HSE DEPARTMENT
PROSEDURE
Document Number KE-HSE-PS- 019 Revision 01
Edition 01
Contractor’s Health, Safety and Revision Date
14 Dec
Environment Management System 2009
Issue Date 30 July 2007 Page 1 of 15
APPENDIX E
PRE-QUALIFICATION
CONTRACTOR’S HSE MANAGEMENT SYSTEM EVALUATION
a) How are the senior managers personally involved in the HSE management?
Answer:
The senior managers involved in HSE management by create commitment in statement in HSE Policy, site
visit, attend in external & internal HSE meetings.
See attachments
• HSE Policy
• Internal HSE meeting
Answer:
The commitment is shown in our Management meeting,
see attachment
• Inter Office Memo
• HSE manual document
Answer:
We promote a positive culture towards HSE matters by create:
• meetings, see attachment
• banners, see attachment
• put in signs, see attachment
• posters. see attachment
PERTAMINA PHE WMO
HSE DEPARTMENT
PROSEDURE
Document Number KE-HSE-PS- 019 Revision 01
Edition 01
Contractor’s Health, Safety and Revision Date
14 Dec
Environment Management System 2009
Issue Date 30 July 2007 Page 2 of 15
Answer:
The company has HSE Policy. See attachment
b) Who has the overall and final responsibility for HSE in your organization?
Answer:
The man who has overall and final responsibility for HSE is Director (Chairman of HSE Committee).The
organization chart with personnel highlighted, see attachment, HSE Manual
c)Who is the most senior officer in your organization responsible for the policies being implemented in the
authorized area and the location where the employees work?
Answer:
QHSE Department Manager as the highest responsible in carried out policy at his/her premise or site he/she
is working. The position of QHSE Manager may be found in attachment, SCI-HSEM-01, HSE Manual.
Answer:
The arrangements for advising employees of changes in the policy by:
- Pernyataan Pemahaman”. See attachment
Answer:
- Email, (no attachment)
- bulletin board,
2
PERTAMINA PHE WMO
HSE DEPARTMENT
PROSEDURE
Document Number KE-HSE-PS- 019 Revision 01
Edition 01
Contractor’s Health, Safety and Revision Date
14 Dec
Environment Management System 2009
Issue Date 30 July 2007 Page 3 of 15
3/10
PART 3 : ORGANIZATION, RESPONSIBILITIES, RESOURCES, STANDARDS AND DOCUMENTATION
c)How is the structure of your company made to manage and communicate HSE effectively?
Answer:
The company structured to manage and communicate HSE effectively by Management meetings, Safety
talks, Toolbox talks, Bulletin boards. Also see attachment
• Management Meeting,
• Weekly Safety talk,
• Daily Toolbox talk,
d) What provisions does your company draw up for meetings on HSE communication?
Answer:
The company structured to manage and communicate HSE effectively by Management meetings, Safety talks,
Toolbox talks, Bulletin boards. Also see attachment
• Management Meeting, see attachment
• Weekly Safety talk, see attachment
• Daily Toolbox talk, see attachment
3.2. The Capacity and Training for Managers/Supervisors/Senior Field Officers/HSE Advisors
Have managers and supervisors at all levels who will plan, monitor, predict and perform works attended formal
trainings on HSE in accordance with their respective responsibilities in connection with work performance in
accordance with the HSE requirements?
Yes No.
If yes, provide the detail. If such training is provided in-house, describe the materials and the duration of the
course
Answer:
Yes. We have records and planning of HSE training for our Manager/Supervisor/Senior Site Staffs/HSE Advisor
b) What arrangements has your Company prepared to ensure that the employees, including
subcontractors understand your HSE policy and procedures?
Answer:
Refer to attachment, the arrangement is all new employees must join in HSE Induction class and then the
company will send him/her/them to another class or topic.
• Copy of training certificates, see attachment CERTIFICATES AND TRAINING PROGRAM
• Induction program, see attachment
c)What arrangements has your company prepared to ensure that the employees and the new employees
have received instruction and information concerning specific hazards that may arise from a work?
3
PERTAMINA PHE WMO
HSE DEPARTMENT
PROSEDURE
Document Number KE-HSE-PS- 019 Revision 01
Edition 01
Contractor’s Health, Safety and Revision Date
14 Dec
Environment Management System 2009
Issue Date 30 July 2007 Page 4 of 15
What trainings have you provided to ensure that all employees understand the company's conditions?
