Professional Documents
Culture Documents
Katara Towers Bms Schematic Diagram 06may2021
Katara Towers Bms Schematic Diagram 06may2021
CP/MCC/MCP
CONTROL PANEL / MOTOR CONTROL CENTER /
MOTOR CONTROL PANEL
REFERENCE DRAWINGS
DRAWING NO. TITLE REV.
CODE D REJECTED
CODE N NOTED
NO ACTION IS REQUIRED
B
of any change to Contract Documents or Variation to the works. Response provided does not constitute a time
A
or cost impact to the project.
Contractor is responsible for dimensions,quantities and coordination with other trades.
C
B
D
A
B
F
C
SHOP DRAWINGS
F
B
A
E
D
E
A
E
H
A
D
B
F
G
C
B
A
F
E
C
D
00 ISSUED FOR APPROVAL 06-05-2021 RAB DRD DRD
A
C
B
D
A
C
B
M
B
Rev. Description DATE DWN CHKD APPD APPD
A
M
B
CLIENT:
A
C
D
M
B
D
A
B
B
M
B
KATARA TOWERS
A
HOTEL MANAGEMENT WLL
D
A
C
B
D
A
A
B
C
B
B
A
PO Box 2977 Doha, Qatar
(C.P.) SALT
PUMP CP/MCC CHLORINATOR (C.P.) SODA (C.P.) UVS PUMP CP/MCC PUMP CP/MCC PUMP CP/MCC Qatar Project Management
A B
NORMAL/FAULT (TRIP)
NORMAL/FAULT (TRIP)
NORMAL/FAULT (TRIP)
SALT CHLORINATOR STATUS
POOL WATER TEMPERATURE
SET ENABLE/DISABLE
SET ENABLE/DISABLE
SET ENABLE/DISABLE
SET ENABLE/DISABLE
SODA ASH NORMAL/FAULT
BYPASS VALVE COMMAND
STATUS (ON/OFF)
STATUS (ON/OFF)
STATUS (ON/OFF)
STATUS (ON/OFF)
WATER LINE PRESSURE
ON/OFF STATUS
WATER LEVEL
TRIP STATUS
M.E.P Contracting
IMAR Trading & Contracting Co. W.L.L. – Midmac Contracting Company W.L.L. Buzwair Bldg B-2, 6th Floor, Bldg# 57, Zone 25, Street 330 Al Mansoura,
Tel.: +974 44131770 | Fax: +974 44369529 | P.o. Box: 22403 | Doha – Qatar P.O.Box: 30774, Doha Qatar, Tel: 974 4437 1906, Fax: 974 4460 1970
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
Email: info@sogeleciskan.com
SHEET TITLE:
REFERENCE DRAWINGS
DRAWING NO. TITLE REV.
CODE D REJECTED
CODE N NOTED
C
B
D
NO ACTION IS REQUIRED
C
B
D
A
D
STRUCTURAL ARCHITECTURAL ELECTRICAL MECHANICAL OTHERS
Contractor
Sign/Date
Consultant
Sign/Date
C
F
B
F
C
C
D
E
A
D
A
E
D
Approval shall not relieve the Contractor of any of his obligations under the Contract or constitute authorization
of any change to Contract Documents or Variation to the works. Response provided does not constitute a time
or cost impact to the project.
B
F
G
C
C
F
B
E
A
E
H
B
A
SHOP DRAWINGS
A
D
B
C
B
C
A
F
B
D
E
A
C
A
D
C
B
A
C
A
C
D
A
A
D
C
B
B
B
D
B
C
CLIENT:
KATARA TOWERS
HOTEL MANAGEMENT WLL
Katara Hospitality Building, Marina District, Lusail City,
PO Box 2977 Doha, Qatar
(C.P.) SALT
PUMP CP/MCC PUMP CP/MCC CHLORINATOR (C.P.) SODA (C.P.) UVS PUMP CP/MCC PUMP CP/MCC
NORMAL/FAULT (TRIP)
NORMAL/FAULT (TRIP)
NORMAL/FAULT (TRIP)
SALT CHLORINATOR STATUS
POOL WATER TEMPERATURE
SET ENABLE/DISABLE
SET ENABLE/DISABLE
SET ENABLE/DISABLE
SET ENABLE/DISABLE
SODA ASH NORMAL/FAULT
MAIN CONTRACTOR:
BYPASS VALVE COMMAND
STATUS (ON/OFF)
STATUS (ON/OFF)
STATUS (ON/OFF)
STATUS (ON/OFF)
WATER LINE PRESSURE
ON/OFF STATUS
WATER LEVEL
WATER LEVEL
TRIP STATUS
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
SUBCONTRACTOR: SUBCONTRACTOR:
DI 2 2 2 2 2 1 1 2 2 2 2 2 2 2 1 1 1 1 1 1 4 4 4 4 4 6 6 6 6 6 DI
DO 2 1 2 2 2 4 6 DO
Ni Ni
AI 0-10V 0-10V AI
M.E.P Contracting
IMAR Trading & Contracting Co. W.L.L. – Midmac Contracting Company W.L.L. Buzwair Bldg B-2, 6th Floor, Bldg# 57, Zone 25, Street 330 Al Mansoura,
4-20mA 1 1 1 1 1 1 1 1 4-20mA Tel.: +974 44131770 | Fax: +974 44369529 | P.o. Box: 22403 | Doha – Qatar P.O.Box: 30774, Doha Qatar, Tel: 974 4437 1906, Fax: 974 4460 1970
Email: info@sogeleciskan.com
AO 1 AO
SW 1 1 1 1 1 1 SW
AND
PROJECT TITLE:
SHEET TITLE:
CP/MCC/MCP
CONTROL PANEL / MOTOR CONTROL CENTER /
MOTOR CONTROL PANEL
B
D
A
REFERENCE DRAWINGS
DRAWING NO. TITLE REV.
