Professional Documents
Culture Documents
DrawHamirA Rath
DrawHamirA Rath
February 2016
India
Consulting engineers pvt. ltd.
Drawing Volume
CONTENTS
PART - A (ROAD WORK DRAWINGS)
LEGENDS
DESIGN REPORT
STANDARD DRAWINGS
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Contents.dwg Feb 18, 2016 - 2:55pm maninder.v
LOCATION MAP
D:\Egis Work\Uttar Pradesh\51.EIRH1UP020_UP PWD\Drawing\1.Hamirpur-Rath Section of SH-42\6.FOR TENDER PURPOSE - R1\0.LOCATION MAP\ LOCATION MAP.dwg Sep 23, 2015 - 10:26am yogesh
Typical Cross Section
RIGHT OF WAY
12000
PROPOSED ROADWAY
VARIES DRAIN VARIES 1000 1500 7000 1500 1000 VARIES DRAIN VARIES
SPACE (As Required) PAVED CARRIAGEWAY PAVED (As Required) SPACE
SHOULDER
SHOULDER
EARTHEN
EARTHEN
FOR SHOULDER SHOULDER FOR
DETAIL AT "A"
SERVICES CL SERVICES
2.5 % 2.5 %
3.0 % 3.0 %
2 2
1 1
ROW
ROW
BC
DBM PCC Varies (Refer to Table-B)
WMM II EXISTING PAVEMENT DETAIL AT "F"
WMM I (Refer to Table-B)
GSB
SUBGRADE DETAIL AT "B"
PAVED EARTHEN
SHOULDER SHOULDER
EXISTING PAVEMENT WIDENED PAVEMENT
2.5 % 3.0 %
400mm BC
DBM 150
WMM II
NEW DBM
EXISTING BT 2
NEW WMM II GSB
1
NEW WMM I
EXISTING SUBGRADE
DETAIL AT "F"
DETAIL AT "A"
4%SLOPE 4%SLOPE
n* n*
500(MIN.)
1 1
h*
500
DETAIL AT "B"
EARTHEN DRAIN (TYPE-I)
I:\EIRH1UP020_UP PWD\Cad\Maninder\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TENDER P R2 TCS INDU.dwg Mar 01, 2016 - 2:20pm inder.k
VARIES (D*) 1500 1500 7000 1500 1500 VARIES (D*)
PAVER FOOTPATH PAVED CARRIAGEWAY PAVED FOOTPATH PAVER
BLOCK CUM DRAIN SHOULDER DETAIL AT "A" SHOULDER CUM DRAIN BLOCK
CL
2.5 % 2.5 %
PCC Varies (Refer to Table-B) DETAIL AT "G" EXISTING PAVEMENT WIDENED PAVEMENT
BC
DBM EXISTING PAVEMENT 400mm
WMM II (Refer to Table-B)
WMM I NEW BC
NEW DBM
GSB EXISTING BT
NEW WMM II
SUBGRADE DETAIL AT "C" NEW WMM I
EXISTING SUBGRADE
12000
PROPOSED ROADWAY
VARIES (D*) 1500 1000 1500 7000 1500 1000 1500 VARIES (D*)
1500 VARIES (D*)
PAVER FOOTPATH PAVER PAVED CARRIAGEWAY PAVED PAVER FOOTPATH PAVER FOOTPATH CUM DRAIN PAVER BLOCK
BLOCK CUM DRAIN BLOCK SHOULDER SHOULDER BLOCK CUM DRAIN BLOCK
DETAIL AT "A" FINISHED ROAD LEVEL
CL
225
2.5 % 2.5 %
3.0 % 3.0 %
M-25(PCC)
200
50 50
100
M-15(PCC)
250
1500 VARIES (D*)
FOOTPATH CUM DRAIN PAVER BLOCK
DETAIL AT "G"
I:\EIRH1UP020_UP PWD\Cad\Maninder\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TENDER P R2 TCS INDU.dwg Mar 01, 2016 - 2:20pm inder.k
RIGHT OF WAY
12000
PROPOSED ROADWAY
VARIES DRAIN VARIES 1000 1500 7000 1500 1000 VARIES DRAIN VARIES
SPACE (As Required) PAVED CARRIAGEWAY PAVED (As Required) SPACE
SHOULDER
SHOULDER
EARTHEN
EARTHEN
FOR SHOULDER SHOULDER FOR
SERVICES CL SERVICES
2 2
1 1
ROW
ROW
SOIL FILL
BC DETAIL AT "F"
DBM
WMM II
EXISTING PAVEMENT
WMM I
DETAIL AT "B" GSB
SUBGRADE
n* n*
500(MIN.)
2.5 % 3.0 %
1 1
h*
BC
DBM 150
WMM I 150
WMM II
2
500 GSB 1
DETAIL AT "F"
I:\EIRH1UP020_UP PWD\Cad\Maninder\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TENDER P R2 TCS INDU.dwg Mar 01, 2016 - 2:20pm inder.k
RIGHT OF WAY
12000
PROPOSED ROADWAY
VARIES DRAIN VARIES 1000 1500 7000 1500 1000 VARIES DRAIN VARIES
SPACE (As Required) PAVED CARRIAGEWAY PAVED (As Required) SPACE
SHOULDER
SHOULDER
EARTHEN
EARTHEN
FOR SHOULDER SHOULDER FOR
SERVICES CL SERVICES
2.5 % 2.5 %
3.0 % 3.0 %
2 2
1 1
ROW
ROW
SOIL FILL
12000
PROPOSED ROADWAY
VARIES DRAIN VARIES 1000 1500 7000 1500 1000 VARIES DRAIN VARIES
SPACE (As Required) PAVED CARRIAGEWAY PAVED (As Required) SPACE
SHOULDER
SHOULDER
EARTHEN
EARTHEN
FOR SHOULDER SHOULDER FOR
SERVICES CL SERVICES 4%SLOPE 4%SLOPE
n* n*
500(MIN.)
2.5 % 2.5 %
3.0 % 3.0 %
1 1
h*
2 2
1 1
ROW
ROW
500
PAVED EARTHEN
SHOULDER SHOULDER
2.5 % 3.0 %
PQC
500
DLC
2
GSB
1
SUBGRADE
DETAIL AT "F1"
I:\EIRH1UP020_UP PWD\Cad\Maninder\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TENDER P R2 TCS INDU.dwg Mar 01, 2016 - 2:20pm inder.k
RIGHT OF WAY
12000
PROPOSED ROADWAY
VARIES (D*) 1500 VARIES 1000 1500 7000 1500 1000 VARIES 1500 VARIES (D*)
PAVER FOOTPATH PAVED CARRIAGEWAY PAVED FOOTPATH PAVER
SHOULDER
SHOULDER
EARTHEN
EARTHEN
BLOCK CUM SHOULDER SHOULDER CUM BLOCK
DRAIN DRAIN
1.5 1.5
1 1
SOIL FILL
PQC-300mm
DLC-150mm
EXISTING PAVEMENT
GSB-150mm
SUBGRADE-500mm
DETAIL AT "E"
DETAIL AT "E"
( FOR DRAIN DETAILS REFER STANDARD DRAWING )
I:\EIRH1UP020_UP PWD\Cad\Maninder\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TENDER P R2 TCS INDU.dwg Mar 01, 2016 - 2:20pm inder.k
RIGHT OF WAY
12000
PROPOSED ROADWAY
VARIES DRAIN VARIES 1000 1500 7000 1500 1000 VARIES DRAIN VARIES
SPACE (As Required) PAVED CARRIAGEWAY PAVED (As Required) SPACE
SHOULDER
SHOULDER
EARTHEN
EARTHEN
FOR SHOULDER SHOULDER FOR
SERVICES CL SERVICES
2 2
1 1
ROW
ROW
BC
DBM PCC (Varies)
WMM II DETAIL AT "F"
EXISTING PAVEMENT
WMM I
DETAIL AT "B" GSB
SUBGRADE
n* n*
500(MIN.)
2.5 % 3.0 %
1 1
h*
BC
DBM 150
WMM I 150
WMM II
2
500 GSB
1
DETAIL AT "F"
I:\EIRH1UP020_UP PWD\Cad\Maninder\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TENDER P R2 TCS INDU.dwg Mar 01, 2016 - 2:20pm inder.k
RIGHT OF WAY
12000
PROPOSED ROADWAY
VARIES DRAIN VARIES 1000 1500 7000 1500 1000 VARIES DRAIN VARIES
SPACE (As Required) PAVED CARRIAGEWAY PAVED (As Required) SPACE
SHOULDER
SHOULDER
EARTHEN
EARTHEN
FOR SHOULDER SHOULDER FOR
SERVICES CL SERVICES
2 2
1 1
ROW
ROW
PQC-300mm DETAIL AT "F1"
DLC-150mm PCC (Varies)
GSB-150mm EXISTING PAVEMENT
DETAIL AT "B" SUBGRADE-500mm
n* n*
500(MIN.)
2.5 % 3.0 %
1 1
h*
PQC
500
DLC
2
500 GSB
1
SUBGRADE
DETAIL AT "B"
EARTHEN DRAIN (TYPE-I)
DETAIL AT "F1"
I:\EIRH1UP020_UP PWD\Cad\Maninder\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TENDER P R2 TCS INDU.dwg Mar 01, 2016 - 2:20pm inder.k
VARIES (D*) 1500 1500 7000 1500 1500 VARIES (D*)
PAVER FOOTPATH PAVED CARRIAGEWAY PAVED FOOTPATH PAVER
BLOCK CUM DRAIN SHOULDER SHOULDER CUM DRAIN BLOCK
CL
2.5 % 2.5 %
DETAIL AT "G"
BC
PCC (Varies) VARIES (D*)
DBM 1500
FOOTPATH CUM DRAIN PAVER BLOCK
WMM II EXISTING PAVEMENT
WMM I FINISHED ROAD LEVEL
225
GSB
SUBGRADE DETAIL AT "C"
150
200
50 50
PAVER BLOCK (M-20) 25mm
CM (1:4) 12mm
100
M-15(PCC) PCC (M-15) 25mm
GSB 150mm
250
DETAIL AT "C"
12000
PROPOSED ROADWAY
VARIES (D*) 1500 1000 1500 7000 1500 1000 1500 VARIES (D*)
PAVER FOOTPATH PAVER PAVED CARRIAGEWAY PAVED PAVER FOOTPATH PAVER
BLOCK CUM DRAIN BLOCK SHOULDER SHOULDER BLOCK CUM DRAIN BLOCK
CL
2.5 % 2.5 %
3.0 % 3.0 %
BC
DBM PCC (Varies) DETAIL AT "G"
WMM II EXISTING PAVEMENT
WMM I DETAIL AT "D"
GSB
SUBGRADE
I:\EIRH1UP020_UP PWD\Cad\Maninder\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TENDER P R2 TCS INDU.dwg Mar 01, 2016 - 2:20pm inder.k
VARIES (D*) 1500 1500 7000 1500 1500 VARIES (D*)
PAVER FOOTPATH PAVED CARRIAGEWAY PAVED FOOTPATH PAVER
BLOCK CUM DRAIN SHOULDER SHOULDER CUM DRAIN BLOCK
CL
2.5 % 2.5 %
DETAIL AT "G"
PQC-300mm
DLC-150mm PCC (Varies) 1500 VARIES (D*)
FOOTPATH CUM DRAIN PAVER BLOCK
GSB-150mm EXISTING PAVEMENT
SUBGRADE-500mm FINISHED ROAD LEVEL
DETAIL AT "C"
225
TCS-2Bi - RECONSTRUCTION FROM GSB + WIDENING IN URBAN SECTION (RIGID PAVEMENT) 150
M-25(PCC)
200
50 50
PAVER BLOCK (M-20) 25mm
CM (1:4) 12mm
PCC (M-15) 25mm
100
M-15(PCC) GSB 150mm
DETAIL AT "C"
RIGHT OF WAY 250
( FOR DRAIN DETAILS REFER STANDARD DRAWING )
12000 DETAIL AT "G"
PROPOSED ROADWAY
VARIES (D*) 1500 1000 1500 7000 1500 1000 1500 VARIES (D*)
PAVER FOOTPATH PAVER PAVED CARRIAGEWAY PAVED PAVER FOOTPATH PAVER
BLOCK CUM DRAIN BLOCK SHOULDER SHOULDER BLOCK CUM DRAIN BLOCK
CL
2.5 % 2.5 %
3.0 % 3.0 %
TCS-4Bi - RECONSTRUCTION FROM GSB + WIDENING IN SEMI URBAN SECTION (RIGID PAVEMENT)
I:\EIRH1UP020_UP PWD\Cad\Maninder\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TENDER P R2 TCS INDU.dwg Mar 01, 2016 - 2:20pm inder.k
DESIGN REPORT
DETAILS OF HORIZONTAL ALIGNMENT
Horizontal Easting Northing Circular curve Trailing transition length Leading transition length Straight
"Length of "Deviation "Transition "Superelevation" "Side of
Intersection Radius, R Speed
HIP No. curve, Lc" Angle, D" length, TL" curve"
point start end start end start end start end length
E N
1. 2423.3620 414213.4270 2869320.4570 2330.660 2516.058 185.4 10000 1.062 100 Left 2516.0580 2577.3220 61.2640
2. 2625.3690 414223.7610 2869530.2180 2612.322 2637.546 25.2 40 86.264 2577.3220 2612.3220 2637.5460 2672.5460 35 4.4 20 Left 2672.5460 3168.5670 496.0210
3. 3408.8200 413433.7510 2869621.0180 3238.567 3572.015 338.4 670 34.501 3168.5670 3238.5670 3572.0150 3642.0150 70 6.6 100 Left 3642.0150 5307.1020 1665.0870
4. 5359.3220 411701.8920 2868702.3140 5307.102 5411.540 104.4 10000 0.598 100 Right 5411.5400 5461.8310 50.2910
5. 5539.2000 411542.0740 2868619.6620 5511.831 5566.556 54.7 1000 6.000 5461.8310 5511.8310 5566.5560 5616.5560 50 4.4 100 Left 5616.5560 5785.8370 169.2810
6. 5856.8600 411276.6640 2868445.0110 5785.837 5927.882 142.0 20000 0.407 100 Right 5927.8820 6008.9590 81.0770
7. 6131.4900 411046.1820 2868295.6790 6008.959 6253.715 244.8 2000 7.012 100 Left 6253.7150 6504.1990 250.4840
8. 6567.0080 410712.0840 2868015.8200 6504.199 6629.775 125.6 2000 3.597 100 Left 6629.7750 7535.4970 905.7220
9. 7622.2370 409947.1890 2867288.7200 7585.497 7658.943 73.4 1000 7.073 7535.4970 7585.4970 7658.9430 7708.9430 50 4.4 100 Left 7708.9430 8552.7730 843.8300
10. 8578.6770 409340.3250 2866549.3370 8552.773 8604.581 51.8 8000 0.371 100 Left 8604.5810 8728.8570 124.2760
11. 8827.3640 409183.7330 2866356.0110 8778.857 8875.796 96.9 1000 8.419 8728.8570 8778.8570 8875.7960 8925.7960 50 4.4 100 Left 8925.7960 9331.8680 406.0720
12. 9386.8200 408898.9530 2865874.2460 9366.868 9406.769 39.9 1500 2.861 9331.8680 9366.8680 9406.7690 9441.7690 35 3.0 100 Right 9441.7690 9549.0290 107.2600
13. 9623.4480 408768.4260 2865676.6600 9594.029 9652.798 58.8 500 11.891 9549.0290 9594.0290 9652.7980 9697.7980 45 5.7 80 Right 9697.7980 9748.4620 50.6640
14. 9846.8680 408609.3400 2865519.4520 9748.462 9945.249 196.8 5000 2.255 100 Left 9945.2490 10006.1320 60.8830
15. 10077.6420 408451.6580 2865350.8620 10036.132 10119.106 83.0 1000 6.473 10006.1320 10036.1320 10119.1060 10149.1060 30 2.8 80 Right 10149.1060 10271.8500 122.7440
16. 10422.1860 408187.7080 2865125.8900 10326.850 10514.029 187.2 400 34.690 10271.8500 10326.8500 10514.0290 10569.0290 55 4.0 80 Left 10569.0290 10782.0750 213.0460
17. 10863.3170 408072.9720 2864693.7240 10837.075 10889.484 52.4 400 15.385 10782.0750 10837.0750 10889.4840 10944.4840 55 4.0 80 Right 10944.4840 11206.3510 261.8670
18. 11276.6460 407864.5230 2864336.3430 11206.351 11346.941 140.6 20000 0.403 100 Left 11346.9410 11766.9570 420.0160
19. 11814.9960 407596.5620 2863869.4190 11766.957 11863.026 96.1 3000 1.835 100 Left 11863.0260 12268.6860 405.6600
20. 12363.0040 407339.1060 2863385.5430 12318.686 12407.265 88.6 1000 7.940 12268.6860 12318.6860 12407.2650 12457.2650 50 4.4 100 Left 12457.2650 12742.6520 285.3870
21. 12832.3560 407177.9420 2862944.5730 12742.652 12921.939 179.3 2000 5.136 100 Left 12921.9390 13170.3190 248.3800
22. 13258.5130 407068.0180 2862532.6050 13230.319 13286.684 56.4 800 8.334 13170.3190 13230.3190 13286.6840 13346.6840 60 5.6 100 Right 13346.6840 13441.0450 94.3610
23. 13535.8480 406958.1650 2862277.2100 13496.045 13575.390 79.3 400 19.244 13441.0450 13496.0450 13575.3900 13630.3900 55 7.0 80 Right 13630.3900 13685.4060 55.0160
24. 13742.0190 406818.2780 2862124.6440 13685.406 13798.631 113.2 10000 0.649 100 Left 13798.6310 13926.7000 128.0690
25. 13967.6440 406667.6890 2861956.6260 13926.700 14008.588 81.9 10000 0.469 100 Right 14008.5880 14394.0540 385.4660
26. 14480.0530 406322.3110 2861577.5660 14449.054 14510.928 61.9 400 16.741 14394.0540 14449.0540 14510.9280 14565.9280 55 7.0 80 Right 14565.9280 14796.5400 230.6120
27. 14842.0180 406011.3400 2861391.2990 14796.540 14887.497 91.0 20000 0.261 100 Right 14887.4970 15510.1920 622.6950
28. 15534.8940 405415.3250 2861037.9680 15510.192 15559.595 49.4 4000 0.708 100 Left 15559.5950 15643.0610 83.4660
29. 15793.0930 405194.1330 2860903.1210 15713.061 15872.324 159.3 650 20.209 15643.0610 15713.0610 15872.3240 15942.3240 70 6.8 100 Right 15942.3240 17043.9240 1101.6000
30. 17130.7490 403879.7370 2860643.8380 17098.924 17162.440 63.5 400 16.976 17043.9240 17098.9240 17162.4400 17217.4400 55 7.0 80 Left 17217.4400 17883.9270 666.4870
31. 18014.6880 403099.7640 2860226.7550 17883.927 18145.446 261.5 20000 0.749 100 Left 18145.4460 19052.7370 907.2910
32. 19089.8600 402158.3450 2859707.3980 19052.737 19126.982 74.2 15000 0.284 100 Left 19126.9820 20166.7220 1039.7400
33. 20200.5860 401188.4650 2859166.0610 20166.722 20234.450 67.7 10000 0.388 100 Left 20234.4500 20481.9820 247.5320
34. 20582.1990 400856.3690 2858977.7410 20541.982 20622.348 80.4 800 10.053 20481.9820 20541.9820 20622.3480 20682.3480 60 5.6 100 Right 20682.3480 21489.5040 807.1560
35. 21575.4140 399919.5500 2858645.9390 21544.504 21606.201 61.7 400 16.716 21489.5040 21544.5040 21606.2010 21661.2010 55 7.0 80 Left 21661.2010 22021.3540 360.1530
36. 22064.6730 399524.4110 2858356.5430 22021.354 22107.992 86.6 10000 0.496 100 Right 22107.9920 22435.3360 327.3440
D:\Egis Work\Uttar Pradesh\51.EIRH1UP020_UP PWD\Drawing\1.Hamirpur-Rath Section of SH-42\6.FOR TENDER PURPOSE - R1\3a.HIP & VIP\HIP HIP.dwg Sep 23, 2015 - 11:10am yogesh
DETAILS OF HORIZONTAL ALIGNMENT
Horizontal Easting Northing Circular curve Trailing transition length Leading transition length Straight
"Length of "Deviation "Transition "Superelevation" "Side of
Intersection Radius, R Speed
HIP No. curve, Lc" Angle, D" length, TL" curve"
point start end start end start end start end length
E N
36. 22064.6730 399524.4110 2858356.5430 22021.354 22107.992 86.6 10000 0.496 100 Right 22107.9920 22435.3360 327.3440
37. 22478.9980 399188.0380 2858114.6360 22435.336 22522.661 87.3 20000 0.250 100 Left 22522.6610 23845.4390 1322.7780
38. 23876.5050 398057.0370 2857293.7460 23845.439 23907.570 62.1 10000 0.356 100 Left 23907.5700 24138.5060 230.9360
39. 24257.3960 397750.1780 2857068.1010 24138.506 24376.006 237.5 2000 6.804 100 Right 24376.0060 24889.5290 513.5230
40. 24969.4200 397130.3710 2856717.0800 24889.529 25049.307 159.8 10000 0.915 100 Left 25049.3070 25683.8060 634.4990
41. 25791.4100 396421.6810 2856300.6280 25683.806 25899.011 215.2 15000 0.822 100 Right 25899.0110 25926.7860 27.7750
42. 25966.9700 396269.0570 2856213.8620 25926.786 26007.152 80.4 5000 0.921 100 Left 26007.1520 26211.1180 203.9660
43. 26287.8030 395991.8810 2856050.3390 26271.118 26304.411 33.3 200 26.726 26211.1180 26271.1180 26304.4110 26364.4110 60 4.0 65 Left 26364.4110 26464.8340 100.4230
44. 26579.9880 395833.3102 2855803.6670 26464.834 26695.140 230.3 20000 0.660 100 Right 26695.1400 27407.4620 712.3220
45. 27546.5980 395301.0438 2854996.2690 27467.462 27625.220 157.8 800 15.596 27407.4620 27467.4620 27625.2200 27685.2200 60 5.6 100 Left 27685.2200 28815.0560 1129.8360
46. 28859.9670 394899.2915 2853744.8490 28815.056 28904.878 89.8 20000 0.257 100 Right 28904.8780 30731.9340 1827.0560
47. 30848.5140 394282.9320 2851854.1660 30766.934 30929.933 163.0 1500 7.563 30731.9340 30766.9340 30929.9330 30964.9330 35 3.0 100 Right 30964.9330 31213.3080 248.3750
48. 31317.8180 394079.5849 2851430.1070 31268.308 31366.828 98.5 400 21.990 31213.3080 31268.3080 31366.8280 31421.8280 55 7.0 80 Right 31421.8280 32080.5580 658.7300
49. 32170.4710 393448.8755 2850854.3720 32120.558 32220.327 99.8 1200 6.673 32080.5580 32120.5580 32220.3270 32260.3270 40 3.7 100 Right 32260.3270 33499.5600 1239.2330
