BOQ CME GF New Build
BOQ CME GF New Build
BOQ CME GF New Build
Contractor
No ITEM WORK Volume Unit
Unit Price (IDR) Total Price (IDR)
II SITE PREPARATION
A Technical Preparation
2 As built drawing & site binder base on SOP list 1.00 - -
a Shelter & Foundation Design - -
b Tower & Foundation Design - -
c Fence & Pavement Design - -
d AC & Environment Control Design - -
e Landscaping Design - -
f Commercial AC Power Design - -
g Site Grounding Design - -
2 Design package (Without Existing Tower & Foundation Analysis) `
B Legal Preparation - -
Please refer to section I. SITAC above - -
B Physical Preparation (Permit)
1 Site Security 1.00 - -
Site Clearing (Site Clearing-Removal all tree,relocation existing building/public facilities, mobilization of required
2 equipment/machines,etc)
Sub Total - Site Preparation -
III IMPLEMENTATION CME
A Tower Structure - GF
Tower Material Fabrication Incl. all accessories as per Design Drawing (Vertical Ladder,Vertical and Horizontal
1 Cableladder,Mounting Antenna Sectoral/GPS/OBL) Kg - -
A Tower Structure - RT
Pole/Mini Tower Fabrication Incl. all accessories as per Design Drawing (Cable Ladder,Mounting Antenna Sectoral etc)
1 Kg - -
B Tower/Pole Foundation - RT
1a Base Frame (IWF) + incl erection Kg - -
1b Concrete (K-225) Kg - -
2 Chemical Bolt / Mechanical Bolt (M16) pcs - -
3 Foundation for ladder and cable tray ls - -
4 Finishing with Grouting & waterproofing ls - -
5 Painting ls - -
Sub Total - Tower Foundation -
C1 Outdoor Cabinet Foundation - GF
1 Soil Excavation 1.70 m³ - -
2 Sand Layer 0.61 m³ - -
3 Stone Mansory 2.23 m³ - -
4 Soil/Land backfilled (compacted) 1.86 m³ - -
5 Concrete Pad and Stair (K-175) 1.43 m³ - -
6 Finishing with cement Plastering & Painting 16.02 m³ - -
7 Concrete Floor (K-125) m³ - -