B
F
G
C
C
F
B
WORK MAY NOT PROCEED
A
D
D
E
A
CODE D
E
H
REJECTED
F
C
C
A
D
A
E
D
CODE N NOTED
NO ACTION IS REQUIRED
C
STRUCTURAL ARCHITECTURAL ELECTRICAL MECHANICAL OTHERS
F
B
A
E
A
Contractor
C
Sign/Date
D
Consultant
Sign/Date
C
A
D
Approval shall not relieve the Contractor of any of his obligations under the Contract or constitute authorization
of any change to Contract Documents or Variation to the works. Response provided does not constitute a time
or cost impact to the project.
Contractor is responsible for dimensions,quantities and coordination with other trades.
C
C
D
SHOP DRAWINGS
C
A
D
D
A
C
B
A
A
00 ISSUED FOR APPROVAL 06-05-2021 RAB DRD DRD
KATARA TOWERS
HOTEL MANAGEMENT WLL
Katara Hospitality Building, Marina District, Lusail City,
PO Box 2977 Doha, Qatar
A
A B DESIGN & SUPERVISING CONSULTANT:
SUBCONTRACTOR: SUBCONTRACTOR:
IN "MANUAL" POSITION AT MCC
Email: info@sogeleciskan.com
NORMAL/FAULT (TRIP)
NORMAL/FAULT (TRIP)
SALT CHLORINATOR STATUS
SET ENABLE/DISABLE
SET ENABLE/DISABLE
SODA ASH NORMAL/FAULT
BYPASS VALVE COMMAND
STATUS (ON/OFF)
WATER LINE PRESSURE
PROJECT TITLE:
PUMP
PUMP
PUMP
PUMP
PUMP
Lusail District, Doha
SHEET TITLE:
DI 2 2 2 2 2 1 1 2 2 1 1 1 1 2 2 2 2 2 DI
DO 2 1 2 2 2 DO
Ni Ni BMS CONTROL SCHEMATIC DIAGRAM
AI 0-10V 0-10V AI
4-20mA 1 1 1 1 4-20mA
AO 1 AO
THIS IS A CAD DRAWING AND MUST NOT BE ALTERED MANUALLY
SW SW DRAWING NUMBER: SCALE 1:100 SIZE: A0 REV.
- Sht. 03 of 20 00
Legend & Symbols
A 2C, 18AWG SHIELDED CABLE
B 2C, 22AWG SHIELDED CABLE
C CAT-6 CABLE
DI DIGITAL INPUT
DO DIGITAL OUTPUT
AI ANALOG INPUT (Ni, 0-10V, 4-20mA Field Devices)
AO ANALOG OUTPUT
SW SOFTWARE POINTS
CP/MCC/MCP
CONTROL PANEL / MOTOR CONTROL CENTER /
MOTOR CONTROL PANEL
C
D
D
REFERENCE DRAWINGS
DRAWING NO. TITLE REV.