50. 33551.2300 392327.7410 2850048.2350 33499.560 33602.899 103.3 20000 0.296 100 Left 33602.8990 33676.1640 73.2650
51. 33841.3600 392092.2740 2849877.0730 33746.164 33935.394 189.2 700 21.218 33676.1640 33746.1640 33935.3940 34005.3940 70 4.0 100 Left 34005.3940 34734.2390 728.8450
52. 34775.7000 391585.4150 2849089.6220 34734.239 34817.162 82.9 20000 0.238 100 Left 34817.1620 35282.1920 465.0300
53. 36050.7350 390898.2864 2848015.4957 36026.461 36072.479 46.0180 5000 0.53 100 Right 35282.1920 36026.4610 744.2690
54. 36732.1990 390525.2877 2847445.1759 36688.705 36773.160 84.4550 5000 0.97 100 Right 36072.4790 36688.7050 616.2260
55. 37007.7090 390370.5771 2847217.1252 36966.791 37046.056 79.2650 1000 7.12 36921.7910 36966.7910 37046.0560 37091.0560 45 4.4 100 Left 36773.1600 36921.7910 148.6310
56. 38000.1540 389919.4557 2846333.0180 37983.970 38013.807 29.8370 3000 0.57 100 Right 37091.0560 37983.9700 892.9140
57. 38254.7830 389801.4642 2846107.3506 38235.601 38271.431 35.8300 1000 4.63 38190.6010 38235.6010 38271.4310 38316.4310 45 4.4 100 Left 38013.8070 38190.6010 176.7940
58. 38661.5550 389642.6990 2845732.8118 38626.002 38694.577 68.5750 6000 0.65 100 Right 38316.4310 38626.0020 309.5710
59. 39396.7530 389348.0491 2845059.2404 39371.756 39419.220 47.4640 6000 0.45 100 Right 38694.5770 39371.7560 677.1790
60. 41426.0390 388520.0782 2843206.5486 41392.508 41457.037 64.5290 3000 1.23 100 Right 39419.2200 41392.5080 1973.2880
61. 41693.2270 388404.6669 2842962.5304 41651.112 41731.705 80.5930 200 40.28 41591.1120 41651.1120 41731.7050 41791.7050 60 7.0 65 Right 41457.0370 41591.1120 134.0750
62. 42296.7620 387851.5771 2842711.5128 42204.711 42386.278 181.5670 10000 1.04 100 Right 41791.7050 42204.7110 413.0060
63. 43184.0630 387037.0662 2842359.5414 43058.578 43306.699 248.1210 2000 7.11 100 Left 42386.2780 43058.5780 672.3000
64. 43535.7330 386733.7155 2842181.0070 43501.994 43566.942 64.9480 10000 0.37 100 Left 43306.6990 43501.9940 195.2950
65. 44257.7360 386113.8423 2841810.7447 44219.571 44293.347 73.7760 1200 5.43 44179.5710 44219.5710 44293.3470 44333.3470 40 3.7 100 Left 43566.9420 44179.5710 612.6290
66. 44525.0120 385898.3443 2841652.5436 44485.964 44561.526 75.5620 3000 1.44 100 Right 44333.3470 44485.9640 152.6170
67. 46068.1470 384631.8119 2840770.9702 46010.481 46123.163 112.6820 1000 6.46 100 Left 44561.5260 46010.4810 1448.9550
68. 46632.1200 384207.8746 2840398.5825 46616.851 46644.849 27.9980 400 11.89 46561.8510 46616.8510 46644.8490 46699.8490 55 7.0 65 Right 46123.1630 46561.8510 438.6880
69. 48290.7810 382762.4899 2839583.8984 48262.352 48316.488 54.1360 325 17.98 48222.3520 48262.3520 48316.4880 48356.4880 40 5.8 65 Right 46699.8490 48222.3520 1522.5030
70. 49294.9360 381777.6921 2839384.8102 49226.094 49361.340 135.2460 10000 0.77 100 Left 48356.4880 49226.0940 869.6060
71. 49845.3180 381239.7457 2839268.4641 49768.440 49919.758 151.3180 10000 0.87 100 Right 49361.3400 49768.4400 407.1000
72. 51273.6840 379839.2471 2838987.6794 51257.692 51287.239 29.5470 2000 0.85 100 Left 49919.7580 51257.6920 1337.9340
D:\Egis Work\Uttar Pradesh\51.EIRH1UP020_UP PWD\Drawing\1.Hamirpur-Rath Section of SH-42\6.FOR TENDER PURPOSE - R1\3a.HIP & VIP\HIP HIP.dwg Sep 23, 2015 - 11:10am yogesh
DETAILS OF HORIZONTAL ALIGNMENT
Horizontal Easting Northing Circular curve Trailing transition length Leading transition length Straight
"Length of "Deviation "Transition "Superelevation" "Side of
Intersection Radius, R Speed
HIP No. curve, Lc" Angle, D" length, TL" curve"
point start end start end start end start end length
E N
72. 51273.6840 379839.2471 2838987.6794 51257.692 51287.239 29.5470 2000 0.85 100 Left 49919.7580 51257.6920 1337.9340
73. 51499.6490 379618.0932 2838939.9316 51470.874 51525.642 54.7680 200 21.42 51450.8740 51470.8740 51525.6420 51545.6420 20 4.0 35 Right 51287.2390 51450.8740 163.6350
74. 51650.1730 379467.0302 2838964.4962 51627.659 51669.624 41.9650 100 44.10 51592.6590 51627.6590 51669.6240 51704.6240 35 4.0 35 Left 51545.6420 51592.6590 47.0170
75. 51810.7720 379333.1834 2838871.2568 51750.990 51868.086 117.0960 2000 3.35 100 Left 51704.6240 51750.9900 46.3660
76. 52123.1480 379087.7287 2838677.9911 52079.275 52164.585 85.3100 10000 0.49 100 Right 51868.0860 52079.2750 211.1890
77. 52350.5670 378907.7979 2838538.7876 52314.816 52383.826 69.0100 700 8.51 52279.8160 52314.8160 52383.8260 52418.8260 35 4.0 65 Left 52164.5850 52279.8160 115.2310
78. 52640.2290 378707.3699 2838329.4862 52529.161 52748.640 219.4790 2000 6.29 100 Left 52418.8260 52529.1610 110.3350
79. 53324.4270 378290.9898 2837786.2948 53269.780 53376.612 106.8320 2000 3.06 100 Right 52748.6400 53269.7800 521.1400
80. 54364.3430 377615.1565 2836995.8974 54347.053 54379.197 32.1440 10000 0.18 100 Left 53376.6120 54347.0530 970.4410
81. 55117.6180 377126.6026 2836420.7937 55093.699 55138.908 45.2090 200 30.14 55033.6990 55093.6990 55138.9080 55198.9080 60 7.0 65 Right 54379.1970 55033.6990 654.5020
82. 55608.3190 376662.6447 2836256.3927 55585.760 55628.441 42.6810 5000 0.49 100 Left 55198.9080 55585.7600 386.8520
83. 56478.1980 375844.1949 2835958.4918 56449.566 56504.232 54.6660 325 24.76 56374.5660 56449.5660 56504.2320 56579.2320 75 7.0 65 Right 55628.4410 56374.5660 746.1250
84. 57593.5500 374731.3238 2836051.2345 57486.817 57697.882 211.0650 2000 6.05 100 Right 56579.2320 57486.8170 907.5850
85. 58007.6490 374324.1369 2836128.9860 57985.637 58027.389 41.7520 300 15.61 57945.6370 57985.6370 58027.3890 58067.3890 40 6.3 65 Left 57697.8820 57945.6370 247.7550
86. 58459.4780 373873.5797 2836091.1266 58432.261 58484.487 52.2260 2000 1.50 100 Left 58067.3890 58432.2610 364.8720
87. 58980.1080 373356.0900 2836034.0013 58798.054 59159.328 361.2740 2500 8.28 100 Right 58484.4870 58798.0540 313.5670
88. 59334.0940 373001.4782 2836046.2634 59276.140 59389.358 113.2180 500 15.84 59251.1400 59276.1400 59389.3580 59414.3580 25 3.8 65 Right 59159.3280 59251.1400 91.8120
89. 59520.5570 372821.9405 2836103.9723 59495.221 59543.454 48.2330 200 31.01 59435.2210 59495.2210 59543.4540 59603.4540 60 7.0 65 Left 59414.3580 59435.2210 20.8630
90. 60226.5550 372130.8834 2835942.0458 60067.311 60378.373 311.0620 700 30.78 60002.3110 60067.3110 60378.3730 60443.3730 65 4.1 65 Right 59603.4540 60002.3110 398.8570
91. 60963.4710 371421.4456 2836167.0056 60929.336 60995.396 66.0600 2000 1.89 100 Left 60443.3730 60929.3360 485.9630
92. 61201.2560 371192.5275 2836231.3564 61172.233 61228.072 55.8390 2000 1.60 100 Right 60995.3960 61172.2330 176.8370
93. 61513.8050 370892.9690 2836324.6630 61492.126 61533.137 41.0110 200 28.94 61432.1260 61492.1260 61533.1370 61593.1370 60 7.0 100 Left 61228.0720 61432.1260 204.0540
94. 61900.8050 370512.6070 2836246.3300 61861.258 61938.139 76.8810 2000 2.20 100 Left 61593.1370 61861.2580 268.1210
95. 62307.7630 370117.0342 2836148.8791 62223.124 62389.596 166.4720 800 15.86 62168.1240 62223.1240 62389.5960 62444.5960 55 5.6 100 Left 61938.1390 62168.1240 229.9850
96. 62748.9370 369732.9218 2835929.7745 62731.366 62764.304 32.9380 2000 0.94 100 Right 62444.5960 62731.3660 286.7700
97. 64363.1490 368317.8016 2835153.1683 64322.869 64401.216 78.3470 2000 2.24 100 Right 62764.3040 64322.8690 1558.5650
98. 64643.2480 368067.1515 2835028.1269 64609.009 64675.282 66.2730 5000 0.76 100 Left 64401.2160 64609.0090 207.7930
99. 64846.8720 367886.1620 2834934.8209 64809.994 64881.545 71.5510 4000 1.02 100 Right 64675.2820 64809.9940 134.7120
100. 65160.2280 367605.1146 2834796.2377 65131.118 65187.133 56.0150 4000 0.80 100 Right 64881.5450 65131.1180 249.5730
101. 65711.1040 367107.6752 2834559.5535 65612.462 65807.387 194.9250 2000 5.58 100 Right 65187.1330 65612.4620 425.3290
102. 66825.0560 366059.8369 2834181.0447 66791.510 66856.393 64.8830 2000 1.86 100 Left 65807.3870 66791.5100 984.1230
103. 66966.2500 365928.6620 2834128.7910 66921.650 67008.638 86.9880 2500 1.99 100 Right 66856.3930 66921.6500 65.2570
104. 67624.7860 365308.7638 2833906.5142 67606.099 67641.268 35.1690 2000 1.01 100 Left 67008.6380 67606.0990 597.4610
105. 67686.9740 365250.6022 2833884.4975 67653.574 67718.165 64.5910 2000 1.85 100 Right 67641.2680 67653.5740 12.3060
106. 68217.3040 364748.7006 2833712.8204 68158.137 68274.136 115.9990 1000 9.22 68113.1370 68158.1370 68274.1360 68319.1360 45 4.4 100 Right 67718.1650 68113.1370 394.9720
107. 68638.0070 364333.7184 2833642.1930 68623.951 68649.860 25.9090 2000 0.74 100 Left 68319.1360 68623.9510 304.8150
108. 69126.5580 363853.1954 2833553.9913 69064.606 69186.289 121.6830 3000 2.32 100 Right 68649.8600 69064.6060 414.7460
D:\Egis Work\Uttar Pradesh\51.EIRH1UP020_UP PWD\Drawing\1.Hamirpur-Rath Section of SH-42\6.FOR TENDER PURPOSE - R1\3a.HIP & VIP\HIP HIP.dwg Sep 23, 2015 - 11:10am yogesh
DETAILS OF HORIZONTAL ALIGNMENT
Horizontal Easting Northing Circular curve Trailing transition length Leading transition length Straight
"Length of "Deviation "Transition "Superelevation" "Side of
Intersection Radius, R Speed
HIP No. curve, Lc" Angle, D" length, TL" curve"
point start end start end start end start end length
E N
108. 69126.5580 363853.1954 2833553.9913 69064.606 69186.289 121.6830 3000 2.32 100 Right 68649.8600 69064.6060 414.7460
109. 69433.2810 363549.4980 2833510.8926 69389.492 69474.854 85.3620 2000 2.45 100 Left 69186.2890 69389.4920 203.2030
110. 69648.3960 363337.9884 2833471.6055 69565.135 69729.394 164.2590 2500 3.76 100 Right 69474.8540 69565.1350 90.2810
111. 70706.8920 362286.7877 2833347.0388 70624.255 70787.311 163.0560 5000 1.87 100 Left 69729.3940 70624.2550 894.8610
112. 71342.7690 361658.0903 2833251.6600 71256.945 71426.288 169.3430 2000 4.85 100 Left 70787.3110 71256.9450 469.6340
113. 72495.8340 360536.6818 2832982.8934 72417.069 72572.382 155.3130 5000 1.78 100 Left 71426.2880 72417.0690 990.7810
114. 74025.2310 359061.1798 2832580.4166 73987.023 74061.232 74.2090 3000 1.42 100 Right 72572.3820 73987.0230 1414.6410
D:\Egis Work\Uttar Pradesh\51.EIRH1UP020_UP PWD\Drawing\1.Hamirpur-Rath Section of SH-42\6.FOR TENDER PURPOSE - R1\3a.HIP & VIP\HIP HIP.dwg Sep 23, 2015 - 11:10am yogesh
DETAILS OF VERTICAL ALIGNMENT FROM KM 2+065 TO KM 76+500
1. Sag
2240.0000 107.4750 2190.0000 107.6250 2290.0000 107.6250 100.0000 -0.3000 0.3000 166.6660
2. Hog
2414.9260 108.0000 2339.9260 107.7750 2489.9260 107.7750 150.0000 0.3000 -0.3000 249.9990
3. Sag
2929.1440 106.4570 2829.1440 106.7570 3029.1440 106.7570 200.0000 -0.3000 0.3000 333.3320
4. Hog
3174.8000 107.1940 3124.8000 107.0440 3224.8000 107.0440 100.0000 0.3000 -0.3000 166.6670
5. Sag
3402.4950 106.5110 3327.4950 106.7360 3477.4950 106.7360 150.0000 -0.3000 0.3000 249.9190
6. Hog
3722.2150 107.4710 3672.2150 107.3210 3772.2150 107.3710 100.0000 0.3000 -0.2000 199.9210
7. Sag
3905.7640 107.1040 3855.7640 107.2040 3955.7640 107.2040 100.0000 -0.2000 0.2000 249.9990
8. Hog
4407.9530 108.1080 4307.9530 107.9080 4507.9530 107.8080 200.0000 0.2000 -0.3000 400.0010
9. Sag
4610.6480 107.5000 4535.6480 107.7250 4685.6480 107.7250 150.0000 -0.3000 0.3000 250.0000
10. Hog
5080.1360 108.9080 5030.1360 108.7580 5130.1360 108.8320 100.0000 0.3000 -0.1530 220.5630
11. Sag
5287.7260 108.5900 5212.7260 108.7050 5362.7260 108.9590 150.0000 -0.1530 0.4920 232.3730
12. Hog
5529.9170 109.7820 5479.9170 109.5360 5579.9170 109.8220 100.0000 0.4920 0.0810 243.1640
13. Hog
6121.7130 110.2610 6046.7130 110.2000 6196.7130 109.9400 150.0000 0.0810 -0.4270 295.1810
14. Sag
6437.8420 108.9100 6337.8420 109.3370 6537.8420 109.1710 200.0000 -0.4270 0.2610 290.5480
15. Hog
6779.9080 109.8030 6719.9080 109.6460 6839.9080 109.7070 120.0000 0.2610 -0.1600 284.8030
16. Sag
7000.0040 109.4500 6950.0040 109.5300 7050.0040 109.5230 100.0000 -0.1600 0.1450 327.6450
17. Hog
7384.7010 110.0080 7234.7010 109.7900 7534.7010 109.7420 300.0000 0.1450 -0.1770 930.7920
18. Sag
7877.9560 109.1330 7727.9560 109.3990 8027.9560 109.7860 300.0000 -0.1770 0.4360 489.3380
19. Hog
8340.3220 111.1470 8265.3220 110.8210 8415.3220 110.9150 150.0000 0.4360 -0.3100 201.1610
20. Sag
8664.9040 110.1410 8589.9040 110.3740 8739.9040 110.0130 150.0000 -0.3100 -0.1710 1081.7400
21. Sag
9055.3900 109.4720 8980.3900 109.6010 9130.3900 109.6740 150.0000 -0.1710 0.2680 341.2130
22. Hog
9284.3670 110.0870 9234.3670 109.9530 9334.3670 110.1510 100.0000 0.2680 0.1290 715.4040
23. Sag
9648.5220 110.5550 9598.5220 110.4900 9698.5220 111.3160 100.0000 0.1290 1.5230 71.7320
24. Hog
10040.0170 116.5160 9965.0170 115.3740 10115.0170 117.2770 150.0000 1.5230 1.0150 295.3190
25. Hog
10342.8490 119.5880 10282.8500 118.9800 10402.8500 118.9820 120.0000 1.0150 1.0110 59.2450
26. Sag
10585.8580 117.1320 10460.8580 118.3960 10710.8580 119.3040 250.0000 1.0110 1.7370 90.9720
27. Hog
10835.6720 121.4720 10785.6720 120.6030 10885.6720 122.1690 100.0000 1.7370 1.3950 291.9210
28. Hog
11072.7490 124.7790 10972.7490 123.3840 11172.7490 124.5770 200.0000 1.3950 -0.2020 125.2580
29. Sag
11896.8530 123.1140 11796.8530 123.3160 11996.8530 123.3300 200.0000 -0.2020 0.2160 478.4610
30. Hog
12392.1170 124.1840 12242.1170 123.8600 12542.1170 123.6740 300.0000 0.2160 -0.3400 539.8240
31. Hog
12840.0000 122.6620 12790.0000 122.8320 12890.0000 122.4630 100.0000 -0.3400 -0.3980 1716.6590
32. Sag
13158.8470 121.3930 13108.8470 121.5920 13208.8470 121.8310 100.0000 -0.3980 0.8760 78.4910
33. Hog
13320.2300 122.8070 13270.2300 122.3690 13370.2300 122.8640 100.0000 0.8760 0.1130 131.0550
34. Sag
13559.9990 123.0780 13509.9990 123.0220 13609.9990 123.3220 100.0000 0.1130 0.4870 267.4570
35. Hog
13720.4580 123.8600 13680.4580 123.6650 13760.4580 123.9110 80.0000 0.4870 0.1280 222.8500
36. Hog
14018.8010 124.2410 13958.8010 124.1650 14078.8010 124.0220 120.0000 0.1280 -0.3650 243.2800
37. Sag
14209.7220 123.5440 14169.7230 123.6900 14249.7230 123.6670 80.0000 -0.3650 0.3080 118.8300
38. Hog
14427.6120 124.2150 14377.6120 124.0610 14477.6120 123.9810 100.0000 0.3080 -0.4680 128.9120
39. Sag
14674.6770 123.0590 14624.6770 123.2930 14724.6770 123.1550 100.0000 -0.4680 0.1930 151.3570
40. Hog
15125.5990 123.9290 15025.5990 123.7360 15225.5990 124.0290 200.0000 0.1930 0.1000 2153.5260
41. Sag
15584.4770 124.3870 15524.4770 124.3270 15644.4770 124.8920 120.0000 0.1000 0.8410 161.9190
D:\Egis Work\Uttar Pradesh\51.EIRH1UP020_UP PWD\Drawing\1.Hamirpur-Rath Section of SH-42\6.FOR TENDER PURPOSE - R1\3a.HIP & VIP\VIP VIP.dwg Sep 23, 2015 - 11:19am yogesh
DETAILS OF VERTICAL ALIGNMENT FROM KM 2+065 TO KM 76+500
42. Hog
15771.5100 125.9610 15731.5100 125.6240 15811.5100 126.0620 80.0000 0.8410 0.2540 136.2610
43. Hog
16140.0660 126.8970 16080.0660 126.7440 16200.0660 126.7720 120.0000 0.2540 -0.2080 259.4770
44. Sag
16341.3450 126.4770 16291.3450 126.5810 16391.3450 126.5530 100.0000 -0.2080 0.1510 277.8810
45. Hog
16539.5880 126.7770 16489.5880 126.7020 16589.5880 126.6010 100.0000 0.1510 -0.3520 198.6890
46. Sag
17238.2810 124.3190 17188.2810 124.4950 17288.2810 124.4820 100.0000 -0.3520 0.3280 147.1590
47. Hog
17599.6750 125.5030 17499.6750 125.1750 17699.6750 125.2030 200.0000 0.3280 -0.3000 318.6560
48. Sag
17851.1450 124.7480 17811.1450 124.8680 17891.1450 124.8640 80.0000 -0.3000 0.2910 135.4510
49. Hog
18113.1080 125.5100 18063.1080 125.3640 18163.1080 125.5600 100.0000 0.2910 0.1000 524.5990
50. Hog
18787.2360 126.1840 18687.2360 126.0840 18887.2360 126.0840 200.0000 0.1000 -0.1000 999.9990
