06/06/2021 BRIDGE DESIGNS OFFICE ROAD DEVELOPMENT AUTHORITY "SETHSIRIPAYA" 526987560.

xls

Designer: mehanathan

Project: ramp-gampaha-end-320to330

TOTAL LENGTH OF DECK (m) 0.000 LENGTH OF ABUTMENT 0.350 WT OF CONC. DECK
C'WAY WIDTH (m) 0.000 C.B WIDTH 0.625 WT OF W.SURFACE
PLATFORM WIDTH (m) 0.000 HT. OF C.B 0.381 WT OF HAND RAILS
DIA OF POLY. DISPLACERS (m) 0.000 WIDTH OF B.WALL 0.150 No OF LANES
LENGTH OF POLY.DISP (m) -1.500 HT OF B.WALL 0.345 K.E.L
NO.OF POLY. DISP. 0 0 HA LOADING
HT OF DECK AT KERB END (m) 0.295 0.295 PEDESTRIAN LOADING
HT OF DECK AT CENTER (m) 0.295 0.295 TOTAL DEAD WT.ON ABT
HT OF DECK AT P.EDGE (m) 0.585 0.585 TOTAL LIVE LOAD ON ABT
FOOTWALK WIDTH (m) 0.000 0.000 LOAD ON ABT./m
ANGLE OF SLOPE AT FACIA END (deg) 0.000 0.000 T.FORCE/mOF ABT
BATTER SLOPE 1 IN 0 WT OF C.BEAM /m
FRICTION COEFF. AT BASE 0.000 WT OF B.WALL /m
HT.OF SOIL BELOW SCOUR (m) 0.000

SECTION XPL XPR XTW XBW YBH YVH TOTAL TOTAL TOTAL e' DIR +
VER LOAD S.M O.T.M BEND

kN kNm kNm m kN/m²

CAP.LEVEL 0 0 0.625 0.625 6.96 2.47 148.78 -21.03 2291.87


2 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87
3 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87
4 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87
5 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87

SLIDING RESISTIN F.O.S REDISTRIBUTED


FORCE FORCE BEARING PRESSURE

kN kN kN/m²
06/06/2021 BRIDGE DESIGNS OFFICE ROAD DEVELOPMENT AUTHORITY "SETHSIRIPAYA" 526987560.xls

346.05 0.00 0.00 ###


06/06/2021 BRIDGE DESIGNS OFFICE ROAD DEVELOPMENT AUTHORITY "SETHSIRIPAYA" 526987560.xls

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
342.86
5.72
1.24

DIR - F.O.S
BEND

kN/m²

-2269.61 0.02
-2269.61 0.02
-2269.61 0.02
-2269.61 0.02
-2269.61 0.02
06/06/2021 Bridge Designs Office RDA 526987560.xls Abut-10 Steps

Designer: Type Your Name here

Project: Type Bridge No. & name of the road

TOTAL LENGTH OF DECK (m) 0.000 LENGTH OF ABUTMENT 0.350 WT OF CONC. DECK 0.00
C'WAY WIDTH (m) 0.000 C.B WIDTH 0.625 WT OF W.SURFACE 0.00
PLATFORM WIDTH (m) 0.000 HT. OF C.B 0.381 WT OF HAND RAILS 0.00
DIA OF POLY. DISPLACERS (m) 0.000 WIDTH OF B.WALL 0.150 No OF LANES 0.00
LENGTH OF POLY.DISP (m) -1.500 HT OF B.WALL 0.345 K.E.L 0.00
NO.OF POLY. DISP. 0 0 HA LOADING 0.00
HT OF DECK AT KERB END (m) 0.295 0.295 PEDESTRIAN LOADING 0.00
HT OF DECK AT CENTER (m) 0.295 0.295 TOTAL DEAD WT.ON ABT 0.00
HT OF DECK AT P.EDGE (m) 0.585 0.585 TOTAL LIVE LOAD ON ABT 0.00
FOOTWALK WIDTH (m) 0.000 0.000 LOAD ON ABT./m 0.00
ANGLE OF SLOPE AT FACIA END (deg) 0.000 0.000 T.FORCE/mOF ABT 342.86
BATTER SLOPE 1 IN 0 WT OF C.BEAM /m 5.72
FRICTION COEFF. AT BASE 0.000 WT OF B.WALL /m 1.24
HT.OF SOIL BELOW SCOUR (m) 0.000