Answer:
To ensure all new employees and new subcontractor employee have been instructed and have received
information on any specific hazards as company activities by inform all company hazards & risk trough
HSE Induction program, see attachment, HSE Training procedure,
Risk Analysis will refer to JSA procedure as attached. The JSA form for sample of risk analysis, see
attachment
HSE Induction attendance list, see attachment
HSE Training Certificate, see attachment
d) What arrangements has your company prepared to ensure that the present employees' knowledge on
HSE is always up to date? If such training is provided in-house, give the details of the training's
materials.
Answer:
We do HSE Meeting monthly
3.4. Special training
a) How do you identify a location in your operation where special training is required to face potential
hazards? Give the list and detail of the training provided.
Answer:
We have analysis all hazards as company’s nature activities and listed the potential hazard. The list is
attached in our “Hazards & Risk Assessment” procedure. And then we provide training that must be cared
and joined by employees to deal with the potential hazards.
The Hazards list is attached in Hazards & Risks Assessment procedure, see attachment E.5
Refer to documents of SCI-HSEM-01, HSE Manual, part 8, page 9, and SCI-HSE-01, HSE Training
procedure, sub part 5.2, page 5, the training program for each (basic first aid, sea survival, fire fighting,
evacuation drill, etc) will be shown in attachment
4
PERTAMINA PHE WMO
HSE DEPARTMENT
PROSEDURE
Document Number KE-HSE-PS- 019 Revision 01
Edition 01
Contractor’s Health, Safety and Revision Date
14 Dec
Environment Management System 2009
Issue Date 30 July 2007 Page 5 of 15
4/10
PART 3 : ORGANIZATION, RESPONSIBILITIES, RESOURCES, STANDARDS AND DOCUMENTATION
b) If a certain work involves radioactive, asbestos disposal, chemical substances or other occupational
health hazards, how do you identify, assess and handle the hazards?
Answer:
We refer to documents:
- SCI-HSE-03, Hazards & Risks Assessment procedure
- SCI-HSE-02, Job Safety Analysis,
to identified by its MSDS. From the MSDS got HSE precautions and to be made SOP for the work related
substances. We also always refer to our “Hazardous Substances Handling” procedure. HSE certificates
(PTW) shall be on hand before commencing the work. The work shall be controlled during its doing and
end to end.
- The “Hazardous Substances Handling” procedure, see attachment
- HSE certificate ( sample for form), see attachment
Answer:
Yes, we have
Answer :
The occupational health, safety and/or environmental to HSE staff is JAMSOSTEK
Answer :
We will assess all our subcontractors include its HSE performance. The assessment by using our
“Subcontract by HSE Requirement” procedure.
The procedure, SCI-HSE-05, Subcontract by HSE Requirement is attached
Answer :
We will assess all our subcontractors include its HSE performance. The assessment by using our
“Subcontract by HSE Requirement” procedure.
The procedure, SCI-HSE-05, Subcontract by HSE Requirement is attached
b) How do you explain that the standards you require are met by your contractors?
Answer:
5
PERTAMINA PHE WMO
HSE DEPARTMENT
PROSEDURE
Document Number KE-HSE-PS- 019 Revision 01
Edition 01
Contractor’s Health, Safety and Revision Date
14 Dec
Environment Management System 2009
Issue Date 30 July 2007 Page 6 of 15
We spell out the standards require our contractors to meet on “Subcontract by HSE Requirement” procedure,
c) How do you ensure that the following standards have been met and checked?
Training on safety for working employees.
The recruitment process for employees to work on your projects.
The employees have comprehended the company's commitment, policies, objectives and standards.
The plans to have relationship with subcontractors? If any?
Answer:
To ensure them by using bidder’s checklist of “Subcontract by HSE Requirement” procedure
6
PERTAMINA PHE WMO
HSE DEPARTMENT
PROSEDURE
Document Number KE-HSE-PS- 019 Revision 01
Edition 01
Contractor’s Health, Safety and Revision Date
14 Dec
Environment Management System 2009
Issue Date 30 July 2007 Page 7 of 15
3.7. Standards
a) Do you have HSE Standards?
Answer:
We spell out the HSE performance standards require to be met on our HSE Manual, see attachment SCI-HSEM-
01, HSE Manual,
Answer:
We ensure the standards are met and verified by activities of field supervision, observation and inspection. These
are based on our procedures:
• Best Supervision, see attachment . SCI-HSE-06, and
• HSE Inspection for Equipment, see attachment . SCI-HSE-07.
• Observation card, see attachment
c)How do identify the industrial standards and new HSE regulations that may be applicable to your
activities?
Answer:
We provide Job Safety Analysis (JSA) technique for identification, assessment, control and mitigation of hazards
and effects. SCI-HSE-03 JSA procedure, see attachment
d) Do you have a comprehensive structure to draw up, revise and distribute HSE standards?