51. Sag
19295.5760 125.6750 19120.5760 125.8500 19470.5760 125.8500 350.0000 -0.1000 0.1000 1749.9980
52. Hog
20066.2640 126.4460 19991.2640 126.3710 20141.2640 126.3710 150.0000 0.1000 -0.1000 749.9920
53. Sag
20350.1090 126.1620 20250.1090 126.2620 20450.1090 126.5820 200.0000 -0.1000 0.4200 384.7050
54. Hog
20616.8920 127.2820 20566.8920 127.0720 20666.8920 127.1620 100.0000 0.4200 -0.2410 151.4050
55. Sag
20916.7370 126.5610 20856.7370 126.7050 20976.7370 126.6230 120.0000 -0.2410 0.1040 348.1890
56. Sag
21688.0480 127.3630 21588.0480 127.2590 21788.0480 127.5790 200.0000 0.1040 0.2160 1790.0720
57. Hog
22077.5650 128.2040 21927.5650 127.8800 22227.5650 127.8970 300.0000 0.2160 -0.2050 713.2680
58. Sag
22580.0000 127.1750 22520.0000 127.2980 22640.0000 127.4400 120.0000 -0.2050 0.4430 185.2330
59. Hog
22802.3280 128.1600 22727.3280 127.8270 22877.3280 128.0470 150.0000 0.4430 -0.1500 252.8410
60. Sag
23310.0000 127.3970 23270.0000 127.4570 23350.0000 127.4390 80.0000 -0.1500 0.1060 312.6630
61. Hog
23501.7850 127.5990 23391.7850 127.4830 23611.7850 127.1310 220.0000 0.1060 -0.4250 414.3280
62. Sag
23693.0900 126.7860 23643.0900 126.9980 23743.0900 126.6790 100.0000 -0.4250 -0.2130 469.9520
63. Sag
23982.1890 126.1710 23922.1890 126.2990 24042.1890 126.2690 120.0000 -0.2130 0.1640 318.8270
64. Hog
24251.3300 126.6120 24176.3300 126.4890 24326.3300 126.5350 150.0000 0.1640 -0.1020 564.8260
65. Sag
24425.7370 126.4340 24375.7370 126.4850 24475.7370 126.4840 100.0000 -0.1020 0.1000 495.6070
66. Hog
24697.7990 126.7060 24622.7990 126.6310 24772.7990 126.4370 150.0000 0.1000 -0.3590 326.6040
67. Sag
24995.5090 125.6370 24945.5090 125.8160 25045.5090 125.6550 100.0000 -0.3590 0.0370 252.0940
68. Hog
25504.8080 125.8270 25464.8080 125.8120 25544.8080 125.3740 80.0000 0.0370 1.1330 68.3350
69. Sag
25606.8370 124.6710 25576.8370 125.0110 25636.8370 124.7190 60.0000 1.1330 0.1610 46.3410
70. Sag
25731.4390 124.8720 25701.4390 124.8240 25761.4390 125.1720 60.0000 0.1610 0.9980 71.6900
71. Hog
25848.6180 126.0420 25798.6180 125.5430 25898.6180 125.9020 100.0000 0.9980 -0.2790 78.2720
72. Sag
26080.0000 125.3960 26030.0000 125.5360 26130.0000 125.5060 100.0000 -0.2790 0.2200 200.3030
73. Hog
26437.7830 126.1830 26387.7830 126.0730 26487.7830 126.1330 100.0000 0.2200 -0.1000 312.4800
74. Sag
26642.9540 125.9780 26542.9540 126.0780 26742.9540 126.0780 200.0000 -0.1000 0.1000 1000.0090
75. Hog
26957.5880 126.2930 26882.5880 126.2180 27032.5880 126.2180 150.0000 0.1000 -0.1000 750.0080
76. Sag
27247.1210 126.0030 27147.1210 126.1030 27347.1210 126.1700 200.0000 -0.1000 0.1670 749.4450
77. Hog
27464.0570 126.3650 27414.0570 126.2820 27514.0570 126.3150 100.0000 0.1670 -0.1000 374.7230
78. Sag
27674.1000 126.1550 27624.1000 126.2050 27724.1000 126.2740 100.0000 -0.1000 0.2370 296.6040
79. Hog
28071.5590 127.0980 28031.5590 127.0030 28111.5590 127.0510 80.0000 0.2370 -0.1180 225.5470
80. Sag
28290.0860 126.8410 28240.0860 126.9000 28340.0860 126.8910 100.0000 -0.1180 0.1000 459.6860
81. Sag
28540.0000 127.0910 28480.0000 127.0310 28600.0000 127.3590 120.0000 0.1000 0.4470 345.5310
82. Hog
28741.6770 127.9930 28681.6770 127.7240 28801.6770 127.8800 120.0000 0.4470 -0.1880 188.9920
D:\Egis Work\Uttar Pradesh\51.EIRH1UP020_UP PWD\Drawing\1.Hamirpur-Rath Section of SH-42\6.FOR TENDER PURPOSE - R1\3a.HIP & VIP\VIP VIP.dwg Sep 23, 2015 - 11:19am yogesh
DETAILS OF VERTICAL ALIGNMENT FROM KM 2+065 TO KM 76+500
99. Sag
34098.9090 131.7870 34048.9090 131.7370 34148.9090 131.8870 100.0000 0.1000 0.2000 995.0940
100. Hog
34317.0420 132.2240 34267.0420 132.1240 34367.0420 132.0880 100.0000 0.2000 -0.2730 211.3690
101. Sag
34608.6270 131.4290 34558.6270 131.5660 34658.6270 131.4870 100.0000 -0.2730 0.1160 257.4400
102. Hog
34933.1810 131.8050 34853.1810 131.7120 35013.1810 131.7110 160.0000 0.1160 -0.1180 684.2390
103. sag
35093.6850 131.6160 35043.6850 131.6750 35143.6850 131.7720 100.0000 -0.1180 0.3130 232.1970
104. 35377.4960 132.5030 35347.4960 132.4090 35407.4960 132.5370 60.0000 Hog 0.3130 0.1130 300.3080
105. 35535.6180 132.6820 35460.6180 132.5970 35610.6180 132.4810 150.0000 Hog 0.1130 -0.2680 393.1190
106. 36002.9010 131.4280 35972.9010 131.5090 36032.9010 131.3090 60.0000 Hog -0.2680 -0.3970 466.8450
107. 36102.3260 131.0340 36072.3260 131.1530 36132.3260 130.9670 60.0000 Sag -0.3970 -0.2220 342.4700
108. 36262.1480 130.6790 36162.1480 130.9010 36362.1480 131.0350 200.0000 Sag -0.2220 0.3560 346.3040
109. 36641.5570 132.0290 36611.5570 131.9230 36671.5570 131.9110 60.0000 Hog 0.3560 -0.3940 80.0410
110. 36943.6360 130.8400 36843.6360 131.2340 37043.6360 131.1420 200.0000 Sag -0.3940 0.3020 287.2780
111. 37482.4920 132.4690 37452.4920 132.3790 37512.4920 132.4730 60.0000 Hog 0.3020 0.0120 206.3200
112. 37977.8500 132.5270 37947.8500 132.5230 38007.8500 132.5860 60.0000 Sag 0.0120 0.1970 323.3800
113. 38241.9660 133.0480 38211.9660 132.9880 38271.9660 133.2450 60.0000 Sag 0.1970 0.6580 130.1390
114. 38343.6840 133.7170 38313.6840 133.5200 38373.6840 133.6160 60.0000 Hog 0.6580 -0.3380 60.2060
115. 38482.4920 133.2470 38452.4920 133.3490 38512.4920 133.2460 60.0000 Sag -0.3380 -0.0040 179.4120
116. 38882.0500 133.2320 38852.0500 133.2330 38912.0500 133.2580 60.0000 Sag -0.0040 0.0870 658.9680
117. 39023.7310 133.3550 38993.7310 133.3290 39053.7310 133.4530 60.0000 Sag 0.0870 0.3260 251.3070
118. 39191.3240 133.9010 39161.3240 133.8030 39221.3240 133.8810 60.0000 Hog 0.3260 -0.0690 152.0950
119. 39392.0800 133.7630 39362.0800 133.7840 39422.0800 133.8070 60.0000 Sag -0.0690 0.1460 280.0780
120. 39589.6270 134.0510 39559.6270 134.0070 39619.6270 134.1160 60.0000 Sag 0.1460 0.2180 831.0370
121. 39851.6750 134.6220 39821.6750 134.5560 39881.6750 134.6350 60.0000 Hog 0.2180 0.0450 346.6480
122. 40191.5100 134.7730 40161.5100 134.7600 40221.5100 134.7430 60.0000 Hog 0.0450 -0.1000 413.8550
123. 40384.2700 134.5800 40354.2700 134.6100 40414.2700 134.7050 60.0000 Sag -0.1000 0.4170 116.0950
D:\Egis Work\Uttar Pradesh\51.EIRH1UP020_UP PWD\Drawing\1.Hamirpur-Rath Section of SH-42\6.FOR TENDER PURPOSE - R1\3a.HIP & VIP\VIP VIP.dwg Sep 23, 2015 - 11:19am yogesh
DETAILS OF VERTICAL ALIGNMENT FROM KM 2+065 TO KM 76+500
124. 40502.0750 135.0710 40472.0750 134.9460 40532.0750 135.0180 60.0000 Hog 0.4170 -0.1770 101.0800
125. 40766.8570 134.6020 40736.8570 134.6550 40796.8570 134.6260 60.0000 Sag -0.1770 0.0790 234.5640
126. 40942.4920 134.7400 40912.4920 134.7170 40972.4920 134.9160 60.0000 Sag 0.0790 0.5850 118.5040
127. 41096.2380 135.6400 41066.2380 135.4640 41126.2380 135.6400 60.0000 Hog 0.5850 -0.0010 102.4290
128. 41682.5330 135.6360 41652.5330 135.6360 41712.5330 135.7570 60.0000 Sag -0.0010 0.4030 148.4400
129. 41789.3020 136.0660 41759.3020 135.9450 41819.3020 136.0660 60.0000 Hog 0.4030 0.0000 148.7030
130. 41923.1290 136.0670 41893.1290 136.0670 41953.1290 136.1580 60.0000 Sag 0.0000 0.3060 196.3310
131. 41995.4770 136.2880 41965.4770 136.1960 42025.4770 136.2140 60.0000 Hog 0.3060 -0.2460 108.7820
132. 42098.0570 136.0350 42068.0570 136.1090 42128.0570 136.2480 60.0000 Sag -0.2460 0.7090 62.8100
133. 42212.4920 136.8470 42182.4920 136.6340 42242.4920 136.7200 60.0000 Hog 0.7090 -0.4250 52.9080
134. 42342.6930 136.2940 42252.6930 136.6760 42432.6930 136.4560 180.0000 Sag -0.4250 0.1800 297.7180
135. 42536.2760 136.6420 42506.2760 136.5880 42566.2760 136.6650 60.0000 Hog 0.1800 0.0750 572.2030
136. 42992.1950 136.9840 42962.1950 136.9620 43022.1950 136.9520 60.0000 Hog 0.0750 -0.1060 331.6120
137. 43117.0050 136.8520 43087.0050 136.8840 43147.0050 136.8520 60.0000 Sag -0.1060 0.0000 566.4600
138. 43382.3930 136.8520 43352.3930 136.8520 43412.3930 136.8910 60.0000 Sag 0.0000 0.1310 457.9740
139. 43538.1040 137.0560 43508.1040 137.0170 43568.1040 137.1670 60.0000 Sag 0.1310 0.3710 249.7090
140. 43647.5060 137.4620 43617.5060 137.3510 43677.5060 137.3340 60.0000 Hog 0.3710 -0.4280 75.0270
141. 43763.3730 136.9660 43733.3730 137.0940 43793.3730 137.0720 60.0000 Sag -0.4280 0.3550 76.5640
142. 43902.4920 137.4600 43872.4920 137.3530 43932.4920 137.3300 60.0000 Hog 0.3550 -0.4330 76.1530
143. 44042.5590 136.8540 44012.5590 136.9840 44072.5590 136.8420 60.0000 Sag -0.4330 -0.0400 152.8280
144. 44204.5970 136.7890 44174.5970 136.8010 44234.5970 136.9790 60.0000 Sag -0.0400 0.6340 89.0120
145. 44332.2600 137.5990 44302.2600 137.4080 44362.2600 137.5410 60.0000 Hog 0.6340 -0.1920 72.6050
146. 44528.8000 137.2200 44498.8000 137.2780 44558.8000 137.2400 60.0000 Sag -0.1920 0.0670 231.6070
147. 44814.4850 137.4110 44784.4850 137.3910 44844.4850 137.4600 60.0000 Sag 0.0670 0.1630 619.7410
148. 44967.5770 137.6610 44937.5770 137.6120 44997.5770 137.8450 60.0000 Sag 0.1630 0.6130 133.6190
149. 45102.4920 138.4880 45072.4920 138.3040 45132.4920 138.3370 60.0000 Hog 0.6130 -0.5020 53.8410
150. 45242.4920 137.7850 45212.4920 137.9360 45272.4920 137.9050 60.0000 Sag -0.5020 0.4000 66.5030
151. 45402.4720 138.4260 45372.4720 138.3050 45432.4720 138.3560 60.0000 Hog 0.4000 -0.2320 94.8550
152. 45542.7920 138.1000 45512.7920 138.1690 45572.7920 138.1300 60.0000 Sag -0.2320 0.1000 180.6460
153. 45794.7970 138.3520 45764.7970 138.3220 45824.7970 138.4540 60.0000 Sag 0.1000 0.3430 247.3600
154. 45963.0500 138.9280 45933.0500 138.8250 45993.0500 139.2230 60.0000 Sag 0.3430 0.9850 93.3690
155. 46069.5130 139.9770 46039.5130 139.6810 46099.5130 139.8500 60.0000 Hog 0.9850 -0.4230 42.6240
156. 46275.6480 139.1060 46245.6480 139.2320 46305.6480 139.2920 60.0000 Sag -0.4230 0.6220 57.4350
157. 46373.9260 139.7170 46343.9260 139.5300 46403.9260 139.7200 60.0000 Hog 0.6220 0.0080 97.7250
158. 46452.4920 139.7230 46422.4920 139.7210 46482.4920 139.6340 60.0000 Hog 0.0080 -0.2990 195.6340
159. 46651.2870 139.1300 46621.2870 139.2200 46681.2870 139.1820 60.0000 Sag -0.2990 0.1720 127.5300
160. 46844.3330 139.4620 46814.3330 139.4100 46874.3330 139.4790 60.0000 Hog 0.1720 0.0580 525.3630
161. 47140.5850 139.6330 47110.5850 139.6160 47170.5850 139.6400 60.0000 Hog 0.0580 0.0240 1766.7220
162. 47543.7850 139.7290 47513.7850 139.7220 47573.7850 139.7480 60.0000 Sag 0.0240 0.0640 1490.7500
163. 47904.8330 139.9600 47874.8330 139.9410 47934.8330 139.8940 60.0000 Hog 0.0640 -0.2180 212.7600
Sag
D:\Egis Work\Uttar Pradesh\51.EIRH1UP020_UP PWD\Drawing\1.Hamirpur-Rath Section of SH-42\6.FOR TENDER PURPOSE - R1\3a.HIP & VIP\VIP VIP.dwg Sep 23, 2015 - 11:19am yogesh
DETAILS OF VERTICAL ALIGNMENT FROM KM 2+065 TO KM 76+500
164. 48139.3750 139.4490 48109.3750 139.5140 48169.3750 139.5360 60.0000 Sag -0.2180 0.2910 117.8000
165. 48496.3480 140.4890 48466.3480 140.4010 48526.3480 140.4350 60.0000 Hog 0.2910 -0.1780 127.7700
166. 48686.8040 140.1490 48656.8040 140.2020 48716.8040 140.2250 60.0000 Sag -0.1780 0.2550 138.5790
167. 48956.4430 140.8360 48881.4430 140.6450 49031.4430 140.6410 150.0000 Hog 0.2550 -0.2590 291.9160
168. 49213.2580 140.1700 49163.2580 140.3000 49263.2580 140.5040 100.0000 Sag -0.2590 0.6670 108.0200
169. 49343.9780 141.0420 49313.9780 140.8420 49373.9780 141.2110 60.0000 Hog 0.6670 0.5640 586.6130
170. 49542.7080 142.1630 49512.7080 141.9940 49572.7080 141.9150 60.0000 Hog 0.5640 -0.8280 43.1050
171. 49718.8400 140.7050 49688.8400 140.9540 49748.8400 140.8310 60.0000 Sag -0.8280 0.4180 48.1680
172. 49838.1400 141.2040 49788.1400 140.9950 49888.1400 141.3500 100.0000 Hog 0.4180 0.2910 787.1020
173. 50266.6670 142.4510 50236.6670 142.3640 50296.6670 142.5040 60.0000 Hog 0.2910 0.1770 524.9220
174. 50802.0130 143.3970 50772.0130 143.3440 50832.0130 143.5020 60.0000 Sag 0.1770 0.3500 345.9770
175. 51053.9750 144.2790 50953.9750 143.9290 51153.9750 144.1270 200.0000 Hog 0.3500 -0.1520 398.1460
176. 51315.8050 143.8800 51285.8050 143.9260 51345.8050 143.9750 60.0000 Sag -0.1520 0.3150 128.4610
177. 51623.1440 144.8480 51593.1440 144.7540 51653.1440 144.6930 60.0000 Hog 0.3150 -0.5180 72.0780
178. 51846.8110 143.6900 51816.8110 143.8460 51876.8110 143.8550 60.0000 Sag -0.5180 0.5470 56.3400
179. 51989.0590 144.4690 51959.0590 144.3050 52019.0590 144.5060 60.0000 Hog 0.5470 0.1230 141.3900
180. 53010.8860 145.7260 52910.8860 145.6030 53110.8860 145.6040 200.0000 Hog 0.1230 -0.1220 816.7150
181. 53242.4920 145.4430 53212.4920 145.4800 53272.4920 145.5150 60.0000 Sag -0.1220 0.2380 166.6930
182. 53422.4920 145.8720 53392.4920 145.8000 53452.4920 145.8360 60.0000 Hog 0.2380 -0.1200 167.5630
183. 53653.9540 145.5940 53623.9540 145.6300 53683.9540 145.6510 60.0000 Sag -0.1200 0.1890 193.8490
184. 53979.9180 146.2120 53949.9180 146.1550 54009.9180 146.1730 60.0000 Hog 0.1890 -0.1300 187.8090
185. 54146.3360 145.9960 54116.3360 146.0340 54176.3360 146.0430 60.0000 Sag -0.1300 0.1570 208.8890
186. 54383.3320 146.3680 54353.3320 146.3210 54413.3320 146.3380 60.0000 Hog 0.1570 -0.1000 233.1780
187. 54559.9370 146.1920 54529.9370 146.2220 54589.9370 146.2500 60.0000 Sag -0.1000 0.1950 203.2410
188. 54802.1460 146.6640 54752.1460 146.5670 54852.1460 146.6020 100.0000 Hog 0.1950 -0.1240 312.9570
189. 54927.3360 146.5090 54897.3360 146.5460 54957.3360 146.6160 60.0000 Sag -0.1240 0.3590 124.1650
190. 55118.2200 147.1940 55088.2200 147.0860 55148.2200 147.2670 60.0000 Hog 0.3590 0.2460 532.0260
191. 55834.8560 148.9570 55804.8560 148.8830 55864.8560 148.9210 60.0000 Hog 0.2460 -0.1190 164.2010
192. 56597.1470 148.0470 56567.1470 148.0830 56627.1470 148.1580 60.0000 Sag -0.1190 0.3690 122.8170
193. 56682.4920 148.3620 56652.4920 148.2520 56712.4920 148.2220 60.0000 Hog 0.3690 -0.4670 71.7350
194. 56802.3320 147.8030 56772.3320 147.9430 56832.3320 147.7670 60.0000 Sag -0.4670 -0.1190 172.4830
195. 56992.8690 147.5750 56962.8690 147.6110 57022.8690 147.3930 60.0000 Hog -0.1190 -0.6080 122.6860
196. 57506.9390 144.4480 57476.9390 144.6300 57536.9390 143.9210 60.0000 Hog -0.6080 -1.7560 52.2820
197. 57758.7020 140.0270 57728.7020 140.5530 57788.7020 140.0130 60.0000 Sag -1.7560 -0.0460 35.0900
198. 57982.8950 139.9230 57952.8950 139.9370 58012.8950 139.6880 60.0000 Hog -0.0460 -0.7850 81.2500
199. 58112.1490 138.9090 58082.1490 139.1440 58142.1490 139.1980 60.0000 Sag -0.7850 0.9620 34.3540
200. 58342.8400 141.1280 58272.8400 140.4550 58412.8400 139.5870 140.0000 Hog 0.9620 -2.2010 44.2610
201. 58806.4500 130.9230 58706.4500 133.1250 58906.4500 132.6070 200.0000 Sag -2.2010 1.6830 51.4850
202. 59019.9800 134.5180 58969.9800 133.6760 59069.9800 134.3880 100.0000 Hog 1.6830 -0.2600 51.4550
203. 59357.4470 133.6410 59327.4470 133.7190 59387.4470 134.1000 60.0000 Sag -0.2600 1.5300 33.5160
204. 59593.5720 137.2540 59563.5720 136.7950 59623.5720 137.2540 60.0000 Hog 1.5300 0.0000 39.2100
D:\Egis Work\Uttar Pradesh\51.EIRH1UP020_UP PWD\Drawing\1.Hamirpur-Rath Section of SH-42\6.FOR TENDER PURPOSE - R1\3a.HIP & VIP\VIP VIP.dwg Sep 23, 2015 - 11:19am yogesh
DETAILS OF VERTICAL ALIGNMENT FROM KM 2+065 TO KM 76+500
204. 59593.5720 137.2540 59563.5720 136.7950 59623.5720 137.2540 60.0000 Hog 1.5300 0.0000 39.2100
205. 59916.1050 137.2540 59886.1050 137.2540 59946.1050 136.7720 60.0000 Hog 0.0000 -1.6080 37.3220
206. 60123.0000 133.9280 60093.0000 134.4100 60153.0000 133.9050 60.0000 Sag -1.6080 -0.0760 39.1810
207. 60490.6430 133.6480 60460.6430 133.6700 60520.6430 133.7370 60.0000 Sag -0.0760 0.2970 160.8280