SECTION XPL XPR XTW XBW YBH YVH TOTAL TOTAL TOTAL e' DIR + DIR - F.O.S
VER LOAD S.M O.T.M BEND BEND

kN kNm kNm m kN/m² kN/m²

CAP.LEVEL 0 0 0.625 0.625 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
2 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
3 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
4 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
5 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
6 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
7 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
8 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
9 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
10 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02

SLIDING RESISTIN F.O.S REDISTRIBUTED


FORCE FORCE BEARING PRESSURE

kN kN kN/m²

346.05 0.00 0.00 ###


06/06/2021 Bridge Designs Section, RDA 526987560.xls Abut-20 Steps

Designer: Type Your Name here

Project: Type Bridge No. & name of the road

TOTAL LENGTH OF DECK (m) 0.000 LENGTH OF ABUTMENT 0.350 WT OF CONC. DECK 0.00
C'WAY WIDTH (m) 0.000 C.B WIDTH 0.625 WT OF W.SURFACE 0.00
PLATFORM WIDTH (m) 0.000 HT. OF C.B 0.381 WT OF HAND RAILS 0.00
DIA OF POLY. DISPLACERS (m) 0.000 WIDTH OF B.WALL 0.150 No OF LANES 0.00
LENGTH OF POLY.DISP (m) ### HT OF B.WALL 0.345 K.E.L 0.00
NO.OF POLY. DISP. 0 0 HA LOADING 0.00
HT OF DECK AT KERB END (m) 0.295 0.295 PEDESTRIAN LOADING 0.00
HT OF DECK AT CENTER (m) 0.295 0.295 TOTAL DEAD WT.ON ABT 0.00
HT OF DECK AT P.EDGE (m) 0.585 0.585 TOTAL LIVE LOAD ON ABT 0.00
FOOTWALK WIDTH (m) 0.000 0.000 LOAD ON ABT./m 0.00
ANGLE OF SLOPE AT FACIA END (deg 0.000 0.000 T.FORCE/mOF ABT 342.86
BATTER SLOPE 1 IN 0 WT OF C.BEAM /m 5.72
FRICTION COEFF. AT BASE 0.000 WT OF B.WALL /m 1.24
HT.OF SOIL BELOW SCOUR (m) 0.000

SECTION XPL XPR XTW XBW YBH YVH TOTAL TOTAL TOTAL e' DIR + DIR - F.O.S
VER LOAD S.M O.T.M BEND BEND

kN kNm kNm m kN/m² kN/m²

CAP.LEVEL 0 0 0.625 0.625 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
2 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
3 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
4 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
5 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
6 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
7 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
8 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
9 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
10 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
11 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
12 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
13 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
14 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
15 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
16 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
17 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
18 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
19 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
20 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02

