A. VOLUME TOTAL
1 Bore pile
TYPE ELEVASI TEBAL DIMENSI BESI
NOS BETON BEKISTING
BORE PILE BAWAH ATAS PLAT LUAS LINGKARAN Z D32 D29 D25 D22
- PC 288 ( t=1,2m) -64.00 -9.95 0.00 76 1.13 54.05 4,643.46 0.00 - - 249,497.55 -
- PC 288 ( t=2,6m) -64.00 -11.45 0.00 147 1.13 52.55 8,732.17 0.00 - - 473,065.11 -
- Borepile strutting + loading test -64.00 -0.05 0.00 65 1.13 63.95 4,698.79 0.00 - - 246,896.69 -
- PC 1 -64.00 -3.35 0.00 1 1.13 60.65 68.56 0.00 - - 3,645.83 -
289 - - 973,105.18 -
TOTAL : 18,142.98 0.00
volume
type posisi panjang tek. kr tek. kn over lap nos tot. pnjg W/m1
D32 D29 D25 D22
Page 1
BESI
D19 D16 D13
- - 90,801.66
- - 172,984.51
- - 88,419.34
- - 1,320.71
- - 353,526.22
volume
D19 D16 D13
Page 2
PROJECT : BUMN CENTER TOWER DANAREKSA
OBJECT : Bore pile
PREPARED BY :
A. VOLUME TOTAL
1 Diagfragma Wall
TYPE ELEVASI TEBAL DIMENSI
NOS
DINDING BAWAH ATAS PLAT X Y
- D wall L=6m -34.00 0.00 0.00 42 6.00 0.60
- D wall L=4m -34.00 0.00 0.00 2 4.00 0.60
- D wall L=1m -34.00 0.00 0.00 1 1.00 0.60
- D wall L=6,2m -34.00 0.00 0.00 1 6.20 0.60
- D wall L=7m -34.00 0.00 0.00 1 7.00 0.60
- D wall L=4,6m -34.00 0.00 0.00 1 4.60 0.60
TOTAL :
- - 349,875.46 -
5,687.52 0.00
7,583.36
volume
tot. pnjg W/m1
D32 D29 D25 D22
- - 7,505.58 -
- - 5,196.17 -
- - 1,732.06 -
- - 7,794.26 -
- - 8,660.28 -
- - 6,062.20 -
BESI
BESI
D19 D16 D13 D10 Æ8
- - 94,463.10 21,421.80 -
- - 3,072.94 706.21 -
- - 467.50 117.70 -
- - 2,320.39 525.74 -
- - 2,605.45 588.51 -
- - 1,750.27 400.19 -
- - 104,679.64 23,760.15 -
478,315.25
volume
D19 D16 D13 D10 Æ8
- - - - -
- - 2,249.12 - -
- - - 510.04 -
- - 2,249.12 510.04 -
- - - - -
- - 1,536.47 - -
- - - 353.11 -
- - 1,536.47 353.11 -
- - - - -
- - 467.50 - -
- - - 117.70 -
- - 467.50 117.70 -
- - - - -
- - 2,320.39 - -
- - - 525.74 -
- - 2,320.39 525.74 -
- - - - -
- - 2,605.45 - -
- - - 588.51 -
- - 2,605.45 588.51 -
- - - - -
- - 1,750.27 - -
- - - 400.19 -
- - 1,750.27 400.19 -
integral
1,995.84
63.36
7.92
49.10
55.44
36.43
2,208.10
PROJECT : BUMN CENTER TOWER DANAREKSA
OBJECT : Bore pile
PREPARED BY :
A. VOLUME TOTAL
1 Caping Beam
TYPE ELEVASI TEBAL DIMENSI
NOS
CAPING BEAM BAWAH ATAS PLAT X Y
- Caping Beam -0.85 -0.05 0.00 1 276.23 1.20
TOTAL :
- - - 10,947.35
265.18 441.97
volume
tot. pnjg W/m1
D32 D29 D25 D22
- - - 10,947.35
BESI
BESI
D19 D16 D13 D10 Æ8
3,961.90 - 10,584.11 - -
3,961.90 - 10,584.11 - -
25,493.36
volume
D19 D16 D13 D10 Æ8
- - - - -
3,961.90 - - - -
- - - - -
- - 6,444.17 - -
- - 4,139.94 - -
3,961.90 - 10,584.11 - -
PROJECT : BUMN CENTER TOWER DANAREKSA
OBJECT : Raft Pondasi
PREPARED BY :
A. VOLUME TOTAL
1 PC
TYPE ELEVASI TEBAL DIMENSI
NOS
CAPING BEAM BAWAH ATAS PLAT Luas
- PC 288 ( t=1,2m) 0.00 0.00 0.00 1 1,246.03
- PC 288 ( t=2,6m) 0.00 0.00 0.00 1 2,796.80
- PC 1 0.00 0.00 0.00 1 5.76
B BESI PC
- PC 288 ( t=1,2m) utama atas x D32 - 200 49.71 0.64 0.64 7.32
utama bawah x D32 - 100 49.71 1.10 1.10 7.32
- PC 288 ( t=2,6m) utama atas x D32 - 200 23.21 0.64 0.64 1.83
utama bawah x D32 - 100 23.21 2.50 2.50 1.83
tambahan lapis ke 3
utama bawah x D32 - 100 19.40 2.50 2.50 1.83
utama bawah x D32 - 100 25.10 2.50 2.50 3.66
utama bawah x D32 - 100 35.90 2.50 2.50 3.66
2,159,601.51 - 834.59 -
TOTAL : 8,773.83 11.52
volume
nos tot. pnjg W/m1
D32 D29 D25 D22
511,274.78 - - -
1,648,326.72 - - -
- - 834.59 -
BESI
BESI
D19 D16 D13 D10 Æ8
- 177.68 - - -
- 1,108.68 - - -
- 30.30 - - -
- 1,316.66 - - -
2,161,752.76
volume
D19 D16 D13 D10 Æ8
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- 177.68 - - -
- 177.68 - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- 1,108.68 - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- 1,108.68 - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- 30.30 - - -
- 30.30 - - -
PROJECT : BUMN CENTER TOWER DANAREKSA
OBYEK : Rekap Bore pile, Diagfragma Wall, Caping Beam
PREPARED BY :
Total 24,095.68 8,773.83 453.49 2,159,601.51 - 1,323,815.23 10,947.35 3,961.90 1,316.66 468,789.97 23,760.15 - 3,992,192.76
PROJECT : BUMN CENTER TOWER DANAREKSA
OBJECT : GALIAN TANAH
Total 48,790.93