Professional Documents
Culture Documents
General Notes and Specifications Air-Conditioning Lay-Out: Ground Floor
General Notes and Specifications Air-Conditioning Lay-Out: Ground Floor
SPECIFICATIONS
1. UNIT INSTALLATION MUST CONFORM TO THE
MANUFACTURERS RECOMMENDATIONS AND
ALL ENGINEERING/ARCHITECTURAL DESIGN
REQUIRED BY THE OWNER.
2. CONDENSATE DRAINS MUST BE DIRECTED TO
RM 101 RM 102 RM 103 RM 104 RM 105
UP UP
NEAREST DRAIN VIA PVC OR FLEXIBLE HOSE.
3. THE ACU MUST BE INSTALLED WITH 1.5 METERS
MINIMUM DISTANCE TO FLOOR LINE. GROUND FLOOR
4. INSTALLATION MUST CONFORM TO PME CODE
AND THE NATIONAL BUILDING CODE. A
MECHANICAL PERMIT SHOULD BE SECURED
PRIOR TO INSTALLATION.
5. AIRCON INSTALLERS MUST BE DEALER
ACCREDITED TECHNICIANS TO INCLUDE
ONE (1) YEAR MAINTENANCE. RM 201 RM 202 RM 203 RM 204 RM 205
UP DN DN UP
COOLING
ELECTRICAL CHARACTERISTIC
QTY. CAPACITY
DESCRIPTION DESIGNATION
(Unit)
Btu/hr Watt Amp Volt pH Hz THIRD FLOOR
3.0 TR FLOOR
ACU MOUNTED SPLIT 20 RM 101 - 405 36168.701 3300 15 220 1 60
TYPE AIRCON
ROOM 201
ROOM 202
31384.29
29234.31
2.62
2.44
3
3
LEGEND AND SYMBOLS LOCATION MAP
SECOND FLOOR ROOM 203 28991.93 2.42 3
(2F)
ROOM 204 28507.18 2.38 3 ACU AIRCONDITIONING UNIT
ROOM 205 29578.41 2.46 3
TOR TONS OF REFRIGERATION
ROOM 301 31384.29 2.62 3 PETRON
ROOM 304
28991.93
28507.18
2.42
2.38
3
3
IS
SI
T E
N
ROOM 305 29578.41 2.46 3
DRAWN AND DESIGNED BY: PROJECT TITLE: OWNER: SHEET CONTENTS: SHEET NO.