208. 60707.1860 134.2900 60677.1860 134.2010 60737.1860 134.2140 60.0000 Hog 0.2970 -0.2560 108.6150
209. 61103.1390 133.2780 61073.1390 133.3550 61133.1390 133.9050 60.0000 Sag -0.2560 2.0910 25.5670
210. 61587.4530 143.4060 61462.4530 140.7920 61712.4530 144.5770 250.0000 Hog 2.0910 0.9370 216.6420
211. 62020.0020 147.4590 61970.0020 146.9910 62070.0020 147.6930 100.0000 Hog 0.9370 0.4670 212.4810
212. 62262.4920 148.5910 62232.4920 148.4510 62292.4920 148.7850 60.0000 Sag 0.4670 0.6480 330.6950
213. 62626.9530 150.9520 62576.9530 150.6280 62676.9530 150.7990 100.0000 Hog 0.6480 -0.3070 104.6900
214. 63245.2550 149.0530 63215.2550 149.1450 63275.2550 148.7710 60.0000 Hog -0.3070 -0.9380 95.0780
215. 63442.1240 147.2060 63392.1240 147.6750 63492.1240 147.5640 100.0000 Sag -0.9380 0.7160 60.4500
216. 63617.6770 148.4630 63587.6770 148.2480 63647.6770 148.5540 60.0000 Hog 0.7160 0.3060 146.1930
217. 64170.4500 150.1510 64070.4500 149.8460 64270.4500 148.9900 200.0000 Hog 0.3060 -1.1620 136.3130
218. 64383.0850 147.6810 64333.0850 148.2620 64433.0850 148.1590 100.0000 Sag -1.1620 0.9560 47.2270
219. 64629.8910 150.0400 64529.8910 149.0850 64729.8910 149.6260 200.0000 Hog 0.9560 -0.4140 145.9570
220. 64930.1130 148.7960 64900.1130 148.9200 64960.1130 149.0780 60.0000 Sag -0.4140 0.9420 44.2350
221. 65105.8460 150.4510 65075.8460 150.1690 65135.8460 150.2750 60.0000 Hog 0.9420 -0.5860 39.2590
222. 65285.1130 149.4000 65255.1130 149.5760 65315.1130 149.3270 60.0000 Sag -0.5860 -0.2440 175.1790
223. 65638.5660 148.5380 65608.5660 148.6110 65668.5660 148.6740 60.0000 Sag -0.2440 0.4550 85.8600
224. 65742.1980 149.0090 65712.1980 148.8730 65772.1980 149.1990 60.0000 Sag 0.4550 0.6340 335.9000
225. 65821.2820 149.5100 65791.2820 149.3200 65851.2820 149.6250 60.0000 Hog 0.6340 0.3830 239.3850
226. 65952.6350 150.0130 65922.6350 149.8980 65982.6350 150.0660 60.0000 Hog 0.3830 0.1770 291.6460
227. 66532.5390 151.0400 66502.5390 150.9870 66562.5390 151.0510 60.0000 Hog 0.1770 0.0380 431.1030
228. 66706.6930 151.1060 66676.6930 151.0950 66736.6930 151.1820 60.0000 Sag 0.0380 0.2540 277.7090
229. 66860.5070 151.4970 66830.5070 151.4210 66890.5070 151.4390 60.0000 Hog 0.2540 -0.1950 133.7620
230. 66995.6920 151.2340 66965.6920 151.2920 67025.6920 151.2670 60.0000 Sag -0.1950 0.1090 197.6910
231. 67311.7850 151.5780 67281.7850 151.5460 67341.7850 151.4350 60.0000 Hog 0.1090 -0.4780 102.2270
232. 67413.1920 151.0940 67383.1920 151.2370 67443.1920 151.1450 60.0000 Sag -0.4780 0.1730 92.2100
233. 67562.5160 151.3520 67532.5160 151.3000 67592.5160 151.3230 60.0000 Hog 0.1730 -0.0940 224.9660
234. 67842.8490 151.0880 67812.8490 151.1160 67872.8490 151.2150 60.0000 Sag -0.0940 0.4250 115.6550
235. 67960.2020 151.5860 67930.2020 151.4590 67990.2020 151.5120 60.0000 Hog 0.4250 -0.2470 89.3160
236. 68237.5860 150.9010 68207.5860 150.9750 68267.5860 150.9590 60.0000 Sag -0.2470 0.1900 137.1910
237. 68422.4970 151.2530 68392.4970 151.1960 68452.4970 151.2470 60.0000 Hog 0.1900 -0.0220 282.4980
238. 68576.3840 151.2190 68546.3840 151.2260 68606.3840 151.0870 60.0000 Hog -0.0220 -0.4420 142.8740
239. 68670.1440 150.8050 68640.1440 150.9380 68700.1440 150.8160 60.0000 Sag -0.4420 0.0370 125.1530
240. 68740.9380 150.8320 68710.9380 150.8200 68770.9380 151.1240 60.0000 Sag 0.0370 0.9760 63.9610
241. 68829.5180 151.6960 68799.5180 151.4030 68859.5180 151.7350 60.0000 Hog 0.9760 0.1320 71.1110
242. 68921.6630 151.8170 68891.6630 151.7780 68951.6630 151.9220 60.0000 Sag 0.1320 0.3500 275.0830
243. 69021.4730 152.1660 68991.4730 152.0610 69051.4730 152.1530 60.0000 Hog 0.3500 -0.0430 152.5380
244. 69117.3800 152.1250 69087.3800 152.1380 69147.3800 152.1710 60.0000 Sag -0.0430 0.1560 301.5070
D:\Egis Work\Uttar Pradesh\51.EIRH1UP020_UP PWD\Drawing\1.Hamirpur-Rath Section of SH-42\6.FOR TENDER PURPOSE - R1\3a.HIP & VIP\VIP VIP.dwg Sep 23, 2015 - 11:19am yogesh
DETAILS OF VERTICAL ALIGNMENT FROM KM 2+065 TO KM 76+500
245. 69631.3950 152.9240 69601.3950 152.8770 69661.3950 152.9400 60.0000 Hog 0.1560 0.0540 593.5120
246. 69890.4550 153.0650 69860.4550 153.0490 69920.4550 153.0710 60.0000 Hog 0.0540 0.0200 1753.3250
247. 70150.2680 153.1170 70120.2680 153.1110 70180.2680 153.0840 60.0000 Hog 0.0200 -0.1110 458.5730
248. 70286.9350 152.9660 70256.9350 152.9990 70316.9350 153.0390 60.0000 Sag -0.1110 0.2420 170.3840
249. 70369.7050 153.1660 70339.7050 153.0940 70399.7050 153.1450 60.0000 Hog 0.2420 -0.0720 191.3780
250. 70540.6690 153.0430 70510.6690 153.0650 70570.6690 153.0940 60.0000 Sag -0.0720 0.1710 246.9600
251. 70672.5200 153.2680 70642.5200 153.2170 70702.5200 153.2850 60.0000 Hog 0.1710 0.0560 521.2690
252. 71122.5000 153.5200 71092.5000 153.5030 71152.5000 153.6340 60.0000 Sag 0.0560 0.3820 184.1450
253. 71216.2440 153.8780 71186.2440 153.7630 71246.2440 153.8140 60.0000 Hog 0.3820 -0.2130 100.9020
254. 71315.6070 153.6660 71285.6070 153.7300 71345.6070 153.6660 60.0000 Sag -0.2130 0.0000 281.7480
255. 71542.9390 153.6660 71512.9390 153.6660 71572.9390 153.7360 60.0000 Sag 0.0000 0.2350 255.3430
256. 71653.0770 153.9250 71623.0770 153.8540 71683.0770 153.8830 60.0000 Hog 0.2350 -0.1390 160.6300
257. 71746.8330 153.7950 71716.8330 153.8360 71776.8330 153.8430 60.0000 Sag -0.1390 0.1620 199.6980
258. 71921.0740 154.0770 71891.0740 154.0280 71951.0740 154.0790 60.0000 Hog 0.1620 0.0080 388.6790
259. 72015.3230 154.0840 71985.3230 154.0820 72045.3230 154.1440 60.0000 Sag 0.0080 0.2000 311.7860
260. 72162.4930 154.3780 72132.4930 154.3180 72192.4930 154.3140 60.0000 Hog 0.2000 -0.2150 144.6710
261. 72365.2290 153.9430 72335.2290 154.0070 72395.2290 154.0210 60.0000 Sag -0.2150 0.2610 126.0570
262. 72583.6330 154.5140 72553.6330 154.4350 72613.6330 154.5140 60.0000 Hog 0.2610 0.0000 229.6970
263. 72722.4920 154.5140 72692.4920 154.5140 72752.4920 154.5940 60.0000 Sag 0.0000 0.2680 224.2710
264. 72802.4820 154.7270 72772.4820 154.6470 72832.4820 154.7460 60.0000 Hog 0.2680 0.0630 293.6650
265. 72891.8540 154.7840 72861.8540 154.7650 72921.8540 154.8930 60.0000 Sag 0.0630 0.3640 199.7570
266. 72972.0830 155.0760 72942.0830 154.9670 73002.0830 155.0460 60.0000 Hog 0.3640 -0.1000 129.2880
267. 73055.9660 154.9910 73025.9660 155.0220 73085.9660 155.0390 60.0000 Sag -0.1000 0.1590 231.3390
268. 73362.3950 155.4780 73332.3950 155.4310 73392.3950 155.4980 60.0000 Hog 0.1590 0.0670 655.8670
269. 73792.1940 155.7680 73762.1940 155.7480 73822.1940 155.8260 60.0000 Sag 0.0670 0.1950 469.8410
270. 74222.8310 156.6080 74192.8310 156.5490 74252.8310 156.5800 60.0000 Hog 0.1950 -0.0910 209.4780
271. 74348.2920 156.4930 74318.2920 156.5210 74378.2920 156.6350 60.0000 Sag -0.0910 0.4720 106.5310
272. 74410.5970 156.7870 74380.5970 156.6460 74440.5970 156.8030 60.0000 Hog 0.4720 0.0520 142.8070
273. 74678.5550 156.9260 74648.5550 156.9100 74708.5550 157.0140 60.0000 Sag 0.0520 0.2950 247.1250
274. 74766.2580 157.1840 74736.2580 157.0960 74796.2580 157.1220 60.0000 Hog 0.2950 -0.2070 119.6670
D:\Egis Work\Uttar Pradesh\51.EIRH1UP020_UP PWD\Drawing\1.Hamirpur-Rath Section of SH-42\6.FOR TENDER PURPOSE - R1\3a.HIP & VIP\VIP VIP.dwg Sep 23, 2015 - 11:20am yogesh
LEGEND FOR EXISTING FEATURES LEGEND FOR PROPOSED PLAN FEATURES
DESCRIPTION LINE TYPE & BLOCKS DESCRIPTION LINE TYPE & BLOCKS DESCRIPTION LINE TYPE & BLOCKS
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
EGIS/DPR/EIRH1UP020/DPR/LEGENDS- 001
(Hamirpur-Rath Section of SH42) Date Dec 2014
Plan and Profile
START OF
PROJECT ROAD
Chianage 2+065
Easting 414189.161
Northing 2868962.918
JUNCTION IMPROVEMENT
For Details, Refer Drg No.
EGIS/DPR/EIRH1UP020/DPR/MJI-001
JUNCTION IMPROVEMENT
For Details, Refer Drg No.
EGIS/DPR/EIRH1UP020/DPR/MJI-002
FRL at PCL
Ch.=2339.926m
Ch.=2489.926m
Lvl.=108.000m
Ch.=2190.000m
Ch.=2290.000m
Lvl.=107.775m
Lvl.=107.775m
Lvl.=107.625m
Lvl.=107.625m
EGL / ERL at PCL
Ch.=2829.144m
Lvl.=106.757m
Datum(m) = 102
107.630 108.000
107.222 107.955
106.829 107.895
106.431 107.835
106.070 107.775
105.930 107.715
105.787 107.655
105.646 107.598
105.565 107.562
105.477 107.550
105.471 107.562
105.498 107.598
105.529 107.655
105.561 107.715
105.507 107.775
105.375 107.827
105.386 107.863
105.521 107.883
105.529 107.887
105.540 107.875
105.645 107.847
105.631 107.803
105.620 107.745
105.587 107.685
105.514 107.625
105.446 107.565
105.399 107.505
105.389 107.445
105.278 107.385
105.360 107.325
105.346 107.265
105.281 107.205
105.087 107.145
105.040 107.085
104.984 107.025
104.911 106.965
104.918 106.905
104.899 106.845
104.844 106.785
104.820 106.726
104.790 106.679
104.746 106.643
104.656 106.620
104.597 106.608
104.594 106.609
104.643 106.621
104.639 106.646
104.662 106.682
FINISHED ROAD LEVEL (FRL) AT PCL (m)
1.066
1.404
1.705
1.785
1.868
1.952
1.997
2.073
2.091
2.100
2.126
2.154
2.268
2.452
2.477
2.362
2.358
2.335
2.202
2.172
2.125
2.098
2.111
2.119
2.106
2.056
2.107
1.965
1.919
1.924
2.058
2.045
2.041
2.054
1.987
1.946
1.941
1.906
1.889
1.897
1.964
2.011
2.015
1.978
2.007
2.020
LEVEL DIFFERENCE
(FRL - EGL/ERL)
R=16666.630m G=0.300 R=33333.202m
VERTICAL PROFILE L=100.000m L=49.926m L=200.000m
AT PROPOSED CENTER LINE (PCL) L=125.000m L=150.000m L=339.218m
G=-0.300 R=-24999.921m G=-0.300
R=-40.000m
R=-10000.000m L=25.224m
HORIZONTAL ALIGNMENT
L=265.660m L=185.398m L=61.264m L=35 .0m L=496.021m
.0m L=35
w=5.75
2577.322
2612.322
2637.546
2672.546
WIDENING
w=5.75
e=4.4
e=2.5 e=2.5
SUPERELEVATION (%)
e=4.4
2065
2080
2100
2120
2140
2160
2180
2200
2220
2240
2260
2280
2300
2320
2340
2360
2380
2400
2420
2440
2460
2480
2500
2520
2540
2560
2580
2600
2620
2640
2660
2680
2700
2720
2740
2760
2780
2800
2820
2840
2860
2880
2900
2920
2940
2960
2980
3000
CHAINAGE (m)
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:11pm maninder.v
CLIENT:-
WIDENING
CHAINAGE (m)
Ex
(FRL - EGL/ERL)
RO
VERTICAL PROFILE
LEVEL DIFFERENCE
W
Datum(m) = 100
SUPERELEVATION (%)
290
0
HORIZONTAL ALIGNMENT
Ex R
O
TO
OW
AG
3
Ch.=3029.144m
IC
Ex R
Lvl.=106.757m
LT
OW
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:11pm maninder.v
e=2.5
3080 2.128 104.782 106.910
OW
G=0.300
L=95.656m
310
Ex
0
TO
CONSULTANT:-
3100 2.134 104.836 106.970
RO
AG
W
RI
CU
Lvl.=107.044m TO
UR
AM
Ex
egisIndia
Span
LA
RO
TA
W
VI
ND
LL
3160 2.190 104.923 107.113
Chainage
AG
E
Ex R
320
0
Box Culvert
L=100.000m
3200 2.304 104.796 107.100
R=-16666.677m
1x2x2
3+180
Ex R
L=70.000m
3220 2.190 104.868 107.058 Ch.=3224.800m
OW
PROJECT:-
Lvl.=107.044m
3240 2.084 104.914 106.998
Ex R
OW
G=-0.300
LT
RO
UR
3300
L=102.695m
W
Lvl.=106.736m
3340 1.798 104.904 106.702
e=6.6
e=6.6
L=150.000m
34.501
L=333.448m
338.448
R=-670.000m
R=24991.887m
413433.751
2869621.018
FRL at PCL
VER 0
HOR 0
Ch.=3477.495m
SCALE:-
Ex ROW
25
2.5
3500 1.754 105.050 106.804 3500
3520 1.712 105.152 106.864
50
Ex ROW
1:2500 @ A2 SHEET
5.0
Span
Date
Box Culvert
Checked by
G=0.300
Prepared by
Designed by
Approved by
1x2x2
3+560
L=194.721m
Ex RO
W
Dec 2014
L=70.000m
O
Rajeev Gupta
W
Balkeshwar Mishra
Ch.=3672.215m
OW
Lvl.=107.321m
R0
Ex RO
3700
ht.=1
Date
R=-19992.083m
Ch.=3772.215m
Ex R
Lvl.=107.371m
OW
3800
Ex RO
G=-0.200
L=83.549m
e=2.5
Ch.=3855.764m
OW
DRG. NO. :
L
L=100.000m
TU
W
RE
R=24999.906m
L AN
3940 0.874 106.303 107.177 D
Ch.=3955.764m
Ex R
L AN
W
TO
RE AG
TU
3980 1.112 106.140 107.252 UL RI C
UL
G RIC TU
T OA RE
Ex RO
ND
FROM KM- 3+000
Ex
Ex R
OW
TO KM- 4+000
4100
Ex R
OW
CLIENT:-
WIDENING
CHAINAGE (m)
(FRL - EGL/ERL)
VERTICAL PROFILE
LEVEL DIFFERENCE
TO
3900
Datum(m) = 100
SUPERELEVATION (%)
AG
RI
Ex ROW
CU
HORIZONTAL ALIGNMENT
LT
UR
E
LA
ND
TO
4000 1.216 106.076 107.292 AG
RI
C
Ex ROW
UL
4020 1.244 106.088 107.332 T UR
E
LA
4040 1.158 106.214 107.372 ND
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:12pm maninder.v
4080 1.239 106.213 107.452
Ex ROW
CONSULTANT:-
4100 1.241 106.251 107.492 4100
Span
G=0.200
4140 1.399 106.173 107.572
Ex ROW
egisIndia
Chainage
L=352.190m
4160 1.515 106.097 107.612
Ex ROW
1x2x2
4+160
4200 1.494 106.198 107.692 4200
TO
Ex ROW
PROJECT:-
RI
CU
4240 1.461 106.311 107.772 LT
Ex ROW
UR
E
LA
4260 1.387 106.425 107.812 N D
L=200.000m
FRL at PCL
R=-40000.108m
4440 1.905 106.049 107.954
Ex ROW
VER 0
HOR 0
Ex ROW
SCALE:-
4480 1.939 105.943 107.882
L=1665.087m
25
2.5
4500 1.976 105.855 107.831 4500
Ch.=4507.953m
e=2.5
Lvl.=107.808m
4520 1.951 105.821 107.772
50
Ex ROW
1:2500 @ A2 SHEET
5.0
G=-0.300
Ch.=4535.648m
L=27.694m
Date
Span
Chainage
Checked by
Prepared by
Designed by
Approved by
Ex ROW
Dec 2014
1x2x2
Ex ROW
4+580
L=150.000m
Rajeev Gupta
Sanjay Kumar
R=25000.020m
Balkeshwar Mishra
R0
Lvl.=107.725m
4700 2.049 105.719 107.768 4700
Ex ROW
Date
DRG. NO. :
Ex ROW
R
TO KM- 5+000
PU
5100
LA
HE
TO
E
AG GE
LL LA
VI VIL
UR R
P PU
LA LA
HE
HE TO
TO
Ex ROW Ex ROW
Ex ROW Ex ROW
Ex ROW Ex ROW
Ex ROW Ex ROW Ex ROW
Ex ROW Ex ROW Ex ROW
Ex ROW Ex ROW Ex ROW Ex ROW
Ex ROW Ex ROW Ex ROW
Ex ROW Ex ROW Ex ROW
Ex ROW Ex ROW Ex ROW
Ex ROW Ex ROW
Ex ROW Ex ROW Ex ROW
Ex ROW Ex ROW
6100
Ex ROW
4900
5100
5900
5200
5800
M
5300
5700
RA
5400
5600
5500
E
ASH
AG
ILL
AV
GN
TO
6 AN S
4 411276.664 TO
411701.892 2868445.011
5
2868702.314 20000
411542.074 100
10000
2868619.662 0.407
100
1000
0.598 142.045
100 -
104.438
6.000 NC
-
54.724 Right
NC JUNCTION IMPROVEMENT
50
Right
4.4 For Details, Refer Drg No.
Left EGIS/DPR/EIRH1UP020/DPR/MJI-003
Ch.=5579.917m
Span 1X1.2 Span 1 X 1.2
Ch.=5479.917m
Lvl.=109.822m
Lvl.=109.536m
Ch.=5362.726m
Ch.=5130.136m
Ch.=5030.136m
Ch.=5212.726m
Lvl.=108.959m
Lvl.=108.832m
Lvl.=108.758m
Lvl.=108.705m
Datum(m) = 100
107.266 108.668
107.633 108.728
107.885 108.786
108.137 108.828
108.259 108.852
108.188 108.857
108.206 108.845
108.136 108.817
108.055 108.786
108.033 108.755
108.017 108.725
107.976 108.695
108.011 108.679
108.089 108.681
108.139 108.699
108.243 108.735
108.256 108.788
108.204 108.858
108.142 108.946
108.147 109.044
108.185 109.143
108.218 109.241
108.443 109.339
108.710 109.438
108.844 109.536
108.875 109.626
109.012 109.700
109.154 109.757
109.230 109.798
109.373 109.822
109.403 109.839
109.403 109.855
109.366 109.871
109.309 109.887
109.219 109.903
109.113 109.920
109.105 109.936
109.163 109.952
109.156 109.968
109.172 109.984
109.203 110.000
109.374 110.017
109.363 110.033
109.371 110.049
109.408 110.065
109.469 110.081
109.570 110.097
109.569 110.114
109.591 110.130
109.624 110.146
109.667 110.162
FINISHED ROAD LEVEL (FRL) AT PCL (m)
1.095
0.901
0.691
0.593
0.669
0.639
0.681
0.731
0.722
0.708
0.719
0.668
0.592
0.560
0.492
0.532
0.654
0.804
0.897
0.958
1.023
0.896
0.728
0.692
0.751
0.688
0.603
0.568
0.449
0.436
0.452
0.505
0.578
0.684
0.807
0.831
0.789
0.812
0.812
0.797
0.643
0.670
0.678
0.657
0.612
0.527
0.545
0.539
0.522
0.495
LEVEL DIFFERENCE
(FRL - EGL/ERL)
R=23237.338m G=0.492 G=0.081
VERTICAL PROFILE L=150.000m L=117.191m L=466.797m
AT PROPOSED CENTER LINE (PCL) L=100.000m L=82.589m L=100.000m
R=-22056.287m G=-0.153 R=-24316.358m
R=10000.000m R=-1000.000m R=20000.000m
HORIZONTAL ALIGNMENT
L=104.438m L=50.291m L=50.000m L=54.724m L=50.000m L=169.281m L=142.045m L=81.077m
WIDENING
e=4.4
e=2.5 e=2.5
SUPERELEVATION (%)
e=4.4
5000
5020
5040
5060
5080
5100
5120
5140
5160
5180
5200
5220
5240
5260
5280
5300
5320
5340
5360
5380
5400
5420
5440
5460
5480
5500
5520
5540
5560
5580
5600
5620
5640
5660
5680
5700
5720
5740
5760
5780
5800
5820
5840
5860
5880
5900
5920
5940
5960
5980
6000
CHAINAGE (m)
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:12pm maninder.v
7
411046.1 8
82 410712.084
2868295.
