Professional Documents
Culture Documents
52535-DMS-EPC-325-310-1182-01 - Lime Silos Foundation - Lime System
52535-DMS-EPC-325-310-1182-01 - Lime Silos Foundation - Lime System
52535-DMS-EPC-325-310-1182-01 - Lime Silos Foundation - Lime System
Project: Shuaibah
Request: Lime Silos Foundation
Date: 01/11/2018 Sheet: 1 of: 1
Design Modification Number 52535-DMS-EPC-325-310-1182-01
52535-DRA-EPC-000-300-7511
Engineering X Electric Quality
Construction Process Other Rev. 2
Civil X Specify: Title: Remineralization Lime Storage silos
Mechanic
Inst & Ctrl.
Design Origin: ABEIMA - FISIA Supplier / Contractor Code AEPC
Indicate: Document Updated with this modification
Reason for the Clarification/Modification Request:
and date of realization:
The walls highlighted in the drawing has been removed for drainage purpose in case of leakage. Concrete pedestals has
been enlarged to allow the installation of the steel base plate. Anchors details added.
Reference Documents:
- Proposed Design:
AL/Estimation x
Cost Estimation
Contractor quotation
AL/Estimation x
Schedule Impact
Contractor quotation
DMS Rejected
DMS Rejected
For Supplier For Engineering Change Accepted
Engineer: Nicola Bono
Approval Director Approval New Revision
Change Rejected
requested
Project Direction: Andrea Grosso / Sergio Piñuelo Otero (N/A) Accepted Rejected