52535-DMS-EPC-325-310-1182-01 Design Modification Sheet (DMS)

Project: Shuaibah
Request: Lime Silos Foundation
Date: 01/11/2018 Sheet: 1 of: 1
Design Modification Number 52535-DMS-EPC-325-310-1182-01

DMS requested by: Applicable Area: Reference Drawing:

52535-DRA-EPC-000-300-7511
Engineering X Electric Quality
Construction Process Other Rev. 2
Civil X Specify: Title: Remineralization Lime Storage silos

Mechanic
Inst & Ctrl.
Design Origin: ABEIMA - FISIA Supplier / Contractor Code AEPC
Indicate: Document Updated with this modification
Reason for the Clarification/Modification Request:
and date of realization:

The walls highlighted in the drawing has been removed for drainage purpose in case of leakage. Concrete pedestals has
been enlarged to allow the installation of the steel base plate. Anchors details added.

Reference Documents:

52535-DRA-EPC-000-300-7511-02_IFC_Remineralization Lime Storage silos - FW & 52535-DRA-EPC-000-300-7512-01_Remineralization Lime Storage silos - RF

- Proposed Design:

See Attached drawing

AL/Estimation x
Cost Estimation
Contractor quotation
AL/Estimation x
Schedule Impact
Contractor quotation

Workflow Approval Signature

Discipline Activity Leader: Max

DMS Rejected
DMS Rejected
For Supplier For Engineering Change Accepted
Engineer: Nicola Bono
Approval Director Approval New Revision
Change Rejected
requested

Supplier Quality Manager:______ Accepted Rejected

Engineering Directionl: Raul García / Flavio Toscano Accepted Rejected

Project Direction: Andrea Grosso / Sergio Piñuelo Otero (N/A) Accepted Rejected