Professional Documents
Culture Documents
TASET Introduction 201808
TASET Introduction 201808
COMPANY INTRODUCTION
COMPANY PROCESS PRODUCT
PROFILE TECHNOLOGY TECHNOLOGY
Contents 1 2 3
1.4 References
1.1 Who we are 5
TASET
TURNKEY CONTRACTOR ...
TURNKEY -
-
Process Engineering
Mechanical Part for Sewage Treatment Plant
CONTRACTOR -
-
Electrical Part for Sewage Treatment Plant
Manufacturing, Installation & Test Operation Service
- Operation Management Service
1.2 Our History 6
2015
CAPACITY
PROJECT CLIENT DELIVERY TURNKEY PART
(m3/d)
Incheon New Airport Drainage Area Sewage Engineering, Procurement, Installation,
HYUNDAI 12,000 1999 Supervision for mechanical and electrical
Treatment Plant
Engineering, Procurement, Installation,
Younghae Sewage Treatment Plant DAEWOO 5,400 2004 Supervision for mechanical and electrical
Engineering, Procurement, Installation,
Joam Sewage Treatment Plant HANWHA 8,000 2005 Supervision for mechanical and electrical
Engineering, Procurement, Installation,
Bongdam Sewage Treatment Plant HANWHA 8,000 2005 Supervision for mechanical and electrical
Engineering, Procurement, Installation,
Hyangnam Sewage Treatment Plant HANWHA 22,000 2005 Supervision for mechanical and electrical
Engineering, Procurement, Installation,
Jeongkwan Sewage Treatment Plant DAEWOO 40,000 2006 Supervision for mechanical and electrical
CAPACITY
PROJECT CLIENT DELIVERY COUNTRY
(m3/d)
Shell Hourbor STP United KG 160,000 2006 Australia
Harbin Municipal Water Supply
1st Harbin Water Treatment Plant 450,000 2007 China
Construction
IBN ZAHR PP-Ⅲ Utilities & Offsite Daelim Industrial Co., Ltd. 500,000 2008 K.S.A.
CAPACITY
PROJECT CLIENT DELIVERY COUNTRY
(m3/d)
Equatorial
ENAS Water Supply PJT Hyundai Engineering 1,450 2010
Guinea
Gas Desulfurization Plant Hyundai Engineering 940 2010 Turkmenistan
CAPACITY
PROJECT CLIENT DELIVERY COUNTRY
(m3/d)
Early Kanddym Hyundai Engineering 60 2014 Uzbekistan
Compact Size
H2RTM
1 Two phase Jet Nozzle Bio-Reactor
Less footprint of aeration tank
2 High Efficiency
Higher denitrification more than 98%
4 Sludge Index
Good sludge volume index (40~100)
5 Stable Operation
Maintain stable operation against shock load and
toxic materials, due to high density MLSS (15,000
mg/L) operation
2.4 H2FF Process 13
H2FFTM
Unitary Dissolved Air Flotation & Sand Filter
Service
- Removal of Suspended Solids
- Removal of Phosphorus
1 Footprint
Footprint saving comparing to sedimentation
process
DAF
2 High Efficiency
98% of sludge removal
SAND FILTER
3 Higher Filtration
Continuous filtration during backwash process
3.1 Sewage Treatment
Waste to Energy
Incineration
Blending Sludge
Centrifuge
and Storage Conditioning
3.3 Major Equipment 17
Circular Type
Sludge Collectors
• EVOQUA
Non Metal • Poly-chem
Sludge Collectors • DEWA
• Pin Chain