SLIDING RESISTI F.O.S REDISTRIBUTED


FORCE FORCE BEARING PRESSURE

kN kN kN/m²

346.05 0.00 0.00 ###


06/06/2021 Bridge Designs Section, RDA 526987560.xls Abutment-General

Designer: Type Your Name here

Project: Type Bridge No. & name of the road

TOTAL LENGTH OF DECK (m) 0.000 LENGTH OF ABUTMENT 0.350 WT OF CONC. DECK 0.00
C'WAY WIDTH (m) 0.000 C.B WIDTH 0.625 WT OF W.SURFACE 0.00
PLATFORM WIDTH (m) 0.000 HT. OF C.B 0.381 WT OF HAND RAILS 0.00
DIA OF POLY. DISPLACERS (m) 0.000 WIDTH OF B.WALL 0.150 No OF LANES 0.00
LENGTH OF POLY.DISP (m) ### HT OF B.WALL 0.345 K.E.L 0.00
NO.OF POLY. DISP. 0 DIST. TO BEARING POINT 0.225 HA LOADING 0.00
HT OF DECK AT KERB END (m) 0.295 0.295 PEDESTRIAN LOADING 0.00
HT OF DECK AT CENTER (m) 0.295 0.295 TOTAL DEAD WT.ON ABT 0.00
HT OF DECK AT P.EDGE (m) 0.585 0.585 TOTAL LIVE LOAD ON ABT 0.00
FOOTWALK WIDTH (m) 0.000 0.000 LOAD ON ABT./m 0.00
ANGLE OF SLOPE AT FACIA END (deg 0.000 0.000 T.FORCE/mOF ABT 342.86
BATTER SLOPE 1 IN 0 0 WT OF C.BEAM /m 5.72
FRICTION COEFF. AT BASE 0.000 WT OF B.WALL /m 1.24
HT.OF SOIL BELOW SCOUR (m) 0.000

SECTION XPL XPR XTW XBW YBH YVH TOTAL TOTAL TOTAL e' DIR + DIR - F.O.S
VER LOAD S.M O.T.M BEND BEND

kN kNm kNm m kN/m² kN/m²

CAP.LEVEL 0 0 0.625 0.625 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
2 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
3 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
4 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
5 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
6 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
7 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
8 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
9 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
10 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
11 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
12 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
13 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
14 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
15 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
16 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
17 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
18 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
19 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02
20 0.000 0.000 0.625 0.625 0.000 0.000 6.96 2.47 148.78 -21.03 2291.87 -2269.61 0.02

SLIDING RESISTI F.O.S REDISTRIBUTED


FORCE FORCE BEARING PRESSURE

kN kN kN/m²

346.05 0.00 0.00 ###


06/06/2021 Bridge Designs Office, RDA 526987560.xls Wingwall-10

Designer: A.M.C.T.K ATTANAYAKE

Project: 17/1 on V-H ROAD

CALCULATION FOR WINGWALL SLIDING RESISTING F.O.S REDISTRIBUTED


FORCE FORCE BEARING PRESSURE
DENSITY OF MASS CONC. (kN/m^3) 23.6
DENSITY OF SOIL (kN/m^3) 17.28 kN kN kN/m²
SURCHARGE PRESURE (kN/m²) 10 98.07 138.15 1.41
BATTER SLOPE 1 IN 0
ANGLE OF SLOPE FILL (deg.) 0.00
FRICTION COEFF.AT BASE 0.40
HT.OF BACKFILL AT W/WALL (m.) 0.000
ACTIVE EARTH PRESS. COEFF. 0.271

SECTION XPL XPR XTW XBW YBH YVH TOTAL TOTAL TOTAL e' DIR+ DIR- F.O.S
VER. S.M O.T.M BEND BEND
LOAD
kN kNm. kNm m kN/m² kN/m²
1 0.000 0.000 0.600 0.600 0.000 1.200 16.99 5.10 3.29 0.11 83.20 -26.56 1.55
2 0.300 0.000 0.900 0.900 0.000 0.821 43.65 19.86 11.96 0.18 135.46 -38.45 1.66
3 0.400 0.000 1.300 1.300 0.000 1.200 98.44 63.56 40.09 0.24 219.55 -68.11 1.59
4 0.400 0.000 1.700 1.700 0.000 1.200 172.84 143.87 93.82 0.29 302.78 -99.44 1.53
5 0.400 0.000 2.100 2.100 1.000 256.96 261.57 164.01 0.38 356.71 -111.98 1.59
6 0.500 0.500 3.100 3.100 0.500 345.38 594.49 209.33 1.12 205.18 17.65 2.84
7 3.100 3.100 345.38 594.49 209.33 1.12 205.18 17.65 2.84
8 3.100 3.100 345.38 594.49 209.33 1.12 205.18 17.65 2.84
9 3.100 3.100 345.38 594.49 209.33 1.12 205.18 17.65 2.84
10 3.100 3.100 345.38 594.49 209.33 1.12 205.18 17.65 2.84
06/06/2021 Bridge Designs Office, RDA 526987560.xls Wingwall-20

