Subject: Drawing for Jabel Haffet Base Pumping Station Proposed DN300 C.S
Suction Pipeline Plan & Profile - Rev.1
References:
Dear Sir,
With reference to the above-mentioned subject, please find enclosed herewith the revised Drawing for Jabel
Haffet Base Pumping Station Proposed DN300 C.S Suction Pipeline Plan & Profile for the project N-16297.
Thanking You,
For Hydropower Energy and General Construction SP LLC
Tanay Kumar
Project Manager
Jabel Haffet Base Pumping Station Proposed DN300 CS Suction Pipeline Plan & Profile
8. Please detail fan room and size of its foundation. An Noted, pipe relocated accordingly
allowance of 3.5m space between foundation to pipe
shall be considered to keep 1:1 slope for open cut.
9. Please mark the space between fence at transformer Indicated, necessary shoring will be provided if
and chainage 0+082.92. Space shall be sufficient necessary
enough for safe open cut.
10. Show the distribution pump discharge line (close to Indicated.
CH0+090) in the profile along with other proposed
utilities/services.
11. Please provide a table of coordinates and present Provided
coordinates of all direction changes in the layout.
12. Whether National Abu Dhabi Datum adopted? Please Vertical Datum was based on Ras Ghumays Datum ,
indicate it in note 4. same will be indicated as note 4.
13. Pipe rating representation shall be PN or Class and Corrected.
not DP.
14. Please rectify few incorrect marking, Corrected.
15. Existing fence to be demolished, present new Noted, however the existing fence is indicated for
boundary wall. clear understanding of location.
16. Correct the spelling of ‘jable’ & ‘hafeet’ in the drawing Corrected
title.
17. Existing services shall be verified at prior to suction Existing services are verified as part of topography
pipeline proposal & laying. and underground utilities surveys and submitted via
our letter reference N16297-HPE-KH-OL-0197
18. The proposed suction pipeline laying for civil part Noted and confirmed
architectural and structural detailed drawings shall be
designed by approved designer and submit separately
for TRANSCO / Engineer approval.
Note: The above comments and/or approvals do not relieve the Contractor from his obligation in the contract to ensure conformance to the specifications. Any
specification deviations found subsequent to approval are to be corrected by the Contract to the satisfaction of the OWNER/ENGINEER.
Signed: Signed:
For Arcadis Consulting Middle East Ltd for TRANSCO
NEW PUMPING STATION
PLANT
NORTH
4
1 TRUE
NORTH
N
A A
W E
STAIR-1
S
8
STAIR-4
TRANSFORMER-1
TRANSFORMER-2
ELECTRIC
PUMP
CABLE CELLAR
PUMP
DIESEL
BATTERIES
MODEL#
284
0 341
0-000
1500
398
568
2500
682
3000
S/N: 0000
USGPM
LPM
3500 795
4000
909
4500
APPROVED
1023
5000
1136
STAIR-3
DETAIL-1
K
STAIR-2
M M
1 4
EXI.SAFETY CLOSE
VALVE CHAMBER
EXI.FLOW METER EXI.FLOW CONTROL EXI.VALVE SHAFT
DN 500mm
CHAMBER VALVE CHAMBER CHAMBER
DN 500mm DN 700mm DN 500mm
ALUMINIUM WALK WAY
ANODIZED EXTRUDED
ALUMINIUM WALK WAY
ANODIZED EXTRUDED
DN 600mm EXISTING
DETAIL-2
CHAMBER
RELIEF
PIPELINE PLAN
SHOP DRAWING
PIPELINE PROFILE
N16297-GE-P00-CN-D011