679 2868015.820
2000
100 2000
7.012 100
244.756 3.597
- 125.576
NC -
Left NC
Left
Ex ROW
Ex ROW
Ex ROW Ex ROW
Ex ROW
Ex ROW Ex ROW
Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW
Ex ROW Ex ROW Ex ROW
Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW
Ex ROW
Ex ROW Ex ROW
Ex ROW
Ex ROW Ex ROW
5900
7100
E
6900
AG
6800
LL
6100
VI
6700
6200
6300
6600
6400
A
6500
GN
AN S
TO AGE
ER VILL
LITE
ALO
TO K
FRL at PCL
Box Culvert
Ch.=6046.713m
Ch.=6839.908m
Ch.=6719.908m
Lvl.=109.940m
Ch.=6950.004m
Lvl.=109.707m
Ch.=6337.842m
Lvl.=109.646m
Lvl.=109.530m
Ch.=6537.842m
Chainage 6+588
Lvl.=109.337m
Lvl.=109.171m
Span 1 X 1.5
Datum(m) = 100
109.667 110.162
109.653 110.178
109.669 110.195
109.668 110.208
109.586 110.208
109.503 110.195
109.432 110.168
109.313 110.128
109.174 110.074
109.083 110.007
108.972 109.926
108.948 109.841
108.847 109.755
108.760 109.670
108.704 109.584
108.641 109.499
108.571 109.413
108.536 109.328
108.498 109.251
108.433 109.188
108.400 109.138
108.311 109.102
108.244 109.080
108.186 109.072
108.202 109.077
108.218 109.097
108.301 109.130
108.289 109.177
108.225 109.229
108.190 109.281
108.323 109.333
108.371 109.385
108.462 109.438
108.539 109.490
108.532 109.542
108.582 109.594
108.614 109.646
108.764 109.692
108.885 109.723
108.960 109.740
109.020 109.743
109.032 109.732
109.008 109.707
108.965 109.675
108.918 109.642
108.874 109.610
108.819 109.578
108.860 109.546
108.887 109.516
108.862 109.496
108.790 109.488
FINISHED ROAD LEVEL (FRL) AT PCL (m)
0.525
0.526
0.540
0.622
0.692
0.736
0.815
0.900
0.924
0.954
0.893
0.908
0.910
0.880
0.858
0.842
0.792
0.753
0.755
0.738
0.791
0.836
0.886
0.875
0.879
0.829
0.888
1.004
1.091
1.010
1.014
0.976
0.951
1.010
1.012
1.032
0.928
0.838
0.780
0.723
0.700
0.699
0.710
0.724
0.736
0.759
0.686
0.629
0.634
0.698
LEVEL DIFFERENCE
(FRL - EGL/ERL)
R=29054.829m G=0.261 R=32764.516m
VERTICAL PROFILE L=200.000m L=182.066m L=100.000m
AT PROPOSED CENTER LINE (PCL) L=150.000m L=141.129m L=120.000m L=110.096m
R=-29518.058m G=-0.427 R=-28480.317m G=-0.160
R=-2000.000m R=-2000.000m
HORIZONTAL ALIGNMENT
L=244.756m L=250.484m L=125.576m
WIDENING
e=2.5
SUPERELEVATION (%)
6000
6020
6040
6060
6080
6100
6120
6140
6160
6180
6200
6220
6240
6260
6280
6300
6320
6340
6360
6380
6400
6420
6440
6460
6480
6500
6520
6540
6560
6580
6600
6620
6640
6660
6680
6700
6720
6740
6760
6780
6800
6820
6840
6860
6880
6900
6920
6940
6960
6980
7000
CHAINAGE (m)
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:13pm maninder.v
Ex ROW
Ex ROW
Ex ROW Ex ROW
Ex ROW
Ex ROW Ex ROW
Ex ROW Ex ROW
Ex ROW Ex ROW
Ex ROW Ex ROW
Ex ROW Ex ROW Ex ROW Ex ROW
Ex ROW Ex ROW Ex ROW
Ex ROW Ex ROW Ex ROW
Ex ROW Ex ROW
Ex ROW Ex ROW
Ex ROW
Ex ROW Ex ROW
8100
Ex ROW Ex ROW
Ex ROW
6900
7100
7900
7200
7300
7800
7400
7700
7500
7600
9
409947.189
2867288.720
1000
100
7.073
73.446
50
4.4
Left
FRL at PCL
Pipe Culvert Box Culvert EGL / ERL at PCL
Ch.=7234.701m
Ch.=7534.701m
Ch.=7050.004m
Lvl.=109.790m
Ch.=7727.956m
Lvl.=109.742m
Chainage 7+341 Chainage 7+661
Lvl.=109.523m
Lvl.=109.399m
Span 1 X 1.2 Span 1 X 1.5
Datum(m) = 100
108.790 109.488
108.838 109.493
108.890 109.510
108.946 109.537
108.998 109.566
109.019 109.595
109.003 109.624
108.986 109.653
108.975 109.682
108.958 109.711
108.860 109.740
108.770 109.769
108.717 109.798
108.762 109.824
108.886 109.845
108.968 109.862
109.058 109.875
109.113 109.883
108.919 109.888
108.776 109.887
108.679 109.883
108.519 109.874
108.468 109.861
108.458 109.844
108.466 109.823
108.501 109.797
108.527 109.767
108.631 109.732
108.695 109.697
108.740 109.661
108.654 109.626
108.525 109.590
108.480 109.555
108.547 109.519
108.557 109.484
108.541 109.448
108.590 109.413
108.616 109.379
108.574 109.353
108.602 109.334
108.633 109.324
108.723 109.322
108.840 109.328
108.904 109.343
108.945 109.365
109.028 109.396
109.013 109.435
109.057 109.482
109.089 109.537
109.112 109.601
109.147 109.673
FINISHED ROAD LEVEL (FRL) AT PCL (m)
0.655
0.620
0.591
0.568
0.576
0.621
0.667
0.707
0.753
0.880
0.999
1.081
1.062
0.959
0.894
0.817
0.770
0.969
1.111
1.204
1.355
1.393
1.386
1.357
1.296
1.240
1.101
1.002
0.921
0.972
1.065
1.075
0.972
0.927
0.907
0.823
0.763
0.779
0.732
0.691
0.599
0.488
0.439
0.420
0.368
0.422
0.425
0.448
0.489
0.526
LEVEL DIFFERENCE
(FRL - EGL/ERL)
R=32764.516m G=0.145 R=48933.774m
VERTICAL PROFILE L=100.000m L=184.697m L=300.000m
AT PROPOSED CENTER LINE (PCL) L=300.000m L=193.254m
R=-93079.186m G=-0.177
R=-1000.000m
HORIZONTAL ALIGNMENT
L=905.722m L=50.000m L=73.446m L=50.000m
WIDENING
e=4.4
e=2.5 e=2.5
SUPERELEVATION (%)
e=4.4
7000
7020
7040
7060
7080
7100
7120
7140
7160
7180
7200
7220
7240
7260
7280
7300
7320
7340
7360
7380
7400
7420
7440
7460
7480
7500
7520
7540
7560
7580
7600
7620
7640
7660
7680
7700
7720
7740
7760
7780
7800
7820
7840
7860
7880
7900
7920
7940
7960
7980
8000
CHAINAGE (m)
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:13pm maninder.v
CLIENT:-
WIDENING
CHAINAGE (m)
Ex ROW
(FRL - EGL/ERL)
7900
VERTICAL PROFILE
LEVEL DIFFERENCE
Ex ROW
Datum(m) = 100
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:14pm maninder.v
8080 0.672 109.341 110.013
8100
CONSULTANT:-
8100 0.701 109.399 110.100
Ex ROW
egisIndia
L=843.830m
G=0.436
8160 0.668 109.694 110.362
L=237.366m
8180 0.585 109.864 110.449
Ex ROW
8200
8200 0.506 110.030 110.536
Ex ROW
PROJECT:-
KIR
A TP
8240 0.509 110.201 110.710 UR
VIL
L AG
E
8260 0.518 110.279 110.797 Ch.=8265.322m
Ex ROW
Lvl.=110.821m
Ex ROW
AGE
8320 0.379 110.606 110.985
Ex ROW
L=150.000m
8360 0.413 110.597 111.010
1 X 1.2
8+311
R=-20116.080m
VER 0
HOR 0
SCALE:-
8480 0.407 110.307 110.714
8500
Ex ROW
25
2.5
8500 0.345 110.307 110.652
e=2.5
Ex ROW
G=-0.310
50
1:2500 @ A2 SHEET
5.0
8540 0.432 110.096 110.528
FRL at PCL
Date
-
NC
10
Ex ROW
Left
100
8000
0.371
51.808
Checked by
Prepared by
Ex ROW
Designed by
Approved by
409340.325
Ch.=8589.904m
2866549.337
8600
L=51.808m
Lvl.=110.374m
R=-8000.000m
Dec 2014
Rajeev Gupta
Sanjay Kumar 8640 0.452 109.778 110.230
Maninder Vashisth
Balkeshwar Mishra
Ex ROW
GE
Ex ROW
Rev.
L=124.276m
8700
R=108174.012m
GRIC
8720 0.514 109.535 110.049 TO A
Dec 2014
Ex ROW
Ex ROW
Ch.=8739.904m
8740 0.508 109.505 110.013 Lvl.=110.013m
Left
1000
8.419
96.939
e=4.4
e=4.4
409183.733
2866356.011
L=240.486m
8900
DRG. NO. :
TO KM- 9+000
9100
Ex ROW
Ex ROW
12
408898.953
2865874.246
1500
100
LAGE
2.861
39.901
35
A VIL
3.0
Right
URAR
TO K
TOE WA
Ex ROW LL ht.=1.
Ex ROW Ex ROW 5m
Ex ROW Ex ROW
Ex ROW
Ex ROW Ex ROW
Ex ROW Ex ROW Ex ROW Ex ROW
Ex ROW Ex ROW
Ex ROW Ex ROW
Ex ROW Ex ROW Ex ROW
Ex RO
Ex ROW Ex ROW Ex ROW W
9600
Ex ROW Ex ROW
9500
Ex ROW Ex ROW
Ex ROW
9400
9700
Ex ROW Ex ROW
9300
9800
Ex ROW
Ex ROW
9200
Ex ROW 13 Ex RO
W
9900
9100
408768.426
2865676.660
D
E LAN
8900
10100
500
80 14
408609.340
LTUR
11.891
58.769 2865519.45
2
5000
U
45 15
GRIC
5.7 100 40845
1
Right 2.255 28653 .658
50.86
TO A
196.786
1000 2
-
80
NC 6.473
Left 82.974
30
2.8
Right
Ch.=9965.017m
Lvl.=115.374m
FRL at PCL Pipe Culvert
Ch.=9698.522m
Lvl.=111.316m
EGL / ERL at PCL
Ch.=9598.522m
Chainage 9+544
Ch.=9334.367m
Lvl.=110.490m
Ch.=9234.367m
Lvl.=110.151m
Ch.=9130.390m
Lvl.=109.953m
Lvl.=109.674m
Span 2 X 0.9
Datum(m) = 100
109.092 109.573
109.122 109.556
109.117 109.551
109.134 109.557
109.169 109.576
109.201 109.606
109.227 109.647
109.274 109.699
109.313 109.753
109.362 109.807
109.449 109.860
109.476 109.914
109.557 109.967
109.619 110.017
109.589 110.060
109.605 110.099
109.525 110.131
109.435 110.158
109.423 110.184
109.382 110.210
109.288 110.235
109.177 110.261
109.140 110.287
109.180 110.312
109.278 110.338
109.401 110.364
109.572 110.390
109.691 110.415
109.808 110.441
109.922 110.467
110.058 110.493
110.153 110.550
110.363 110.664
110.648 110.833
110.856 111.058
111.072 111.339
111.282 111.643
111.521 111.948
111.780 112.252
111.997 112.557
112.236 112.861
112.495 113.166
112.801 113.470
113.117 113.775
113.429 114.079
113.743 114.384
114.024 114.688
114.366 114.993
114.693 115.297
115.046 115.598
115.332 115.886
FINISHED ROAD LEVEL (FRL) AT PCL (m)
0.434
0.434
0.423
0.407
0.405
0.420
0.425
0.440
0.445
0.411
0.438
0.410
0.398
0.471
0.494
0.606
0.723
0.761
0.828
0.947
1.084
1.147
1.132
1.060
0.963
0.818
0.724
0.633
0.545
0.435
0.397
0.301
0.185
0.202
0.267
0.361
0.427
0.472
0.560
0.625
0.671
0.669
0.658
0.650
0.641
0.664
0.627
0.604
0.552
0.554
LEVEL DIFFERENCE
(FRL - EGL/ERL)
R=34121.290m G=0.268 G=0.129 R=7173.188m G=1.523
VERTICAL PROFILE L=150.000m L=103.977m L=264.155m L=100.000m L=266.495m
AT PROPOSED CENTER LINE (PCL) L=100.000m
R=-71540.354m
R=1500.000m R=500.000m
R=-5000.000m
HORIZONTAL ALIGNMENT m L=45.000
L=406.072m L=35.000m L=39.901m L=35.000m L=107.260m L=45.000 L=58.769m m L=50.664m L=196.786m L=60.883m L=30.000m
WIDENING
e=3.0 e=5.7
e=2.5 e=2.5 e=2.5
SUPERELEVATION (%)
e=3.0 e=5.7
10000
9000
9020
9040
9060
9080
9100
9120
9140
9160
9180
9200
9220
9240
9260
9280
9300
9320
9340
9360
9380
9400
9420
9440
9460
9480
9500
9520
9540
9560
9580
9600
9620
9640
9660
9680
9700
9720
9740
9760
9780
9800
9820
9840
9860
9880
9900
9920
9940
9960
9980
CHAINAGE (m)
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:14pm maninder.v
TOE
WALL
ht.=1
.5 m 16
Ex R 408187.708
OW
2865125.890
Ex RO 400
W
80
Ex RO Ex R 34.690
W O W
187.179
Ex R Ex ROW Ex ROW Ex ROW
Ex R
O W OW 55 Ex ROW
4.0
Left W
Ex R
OW Ex R
OW Ex RO
Ex ROW Ex ROW
Ex ROW
W
Ex ROW Ex RO
9900
Ex R O W
OW Ex R W
Ex R Ex RO
11100
10900
OW
14 OW
Ex R Ex R x RO
W
40860
0
OW E
28655 9.340
1080
Ex R
0
OW
1010
19.45 W
Ex RO
5000 2
W
Ex R Ex RO
O W Ex ROW
0
100 Ex R 17
1070
2.255 OW
00
Ex ROW 72
196.7 1 Ex R
OW 408072.9 4
4084 5
102
86 72
- Ex R 2864693.
2865 51.658 OW
0
400
1060
NC 350.8 Ex ROW Ex ROW
Left 1000 62 80
0
15.385
1030
80
52.409
10500
6.47
82.9 3
10400
55
74 4.0
30
2.8 Right
Righ
t
Box Culvert
Chainage 10+936
Span 1 X 2.0
Ch.=10972.749m
Lvl.=123.384m
Ch.=10885.672m
Box Culvert
Lvl.=122.169m
Chainage 10+551
Ch.=10785.672m
FRL at PCL
Lvl.=120.603m
EGL / ERL at PCL Span 1 X 1.5
Ch.=10710.858m
Ch.=10282.850m
Ch.=10402.850m
Lvl.=119.304m
Ch.=10460.858m
Lvl.=118.980m
Lvl.=118.982m
Lvl.=118.396m
Ch.=10115.017m
Lvl.=117.277m
Datum(m) = 110
115.332 115.886
115.598 116.160
115.892 116.420
116.204 116.667
116.552 116.901
116.772 117.120
116.940 117.327
117.148 117.530
117.274 117.733
117.363 117.936
117.534 118.139
117.690 118.342
117.874 118.545
118.105 118.748
118.361 118.951
118.583 119.129
118.881 119.240
119.138 119.284
119.075 119.260
118.791 119.169
118.450 119.010
118.065 118.809
117.956 118.606
117.895 118.404
117.802 118.222
117.820 118.084
117.844 117.990
117.798 117.940
117.654 117.934
117.600 117.971
117.746 118.053
117.814 118.179
117.936 118.349
118.078 118.562
118.315 118.820
118.645 119.122
118.938 119.462
119.430 119.810
119.859 120.157
120.212 120.505
120.484 120.849
120.748 121.180
121.029 121.497
121.314 121.800
121.579 122.090
121.920 122.369
122.493 122.648
122.462 122.927
123.100 123.206
123.432 123.483
123.695 123.734
FINISHED ROAD LEVEL (FRL) AT PCL (m)
0.562
0.528
0.463
0.349
0.348
0.387
0.382
0.459
0.573
0.605
0.652
0.671
0.643
0.590
0.546
0.359
0.146
0.185
0.378
0.560
0.744
0.650
0.509
0.420
0.264
0.146
0.142
0.280
0.371
0.307
0.365
0.413
0.484
0.505
0.477
0.524
0.380
0.298
0.293
0.365
0.432
0.468
0.486
0.511
0.449
0.155
0.465
0.106
0.051
0.039
LEVEL DIFFERENCE
(FRL - EGL/ERL)
G=1.015 R=9097.217m G=1.737 G=1.395
VERTICAL PROFILE L=167.832m L=250.000m L=74.815m L=87.077m
AT PROPOSED CENTER LINE (PCL) L=150.000m L=120.000m L=58.008m L=100.000m
R=-29531.895m R=-5924.460m G=-1.011 R=-29192.096m
m L=55.000
R=1000.000m R=-400.000m L=55.000 R=400.000m m
HORIZONTAL ALIGNMENT
L=60.883m L=30.000m L=82.974m L=30.000m L=122.744m L=55.000 L=187.179m m L=213.046m L=52.409m
m L=55.000
WIDENING
10020
10040
10060
10080
10100
10120
10140
10160
10180
10200
10220
10240
10260
10280
10300
10320
10340
10360
10380
10400
10420
10440
10460
10480
10500
10520
10540
10560
10580
10600
10620
10640
10660
10680
10700
10720
10740
10760
10780
10800
10820
10840
10860
10880
10900
10920
10940
10960
10980
11000
CHAINAGE (m)
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:14pm maninder.v
18
ND
407864.523
2864336.343
E LA
20000
CULTUR
100
0.403
140.589
-
TO AGRI
NC
Left
12
Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW
Ex ROW Ex ROW Ex ROW Ex ROW
Ex ROW Ex ROW Ex ROW
Ex ROW Ex ROW Ex ROW
TO FISH FARM
12100
10900
11100
11200
11900
11300
11400
11500
11600
11700
11800
E
19
AG
17 407596.562
ILL
408072.972 2863869.419
RV
4
2864693.72 3000
PU
400 100
RA
80 1.835
HU
15.385 96.069
SA
52.409 -
55
TO
NC
4.0 Left
Right
Ch.=11172.749m
Lvl.=124.577m
Ch.=11996.853m
Ch.=11796.853m
Lvl.=123.330m
Lvl.=123.316m
Datum(m) = 110
123.695 123.734
123.907 123.954
124.009 124.141
124.048 124.297
124.009 124.421
123.954 124.512
123.916 124.572
123.752 124.600
123.792 124.596
123.910 124.562
124.019 124.522
123.922 124.481
123.816 124.441
123.740 124.400
123.676 124.360
123.605 124.320
123.452 124.279
123.433 124.239
123.418 124.198
123.397 124.158
123.480 124.118
123.483 124.077
123.466 124.037
123.452 123.996
123.464 123.956
123.491 123.916
123.501 123.875
123.416 123.835
123.355 123.794
123.277 123.754
123.125 123.714
122.935 123.673
122.853 123.633
122.840 123.592
122.848 123.552
122.848 123.512
122.797 123.471
122.772 123.431
122.793 123.390
122.840 123.350
122.830 123.310
122.779 123.275
122.805 123.248
122.792 123.230
122.778 123.220
122.735 123.219
122.745 123.226
122.691 123.241
122.656 123.265
122.860 123.297
122.925 123.337
FINISHED ROAD LEVEL (FRL) AT PCL (m)
0.047
0.132
0.249
0.412
0.558
0.656
0.848
0.804
0.652
0.503
0.559
0.625
0.660
0.684
0.715
0.827
0.806
0.780
0.761
0.638
0.594
0.571
0.544
0.492
0.425
0.374
0.419
0.439
0.477
0.589
0.738
0.780
0.752
0.704
0.664
0.674
0.659
0.597
0.510
0.480
0.496
0.443
0.438
0.442
0.484
0.481
0.550
0.609
0.437
0.412
LEVEL DIFFERENCE
(FRL - EGL/ERL)
R=47846.115m
VERTICAL PROFILE L=200.000m
AT PROPOSED CENTER LINE (PCL) L=200.000m L=624.104m
R=-12525.836m G=-0.202
R=-20000.000m R=-3000.000m
HORIZONTAL ALIGNMENT
L=261.867m L=140.589m L=420.017m L=96.069m
WIDENING
e=2.5
SUPERELEVATION (%)
11000
11020
11040
11060
11080
11100
11120
11140
11160
11180
11200
11220
11240
11260
11280
11300
11320
11340
11360
11380
11400
11420
11440
11460
11480
11500
11520
11540
11560
11580
11600
11620
11640
11660
11680
11700
11720
11740
11760
11780
11800
11820
11840
11860
11880
11900
11920
11940
11960
11980
12000
CHAINAGE (m)