Designer: Type Your Name here

Project: Type Bridge No. & name of the road

CALCULATION FOR WINGWALL

DENSITY OF MASS CONC. (kN/m^3) 23.6 SLIDING RESISTING F.O.S


DENSITY OF SOIL (kN/m^3) 17.28 FORCE FORCE
SURCHARGE PRESURE (kN/m²) 10
BATTER SLOPE 1 IN 0 kN kN
ANGLE OF SLOPE FILL (deg.) 0.00 6.61 8.50 1.29
FRICTION COEFF.AT BASE 0.50
HT.OF BACKFILL AT W/WALL (m.) 0.000
ACTIVE EARTH PRESS. COEFF. 0.271

SECTION XPL XPR XTW XBW YBH YVH TOTAL TOTAL TOTAL e' DIR+
VER. S.M O.T.M BEND
LOAD
kN kNm. kNm m kN/m²
1 0.000 0.000 0.600 0.600 0.000 1.200 16.99 5.10 3.29 0.11 83.20
2 0.000 0.000 0.600 0.600 0.000 0.000 16.99 5.10 3.29 0.11 83.20
3 0.000 0.000 0.600 0.600 0.000 0.000 16.99 5.10 3.29 0.11 83.20
4 0.000 0.000 0.600 0.600 0.000 0.000 16.99 5.10 3.29 0.11 83.20
5 0.000 0.000 0.600 0.600 0.000 0.000 16.99 5.10 3.29 0.11 83.20
6 0.000 0.000 0.600 0.600 0.000 0.000 16.99 5.10 3.29 0.11 83.20
7 0.000 0.000 0.600 0.600 0.000 0.000 16.99 5.10 3.29 0.11 83.20
8 0.000 0.000 0.600 0.600 0.000 0.000 16.99 5.10 3.29 0.11 83.20
9 0.000 0.000 0.600 0.600 0.000 0.000 16.99 5.10 3.29 0.11 83.20
10 0.000 0.000 0.600 0.600 0.000 0.000 16.99 5.10 3.29 0.11 83.20
11 0.000 0.000 0.600 0.600 0.000 0.000 16.99 5.10 3.29 0.11 83.20
12 0.000 0.000 0.600 0.600 0.000 0.000 16.99 5.10 3.29 0.11 83.20
13 0.000 0.000 0.600 0.600 0.000 0.000 16.99 5.10 3.29 0.11 83.20
14 0.000 0.000 0.600 0.600 0.000 0.000 16.99 5.10 3.29 0.11 83.20
15 0.000 0.000 0.600 0.600 0.000 0.000 16.99 5.10 3.29 0.11 83.20
16 0.000 0.000 0.600 0.600 0.000 0.000 16.99 5.10 3.29 0.11 83.20
17 0.000 0.000 0.600 0.600 0.000 0.000 16.99 5.10 3.29 0.11 83.20
18 0.000 0.000 0.600 0.600 0.000 0.000 16.99 5.10 3.29 0.11 83.20
06/06/2021 Bridge Designs Office, RDA 526987560.xls Wingwall-20

19 0.000 0.000 0.600 0.600 0.000 0.000 16.99 5.10 3.29 0.11 83.20
20 0.000 0.000 0.600 0.600 0.000 0.000 16.99 5.10 3.29 0.11 83.20
06/06/2021 Bridge Designs Office, RDA 526987560.xls Wingwall-20

