 Nov 17
To Enhance Training activities No of trainings conducted
M-9, Nashik 02 01 01 01 01 07 Training
Singapore 00 00 02 02 02 06 Training
Hyderabad 03 03 02 02 00 10 Training
Result of participation :-
Following decisions made in safety committee meetings
Hazardous & Non Hazardous Material collection, handling system improved. Waste Collections bins
are provided separately for hazardous and non hazardous waste n Gonde Plant.
Mock drill conducting system needs further improvement in Hyderabad.
Earth Pits are identified and tested for resistance in Gonde Plant.
Height of DG set stack is increased in Gonde Plant.
All operators are supervised by IMS committee team member for wearing safety equipments during
machine operation.
Consultation :
1. Consultation is going on with Factory Inspector for submission of Annual return.
2. Consultation is going on with MPCB Officers regarding data requirement of Environmental statement
and Water cess as per MPCB Consent.
3. For training & implementation of requirements of IMS management system consulting services are
taken from Shubhkiran Quality Forum.
Achievement Status
Sr. IMS Objective Target Remarks
July 17 Aug 17 Sept 17 Oct 17 Nov 17
Near Miss and Accident Only one Near
M-9, Nashik Nil Nil Nil Nil Nil miss found in
Gonde plant.
NEC, Nashik Nil Nil Nil Nil Nil
Raw material Store was re-organized to comply the requirement of OHSAS. The distance between
two racks was less, now it is reorganized by increasing the distance in Gonde and Dubai Plant.
The scrap storage is now organized in better way. Partitions between different scraps are put in
the scrap yard at Gonde Plant. Hazardous identification system improved with Form 8 Label.
Gangways are marked by taking care of all safety & environmental requirements. Emergency exit
way, assembly point signage are displayed throughout the factory premises to gather at safe
assembly point area in case of any emergency. Awareness is also provided to operators on
gangway marking, material identification.
Safety shoes, aprons, goggles like all PPE’s are provided to all workers as safety precaution. Safety
instructions and slogans are displayed at shop floor area to motivate the employees.
Safety & environmental objectives are included for continual improvement of Environment
Management system.
Following requirements which are in-process needs to be comply
1. Construction and fabrication of Raw material stores in shop floor at Gonde Plant.
2. Installation of Wind Sack at Gonde.
Prepared By :-
Prashant Chaudhari
System Coordinator