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:15pm maninder.v
TO AGRICULTURE LAND
21
407177.942
2862944.573
2000
100
5.136
179.287
TO SIKRI VILLAGE
-
NC
Left
12 Ex ROW
Ex ROW
Ex ROW Ex ROW
Ex ROW Ex ROW
Ex ROW
Ex ROW
Ex ROW Ex ROW
Ex ROW Ex ROW
Ex ROW Ex ROW
Ex ROW Ex ROW Ex ROW Ex ROW
Ex ROW Ex ROW Ex ROW
Ex ROW
Ex ROW
13100
11900
BUSBAY
Ex ROW
Ex ROW Ex ROW
BUSBAY
Ex ROW Ex ROW
Ex ROW Ex ROW
Ex ROW Ex ROW
12100
Ex ROW
12900
12800
12200
12700
12600
12300
12500
12400
E
ILLAG
20
407339.106
PUR V
2863385.543
1000
100 JUNCTION IMPROVEMENT
HURA
7.940
88.578 For Details, Refer Drg No.
TO SA
50 EGIS/DPR/EIRH1UP020/DPR/MJI-004
4.4
Left
Ch.=12242.117m
Ch.=12542.117m
Ch.=11996.853m
Lvl.=123.860m
Lvl.=123.674m
Span 1 X 0.9 Span 1 X 3.0
Ch.=12790.000m
Lvl.=123.330m
Ch.=12890.000m
Lvl.=122.832m
Lvl.=122.463m
Datum(m) = 112
122.925 123.337
122.936 123.380
122.990 123.423
122.968 123.466
122.980 123.510
123.034 123.553
123.093 123.596
123.176 123.639
123.259 123.682
123.342 123.726
123.409 123.769
123.479 123.812
123.540 123.855
123.451 123.896
123.399 123.928
123.349 123.954
123.279 123.972
123.144 123.983
123.138 123.986
123.146 123.982
123.145 123.970
123.121 123.951
123.149 123.925
123.278 123.891
123.564 123.850
123.586 123.801
123.326 123.745
123.058 123.681
122.952 123.614
122.977 123.546
122.943 123.478
122.835 123.410
122.764 123.342
122.715 123.274
122.609 123.206
122.408 123.138
122.210 123.070
122.130 123.002
122.097 122.934
122.075 122.866
122.060 122.798
122.126 122.728
122.177 122.655
122.212 122.580
122.147 122.503
121.991 122.424
121.866 122.344
121.834 122.264
121.851 122.185
121.804 122.105
121.624 122.026
FINISHED ROAD LEVEL (FRL) AT PCL (m)
0.444
0.433
0.498
0.530
0.519
0.503
0.463
0.423
0.384
0.360
0.333
0.315
0.445
0.529
0.605
0.693
0.839
0.848
0.836
0.825
0.830
0.776
0.613
0.286
0.215
0.419
0.623
0.662
0.569
0.535
0.575
0.578
0.559
0.597
0.730
0.860
0.872
0.837
0.791
0.738
0.602
0.478
0.368
0.356
0.433
0.478
0.430
0.334
0.301
0.402
LEVEL DIFFERENCE
(FRL - EGL/ERL)
G=0.216
VERTICAL PROFILE L=245.264m
AT PROPOSED CENTER LINE (PCL) L=300.000m L=247.883m L=100.000m L=218.847m
R=-53982.447m G=-0.340 R=-171665.864m G=-0.398
R=-1000.000m R=-2000.000m
HORIZONTAL ALIGNMENT
L=405.660m L=50.000m L=88.578m L=50.000m L=285.388m L=179.287m
WIDENING
e=4.4
e=2.5 e=2.5
SUPERELEVATION (%)
e=4.4
12000
12020
12040
12060
12080
12100
12120
12140
12160
12180
12200
12220
12240
12260
12280
12300
12320
12340
12360
12380
12400
12420
12440
12460
12480
12500
12520
12540
12560
12580
12600
12620
12640
12660
12680
12700
12720
12740
12760
12780
12800
12820
12840
12860
12880
12900
12920
12940
12960
12980
13000
CHAINAGE (m)
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:15pm maninder.v
Ex ROW Ex ROW
Ex ROW Ex RO
W
Ex ROW
Ex ROW Ex RO
W Ex ROW W
Ex RO Ex ROW Ex RO Ex RO
Ex ROW W W
W
Ex RO
13500
OW Ex RO Ex RO
Ex R W W
13600
13400
OW
Ex R
13300
W Ex RO Ex RO
E x RO W W
13700
OW
Ex R 23 Ex RO Ex RO
0
OW W BUSBAY
W
Ex R
1320
406958.165 24 Ex ROW
13800
W
Ex RO 2862277.210 40681 Ex R
OW
8
OW 22 400 28621 .278
0
Ex R 18 24.64 Ex RO
68.0 W
1310
4070 32.605 10000 4
13900
80
5 19.244
2862 00
Ex RO
OW 100 W
Ex R 8 79.345 0.649
100 55 113.22
4
8.33 5 7.0 4
25
6 -
56.3 Right 40666
14100
0
NC 7
60 28619 .689
1290
Ch.=13958.801m
Ch.=13760.458m
Ch.=13680.458m
Lvl.=124.165m
Ch.=13609.999m
Lvl.=123.911m
Ch.=13509.999m
Lvl.=123.665m
Ch.=13370.230m
Lvl.=123.322m
Ch.=13270.230m
Lvl.=123.022m
Lvl.=122.864m
Ch.=13208.847m
Lvl.=122.369m
Ch.=13108.847m
Lvl.=121.831m
Lvl.=121.592m
Datum(m) = 112
121.624 122.026
121.454 121.946
121.308 121.866
121.190 121.787
121.152 121.707
121.087 121.628
121.094 121.556
121.253 121.530
121.395 121.556
121.458 121.632
121.550 121.759
121.642 121.929
121.778 122.104
121.946 122.280
122.108 122.451
122.329 122.596
122.395 122.711
122.422 122.795
122.418 122.848
122.343 122.875
122.437 122.897
122.455 122.920
122.487 122.943
122.628 122.965
122.638 122.988
122.516 123.010
122.503 123.035
122.454 123.072
122.429 123.125
122.479 123.192
122.531 123.275
122.599 123.370
122.706 123.468
122.783 123.565
122.775 123.663
122.781 123.751
122.842 123.822
122.865 123.875
122.877 123.910
122.905 123.936
122.955 123.961
123.009 123.987
123.085 124.013
123.182 124.038
123.209 124.064
123.226 124.089
123.217 124.115
123.306 124.140
123.431 124.166
123.553 124.182
123.658 124.182
FINISHED ROAD LEVEL (FRL) AT PCL (m)
0.492
0.558
0.597
0.555
0.541
0.462
0.277
0.161
0.174
0.209
0.287
0.326
0.334
0.343
0.267
0.316
0.373
0.430
0.532
0.460
0.465
0.456
0.337
0.350
0.494
0.532
0.618
0.696
0.713
0.744
0.771
0.762
0.782
0.888
0.970
0.980
1.010
1.033
1.031
1.006
0.978
0.928
0.856
0.855
0.863
0.898
0.834
0.735
0.629
0.524
LEVEL DIFFERENCE
(FRL - EGL/ERL)
R=7849.074m G=0.876 G=0.113 R=26745.667m G=0.487 G=0.128
VERTICAL PROFILE L=100.000m L=61.384m L=139.769m L=100.000m L=70.459m L=198.343m
AT PROPOSED CENTER LINE (PCL) L=218.847m L=100.000m L=80.000m L=120.000m
G=-0.398 R=-13105.524m R=-22285.024m R=-24327.996m
m L=55.000
L=60.000m
R=800.000m L=60.000m L=55.000 R=400.000m m R=-10000.000m R=10000.000m
HORIZONTAL ALIGNMENT
L=248.380m L=56.365m L=94.361m L=79.345m L=55.016m L=113.224m L=128.069m L=81.888m
WIDENING
e=5.6 e=7.0
e=2.5 e=2.5 e=2.5
SUPERELEVATION (%)
e=5.6 e=7.0
13000
13020
13040
13060
13080
13100
13120
13140
13160
13180
13200
13220
13240
13260
13280
13300
13320
13340
13360
13380
13400
13420
13440
13460
13480
13500
13520
13540
13560
13580
13600
13620
13640
13660
13680
13700
13720
13740
13760
13780
13800
13820
13840
13860
13880
13900
13920
13940
13960
13980
14000
CHAINAGE (m)
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:16pm maninder.v
D
AN
EL
T UR
UL
RIC
AG
TO
D
LAN
Ex ROW Ex ROW
RE
Ex ROW Ex ROW
TU
Ex ROW Ex ROW
UL
Ex ROW
RIC
Ex ROW
Ex ROW Ex ROW
Ex ROW
AG
W Ex ROW Ex RO
Ex RO Ex ROW
W
ND
TO
14500
Ex ROW Ex ROW
LA
Ex ROW Ex ROW
144 00
Ex ROW
14600
E
Ex ROW
Ex ROW Ex ROW
UR
Ex ROW Ex ROW
1430 0
W
Ex RO
LT
14700
Ex ROW Ex RO
ICU
W
14200
Ex ROW 26
14800
R
Ex ROW
406322.311
AG
W
Ex RO
1 4100
BUSBAY
14900
2861577.566 Ex ROW
TO
400
E LAND
80
16.741 27
15100
13900
406011
.3
61.874 286139 40
UR
55 1.299
20000
RICULT
7.0
25 100
.689 Right
406667 26 0.261
6.6 90.957
286195 0
TO AG
1 0
0 0 -
100 NC
0.469 Right
81.888
-
NC
Right
Pipe Culvert
Chainage 14+275 FRL at PCL
Pipe Culvert
Span 2 X 1.2 EGL / ERL at PCL
Chainage 14+801
Ch.=14377.612m
Ch.=14078.801m
Ch.=14477.612m
Ch.=14169.723m
Ch.=14249.723m
Lvl.=124.061m
Ch.=14624.677m
Lvl.=124.022m
Lvl.=123.981m
Ch.=14724.677m
Lvl.=123.690m Span 2 X 1.0
Lvl.=123.667m
Lvl.=123.293m
Lvl.=123.155m
Datum(m) = 112
123.658 124.182
123.741 124.166
123.688 124.133
123.547 124.083
123.410 124.018
123.362 123.945
123.325 123.872
123.280 123.799
123.235 123.725
123.198 123.657
123.180 123.618
123.191 123.613
123.283 123.641
123.473 123.699
123.662 123.760
123.506 123.822
123.455 123.883
123.500 123.945
123.546 124.007
123.527 124.068
123.522 124.110
123.464 124.122
123.439 124.102
123.440 124.051
123.397 123.970
123.259 123.876
123.217 123.782
123.215 123.689
123.119 123.595
123.015 123.502
122.936 123.408
122.848 123.315
122.807 123.229
122.765 123.169
122.711 123.135
122.720 123.128
122.672 123.147
122.702 123.185
122.767 123.223
122.921 123.262
123.191 123.301
123.112 123.339
123.037 123.378
123.027 123.416
123.064 123.455
123.156 123.493
123.211 123.532
123.309 123.571
123.325 123.609
123.279 123.648
123.325 123.686
FINISHED ROAD LEVEL (FRL) AT PCL (m)
0.425
0.445
0.536
0.608
0.583
0.547
0.519
0.490
0.459
0.438
0.422
0.358
0.226
0.098
0.316
0.428
0.445
0.461
0.541
0.588
0.658
0.663
0.611
0.573
0.617
0.565
0.474
0.476
0.487
0.472
0.467
0.422
0.404
0.424
0.408
0.475
0.483
0.456
0.341
0.110
0.227
0.341
0.389
0.391
0.337
0.321
0.262
0.284
0.369
0.361
LEVEL DIFFERENCE
(FRL - EGL/ERL)
R=11883.003m G=0.308 R=15135.735m G=0.193
VERTICAL PROFILE L=80.000m L=127.889m L=100.000m L=300.922m
AT PROPOSED CENTER LINE (PCL) L=120.000m L=90.922m L=100.000m L=147.065m
R=-24327.996m G=-0.365 R=-12891.165m G=-0.468
m L=55.000
R=10000.000m L=55.000 R=400.000m m R=20000.000m
HORIZONTAL ALIGNMENT
L=385.466m L=61.874m L=230.612m L=90.957m
WIDENING
e=7.0
e=2.5 e=2.5
SUPERELEVATION (%)
e=7.0
14000
14020
14040
14060
14080
14100
14120
14140
14160
14180
14200
14220
14240
14260
14280
14300
14320
14340
14360
14380
14400
14420
14440
14460
14480
14500
14520
14540
14560
14580
14600
14620
14640
14660
14680
14700
14720
14740
14760
14780
14800
14820
14840
14860
14880
14900
14920
14940
14960
14980
15000
CHAINAGE (m)
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:16pm maninder.v
CLIENT:-
WIDENING
CHAINAGE (m)
(FRL - EGL/ERL)
VERTICAL PROFILE
LEVEL DIFFERENCE
406011.340
2861391.299
Datum(m) = 110
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
14900
Ex ROW
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:16pm maninder.v
15080 0.449 123.385 123.834
Ex ROW
TO AGRICULTURE LAND
CONSULTANT:-
15100 0.404 123.462 123.866 TO AG
R ICULT
Ex ROW
URE L
15100 AND
15120 0.428 123.469 123.897
egisIndia
L=200.000m
R=-215352.589m
Ex ROW
15200
L=622.695m
15220 0.520 123.503 124.023 Ch.=15225.599m
PROJECT:-
Lvl.=124.029m
Ex ROW
G=0.100
Ex ROW
L=298.878m
FRL at PCL
15400
VER 0
HOR 0
SCALE:-
15480 0.467 123.816 124.283
Ex ROW
25
2.5
15500 0.522 123.781 124.303
e=2.5
15500
15520 0.523 123.800 124.323 Ch.=15524.477m
50
1:2500 @ A2 SHEET
5.0
Lvl.=124.327m
15540 0.499 123.851 124.350
Ex ROW
L=49.404m
28
-
100
Span
NC
R=-4000.000m
4000
Left
0.708
Date
405415.325
Ex ROW
2861037.968
Chainage
Checked by
Prepared by
Designed by
Approved by
15600 0.500 124.079 124.579
Pipe Culvert
L=120.000m
R=16191.946m
1X1.2
15600
L=83.466m
Ex ROW
Dec 2014
TO
Rajeev Gupta
Sanjay Kumar
AG
RI
Balkeshwar Mishra
C
Lvl.=124.892m
UL
T
R0
Rev.
Ex ROW
L=70.000m
G=0.841
15700
Date
Ex ROW
Ch.=15731.510m
Lvl.=125.624m
15740 0.513 125.180 125.693
e=6.8
e=6.8
R=-13626.128m
Ch.=15811.510m
15800
L=159.263m
R=650.000m
Lvl.=126.062m
FOR TENDER PURPOSE
Ex ROW
100
159.26
650
29
405194
20.209
3
.1
Ex ROW
DRG. NO. :
1590
15900 0.618 125.669 126.287 0
Ex R
OW
G=0.254
Ex R
1610
0
OW
CHAINAGE (m)
(FRL - EGL/ERL)
VERTICAL PROFILE
LEVEL DIFFERENCE
Datum(m) = 112
15900
SUPERELEVATION (%)
Ex ROW
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
Ex ROW
Ch.=16080.066m
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:17pm maninder.v
16080 0.544 126.200 126.744
Lvl.=126.744m
Ex ROW
CONSULTANT:-
16100 0.689 126.098 126.787 16100
egisIndia
L=120.000m
16160 0.838 125.986 126.824
R=-25947.680m
Ex ROW
RE
Ex ROW
LA
16220 0.819 125.911 126.730 ND
Chainage
PROJECT:-
16240 0.800 125.888 126.688
Ex ROW
Box Culvert
G=-0.208
16260 0.708 125.939 126.647
L=91.279m
1x2x1.5
16+240
Lvl.=126.581m
16300 0.505 126.060 126.565 16300
L=100.000m
16360 0.389 126.134 126.523
Ex ROW
R=27788.081m
FRL at PCL
G=0.151
L=98.243m
16460 0.598 126.059 126.657
VER 0
HOR 0
SCALE:-
Ex ROW
25
2.5
16500 0.565 126.150 126.715 16500
e=2.5
L=1101.600m
Ex ROW
50
1:2500 @ A2 SHEET
5.0
16540 0.547 126.167 126.714
Ex ROW
L=100.000m
Date
R=-19868.886m
Checked by
Prepared by
Designed by
Approved by
Ch.=16589.588m
Lvl.=126.601m
Ex ROW
Dec 2014
Rajeev Gupta
Ex ROW
Balkeshwar Mishra
R0
Date
AUPUR
TO KUM
16840 0.485 125.235 125.720
DRG. NO. :
G=-0.352
L=598.693m
Ex ROW
17100
Ex ROW
CLIENT:-
WIDENING
CHAINAGE (m)
(FRL - EGL/ERL)
VERTICAL PROFILE
LEVEL DIFFERENCE
1690
0
Ex R
Datum(m) = 112
SUPERELEVATION (%)
OW
HORIZONTAL ALIGNMENT
Ex R
OW
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:17pm maninder.v
L=55.000
17080 0.745 124.131 124.876
OW
m
17100
CONSULTANT:-
17100 0.779 124.026 124.805
e=7.0
e=7.0
17140 0.902 123.762 124.664
egisIndia
L=63.515m
Left
55
7.0
R=-400.000m
80
30
400
63.515
16.976
2860643.
Ex ROW
Span
Lvl.=124.495m
L=55.000
17200 0.478 123.980 124.458 17200
m
Ex ROW
PROJECT:-
1 X 1.5
Ex ROW
17+206
L=100.000m
17260 0.584 123.833 124.417
R=14715.901m
17280 0.566 123.892 124.458
Ch.=17288.281m
Ex ROW
Lvl.=124.482m
17300 0.579 123.942 124.521 17300
Ex ROW
G=0.328
17400
VER 0
HOR 0
SCALE:-
17480 0.461 124.650 125.111
Ch.=17499.675m
25
2.5
17500 0.494 124.682 125.176 Lvl.=125.175m 17500
e=2.5
Ex ROW
50
1:2500 @ A2 SHEET
5.0
17540 0.587 124.695 125.282
Ex ROW
Date
L=666.487m
Checked by
Prepared by
Designed by
Approved by
Ex ROW
Dec 2014
R=-31865.571m
Rajeev Gupta
FRL at PCL
Balkeshwar Mishra
EGL / ERL at PCL
R0
Ch.=17699.675m
17700 0.549 124.653 125.202 Lvl.=125.203m 17700
Date
Revisions
Ex ROW
L=111.470m
Ch.=17811.145m
Lvl.=124.868m
FOR TENDER PURPOSE
Chainage
Ch.=17891.145m
Pipe Culvert
Lvl.=124.864m
DRG. NO. :
Ex ROW
L=261.519m
ND
LA
Ex ROW
E
UR
LT
ICU
R
Ex ROW
AG
TO
FROM KM- 17+000 TO KM- 18+000
18100
31
-
100
NC
Left
0.749
20000
261.519
403099.764
2860226.755
Ex ROW
CLIENT:-
Ex ROW
Ex ROW
WIDENING
CHAINAGE (m)
(FRL - EGL/ERL)
VERTICAL PROFILE
LEVEL DIFFERENCE
17900
Ex ROW
Datum(m) = 110
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
Ex ROW
L=261.519m
18040 0.433 124.864 125.297
R=-20000.000m
ND
Ex ROW
Ch.=18063.108m LA
18060 0.420 124.935 125.355 E
Lvl.=125.364m UR
LT
CU
Ex ROW
RI
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:18pm maninder.v
18080 0.416 124.995 125.411
AG
TO
CONSULTANT:-
18100 0.407 125.051 125.458
-
18100
31
NC
100
Left
0.749
20000
261.519
403099.764
L=100.000m
18140 0.361 125.170 125.531
R=-52459.923m
egisIndia
Ex ROW
PROJECT:-
Ex ROW
Pipe Culvert
G=0.100
Ex ROW
18460
VER 0
HOR 0
SCALE:-
18480 0.664 125.212 125.876
25
2.5
18500 0.546 125.350 125.896 18500
e=2.5
Ex ROW
50
1:2500 @ A2 SHEET
5.0
Ex ROW
Date
18580 0.492 125.484 125.976
Checked by
Prepared by
Designed by
Approved by
Ex ROW
L=907.291m
Dec 2014
Rajeev Gupta
Sanjay Kumar 18640 0.598 125.438 126.036
Maninder Vashisth
Balkeshwar Mishra
R0
Lvl.=126.084m
18700 0.579 125.517 126.096 18700
Date
Revisions
R=-99999.857m
Ex ROW
Ch.=18887.236m ND
Lvl.=126.084m LA
Ex ROW
RE
DRG. NO. :
TO
M
O
AG
Ex ROW
19100
Ex ROW
CLIENT:-
WIDENING
CHAINAGE (m)
(FRL - EGL/ERL)
ND
LA
VERTICAL PROFILE
LEVEL DIFFERENCE
E
Ex ROW
18900 UR
Datum(m) = 112
SUPERELEVATION (%)
LT
I CU
HORIZONTAL ALIGNMENT
R
Ex ROW
AG
TO
TO
M
O
G=-0.100
19020 0.468 125.483 125.951
L=233.340m
19040 0.434 125.497 125.931
Ex ROW
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:18pm maninder.v
19080 0.470 125.421 125.891
CONSULTANT:-
L=74.245m
19100 0.451 125.420 125.871 19100
R=-15000.000m
19120 0.436 125.415 125.851 Ch.=19120.576m
Lvl.=125.850m
Ex ROW
-
32
egisIndia
NC
100
Left
0.284
15000
74.245
Ex ROW
402158.345
2859707.398
19200
PROJECT:-
19240 0.349 125.423 125.772
ND
19260 0.410 125.356 125.766 LA
E
UR
LT
Ex ROW
L=350.000m
19320 0.349 125.416 125.765
R=174999.790m
19340 0.384 125.384 125.768
Ex ROW
UR
19440 0.379 125.443 125.822 LT
CU
RI
Ex ROW
AG
19460 0.412 125.428 125.840 TO
Ch.=19470.576m
VER 0
HOR 0
Lvl.=125.850m
SCALE:-
19480 0.444 125.416 125.860
25
2.5
19500 0.570 125.310 125.880 19500
e=2.5
Ex ROW
50
1:2500 @ A2 SHEET
5.0
Ex ROW
Date
19580 0.705 125.255 125.960
Checked by
Prepared by
Designed by
Ex ROW
Approved by
19600 0.720 125.260 125.980 19600
Ex ROW
Dec 2014
Rajeev Gupta
Sanjay Kumar 19640 0.723 125.297 126.020
Maninder Vashisth
Balkeshwar Mishra
Ex ROW
R0
Rev.
