Drawing For Jabel Haffet Base Pumping Station Proposed DN300 C.S Suction Pipline Plan and Profile - Rev.1

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

To, Your reference: N16297-TECH-0135-21

M/s. Arcadis Design & Consultancy Our reference: N16297-HPE-KH-OL-0304


P.O. Box : 2774
Abu Dhabi, United Arab Emirates Department: Operations
Ph: +971 2 566 4000 Name Eng. Unni Cyriac
Fax : +971 2 635 9109
Contact Details ucyric@hydropower.ae
Kind Attn: Project Manager
Date 07.04.2021

Project: N-16297 – Construction of New Pumping Station at Jabel Haffet Base

Subject: Drawing for Jabel Haffet Base Pumping Station Proposed DN300 C.S
Suction Pipeline Plan & Profile - Rev.1

References:

1) HYD Letter Ref. – N16297-HPE-KH-OL-0192 Dated 11.02.2021


2) ADC Letter Ref. – N16297-TECH-0135-21 Dated 24.02.2021

Dear Sir,

With reference to the above-mentioned subject, please find enclosed herewith the revised Drawing for Jabel
Haffet Base Pumping Station Proposed DN300 C.S Suction Pipeline Plan & Profile for the project N-16297.

Sr. No. Drawing Description Drawing No. Rev.


Jabel Haffet Base Pumping Station Proposed
1 N-16297-GE-P00-CN-D011 01
DN300 C.S Suction Pipeline Plan & Profile

This is for your kind review and approval.

Thanking You,
For Hydropower Energy and General Construction SP LLC

Tanay Kumar
Project Manager

Encl: As Stated Above.

Cc: Project Manager – Transco

Answers Required (Yes / No)


DOCUMENT – COMMENT SHEET – RESPONSE SHEET

Jabel Haffet Base Pumping Station Proposed DN300 CS Suction Pipeline Plan & Profile

Comment Sheet Ref: N- 1 62 9 7 - TE CH- 01 3 5- 2 1 Date of Comment: 24.02.2021

Incoming Submittal Ref: N1 6 29 7- HP E- K H-O L- 0 1 92 Date of Receipt: 11.02.2021

ARCADIS / TRANSCO Comments HPE Reply


1. High point at Chainage 0+077.53 shall be eliminated Noted the high point at chainage0+077.53 is avoided
to prevent air lock. due to the lowering of pump hall level.
2. Reservoir water levels (operating, alarms, overflow) At present the Low levels and high levels are
shall be presented in the sectional view. indicated only for information. Various set points will
be indicated in the operation and control philosophy.
3. Low water levels (stop, alarm) shall be based on Noted NPSH calculation conducted, please refer to
NPSH calculation results. the steady state report N16297-GE-M00-EN-S003-
00
4. Existing line to be depressurised during pipe Method statement for pipeline crossing will be
crossing works; contractor to assess the impact and submitted separately
feasibility.
5. Contractor shall evaluate drainage pipes levels, Site survey is conducted and no clashing found, more
assess pipe crossing levels, and shall present it in the over the pipe cover at crossing locations are above 3
drawing - sewer, plant drains (transformer, hypo meters to avoid any clashes
chlorination etc.) and storm water drains (existing and
new).
6. Pipe protection under the road shall be presented in Presented
the drawing.
7. Please check and confirm that the chamber base shall Noted, pipe relocated accordingly
not be exposed to install the pipe. If exposed, due to
proximity, pauses risk and contractor to locate the
corridor 2-3m away from chamber.

8. Please detail fan room and size of its foundation. An Noted, pipe relocated accordingly
allowance of 3.5m space between foundation to pipe
shall be considered to keep 1:1 slope for open cut.

9. Please mark the space between fence at transformer Indicated, necessary shoring will be provided if
and chainage 0+082.92. Space shall be sufficient necessary
enough for safe open cut.
10. Show the distribution pump discharge line (close to Indicated.
CH0+090) in the profile along with other proposed
utilities/services.
11. Please provide a table of coordinates and present Provided
coordinates of all direction changes in the layout.
12. Whether National Abu Dhabi Datum adopted? Please Vertical Datum was based on Ras Ghumays Datum ,
indicate it in note 4. same will be indicated as note 4.
13. Pipe rating representation shall be PN or Class and Corrected.
not DP.
14. Please rectify few incorrect marking, Corrected.

15. Existing fence to be demolished, present new Noted, however the existing fence is indicated for
boundary wall. clear understanding of location.
16. Correct the spelling of ‘jable’ & ‘hafeet’ in the drawing Corrected
title.
17. Existing services shall be verified at prior to suction Existing services are verified as part of topography
pipeline proposal & laying. and underground utilities surveys and submitted via
our letter reference N16297-HPE-KH-OL-0197
18. The proposed suction pipeline laying for civil part Noted and confirmed
architectural and structural detailed drawings shall be
designed by approved designer and submit separately
for TRANSCO / Engineer approval.

Note: The above comments and/or approvals do not relieve the Contractor from his obligation in the contract to ensure conformance to the specifications. Any
specification deviations found subsequent to approval are to be corrected by the Contract to the satisfaction of the OWNER/ENGINEER.

STATUS CODE: Not Approved – Re-submit

Signed: Signed:
For Arcadis Consulting Middle East Ltd for TRANSCO
NEW PUMPING STATION

PLANT
NORTH
4
1 TRUE
NORTH
N
A A

W E

STAIR-1
S
8

STAIR-4

TRANSFORMER-1

CP-D CP-J CP-J


CP-E

TRANSFORMER-2

ELECTRIC
PUMP

CABLE CELLAR

PUMP
DIESEL

BATTERIES
MODEL#

284

0 341
0-000

1500

398

1250 1750 455


2000

568
2500

682

3000
S/N: 0000

USGPM

LPM

3500 795

4000
909

4500
APPROVED

1023

5000
1136

STAIR-3

DETAIL-1
K
STAIR-2

M M

1 4

EXI.SAFETY CLOSE
VALVE CHAMBER
EXI.FLOW METER EXI.FLOW CONTROL EXI.VALVE SHAFT
DN 500mm
CHAMBER VALVE CHAMBER CHAMBER
DN 500mm DN 700mm DN 500mm
ALUMINIUM WALK WAY
ANODIZED EXTRUDED
ALUMINIUM WALK WAY
ANODIZED EXTRUDED

DN 600mm EXISTING

DETAIL-2
CHAMBER
RELIEF

PIPELINE PLAN
SHOP DRAWING

NEW PUMPING STATION AT


JABEL HAFFET BASE
EPC Contract No:- N-16297
Design & Consultancy
for natural and
built assets
Tel: +971 02 5664000
Fax: +971 02 6359109
P.O. Box: 2774
Abu Dhabi, U.A.E
www.arcadis.com

Hydropower Energy and General Construction L.L.C


Tel:03-7621400, Fax:03-7630401
P.O.Box:15253, Al Ain, U.A.E

JABEL HAFFET BASE PUMPING STATION


PROPOSED DN300 C.S SUCTION PIPELINE
PLAN & PROFILE

PIPELINE PROFILE
N16297-GE-P00-CN-D011