REDISTRIBUTED
BEARING PRESSURE

kN/m²
###

DIR- F.O.S
BEND

kN/m²
-26.56 1.55
-26.56 1.55
-26.56 1.55
-26.56 1.55
-26.56 1.55
-26.56 1.55
-26.56 1.55
-26.56 1.55
-26.56 1.55
-26.56 1.55
-26.56 1.55
-26.56 1.55
-26.56 1.55
-26.56 1.55
-26.56 1.55
-26.56 1.55
-26.56 1.55
-26.56 1.55
06/06/2021 Bridge Designs Office, RDA 526987560.xls Wingwall-20

-26.56 1.55
-26.56 1.55
06/06/2021 526987560.xls Pile Group

DESIGN OF PILE FOUNDATIONS

LENGTH OF ABUTMENT / WINGWALL


Front face = 10 m
Rear face = 10 m
Vertical Load = 100.000 Kn/m
Ecc. from front = 1.400 m
Total vertical Load = 1000.000 Kn
Minimum No of Piles = 3 Nos

TRIAL 1 TRIAL 2

Pile Row No of Dist. from Load on Pile Row No of Dist.from Load on


No Piles Front each pile No Piles Front each pile
1 5 0.6 68.000 1 5 0.6 68.000
2 5 1.6 104.000 2 5 1.6 104.000
3 1 2.6 140.000 3 1 2.6 140.000

Total no of Piles 11 Total no of Piles 11


C.G. of Pile Group 1.236 C.G. of Pile Group 1.236
Designer: c.t.k Attanayake

Project: 18/3 AHN Road Bridge

CALCULATION FOR WINGWALL SLIDING


FORCE
DENSITY OF MASS CONC. (kN/m^3) 23.6
DENSITY OF SOIL (kN/m^3) 17.28 kN
SURCHARGE PRESURE (kN/m²) 10 213.95
BATTER SLOPE 1 IN 0
ANGLE OF SLOPE FILL (deg.) 0.00
FRICTION COEFF.AT BASE 0.45
HT.OF BACKFILL AT W/WALL (m.) 3.000
ACTIVE EARTH PRESS. COEFF. 0.271

SECTION XPL XPR XTW XBW YBH YVH TOTAL TOTAL TOTAL
VER. S.M O.T.M
LOAD
kN kNm. kNm
1 0.000 0.000 0.600 0.950 0.000 1.200 21.95 12.20 3.29
2 0.400 1.350 1.000 0.000 1.200 67.52 35.62 18.56
3 0.400 1.400 1.200 0.000 1.200 124.92 76.41 53.91
4 0.400 1.600 1.200 0.000 1.200 193.45 124.93 117.42
5 0.400 1.600 0.900 0.000 1.200 266.03 160.11 217.18
6 0.500 0.400 1.800 0.600 0.000 1.200 356.86 284.72 361.29
7 0.600 0.000 1.200 365.35 283.02 557.83
8 0.000 0.000 0.600 365.35 #DIV/0! 678.30
9 0.000 365.35 #DIV/0! 678.30
10 0.000 365.35 #DIV/0! 678.30

678.30
RESISTING F.O.S REDISTRIBUTED
FORCE BEARING PRESSURE

kN kN/m²
308.41 1.44 #DIV/0!

e' DIR+ DIR- F.O.S


BEND BEND

m kN/m² kN/m²
0.41 33.19 13.02 3.71
0.25 167.75 -32.72 1.92
0.18 322.66 -114.45 1.42
0.04 613.55 -291.13 1.06
-0.21 1605.10 -1013.92 0.74
-0.21 3655.20 -2465.68 0.79
-0.75 #DIV/0! #DIV/0! 0.51
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
F.O.S F.O.S F.O.S F.O.S F.O.S F.O.S F.O.S F.O.S F.O.S
BEND BEND BEND BEND BEND BEND
LOAD LOAD LOAD
kN/m² kN/m² kN/m² kN/m² kN/m² kN/m²

