Investor: Municipality of Devoll, Undp Object: Multifunctional Social Centre - Bilisht, Devoll Works Cost Estimate
Investor: Municipality of Devoll, Undp Object: Multifunctional Social Centre - Bilisht, Devoll Works Cost Estimate
II Masonry works
9 2.71/1 Double lightweight brick wall up to 8 m with mixed mortar M15 m3 138
Amount II
IV Roofing works
V Layer works
36 2.310/1 Plastering of internal brick walls using a pump h~4 m, mixed mortar m2 800
37 2.314/1 Plastering of beams and columns using a pump h~4 m, mixed morta m2 100
38 2.267/a Porcelain gress tiles layer m2 100
IX Electrical works
X Sanitary works
73 2.491/c SI Pipes and fittings for hydraulic installations PPR d=20~32 mm, P ml 100
74 2.491/e SI Pipes and fittings for hydraulic installations PE d=50 mm, PN 16 ml 10
75 An - 10 SI valve PPR 3/4" pcs 6
76 2.516 Plastic pipes and fittings tonnes 0.05
78 2.512/2 SI Collector 3/4" ( 4+4 ) pcs 3
79 2.508 SI Imported boiler, 100 litres pcs 3
81 2.501 SI Imported “French” toilet pcs 8
82 2.495 SI Imported porcelain sink with mixer tap pcs 8
Amount X
XI Sewage works
TOTAL (0 - XIV)
Total of Construction
Construction VAT
Total of Construction with VAT