Professional Documents
Culture Documents
Concrete, Exp-4
Concrete, Exp-4
Procedure:-
1. Take a neat cement paste by gauging the cement with 0.85 P water. Where P = standard
consistency
2. The gauging time should be in between 3 to 5 minutes. Start the stopwatch at the instant when
the water is added to the cement.
3. Fill the Vicat mould and smooth off the surface of the paste making it level with the top of the
mould.
4. For determination of initial setting time, place the test block confined in the mould and resting
on non porous plate under the rod attached with the needle (B) lower the needle gently in
contact with the surface of the test block and release quickly allowing it to penetrate into the
test block.
5. Repeat this process until the needle fails to pierce the block for about 5mm measured from the
bottom of the mould. The arid elapsed between the time when water is added to the cement and
the time at which needle fails to pierce the test block by about 5mm is the initial setting time.
6. For determination of final setting time, replace the needle (B) of the Vicat apparatus by the
needle with an angular attachment C. The cement is considered finally set when upon applying
the needle C gently to the surface of the test block, the needle makes an impression thereon.
While the attachment fails to do so. In the event of scum forming on the surface of the test
block, use the underside of the test block for the determination of final setting time.
1
CH. Devi Lal State Institute of Engineering & Technology, Panniwala
Mota, Sirsa.
LABORATORY MANUAL
EXPERIMENT NO.: CVE- 305-P – 04 ISSUE NO. : 01 ISSUE DATE : 15-08-2019
Result:
Initial setting time of cement = ________________minutes
Final setting time of cement = _________________minutes