Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Installation

2.2 Mounting

English
Xgard Bright should be installed at the designated location with the sensor
pointing down. This ensures that dust or water will not collect on the sensor
and stop gas entering the cell. Care should be taken when installing the
detector to avoid damaging the painted surface of the enclosure.
There are two M20x1.5 entry ports on the base. One entry port will be used
for power supply input during normal operation. Unused port will be blocked
by blind plug, or can be used to connect external alarm device or be used for
connecting devices to the multi drop communications. End user will only use
certified cable gland for installation.

2.3 Internal Electrical Connections


Power and Loop Connector SOURCE/SINK
Jumpers Fitted to
LHS = SINK, see
lengend on board
Sounder Out
+ P
O
SIG LO

Production use
– mA
0

only
4-2

Alarm Level 1
Relay Output NOT USB!
SOUNDER OUT

Vmax=30V Wmax=3W SIN


K
Xgard Bright Gas Detector
SO
485 UR
CE
Alarm Level 1 B A B A RS485 IN/OUT
NO/NC Jumper Le
ve
l1
or End of Line
Selection Terminator
NC

RT
NO

Production Fault Relay


l2

Fault
Leve
NO
NC

NO
NC

use only Output

Lower Board
Alarm level 2 Programming
Relay Output Connector
Alarm Level 2 Lower Board
NO/NC Jumper Fault NO/NC Sensor
Selection Jumper Selection Connector

Diagram 4: Xgard Bright internal electrical connections

You might also like