G=0.100
L=520.688m
Chainage
Revisions
DRG. NO. :
Lvl.=126.371m
20000 0.663 125.716 126.379
PLAN & PROFILE
Ex ROW
Ex ROW
20100
Ex ROW
33
401188.465
2859166.061
10000
100
0.388
67.728
-
NC
Left
Ex ROW Ex ROW
Ex ROW Ex ROW
Ex ROW Ex ROW
Ex ROW Ex ROW
Ex ROW
Ex ROW BUSBAY
Ex ROW
Ex ROW Ex ROW Ex ROW 21
Ex ROW Ex ROW Ex ROW
Ex ROW Ex ROW Ex ROW
W
Ex RO Ex ROW
Ex ROW Ex ROW
20600
Ex ROW
20500
Ex ROW Ex ROW
20700
20400
Ex ROW Ex ROW
TOE WALL ht
20300
Ex ROW
20800
Ex ROW .=2.0m Ex ROW
20200
20900
20100
19900
34
21100
400856.369
2858977.741
800
100
10.053
80.366
60
5.6
Right
Ch.=20666.892m
Ch.=20566.892m
Ch.=20856.737m
Ch.=20976.737m
Ch.=20450.109m
Lvl.=127.162m
Ch.=19991.264m
Ch.=20141.264m
Lvl.=127.072m
Ch.=20250.109m
Lvl.=126.705m
Lvl.=126.623m
Lvl.=126.582m
Lvl.=126.371m
Lvl.=126.371m
Lvl.=126.262m
Datum(m) = 112
125.716 126.379
125.717 126.394
125.690 126.404
125.741 126.408
125.780 126.407
125.793 126.401
125.765 126.389
125.744 126.372
125.785 126.352
125.759 126.332
125.739 126.312
125.734 126.292
125.721 126.272
125.733 126.254
125.770 126.244
125.839 126.245
125.920 126.256
125.997 126.277
125.966 126.309
126.063 126.352
126.123 126.404
126.120 126.467
126.106 126.541
126.124 126.624
126.190 126.708
126.310 126.792
126.426 126.876
126.505 126.959
126.551 127.043
126.697 127.122
126.944 127.175
127.137 127.202
126.987 127.203
126.688 127.177
126.558 127.131
126.547 127.082
126.489 127.034
126.361 126.986
126.349 126.938
126.263 126.890
126.374 126.842
126.264 126.794
126.308 126.746
126.326 126.698
126.271 126.657
126.252 126.628
126.237 126.611
126.212 126.605
126.199 126.610
126.145 126.627
126.205 126.648
FINISHED ROAD LEVEL (FRL) AT PCL (m)
0.677
0.714
0.667
0.627
0.608
0.624
0.628
0.567
0.573
0.573
0.558
0.551
0.521
0.474
0.406
0.336
0.280
0.343
0.289
0.281
0.347
0.435
0.500
0.518
0.482
0.450
0.454
0.492
0.425
0.231
0.065
0.216
0.489
0.573
0.535
0.545
0.625
0.589
0.627
0.468
0.530
0.438
0.372
0.386
0.376
0.374
0.393
0.411
0.482
0.443
LEVEL DIFFERENCE
(FRL - EGL/ERL)
R=38470.471m G=0.420 R=34818.897m
VERTICAL PROFILE L=200.000m L=116.783m L=120.000m
AT PROPOSED CENTER LINE (PCL) L=150.000m L=108.845m L=100.000m L=189.845m
R=-74999.244m G=-0.100 R=-15140.547m G=-0.241
R=-10000.000m L=60.000m R=800.000m L=60.000m
HORIZONTAL ALIGNMENT
L=67.728m L=247.533m L=80.366m
WIDENING
e=5.6
e=2.5 e=2.5
SUPERELEVATION (%)
e=5.6
20000
20020
20040
20060
20080
20100
20120
20140
20160
20180
20200
20220
20240
20260
20280
20300
20320
20340
20360
20380
20400
20420
20440
20460
20480
20500
20520
20540
20560
20580
20600
20620
20640
20660
20680
20700
20720
20740
20760
20780
20800
20820
20840
20860
20880
20900
20920
20940
20960
20980
21000
CHAINAGE (m)
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:19pm maninder.v
CLIENT:-
WIDENING
Ex ROW
CHAINAGE (m)
(FRL - EGL/ERL)
20900
VERTICAL PROFILE
LEVEL DIFFERENCE
Ex ROW
Datum(m) = 114
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:19pm maninder.v
21080 0.442 126.289 126.731 21100
CONSULTANT:-
21100 0.397 126.355 126.752
Ex ROW
L=807.156m
21120 0.457 126.315 126.772
Ex ROW
egisIndia
21160 0.439 126.375 126.814
Ex ROW
PROJECT:-
21240 0.403 126.494 126.897
Ex ROW
e=2.5
21260 0.457 126.461 126.918
Ex ROW
G=0.104
21300 0.451 126.509 126.960
L=611.311m
21320 0.412 126.568 126.980
Ex ROW
VER 0
HOR 0
SCALE:-
21480 0.426 126.721 127.147
Ex ROW
21500
25
2.5
21500 0.423 126.745 127.168
Ex ROW
50
1:2500 @ A2 SHEET
5.0
L=55.000
m
Date
35
80
55
7.0
400
Left
Checked by
2858645.939
Prepared by
Designed by
Approved by
Ch.=21588.048m
L=61.697m
Lvl.=127.259m 21600
R=-400.000m
Dec 2014
Rajeev Gupta
Sanjay Kumar
Ex ROW
Balkeshwar Mishra
L=55.000
m
Ex RO
W
L=200.000m
Ex ROW
Date
R=179007.243m
Box Culvert
Lvl.=127.579m 21800
21800 0.613 126.992 127.605
Description
Ex ROW
AG
ILL
AV
L=360.153m
Ex ROW
AN
DH
L=139.517m
Ex RO
21900
DRG. NO. :
Ex RO
W
6
1000
100
-
285835 0
0.496
NC
86.638
4.411
Right
39952 .543
Ex RO
W
22100
FROM KM- 21+000 TO KM- 22+000
Ex ROW
CLIENT:-
WIDENING
E
L AG
CHAINAGE (m)
VIL
(FRL - EGL/ERL)
RA
PU
VERTICAL PROFILE
AN
LEVEL DIFFERENCE
Ex ROW
21900 DH
TO
Datum(m) = 114
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
L=86.638m
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:19pm maninder.v
22080 0.982 127.064 128.046
36
R=10000.000m
NC
100
0.496
Right
10000
86.638
L=300.000m
22100
CONSULTANT:-
22100 1.069 126.975 128.044
399524.411
2858356.543
R=-71326.755m
Ex ROW
egisIndia
22160 1.002 127.001 128.003
PROJECT:-
Lvl.=127.897m
22240 0.840 127.031 127.871 TO
BH
AJE
DA
Ex ROW
L=327.343m
TO
22300 0.673 127.075 127.748 22300 AG
RIC
UL
TU
RE
22320 0.582 127.125 127.707 L AN
D
Ex ROW
G=-0.205
L=292.435m
NC
100
Left
0.250
20000
87.326
VER 0
HOR 0
SCALE:-
22480 0.191 127.189 127.380
Ex ROW
L=87.326m
25
22500
2.5
22500 0.137 127.202 127.339
e=2.5
Ex ROW
R=-20000.000m
Ch.=22520.000m
22520 0.082 127.216 127.298
50
1:2500 @ A2 SHEET
Lvl.=127.298m
5.0
GE
LA
VIL
22540 0.116 127.151 127.267 RA
PU
AN
DH
TO
22560 0.031 127.228 127.259
Date
Ex ROW
Checked by
Prepared by
Ex ROW
Designed by
Approved by
22600
L=120.000m
Dec 2014
Rajeev Gupta
Sanjay Kumar
Ch.=22640.000m
Span
Maninder Vashisth
Balkeshwar Mishra
Lvl.=127.440m
Chainage
Ex ROW
G=0.443
22700
L=87.328m
Date
Ex ROW
Ch.=22727.328m
Lvl.=127.827m
Ex ROW
Ch.=22877.328m
22880 0.830 127.213 128.043 Lvl.=128.047m
TITLE :
Ex ROW
DRG. NO. :
23100
Ex ROW
CHAINAGE (m)
(FRL - EGL/ERL)
Ex ROW
VERTICAL PROFILE
LEVEL DIFFERENCE
22900
Datum(m) = 112
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:20pm maninder.v
23080 0.628 127.114 127.742
G=-0.150
L=392.672m
CONSULTANT:-
23100 0.601 127.111 127.712 23100
Ex ROW
egisIndia
23160 0.437 127.185 127.622 GE
LA
VIL
RA
PU
Ex ROW
L=1322.777m
23220 0.541 126.991 127.532
PROJECT:-
ND
LA
23240 0.561 126.941 127.502 RE
L TU
R ICU
AG
Ex ROW
L=80.000m
FRL at PCL
Ex ROW
R=31266.323m
23340 0.605 126.825 127.430
Ch.=23350.000m
Ex ROW
Lvl.=127.439m
23360 0.642 126.808 127.450
G=0.106
L=41.785m
Ch.=23391.785m
VER 0
HOR 0
SCALE:-
23480 0.837 126.645 127.482
Ex ROW
Pipe Culvert
25
2.5
23500 0.869 126.587 127.456 23500
Ex ROW
e=2.5
1X1.2
23+520
L=220.000m
50
1:2500 @ A2 SHEET
5.0
R=-41432.788m
Date
Ex ROW
Ex ROW
Checked by
Prepared by
Designed by
Approved by
23600 0.701 126.479 127.180 23600
Ch.=23611.785m
Lvl.=127.131m
23620 0.690 126.406 127.096
Dec 2014
Rajeev Gupta
Sanjay Kumar
G=-0.425
Ex ROW
Balkeshwar Mishra
Lvl.=126.998m
Ex ROW
Date
Ex ROW
R=46995.238m
L=179.099m
38
NC
Left
100
0.356
10000
62.132
2857293.746
L=62.132m
DRG. NO. :
23900
L=230.936m
ND
LA
U RE
LT
R ICU
AG
TO
Ex ROW
24100
Ex ROW
CLIENT:-
WIDENING
CHAINAGE (m)
Ex ROW
(FRL - EGL/ERL)
VERTICAL PROFILE
LEVEL DIFFERENCE
23900
Datum(m) = 112
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
Ex ROW
L=120.000m
R=31882.689m
Ex ROW
L=230.936m
Lvl.=126.269m
ND
24060 0.486 125.812 126.298 LA
U RE
Span
LT
CU
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:20pm maninder.v
24080 0.331 126.000 126.331 RI
Chainage
AG
Ex ROW
TO
CONSULTANT:-
24100 0.126 126.238 126.364 24100
Ex ROW
G=0.164
24120 0.286 126.111 126.397 Slab Culvert
L=134.141m
1 X 3.0
24+103
24140 0.499 125.930 126.429
egisIndia
24160 0.702 125.760 126.462
Ex ROW
Ch.=24176.330m
24180 0.831 125.664 126.495 Lvl.=126.489m
Ex ROW
PROJECT:-
24240 0.721 125.836 126.557
Ex ROW
L=150.000m
39
L=237.500m
-
R=-56482.591m
R=2000.000m
24280 0.730 125.834 126.564
FRL at PCL
NC
100
2000
6.804
Right
237.500
397750.178
24300
2857068.101
G=-0.102
24360 0.546 125.955 126.501
L=49.407m
Ch.=24375.737m
Lvl.=126.485m
LA
L=100.000m
R=49560.724m TO
24460 0.428 126.043 126.471
ND
Ex ROW
VER 0
HOR 0
Ch.=24475.737m LA
SCALE:-
24480 0.471 126.018 126.489 Lvl.=126.484m RE
LTU
Ex ROW
24500 CU
RI
25
2.5
24500 0.470 126.039 126.509 AG
e=2.5
TO
24520 0.515 126.014 126.529
50
1:2500 @ A2 SHEET
5.0
24540 0.567 125.982 126.549
Ex ROW
G=0.100
Date
Ex ROW
L=147.063m
Checked by
Prepared by
Designed by
Approved by
ND
24600 LA
E
24600 0.589 126.020 126.609 UR
U LT
R IC
24620 0.610 126.019 126.629 Ch.=24622.799m
Dec 2014
AG
Ex ROW
Lvl.=126.631m TO
Rajeev Gupta
Sanjay Kumar 24640 0.614 126.030 126.644
Maninder Vashisth
Balkeshwar Mishra
Ex ROW
L=513.523m
24700
Ex ROW
Dec 2014
R=-32660.389m
Ch.=24772.799m
Ex ROW
L=172.710m
24900
DRG. NO. :
-
NC
Left
100
0.915
10000
159.779
397130.371
L=100.000m
R=25209.410m
Ex ROW
25100
FROM KM- 24+000 TO KM- 25+000
Ex ROW
Ex ROW Ex ROW Ex ROW 26
Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW
Ex ROW
Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW
Ex ROW Ex ROW Ex ROW Ex ROW
25700
25800
25600
24900
25500
25900
25400
25300
25200
25100
26100
40 41 42
397130.371 396421.681 396269.057
2856717.080 2856300.628 2856213.862
10000 15000 5000
100 100 100
0.915 0.822 0.921
159.779 215.205 80.366
- - -
NC NC NC
Left Right Left
Ch.=25898.618m
Ch.=25464.808m
Ch.=25045.509m
Ch.=25798.618m
Ch.=25544.808m
Ch.=25761.439m
Lvl.=125.902m
Lvl.=125.812m
Ch.=25576.837m
Lvl.=125.655m
Ch.=25701.439m
Lvl.=125.543m
Ch.=25636.837m
Lvl.=125.374m
Lvl.=125.172m
Lvl.=125.011m
Lvl.=124.824m
Lvl.=124.719m
Datum(m) = 112
125.217 125.680
125.235 125.659
125.397 125.654
125.564 125.661
125.605 125.668
125.373 125.676
125.138 125.683
124.956 125.691
124.870 125.698
124.903 125.706
125.040 125.713
125.159 125.721
125.247 125.728
125.233 125.736
125.199 125.743
125.152 125.751
125.109 125.758
125.051 125.766
124.982 125.773
124.929 125.781
124.980 125.788
125.114 125.796
125.228 125.803
125.258 125.811
125.323 125.801
125.342 125.735
125.341 125.610
125.295 125.427
125.162 125.202
124.937 124.976
124.711 124.806
124.652 124.723
124.658 124.725
124.112 124.757
124.711 124.789
124.717 124.821
124.752 124.878
124.746 124.990
124.825 125.157
125.104 125.357
125.209 125.557
125.334 125.727
125.393 125.847
125.346 125.915
125.272 125.932
125.196 125.899
125.152 125.843
125.125 125.787
125.158 125.731
125.115 125.675
125.041 125.619
FINISHED ROAD LEVEL (FRL) AT PCL (m)
0.424
0.257
0.097
0.063
0.303
0.545
0.735
0.828
0.803
0.673
0.562
0.481
0.503
0.544
0.599
0.649
0.715
0.791
0.852
0.808
0.682
0.575
0.553
0.478
0.393
0.269
0.132
0.040
0.039
0.095
0.071
0.067
0.645
0.078
0.104
0.126
0.244
0.332
0.253
0.348
0.393
0.454
0.569
0.660
0.703
0.691
0.662
0.573
0.560
0.578
LEVEL DIFFERENCE
(FRL - EGL/ERL)
R=25209.410m G=0.037 R=4634.132m G=0.161 R=7168.989m G=0.998
VERTICAL PROFILE L=100.000m L=419.299m L=60.000m L=64.602m L=60.000m L=37.179m
AT PROPOSED CENTER LINE (PCL) L=80.000m L=32.029m L=100.000m L=131.382m
R=-6833.500m G=-1.133 R=-7827.164m G=-0.279
WIDENING
e=2.5
SUPERELEVATION (%)
25000
25020
25040
25060
25080
25100
25120
25140
25160
25180
25200
25220
25240
25260
25280
25300
25320
25340
25360
25380
25400
25420
25440
25460
25480
25500
25520
25540
25560
25580
25600
25620
25640
25660
25680
25700
25720
25740
25760
25780
25800
25820
25840
25860
25880
25900
25920
25940
25960
25980
26000
CHAINAGE (m)
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:21pm maninder.v
44
10
Ex R 395833.3 7
66
OW
2855803.
20 00 0
Ex R 100
Ex R
O W 0.660
OW 230.306 Ex ROW
6
Ex R
2 - ROW
Ex 27
Ex R
OW NC
OW Right Ex ROW
Ex ROW
00
Ex R Ex ROW
OW Ex ROW
259
Ex R
396 Ex ROW
421
OW Ex ROW
Ex ROW
27100
.681
10.0
Ex ROW
10.0
Ex R Ex ROW
OW
Ex Ex ROW
RO
W Ex ROW
Ex ROW
26900
396 42 Ex R Ex ROW
285 269.0 OW Ex ROW
26800
621 57 Ex
RO Ex ROW
3 Ex ROW
00
500 .862 W
Ex ROW
26700
0
261
100
Ex ROW
26600
0.9 Ex R
80. 21 OW Ex ROW
366
26500
Ex ROW
00
-
262
NC
26400
Left
26300
43
395991.881
2856050.339 JUNCTION IMPROVEMENT
200 For Details, Refer Drg No.
65 EGIS/DPR/EIRH1UP020/DPR/MJI-005
26.726
33.293
60
4.0
Left
Ch.=26882.588m
Ch.=26487.783m
Ch.=26387.783m
Ch.=26542.954m
Ch.=26742.954m
Ch.=26030.000m
Ch.=26130.000m
Lvl.=126.218m
Lvl.=126.133m
Lvl.=126.073m
Lvl.=126.078m
Lvl.=126.078m
Lvl.=125.536m
Lvl.=125.506m
Datum(m) = 112
125.041 125.619
125.015 125.564
125.000 125.510
125.006 125.474
125.034 125.458
125.062 125.462
125.065 125.486
125.087 125.528
125.140 125.572
125.292 125.616
125.353 125.660
125.325 125.704
125.337 125.748
125.311 125.792
125.326 125.836
125.385 125.880
125.380 125.924
125.364 125.968
125.308 126.012
125.300 126.056
125.301 126.098
125.611 126.127
125.728 126.144
125.716 126.149
125.744 126.140
125.755 126.121
125.728 126.101
125.708 126.081
125.730 126.062
125.745 126.048
125.747 126.037
125.715 126.031
125.691 126.028
125.687 126.029
125.661 126.035
125.642 126.044
125.621 126.058
125.626 126.075
125.626 126.095
125.529 126.115
125.465 126.135
125.484 126.155
125.637 126.175
125.839 126.195
125.958 126.215
126.129 126.233
126.033 126.246
125.843 126.253
125.629 126.255
125.505 126.252
125.531 126.243
FINISHED ROAD LEVEL (FRL) AT PCL (m)
0.549
0.510
0.468
0.424
0.400
0.421
0.441
0.432
0.324
0.307
0.379
0.411
0.481
0.510
0.495
0.544
0.604
0.704
0.756
0.797
0.516
0.416
0.433
0.396
0.366
0.373
0.373
0.332
0.303
0.290
0.316
0.337
0.342
0.374
0.402
0.437
0.449
0.469
0.586
0.670
0.671
0.538
0.356
0.257
0.104
0.213
0.410
0.626
0.747
0.712
LEVEL DIFFERENCE
(FRL - EGL/ERL)
R=20030.320m G=0.220 G=0.100
VERTICAL PROFILE L=100.000m L=257.783m L=200.000m L=139.634m
AT PROPOSED CENTER LINE (PCL) L=100.000m L=55.171m L=150.000m
R=-31247.952m G=-0.100 R=-75000.840m
R=-5000.000m R=-200.000m R=20000.000m
HORIZONTAL ALIGNMENT
L=203.967m L=60.000 L=33.293m 00m L=100.423m L=230.306m
m L=60.0
26211.118
26270.000
26304.411
26364.411
w=5.30
WIDENING
w=5.30
e=4.0
e=2.5 e=2.5
SUPERELEVATION (%)
e=4.0
26000
26020
26040
26060
26080
26100
26120
26140
26160
26180
26200
26220
26240
26260
26280
26300
26320
26340
26360
26380
26400
26420
26440
26460
26480
26500
26520
26540
26560
26580
26600
26620
26640
26660
26680
26700
26720
26740
26760
26780
26800
26820
26840
26860
26880
26900
26920
26940
26960
26980
27000
CHAINAGE (m)
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:21pm maninder.v
CLIENT:-
WIDENING
CHAINAGE (m)
(FRL - EGL/ERL)
26900
VERTICAL PROFILE
LEVEL DIFFERENCE
Datum(m) = 116
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
Ex ROW
Ex ROW
Ex ROW
L=712.322m
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:21pm maninder.v
27080 0.551 125.619 126.170
Ex ROW
Ex ROW
27100
CONSULTANT:-
G=-0.100
27100 0.507 125.643 126.150
L=114.533m
27120 0.425 125.705 126.130
egisIndia
Ch.=27147.121m
Lvl.=126.103m
Ex ROW
Ex ROW
e=2.5
27220 0.374 125.692 126.066
PROJECT:-
Ex ROW
Ex ROW
L=200.000m
FRL at PCL
R=74944.467m
27280 0.389 125.699 126.088
27300
EGL / ERL at PCL
Ex ROW
Ex ROW
G=0.167
27400
L=60.000m
Ex ROW
VER 0
HOR 0
SCALE:-
27480 0.466 125.868 126.334
L=100.000m
27500
R=-37472.333m
25
2.5
27500 0.197 126.130 126.327
Ch.=27514.057m
27520 0.150 126.159 126.309 Lvl.=126.315m
50
1:2500 @ A2 SHEET
5.0
Ex ROW
Ex ROW
e=5.6
e=5.6
Date
Chainage
L=157.758m
R=-800.000m
G=-0.100
Checked by
Prepared by
Designed by
Approved by
L=110.044m
Pipe Culvert
27+511
285
Ex ROW
Dec 2014
45
499
Lvl.=126.205m
800
60
100
Rajeev Gupta
Sanjay Kumar
5.6
Left
15.596
157.758
Maninder Vashisth
Balkeshwar Mishra
6.269
R0
Ex ROW
L=100.000m
Date
Lvl.=126.274m
27740 0.443 125.868 126.311
Ex ROW
Revisions
e=2.5
DRG. NO. :
Ex ROW
Ex ROW
Ex ROW
281 00
FROM KM- 27+000 TO KM- 28+000
CLIENT:-
WIDENING
CHAINAGE (m)
(FRL - EGL/ERL)
VERTICAL PROFILE
LEVEL DIFFERENCE
27900
Datum(m) = 114
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
Ex ROW
Ex ROW
Span
28040 0.392 126.629 127.021
Chainage
28060 0.082 126.970 127.052
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:22pm maninder.v
28080 0.164 126.902 127.066
Ex ROW
Ex ROW
Pipe Culvert
L=80.000m
CONSULTANT:-
R=-22554.715m
28100 0.418 126.643 127.061
1 x 1.0
28100
28+071
Ch.=28111.559m
Lvl.=127.051m
28120 0.638 126.403 127.041
egisIndia
Ex ROW
Ex ROW
G=-0.118
L=128.528m
28200 0.601 126.346 126.947 28200
PROJECT:-
Ex ROW
Ch.=28240.086m
Ex ROW
L=1129.836m
28280 0.346 126.524 126.870
L=100.000m
Ex ROW
Ex ROW
R=45968.625m
28320 0.301 126.574 126.875
Ch.=28340.086m
28340 0.313 126.578 126.891
Lvl.=126.891m
L=139.914m
28440 0.438 126.553 126.991
VER 0
HOR 0
SCALE:-
Ch.=28480.000m
28480 0.501 126.530 127.031 Lvl.=127.031m
25
2.5
28500 0.500 126.556 127.056 28500
e=2.5
28520 0.503 126.591 127.094
50
1:2500 @ A2 SHEET
5.0
Ex ROW
L=120.000m
Date
R=34553.138m
Checked by
Prepared by
Designed by
Approved by
Ch.=28600.000m
28600 0.755 126.604 127.359 Lvl.=127.359m 28600
Ex ROW
Ex ROW
Dec 2014
Rajeev Gupta
Sanjay Kumar 28640 0.942 126.596 127.538
FRL at PCL
Maninder Vashisth
Balkeshwar Mishra
G=0.447
L=81.677m
Ch.=28681.677m
R0
Lvl.=127.724m
Ex ROW
Ex ROW
Date
L=120.000m
R=-18899.249m
Ex ROW
28+740
Lvl.=127.880m
FOR TENDER PURPOSE
-
46
NC
Right
0.257
20000
89.822
394899.292
L=89.822m
2853744.849
DRG. NO. :
28900
29100
FROM KM- 28+000 TO KM- 29+000
CLIENT:-
394899.292
2853744.849
WIDENING
CHAINAGE (m)
28900
(FRL - EGL/ERL)
VERTICAL PROFILE
LEVEL DIFFERENCE
Ex ROW
Ex ROW
Datum(m) = 112
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
29100
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:22pm maninder.v
29080 0.485 126.923 127.408
CONSULTANT:-
29100 0.426 126.963 127.389
egisIndia
29160 0.455 126.893 127.348
L=400.000m
R=139054.676m
29200 0.301 127.035 127.336
Ex ROW
Ex ROW
PROJECT:-
29240 0.295 127.040 127.335
FRL at PCL
Ch.=29362.212m
Ex ROW
VER 0
HOR 0
SCALE:-
29480 0.340 127.181 127.521 29500
25
2.5
29500 0.345 127.196 127.541
e=2.5
Ex ROW
Ex ROW
50
1:2500 @ A2 SHEET
5.0
Ch.=29530.000m
Lvl.=127.571m
29540 0.428 127.155 127.583
Date
29580 0.454 127.195 127.649 29600
Checked by
Prepared by
Designed by
Approved by
Ex ROW
Ex ROW
L=100.000m
Dec 2014
Ch.=29630.000m
Rajeev Gupta
Sanjay Kumar
Lvl.=127.783m
29640 0.614 127.201 127.815
Maninder Vashisth
Balkeshwar Mishra
29700
R0
Rev.
