Download as pdf or txt
Download as pdf or txt
You are on page 1of 18

Welcome to

COMPANY INTRODUCTION
COMPANY PROCESS PRODUCT
PROFILE TECHNOLOGY TECHNOLOGY

Contents 1 2 3

Who we are What We Do What We Produce


1.1 Who we are

1.2 Our History

1. COMPANY PROFILE 1.3 Business Pattern

1.4 References
1.1 Who we are 5

PRODUCT SUPPLIER ...


- Grit Chamber Facility
PRODUCT -
-
Sedimentation Facility
Biological Reactor & Tertiary Treatment Facility
SUPPLIER -
-
Filtering Facility
Sludge Handling Facility
- Thickening & Dewatering Facility
- Silo & Chemical Dosing System

TASET
TURNKEY CONTRACTOR ...
TURNKEY -
-
Process Engineering
Mechanical Part for Sewage Treatment Plant
CONTRACTOR -
-
Electrical Part for Sewage Treatment Plant
Manufacturing, Installation & Test Operation Service
- Operation Management Service
1.2 Our History 6

2015

2015 Self-Developed H2R


2005 Process for Sewage
Treatment Plant and
High-Load Industrial
1995 2006 CE Certification Wastewater Treatment
2007 Exported equipment and Plant
systems for sewage 2017 Exported H2R Process
1996 Awarded by ME, Korea treatment to Australia, to Kuwait
SINCE 1985 China, UAE, etc. (2,000 ton/day)
1997 ISO 9001
1998 R&D Center 2008 Signed on the long term 2018 Santo Domingo PJT(Ecuador)
2003 Certified New Technology supply contractor for Deduru Oya PJT(Sri Lanka)
1985 Established TASET sewage treatment
from Korean Government
Trading of equipment for equipment with Kubota,
(KT, EEC, GQ, etc.)
Sewage Treatment Plant Japan
2004 Awarded by the President
1993 Localization through R&D 2010 ASME “U” & “S” Stamp
of Republic of Korea
2013 OHSA Certification
1.4 Reference for Sub-Turnkey Projects 7

CAPACITY
PROJECT CLIENT DELIVERY TURNKEY PART
(m3/d)
Incheon New Airport Drainage Area Sewage Engineering, Procurement, Installation,
HYUNDAI 12,000 1999 Supervision for mechanical and electrical
Treatment Plant
Engineering, Procurement, Installation,
Younghae Sewage Treatment Plant DAEWOO 5,400 2004 Supervision for mechanical and electrical
Engineering, Procurement, Installation,
Joam Sewage Treatment Plant HANWHA 8,000 2005 Supervision for mechanical and electrical
Engineering, Procurement, Installation,
Bongdam Sewage Treatment Plant HANWHA 8,000 2005 Supervision for mechanical and electrical
Engineering, Procurement, Installation,
Hyangnam Sewage Treatment Plant HANWHA 22,000 2005 Supervision for mechanical and electrical
Engineering, Procurement, Installation,
Jeongkwan Sewage Treatment Plant DAEWOO 40,000 2006 Supervision for mechanical and electrical

K.S.A. Jeddah Engineering, Procurement, Supervision for


DOOSAN 31,920 2012 mechanical
Wastewater Treatment Plant
K.S.A. Ras Az Zawr Engineering, Procurement, Supervision for
DHT 40,850 2013 mechanical
Desalination Plant
KUWAIT Al-Jour Engineering, Procurement, Supervision for
HYUNDAI 2,000 2017 mechanical
Sewage Treatment Plant
Ecuador Santo Domingo Engineering, Procurement, Supervision for
HANSOL EME 30,000 2018 mechanical
Sewage Treatment plate extension work
1.4 Overseas Reference Ⅰ 8

CAPACITY
PROJECT CLIENT DELIVERY COUNTRY
(m3/d)
Shell Hourbor STP United KG 160,000 2006 Australia
Harbin Municipal Water Supply
1st Harbin Water Treatment Plant 450,000 2007 China
Construction
IBN ZAHR PP-Ⅲ Utilities & Offsite Daelim Industrial Co., Ltd. 500,000 2008 K.S.A.