###
###
###
### ###
### ### ###
### ### ###
### ### ###
Designer:

Project: Br 7/1 on Rathmalana Mirihana Road Rath End

CALCULATION FOR WINGWALL SLIDING


FORCE
DENSITY OF MASS CONC. (kN/m^3) 23.6
DENSITY OF SOIL (kN/m^3) 17.28 kN
SURCHARGE PRESURE (kN/m²) 10 113.18
BATTER SLOPE 1 IN 0
ANGLE OF SLOPE FILL (deg.) 0.00
FRICTION COEFF.AT BASE 0.45
HT.OF BACKFILL AT W/WALL (m.) 2.000
ACTIVE EARTH PRESS. COEFF. 0.271

SECTION XPL XPR XTW XBW YBH YVH TOTAL TOTAL TOTAL
VER. S.M O.T.M
LOAD
kN kNm. kNm
1 0.000 0.000 0.650 0.650 0.000 1.400 21.48 6.98 4.79
2 0.400 1.050 1.050 1.200 64.89 34.22 22.84
3 0.400 1.450 1.450 0.000 1.200 127.92 91.45 62.32
4 0.350 1.800 1.800 0.000 1.200 205.38 180.36 131.31
5 0.350 2.150 2.150 0.000 0.800 279.71 290.64 197.69
6 0.300 0.300 2.750 2.750 0.000 0.600 351.72 514.07 259.89
7 2.750 2.750 0.000 351.72 514.07 259.89
8 2.750 2.750 351.72 514.07 259.89
9 2.750 2.750 351.72 514.07 259.89
10 2.750 2.750 351.72 514.07 259.89

259.89
RESISTING F.O.S REDISTRIBUTED
FORCE BEARING PRESSURE

kN kN/m²
222.27 1.96 324.46

e' DIR+ DIR- F.O.S


BEND BEND

m kN/m² kN/m²
0.10 101.03 -34.95 1.46
0.18 185.30 -61.70 1.50
0.23 269.76 -93.31 1.47
0.24 365.56 -137.36 1.37
0.33 399.75 -139.55 1.47
0.72 309.93 -54.13 1.98
0.72 309.93 -54.13 1.98
0.72 309.93 -54.13 1.98
0.72 309.93 -54.13 1.98
0.72 309.93 -54.13 1.98
F.O.S F.O.S F.O.S F.O.S F.O.S F.O.S F.O.S F.O.S F.O.S
BEND BEND BEND BEND BEND BEND
LOAD LOAD LOAD
kN/m² kN/m² kN/m² kN/m² kN/m² kN/m²
Designer:

Project: Br 7/1 on Rathmalana Mirihana Road Rath End

CALCULATION FOR WINGWALL SLIDING


FORCE
DENSITY OF MASS CONC. (kN/m^3) 23.6
DENSITY OF SOIL (kN/m^3) 17.28 kN
SURCHARGE PRESURE (kN/m²) 10 126.62
BATTER SLOPE 1 IN 0
ANGLE OF SLOPE FILL (deg.) 0.00
FRICTION COEFF.AT BASE 0.45
HT.OF BACKFILL AT W/WALL (m.) 3.000
ACTIVE EARTH PRESS. COEFF. 0.271

SECTION XPL XPR XTW XBW YBH YVH TOTAL TOTAL TOTAL
VER. S.M O.T.M
LOAD
kN kNm. kNm
1 0.000 0.000 0.650 0.650 0.000 1.400 21.48 6.98 4.79
2 0.400 1.050 1.050 1.200 64.89 34.22 22.84
3 0.400 1.450 1.450 0.000 1.200 127.92 91.45 62.32
4 0.350 1.800 1.800 0.000 1.200 205.38 180.36 131.31
5 0.350 2.150 2.150 0.000 1.200 300.01 312.46 237.90
6 0.300 0.300 2.750 2.750 0.000 0.600 374.09 547.37 307.82
7 2.750 2.750 0.000 374.09 547.37 307.82
8 2.750 2.750 374.09 547.37 307.82
9 2.750 2.750 374.09 547.37 307.82
10 2.750 2.750 374.09 547.37 307.82