Chainage
L=159.034m
Ex ROW
1x2x1.5
29+760
Ch.=29889.034m
Ex ROW
Lvl.=128.311m
Ex ROW
DRG. NO. :
Lvl.=128.086m
Ex ROW
30100
FROM KM- 29+000 TO KM- 30+000
Ex ROW
Ex ROW
CLIENT:-
WIDENING
CHAINAGE (m)
(FRL - EGL/ERL)
VERTICAL PROFILE
LEVEL DIFFERENCE
29900
Datum(m) = 114
SUPERELEVATION (%)
Ex ROW
HORIZONTAL ALIGNMENT
Ex ROW
L=100.000m
30040 0.593 127.407 128.000
R=21167.782m
30060 0.604 127.417 128.021 Ch.=30066.231m
Ex ROW
Ex ROW
Lvl.=128.032m
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:23pm maninder.v
30080 0.565 127.492 128.057
CONSULTANT:-
30100 0.521 127.572 128.093 30100
egisIndia
Ex ROW
Ex ROW
G=0.182
30160 0.674 127.528 128.202
L=173.769m
30180 0.717 127.522 128.239
PROJECT:-
Ch.=30240.000m
30240 0.794 127.554 128.348 Lvl.=128.348m
L=160.000m
30340 0.926 127.420 128.346
1X1.2
R=-27336.254m
30+320
G=-0.404
L=41.867m
30440 0.486 127.523 128.009 Ch.=30441.867m
Lvl.=128.001m
Ex ROW
Ex ROW
VER 0
HOR 0
SCALE:-
30480 0.344 127.540 127.884
25
2.5
30500 0.267 127.585 127.852 30500
FRL at PCL
e=2.5
L=100.000m
R=19857.865m
50
1:2500 @ A2 SHEET
5.0
EGL / ERL at PCL
Ex ROW
Ex ROW
Date
30580 0.394 127.493 127.887
Checked by
Prepared by
Designed by
Approved by
30600 0.476 127.431 127.907 30600
Ex ROW
Ex ROW
Dec 2014
Rajeev Gupta
Sanjay Kumar 30640 0.461 127.486 127.947
Maninder Vashisth
Balkeshwar Mishra
G=0.100
L=193.352m
R0
Ex ROW
Ch.=30735.219m
30740 0.492 127.556 128.048 Lvl.=128.043m
Ex ROW
Ex ROW
L=35.000
Revisions
Description
35
3.0
47
100
Right
R=33498.134m
1500
7.563
162.999
Ch.=30835.219m
Ex ROW
30900
DRG. NO. :
Lvl.=128.575m
30920 0.179 128.442 128.621
Chainage
L=35.000
m
1 X4.2
30+911
R=-10985.261m
Lvl.=128.602m
31000 0.646 127.911 128.557 TO N
IWAD
A VIL
LAG
E
PLAN & PROFILE
BUSBAY
TO
AG
RIC
Ex ROW
Ex ROW
UL
T UR
E LA
ND
31100
FROM KM- 30+000 TO KM- 31+000
CLIENT:-
WIDENING
CHAINAGE (m)
(FRL - EGL/ERL)
VERTICAL PROFILE
LEVEL DIFFERENCE
Datum(m) = 114
SUPERELEVATION (%)
Ex R
E
O
HORIZONTAL ALIGNMENT
W
x RO
0
W
3090
Lvl.=128.602m
Ex R
G=-0.330
BAY
Ex R
A VILLAG
31060 0.279 128.080 128.359 TO NIWAD
L=113.846m
OW
Ex R
OW
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:23pm maninder.v
31080 0.209 128.084 128.293
Ch.=31099.999m
CONSULTANT:-
31100 0.132 128.095 128.227 Lvl.=128.227m
L=248.375m
e=2.5
0
31120 0.111 128.058 128.169 3110
Ex R
O
Span
W
Ex R
egisIndia
O W
Chainage
E
31160 0.038 128.062 128.100 A VILLAG
TO NIWAD
1 X 1.5
L=160.000m
31+136
R=25259.661m
W
Ex R
0
31220 0.032 128.084 128.116 3120
OW
PROJECT:-
31240 0.040 128.113 128.153
L=55.000
m
Ch.=31259.999m
31260 0.106 128.100 128.206 Lvl.=128.206m
Ex RO
Ex ROW
e=7.0
e=7.0
80
0
2851430.
55
7.0
21.990
L=98.520m
98.520
Right
10
85
G=0.304
R=400.000m
394079.5 7
L=140.001m
31360 0.317 128.193 128.510
Ex ROW
Ex ROW
L=55.000
Lvl.=128.631m
VER 0
HOR 0
SCALE:-
L=120.000m
31480 0.561 128.266 128.827
R=-67399.146m
31500
25
2.5
31500 0.593 128.268 128.861
Ex ROW
Ch.=31520.000m
31520 0.562 128.327 128.889
50
1:2500 @ A2 SHEET
Lvl.=128.889m
5.0
Ex ROW
Date
Ch.=31570.005m
Lvl.=128.952m
31580 0.528 128.437 128.965
Checked by
Prepared by
Designed by
Approved by
TO AGRICULTURE LAND
Ex ROW
31600
Ex ROW
Dec 2014
Rajeev Gupta
Sanjay Kumar
L=100.000m
Balkeshwar Mishra
R=76449.406m
Ch.=31670.005m
Lvl.=129.143m
Ex ROW
R0
31700
31700 0.631 128.589 129.220
EGL / ERL at PCL
Date
G=0.256
Ch.=31750.000m
Ex ROW
Lvl.=129.348m
31760 0.686 128.686 129.372
Span
Revisions
L=658.731m
e=2.5
E
31780 0.702 128.710 129.412 A VILLAG
Chainage
TO NIWAD
31800
31800 0.747 128.693 129.440
Description
Pipe Culvert
Ex ROW
L=100.000m
R=-34797.213m
31+800
31900
Ex ROW
Ch.=31900.379m
DRG. NO. :
Lvl.=129.445m
R=54862.109m
Ex ROW
Ex ROW
32100
FROM KM- 31+000 TO KM- 32+000
Ex ROW
CLIENT:-
WIDENING
CHAINAGE (m)
(FRL - EGL/ERL)
VERTICAL PROFILE
LEVEL DIFFERENCE
Ex ROW
Datum(m) = 114
SUPERELEVATION (%)
31900
HORIZONTAL ALIGNMENT
Ex ROW
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:24pm maninder.v
32080 0.421 129.205 129.626
CONSULTANT:-
32100 0.380 129.276 129.656
32100
L=40.000m
32120 0.423 129.263 129.686
Ex ROW
egisIndia
Ex ROW
e=3.7
e=3.7
32180 0.471 129.306 129.777
49
L=99.769m
40
100
3.7
1200
R=1200.000m
6.673
Right
99.769
393448.876
2850854.372
G=0.151
Ex ROW
L=407.442m
PROJECT:-
32240 0.385 129.483 129.868
L=40.000m
32260 0.396 129.502 129.898
Ex ROW
VER 0
HOR 0
SCALE:-
L=100.000m
25
2.5
32500 0.543 129.766 130.309
Ch.=32507.821m
32500
e=2.5
Ex ROW
Lvl.=130.329m
32520 0.586 129.775 130.361
50
1:2500 @ A2 SHEET
5.0
Ex ROW
Date
L=82.179m
Checked by
Prepared by
Designed by
Ex ROW
Approved by
Ch.=32590.000m
Lvl.=130.545m
32600 0.654 129.915 130.569 32600
Ex ROW
Span
Dec 2014
Chainage
Rajeev Gupta
Sanjay Kumar 32640 0.664 129.964 130.628
Maninder Vashisth
Balkeshwar Mishra
Box Culvert
L=100.000m
Ex ROW
R=-26309.979m
32+640
Ex ROW
R0
Ch.=32690.000m
Lvl.=130.617m
32700 0.565 130.040 130.605 32700
Date
L=100.000m
Lvl.=130.538m
32860 0.436 130.112 130.548
EGL / ERL at PCL
DRG. NO. :
Ex ROW
33100
FROM KM- 32+000 TO KM- 33+000
Ex ROW
JUNCTION IMPROVEMENT
For Details, Refer Drg No.
50 EGIS/DPR/EIRH1UP020/DPR/MJI-006
392327.741 51
2850048.235 .274
392092
20000 7.073
28 87
49
100 700
0.296 100
103.338 21.218
- 189.230 Ex R
OW
NC 70
Left 4.0
Left W
Ex ROW 34Ex RO OW
Ex ROW 33Ex ROW Ex R
Ex ROW
Ex ROW OW
Ex ROW Ex R W
RO
Ex ROW Ex
00
Ex ROW Ex ROW
W
Ex ROW Ex RO
341
Ex ROW
Ex ROW Ex ROW
Ex ROW Ex ROW W
Ex ROW Ex ROW O
Ex ROW Ex R
10.0
Ex ROW
32900
10.0
Ex ROW
Ex ROW
Ex ROW
33100
Ex ROW
Ex ROW
33200
Ex ROW Ex ROW Ex ROW
33300
33900
33400
33500
33600
33800
33700
FRL at PCL
Box Culvert EGL / ERL at PCL
Chainage 33+323
Span 1 X 1.5
Datum(m) = 118
130.238 130.688
130.280 130.708
130.336 130.728
130.362 130.748
130.345 130.768
130.318 130.788
130.356 130.808
130.370 130.828
130.408 130.848
130.454 130.868
130.490 130.888
130.544 130.908
130.517 130.928
130.432 130.948
130.442 130.968
130.597 130.988
130.793 131.008
130.612 131.028
130.509 131.048
130.513 131.068
130.508 131.088
130.537 131.108
130.547 131.128
130.527 131.148
130.490 131.168
130.486 131.188
130.518 131.208
130.446 131.228
130.399 131.248
130.361 131.268
130.377 131.288
130.410 131.308
130.448 131.328
130.498 131.348
130.591 131.368
130.705 131.388
130.795 131.408
130.863 131.428
130.894 131.448
130.874 131.468
130.808 131.488
130.778 131.508
130.763 131.528
130.818 131.548
130.789 131.568
130.747 131.588
130.771 131.608
130.855 131.628
130.883 131.648
130.903 131.668
130.961 131.688
FINISHED ROAD LEVEL (FRL) AT PCL (m)
0.428
0.392
0.386
0.423
0.470
0.452
0.458
0.440
0.414
0.398
0.364
0.411
0.516
0.526
0.391
0.215
0.416
0.539
0.555
0.580
0.571
0.581
0.621
0.678
0.702
0.690
0.782
0.849
0.907
0.911
0.898
0.880
0.850
0.777
0.683
0.613
0.565
0.554
0.594
0.680
0.730
0.765
0.730
0.779
0.841
0.837
0.773
0.765
0.765
0.727
LEVEL DIFFERENCE
(FRL - EGL/ERL)
G=0.100
VERTICAL PROFILE L=1198.909m
AT PROPOSED CENTER LINE (PCL)
R=-20000.000m R=-700.000m
HORIZONTAL ALIGNMENT
L=103.338m L=73.266m L=70.000m L=70.000m
L=189.230m
WIDENING
e=4.0
e=2.5
SUPERELEVATION (%)
e=4.0
33000
33020
33040
33060
33080
33100
33120
33140
33160
33180
33200
33220
33240
33260
33280
33300
33320
33340
33360
33380
33400
33420
33440
33460
33480
33500
33520
33540
33560
33580
33600
33620
33640
33660
33680
33700
33720
33740
33760
33780
33800
33820
33840
33860
33880
33900
33920
33940
33960
33980
34000
CHAINAGE (m)
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:24pm maninder.v
CLIENT:-
WIDENING
CHAINAGE (m)
(FRL - EGL/ERL)
10.0
Ex ROW
VERTICAL PROFILE
LEVEL DIFFERENCE
Ex ROW
33900
Datum(m) = 118
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
Ch.=34048.909m
Ex ROW
Lvl.=131.737m
34060 0.838 130.910 131.748
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:24pm maninder.v
34080 0.965 130.808 131.773
CONSULTANT:-
34100 0.896 130.905 131.801 34100
L=100.000m
Ex ROW
R=99509.374m
Ex ROW
egisIndia
Ch.=34148.909m
Lvl.=131.887m
34160 0.553 131.356 131.909
Span
G=0.200
34220 0.662 131.368 132.030
Pipe Culvert
L=118.133m
PROJECT:-
1 X 0.9
Ex ROW
L=100.000m
34340 0.404 131.740 132.144
R=-21136.915m
Ex ROW
Ex ROW
L=728.845m
Span
Ex ROW
VER 0
HOR 0
G=-0.273
Slab Culvert
SCALE:-
34480 0.303 131.477 131.780
L=191.585m
1 X 1.8
34+458
25
2.5
34500 0.417 131.308 131.725
Ex ROW
34500
e=2.5
Ex ROW
50
1:2500 @ A2 SHEET
5.0
34540 0.290 131.326 131.616
Ch.=34558.627m
34560 0.227 131.335 131.562
Date
Lvl.=131.566m
Ex ROW
Checked by
Prepared by
Designed by
Approved by
Ex ROW
Dec 2014
L=100.000m
Rajeev Gupta
Sanjay Kumar
R=25743.997m
Balkeshwar Mishra
Ex ROW
Ch.=34658.627m
34660 0.357 131.132 131.489
Ex ROW
Lvl.=131.487m
R0
34700
NC
100
Left
0.238
20000
82.923
Date
391585.415
2849089.622
Ex ROW
Revisions
L=194.554m
L=82.923m
Description
Ex ROW
Ex ROW
Span
DRG. NO. :
Ex ROW
35100
Ex ROW
Ex ROW
CLIENT:-
WIDENING
CHAINAGE (m)
(FRL - EGL/ERL)
Ex ROW
Ex ROW
VERTICAL PROFILE
LEVEL DIFFERENCE
34900
Datum(m) = 118
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
G=-0.118
35040 0.404 131.275 131.679 Ch.=35043.685m
Ex ROW
L=30.504m
Lvl.=131.675m
35060 0.385 131.276 131.661
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:25pm maninder.v
35080 0.342 131.318 131.660
CONSULTANT:-
35100 0.397 131.280 131.677 35100
L=100.000m
Ex ROW
Ex ROW
R=23219.722m
35120 0.373 131.337 131.710
egisIndia
Lvl.=131.772m
35160 0.343 131.480 131.823
Ex ROW
G=0.313
35220 0.363 131.648 132.011
PROJECT:-
L=203.812m
35240 0.372 131.701 132.073
TO A
35260 0.345 131.791 132.136 GRIC
ULTU
Ex ROW
RE LA
ND
Ex ROW
Ch.=35347.496m
Ex ROW
Lvl.=132.409m
35360 0.385 132.061 132.446
L=1210.565m
L=60.00m
VER 0
HOR 0
SCALE:-
35480 0.417 132.197 132.614
Span
Ex ROW
25
2.5
35500 0.456 132.166 132.622 35500
Ex ROW
e=2.5
Chainage
50
1:2500 @ A2 SHEET
5.0
Slab Culvert
R=-39311.93m
35+466
Date
Ex ROW
Ex ROW
Checked by
Prepared by
Designed by
Approved by
35600 0.446 132.062 132.508 35600
Ch.=35610.618m
Lvl.=132.481m
35620 0.410 132.046 132.456
Dec 2014
Rajeev Gupta
Sanjay Kumar 35640 0.404 131.998 132.402
Maninder Vashisth
Balkeshwar Mishra
Ex ROW
Ex ROW
Ex ROW
G=-0.27
35800
Description
L=362.28m
Ex ROW
35820
FOR TENDER PURPOSE
DRG. NO. :
Ch.=35972.901m
35980 0.253 131.236 131.489 Lvl.=131.509m
36100
FROM KM- 35+000 TO KM- 36+000
Ex ROW
Ex ROW
55
390371.638
2847216.498
1000
100
7.120
79.266
45
4.4
Left
37 Ex ROW
Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW
Ex ROW Ex ROW
Ex ROW
Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW Ex ROW
37100
36700
36600
36500
36400
36300
36800
36200
36100
36900
35900
37+000
36+000
53
390898.286 54
2848015.496 390525.288
5000 2847445.176
100 5000
0.527 100
46.018 0.968
- 84.455
NC -
Right NC
Right
FRL at PCL
EGL / ERL at PCL
Pipe Culvert Box Culvert
Ch.=36611.557m
Ch.=36671.557m
Chainage 36+264 Chainage 36+907
Ch.=36032.901m
Ch.=36843.636m
Lvl.=131.923m
Ch.=36072.326m
Lvl.=131.911m
Ch.=36362.148m
Ch.=36132.326m
Ch.=36162.148m
Lvl.=131.309m
Lvl.=131.234m
Lvl.=131.153m
Lvl.=131.035m
Lvl.=130.967m
Datum(m) = 118
131.191 131.428
131.137 131.358
131.054 131.281
130.952 131.201
130.857 131.123
130.712 131.054
130.556 130.997
130.435 130.950
130.415 130.906
130.394 130.866
130.368 130.838
130.366 130.821
130.385 130.816
130.394 130.822
130.395 130.840
130.430 130.870
130.534 130.911
130.696 130.963
130.877 131.027
131.041 131.099
131.114 131.170
131.160 131.241
131.177 131.312
131.166 131.383
131.312 131.454
131.397 131.526
131.454 131.597
131.509 131.668
131.576 131.739
131.654 131.810
131.784 131.881
131.868 131.948
131.843 131.973
131.908 131.948
131.736 131.878
131.551 131.799
131.414 131.720
131.315 131.642
131.207 131.563
131.062 131.484
130.845 131.405
130.601 131.327
130.353 131.248
130.150 131.174
129.999 131.113
129.934 131.067
129.869 131.034
129.809 131.016
129.817 131.011
129.927 131.020
130.059 131.043
FINISHED ROAD LEVEL (FRL) AT PCL (m)
0.221
0.227
0.249
0.266
0.342
0.441
0.515
0.491
0.472
0.470
0.455
0.431
0.428
0.445
0.440
0.377
0.267
0.150
0.058
0.056
0.081
0.135
0.217
0.142
0.129
0.143
0.159
0.163
0.156
0.097
0.080
0.130
0.040
0.142
0.248
0.306
0.327
0.356
0.422
0.560
0.726
0.895
1.024
1.114
1.133
1.165
1.207
1.194
1.093
0.984
LEVEL DIFFERENCE
(FRL - EGL/ERL)
R=34246.98m R=34630.41m G=0.36 R=28727.81m
VERTICAL PROFILE L=60.00m L=200.00m L=249.41m L=200.00m
AT PROPOSED CENTER LINE (PCL) L=60.00m L=39.43m L=29.82m L=60.00m L=172.08m
R=-46684.54m G=-0.40 G=-0.22 R=-8004.12m G=-0.39
R=5000.00m R=5000.00m R=-1000.00m
HORIZONTAL ALIGNMENT
L=46.02m L=616.23m L=84.46m L=148.63m L=45.0 L=79.27m
0m
WIDENING
e=4.4
e=2.5
SUPERELEVATION (%)
e=4.4
36000
36020
36040
36060
36080
36100
36120
36140
36160
36180
36200
36220
36240
36260
36280
36300
36320
36340
36360
36380
36400
36420
36440
36460
36480
36500
36520
36540
36560
36580
36600
36620
36640
36660
36680
36700
36720
36740
36760
36780
36800
36820
36840
36860
36880
36900
36920
36940
36960
36980
37000
CHAINAGE (m)
Public Works Department Part-A: Project Preparation Approved by Rajeev Gupta DRG. NO. :
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:25pm maninder.v
CLIENT:-
Ex ROW
WIDENING
Ex ROW
CHAINAGE (m)
(FRL - EGL/ERL)
36900
VERTICAL PROFILE
LEVEL DIFFERENCE
Datum(m) = 118
SUPERELEVATION (%)
HORIZONTAL ALIGNMENT
AT PROPOSED CENTER LINE (m)
Ex ROW
Ex ROW
Ex ROW
L=79.27m
R=-1000.00m
e=4.4
e=4.4
37040 1.025 130.106 131.131 Ch.=37043.636m
Lvl.=131.142m
37060 1.036 130.156 131.192
L=45.0
D:\Maninder data\Maninder\My Projects\51.EIRH1UP020_UP PWD\Drawing\Phase-1 PART A\3.DPR\1.Hamirpur-Rath Section of SH-42\6.FOR TEND Print Plan.dwg Feb 16, 2016 - 2:26pm maninder.v
37080 1.034 130.218 131.252
0m
37100
Ex ROW
Ex ROW
CONSULTANT:-
37100 0.959 130.354 131.313
55
45
4.4
Left
100
1000
7.120
79.266
egisIndia
37160 0.683 130.811 131.494
Ex ROW
Ex ROW
PROJECT:-
FRL at PCL
Ex ROW
G=0.30
EGL / ERL at PCL
L=408.86m
37280 0.113 131.744 131.857
37300
37300 0.112 131.806 131.918
Ex ROW
VER 0
HOR 0
Ex ROW
SCALE:-
Ex ROW
25
2.5
37500 0.094 132.374 132.468
e=2.5
R=-20631.98m
Ch.=37512.492m
37520 Lvl.=132.473m
0.110 132.364 132.474
50
1:2500 @ A2 SHEET
5.0
37540 0.106 132.370 132.476
L=892.91m
Ex ROW
Ex ROW
Date
37580 0.149 132.332 132.481
Checked by
Prepared by
Designed by
Approved by
37600
37600 0.131 132.352 132.483
Dec 2014
Ex ROW
Ex ROW
Rajeev Gupta
Sanjay Kumar 37640 0.130 132.358 132.488
Maninder Vashisth
Balkeshwar Mishra
37700
37700 0.125 132.370 132.495
Ex ROW
Ex ROW
Date
37800
37800 0.111 132.395 132.506
Description
37820
FOR TENDER PURPOSE
Ex ROW
37900
DRG. NO. :
Ex ROW
38+000
R=32337.96m
L=29.84m
Ex ROW
R=3000.00m
38
NC
Ex ROW
100
Right
3000
0.570
Ex ROW
38100
29.837
389919.456
CHAINAGE (m)