Answer:
We have corresponding standards, it can by letters, email
Answer:
We provide Job Safety Analysis (JSA) technique for identification, assessment, control
and mitigation of hazards and effects.
The JSA procedure, see attachment E.4. SCI-HSE-02.
And sample of it see attachment
Answer:
We use risk assessment system and risk control/JSA (counter measure implemented, and
then do control the implementation by inspection or observation the exposure of our
workforce to chemical or physical agents).
- Sample of risk assessment, see attachment
- Sample of JSA, see attachment
7
PERTAMINA PHE WMO
HSE DEPARTMENT
PROSEDURE
Document Number KE-HSE-PS- 019 Revision 01
Edition 01
Contractor’s Health, Safety and Revision Date
14 Dec
Environment Management System 2009
Issue Date 30 July 2007 Page 8 of 15
How do your workers notify others concerning hazards that may arise such as chemical substances, noise,
radiation etc in their works?
Answer:
Workforce advised on potential hazards encountered in the course of their work by
Instruction/Memo, (liat file SOP MSDS, upd). See attachment
We have:
- PPE procedure, see attachment E.10. SCI-HSE-08.
- PPE stock records form, see attachment
b) Do you provide Personal Protective Equipment (PPE) which fit your employees? Give list of PPE for
this work scope.
Answer:
yes, we provide PPE for employees.
Employee’s receipt card,
c)Do you provide training concerning the procedure to use PPE ? Explain the training's materials and any
follow up.
Answer:
Yes, we provide PPE training before give them to employees. Content of the training are:
- Main type of PPE
- Function of PPE includes all equipment designed to be worn or held by a person at work to protect against
one or more risks
- PPE as a ‘Last Resort’
- Maintenance.
After the training, we control compliance of PPE usage at field and evaluation and take corrective action, if
needed.
The attendance list of the training us
d)Do you have a program to ensure that PPE is used and maintained?
Answer:
Yes, we have PPE program is impacted and maintained by using a checklist “Kartu
Pengamatan Lapangan” for observation/inspection
8
PERTAMINA PHE WMO
HSE DEPARTMENT
PROSEDURE
Document Number KE-HSE-PS- 019 Revision 01
Edition 01
Contractor’s Health, Safety and Revision Date
14 Dec
2009
Environment Management System
Issue Date 30 July 2007 Page 9 of 15
Answer:
We have a system in:
- HSE Manual, SCI-HSEM-01, page 8, sub part 7.2.
- Waste Management procedure, SCI-HSE-09, page 2 & 3, part 6.
c) Provide us with the total number of incidents that caused damage to the environment in the amount
exceeding USD$ 50,000 in the last 24 months. Please attach the copies of reports submitted to the
government.
Answer:
We have not any experience/record of accident resulting environmental damage in the
amount greater than $50,000.
Answer:
We have waste disposal procedure. It is spell out in Waste Management procedure, SCI-HSE-09,
f) Do you have the procedures for reporting oil spills and / or other hazardous materials?
Yes No
Answer:
We have procedure for spill reporting in document Controlling to Spill, SCI-HSE-10,
g) Do you have the procedures for cleaning oil spills and / or other hazardous materials?
Yes No
Answer:
We have equipment related environmental matters
h) Provide a detail about the equipment you have related to environmental issues.
Answer:
We have equipment related environmental matters, see attachment-4.5e.
Answer:
The person in charge who coordinating environment matter is HSE Manager, see
Organization chart in, HSE Manual, SCI-HSEM-01
9
PERTAMINA PHE WMO
HSE DEPARTMENT
PROSEDURE
Document Number KE-HSE-PS- 019 Revision 01
Edition 01
Contractor’s Health, Safety and Revision Date
14 Dec
2009
Environment Management System
Issue Date 30 July 2007 Page 10 of 15
Answer:
We have an industrial hygiene program. The program are included medical evaluations to employees regularly, first
aid services/clinic/hospital provided at all SIGMA offices. See attachment-3.7.e.1, HSE Manual, SCI-HSEM-01
b) Do you have risk assessment, or similar business, to identify hazards at work places? Explain the process.
Answer:
we have a risk assessment for identifying workplace hazards. See attachment-3.7.e.4,
SCI-HSE-03, Hazards and Risks Assessment and JSA procedure, attachment-3.7.e.3, SCI-HSE-
02.
Sample of risk assessment,
c) If you procure hazardous materials/substances to the work places, please explain the process you will
apply to document and supervise them.
Answer:
We refer to our Hazardous Substances Handling procedure, SCI-HSE-04 in attachment-3.7.e.5. The flow chart
may be met in attachment 4.6.c.