Abudabi I-CAD IEPT PJT Samsung Engineering 40,000 2008 U.A.E


China National Chemical
Hebin Water Treatment Plant 80,000 2008 China
Construction Corp.
China National Chemical
Longsan Warter Treatment Plant 30,000 2008 China
Construction Corp.
Harbin Municipal Water Supply
2nd Harbin Water Treatment Plant 450,000 2009 China
Construction
Polonnaurwa Water Supply PJT Hyundai Engineering 60,000 2009 Sri Lanka
Equatorial
EBAS Water Supply PJT Hyundai Engineering 1,100 2010
Guinea
1.4 Overseas Reference Ⅱ 9

CAPACITY
PROJECT CLIENT DELIVERY COUNTRY
(m3/d)
Equatorial
ENAS Water Supply PJT Hyundai Engineering 1,450 2010
Guinea
Gas Desulfurization Plant Hyundai Engineering 940 2010 Turkmenistan

Jeddah SWRO-3 WWTP Doosan Heavy Industries 31,920 2012 K.S.A.

Ruwais Refinery Expansion PJT #3 Samsung Engineering 21,000 2012 U.A.E

AN HOA PM1 PJT Hansol EME 9,600 2012 Vietnam

Ras Az Zawr Desalination Plant DHT 40,850 2013 K.S.A.

Muharraq STP Samsung Engineering 110,000 2013 Bahrain


Rehabilitation & Expansion of SWTP,
POSCO 47,000 2013 K.S.A.
Yanbu
Jubail Export Refinery PJT #4 Delayed
Samsung Engineering 1,700 2013 K.S.A.
Coked
Escondida DMF Doosan Heavy Industries 2014 Chile
1.4 Overseas Reference Ⅲ 10

CAPACITY
PROJECT CLIENT DELIVERY COUNTRY
(m3/d)
Early Kanddym Hyundai Engineering 60 2014 Uzbekistan

Sino Iron WWTP VoR 2015 Australia

Karbala PJT DHT 2015 Iraq

Modunagot WWTP Taeyoung E&C 90,000 2016 Bangladesh

Al Ansab 2nd STP Doosan Heavy Industries 2016 Oman

Al-Zour Hyundai E&C 2,000 2017 Kuwait

Dohwa Doosan Heavy Industries 17,760 2017 Kuwait

Deduru Oya Kolon Global 2018 Sri Lanka


2.1 What We Do

2.2 Sewage Process

2. PROCESS 2.3 Our Unique Process


TECHNOLOGY
2.4 H2R & H2FF Process
2.4 H2R Process 12

Compact Size
H2RTM
1 Two phase Jet Nozzle Bio-Reactor
Less footprint of aeration tank

2 High Efficiency
Higher denitrification more than 98%

3 Biggest Volume Loading


Biggest volume loading rate of BOD up to 20 kg/m3··day

4 Sludge Index
Good sludge volume index (40~100)

5 Stable Operation
Maintain stable operation against shock load and
toxic materials, due to high density MLSS (15,000
mg/L) operation
2.4 H2FF Process 13

H2FFTM
Unitary Dissolved Air Flotation & Sand Filter

Service
- Removal of Suspended Solids
- Removal of Phosphorus

1 Footprint
Footprint saving comparing to sedimentation
process

DAF
2 High Efficiency
98% of sludge removal
SAND FILTER

3 Higher Filtration
Continuous filtration during backwash process
3.1 Sewage Treatment

3.2 Sludge Treatment

3. PRODUCT 3.3 Major Equipment


TECHNOLOGY
3.1 Sewage Treatment 15

Preliminary & Primary Treatment Secondary Treatment Tertiary Treatment

Coarse & Fine Grit Primary Secondary


Bioreactor Tertiary Disinfection
Screen Removal Clarifier Clarifier

Grab lake screen Grit & FOG H2FF Process UV disinfection


remover

Sludge collectors Sludge collectors


Drum screens
H2R Process
3.2 Sludge Treatment 16

Gravity Thickening Dissolved Air Flotation Thickening

Waste to Energy
Incineration
Blending Sludge
Centrifuge
and Storage Conditioning
3.3 Major Equipment 17

Item Figure Major Manufacturer

Circular Type
Sludge Collectors

• EVOQUA
Non Metal • Poly-chem
Sludge Collectors • DEWA
• Pin Chain

• Passa Vant - Roediger


• Huber Technology
Screens & • JWC
Grit removers • OVIVO
• Suez Water
• Veolia
THANKS FOR WATCHING
sales@taset.com

You might also like