Cable Splicing Procedure 003
Cable Splicing Procedure 003
HVS-500 Series
5-8kV Class
Splice for Non-Shielded
Extruded Dielectric
(Poly/EPR) Power Cables
Safety lnstructions
Warning: When installing electrical To avoid risk of accidental fire or To minimize any effect of fumes
power system accessories, failure explosion when using gas produced during installation, always
to follow applicable personal safety torches, always check all provide good ventilation of confined
requirements and written connections for leaks before work spaces.
installation instructions could result igniting the torch and follow the
in fire or explosion and serious or torch manufacturer's safety
fatal injuries. instructions.
Adjusting the Torch
Adjust regulator and torch as The FH-2629 will be all blue, the Regulator Pressure
required to provide an overall 12- other torch will have a 3- to 4-inch
inch bushy flame. yellow tip. Use the yellow tip for FH-2616A1 Full pressure
shrinking. FH-2629 15 psig
• Apply outer 3- to 4-inch tip of the To determine if a tube has Note: When installing multiple
flame to heat-shrinkable material completely recovered, look for the tubes, make sure that the surface of
with a rapid brushing motion. following, especially on the back the last tube is still warm before
• Keep flame moving to avoid and underside of the tube: positioning and shrinking the next
scorching. tube. If installed tube has cooled,
• Unless otherwise instructed, start 1. Uniform wall thickness re-heat the entire surface.
shrinking tube at center, working 2. Conformance to substrate
flame around all sides of the tube to 3. No flat spots or chill marks
apply uniform heat. 4. Visible sealant flow if the tube is
coated
Installation Instructions
1. Product selection.
1080
Y
1081
1082
1083
6. Install connector.
Clean
After installation, deburr connector.
cloth.