307.82
RESISTING F.O.S REDISTRIBUTED
FORCE BEARING PRESSURE

kN kN/m²
312.34 2.47 389.47

e' DIR+ DIR- F.O.S


BEND BEND

m kN/m² kN/m²
0.10 101.03 -34.95 1.46
0.18 185.30 -61.70 1.50
0.23 269.76 -93.31 1.47
0.24 365.56 -137.36 1.37
0.25 461.38 -182.30 1.31
0.64 354.08 -82.01 1.78
0.64 354.08 -82.01 1.78
0.64 354.08 -82.01 1.78
0.64 354.08 -82.01 1.78
0.64 354.08 -82.01 1.78
F.O.S F.O.S F.O.S F.O.S F.O.S F.O.S F.O.S F.O.S F.O.S
BEND BEND BEND BEND BEND BEND
LOAD LOAD LOAD
kN/m² kN/m² kN/m² kN/m² kN/m² kN/m²
Designer:

Project: Br 7/1 on Rathmalana Mirihana Road Rath End

CALCULATION FOR WINGWALL SLIDING


FORCE
DENSITY OF MASS CONC. (kN/m^3) 23.6
DENSITY OF SOIL (kN/m^3) 17.28 kN
SURCHARGE PRESURE (kN/m²) 10 126.62
BATTER SLOPE 1 IN 0
ANGLE OF SLOPE FILL (deg.) 0.00
FRICTION COEFF.AT BASE 0.35
HT.OF BACKFILL AT W/WALL (m.) 2.000
ACTIVE EARTH PRESS. COEFF. 0.271

SECTION XPL XPR XTW XBW YBH YVH TOTAL TOTAL TOTAL
VER. S.M O.T.M
LOAD
kN kNm. kNm
1 0.000 0.000 0.650 0.650 0.000 1.400 21.48 6.98 4.79
2 0.400 1.050 1.050 1.200 64.89 34.22 22.84
3 0.400 1.450 1.450 0.000 1.200 127.92 91.45 62.32
4 0.350 1.800 1.800 0.000 1.200 205.38 180.36 131.31
5 0.350 2.150 2.150 0.000 1.200 300.01 312.46 237.90
6 0.300 0.300 2.750 2.750 0.000 0.600 374.09 547.37 307.82
7 2.750 2.750 0.000 374.09 547.37 307.82
8 2.750 2.750 374.09 547.37 307.82
9 2.750 2.750 374.09 547.37 307.82
10 2.750 2.750 374.09 547.37 307.82

307.82
RESISTING F.O.S REDISTRIBUTED
FORCE BEARING PRESSURE

kN kN/m²
194.93 1.54 389.47

e' DIR+ DIR- F.O.S


BEND BEND

m kN/m² kN/m²
0.10 101.03 -34.95 1.46
0.18 185.30 -61.70 1.50
0.23 269.76 -93.31 1.47
0.24 365.56 -137.36 1.37
0.25 461.38 -182.30 1.31
0.64 354.08 -82.01 1.78
0.64 354.08 -82.01 1.78
0.64 354.08 -82.01 1.78
0.64 354.08 -82.01 1.78
0.64 354.08 -82.01 1.78
F.O.S F.O.S F.O.S F.O.S F.O.S F.O.S F.O.S F.O.S F.O.S
BEND BEND BEND BEND BEND BEND
LOAD LOAD LOAD
kN/m² kN/m² kN/m² kN/m² kN/m² kN/m²