Yes, we have Drugs and Alcohol policy. This policy will include in pre-employment, see attachment-3.7.e1, SCI-
HSEM-01, HSE Manual, page 7, sub part 6.1.
And also shown by document SIGMA Safety Security Rule
Answer:
Yes, we have HSE documents to guide working practice in our activities. The document is part of our HSE
system. These are HSE Manual and procedures. See attachment
How do you ensure that the procedures applied by the employees on the field are consistent with your HSE
objectives and policies?
Answer:
We ensure this by implement permit to work system and JSA. See attachment
10
PERTAMINA PHE WMO
HSE DEPARTMENT
PROSEDURE
Document Number KE-HSE-PS- 019 Revision 01
Edition 01
Contractor’s Health, Safety and Revision Date
14 Dec
Environment Management System 2009
Issue Date 30 July 2007 Page 11 of 15
Answer:
Refer to HSE Inspection for Equipment procedure on attachment-3.7.e.8, so all equipment related our activities are
maintenance scheduled and records.
Answer:
The arrangement company has for vehicle incident prevention is “Save Traffic” procedure, SCI-HSE-12, see
attachment-
Put posters on visible & right places, see attachment-
Driving safety check list. See attachment-
Answer:
The arrangement company has for supervision and monitoring of HSE performance are “Best Supervision”
procedure, “Internal HSE Audit” procedure that can see on attachment-3.7.e7. and 3.7.e14. Result of the
Supervision and audit will be discussed in regular meetings include safety. See attachment-6.1.a. For sample
of heduled (safety talk), speaker, MOM & clear topics
b) What criteria does your company use in assessing performance; give example
c) What arrangements does your company have to convey the results and findings from supervision and
monitoring to:
11
PERTAMINA PHE WMO
HSE DEPARTMENT
PROSEDURE
Document Number KE-HSE-PS- 019 Revision 01
Edition 01
Contractor’s Health, Safety and Revision Date
14 Dec
2009
Environment Management System
Issue Date 30 July 2007 Page 12 of 15
Answer:
Not yet
12
PERTAMINA PHE WMO
HSE DEPARTMENT
PROSEDURE
Document Number KE-HSE-PS- 019 Revision 01
Edition 01
Contractor’s Health, Safety and Revision Date
14 Dec
Environment Management System 2009
Issue Date 30 July 2007 Page 13 of 15
Answer:
Yes, we organize in-house safety meetings. The meeting is weekly meeting who attended by management for
management meeting and attended by all level for site safety talk meeting. The topic of the meeting is a line with
work activities at that time. Sample of meeting schedule, see attachment
We organize campaign to stimulate safe working practice. The campaign will be (see attachments-1):
1.Meetings / socialization
2.Poster
3.Banners
Answer:
NONE
Please include your company's definition on the above terms on a separate sheet.
Answer
For records, see attachment-6.
For Definition, see attachment. Incident-Investigation Reporting procedure,
13
PERTAMINA PHE WMO
HSE DEPARTMENT
PROSEDURE
Document Number KE-HSE-PS- 019 Revision 01
Edition 01
Contractor’s Health, Safety and Revision Date
14 Dec
Environment Management System 2009
Issue Date 30 July 2007 Page 14 of 15
Answer:
Environmental recorded by using attachment
Answer:
Every end of the project and then 1 a year. See attachment-
Answer:
Yes, we have, see attachment-3, Incident and Investigation procedure
b) How is a finding, after being investigated, or relevant incident in other places, is communicated to your
employees?
Answer:
Yes. This is parts of campaign materials. See attachments
Answer:
Yes. Sample of the near miss report, see attachment-3, Incident and Investigation procedure.
Answer:
No nothing because no incident happened during the periodic time.
Answer:
See attachment-3, SCI-HSE-013, Internal HSE Audit.
b) How do the above policies explain about the auditing standards, including unsafe actions and qualification
for auditors?
Answer:
We will do the audit since this project and recorded.
14
PERTAMINA PHE WMO
HSE DEPARTMENT
PROSEDURE
Document Number KE-HSE-PS- 019 Revision 01
Edition 01
Contractor’s Health, Safety and Revision Date
14 Dec
Environment Management System 2009
Issue Date 30 July 2007 Page 15 of 15
Answer:
Yes. The audit activity is one of our program, see attachment-7.
d) How is the auditing effectiveness examined and how does the management report and follow up on the
audit result?
Answer:
We will do for next audit, see answer item 7.b. above.
Explain how the emergency preparedness is maintained and the command structure under an emergency situation.
Answer:
Yes, we have. SCI-HSE-015, Emergency and Evacuation Procedure
Answer:
PT SCI participated in KADIN and APTEK
b) Does your company have other features or HSE regulations not included in your response in questionnaire?