F
B
D
E
A
KATARA TWIN TOWERS HOTEL PROJECT, LUSAIL
CODE A APPROVED
CODE B APPROVED AS NOTED
WORK MAY PROCEED SUBJECT TO INCORPORATION OF COMMENTS
CODE D REJECTED
CODE N NOTED
NO ACTION IS REQUIRED
SHOP DRAWINGS
B
F
G
C
C
G
F
B
C
F
B
F
C
C
F
B
F
C
A
D
D
E
A
E
D
D
A
E
H
H
E
D
E
A
E
D
00 ISSUED FOR APPROVAL 06-05-2021 RAB DRD DRD
F
C
C
F
B
E
D
D
E
A
B
D
A
B
CLIENT:
A
D
C
C
A
B
C
B
B
KATARA TOWERS
B
A
A
C
B
B
C
A
A
A
B
B
A
A
D
D
D
PO Box 2977 Doha, Qatar
C
C
B
B
A
A
Qatar Project Management
NORMAL/FAULT (TRIP)
SALT CHLORINATOR STATUS
SET ENABLE/DISABLE
SET ENABLE/DISABLE
SUBCONTRACTOR: SUBCONTRACTOR:
SODA ASH NORMAL/FAULT
STATUS (ON/OFF)
WATER LINE PRESSURE
IMAR Trading & Contracting Co. W.L.L. – Midmac Contracting Company W.L.L. Buzwair Bldg B-2, 6th Floor, Bldg# 57, Zone 25, Street 330 Al Mansoura,
ON/OFF STATUS
ON/OFF STATUS
Tel.: +974 44131770 | Fax: +974 44369529 | P.o. Box: 22403 | Doha – Qatar P.O.Box: 30774, Doha Qatar, Tel: 974 4437 1906, Fax: 974 4460 1970
FILTER STATUS
FILTER STATUS
Email: info@sogeleciskan.com
TRIP STATUS
TRIP STATUS
PUMP
PUMP
PUMP
PUMP
PUMP
AND
DI 2 2 2 2 2 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 2 2 1 1 2 2 2 2 2 DI
DO 2 1 2 2 2 2 1 2 DO PROJECT TITLE:
Ni Ni
AI 0-10V 0-10V AI
Katara Twin Tower
4-20mA 1 1 1 1 1 1 1 1 4-20mA Hotel Project
AO 1 1 AO
Lusail District, Doha
SW SW
SHEET TITLE:
MALE COLD & WARM PLUNGE SET WATER HIGH/MEDIUM/LOW LEVEL SENSOR IN TANK
DIFFERENTIAL PRESSURE (DP) SWITCH
2-WAY MOTORIZED VALVE
3-WAY MOTORIZED VALVE
HOT & CHILLED WATER 2-WAY MOTORIZED VALVE
T/H TEMPERATURE AND HUMIDITY SENSOR
TEMP
T TEMPERATURE SENSOR
CO₂
CARBON DIOXIDE
MOTORIZED DAMPER
M KWH METER
CP/MCC/MCP
CONTROL PANEL / MOTOR CONTROL CENTER /
MOTOR CONTROL PANEL
REFERENCE DRAWINGS
C
D
D
DRAWING NO. TITLE REV.
F
B
D
E
A
KATARA TWIN TOWERS HOTEL PROJECT, LUSAIL
CODE A APPROVED
CODE B APPROVED AS NOTED
WORK MAY PROCEED SUBJECT TO INCORPORATION OF COMMENTS
CODE D REJECTED
F
C
C
G
F
B
B
F
C
A
E
D
D
A
H
E
A
E
D
CODE N NOTED
NO ACTION IS REQUIRED
F
C
STRUCTURAL ARCHITECTURAL ELECTRICAL MECHANICAL OTHERS
E
D
C
B
Contractor
A
Sign/Date
Consultant
B
Sign/Date
C
D
B
Approval shall not relieve the Contractor of any of his obligations under the Contract or constitute authorization
B
of any change to Contract Documents or Variation to the works. Response provided does not constitute a time
A
B
F
G
C
C
F
B
C
F
B
E
A
B
E
H
A
A
D
E
A
B
Contractor is responsible for dimensions,quantities and coordination with other trades.
A
SHOP DRAWINGS
D
C
F
B
C
D
E
A
B
A
A
B
C
A
D
C
C
B
C
B
CLIENT:
A
D
B
C
A
D
D
KATARA TOWERS
C
B
A
NORMAL/FAULT (TRIP)
SALT CHLORINATOR STATUS
SET ENABLE/DISABLE
SUBCONTRACTOR: SUBCONTRACTOR:
SODA ASH NORMAL/FAULT
STATUS (ON/OFF)
WATER LINE PRESSURE
M.E.P Contracting
SODA ASH STATUS
IMAR Trading & Contracting Co. W.L.L. – Midmac Contracting Company W.L.L. Buzwair Bldg B-2, 6th Floor, Bldg# 57, Zone 25, Street 330 Al Mansoura,
ON/OFF STATUS
ON/OFF STATUS
Tel.: +974 44131770 | Fax: +974 44369529 | P.o. Box: 22403 | Doha – Qatar P.O.Box: 30774, Doha Qatar, Tel: 974 4437 1906, Fax: 974 4460 1970
FILTER STATUS
FILTER STATUS
Email: info@sogeleciskan.com
TRIP STATUS
TRIP STATUS
PUMP
PUMP
PUMP
PUMP
PUMP
AND
DI 2 2 2 2 2 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 2 2 1 2 2 2 2 2 DI
DO 2 1 2 2 2 2 2 DO PROJECT TITLE:
Ni Ni
AI 0-10V 0-10V AI
Katara Twin Tower
4-20mA 1 1 1 1 1 1 1 1 4-20mA Hotel Project
AO 1 1 AO
SW SW
Lusail District, Doha
SHEET TITLE:
FOUNTAIN SET A
B
2C, 18AWG SHIELDED CABLE
2C, 22AWG SHIELDED CABLE
C CAT-6 CABLE
DI DIGITAL INPUT
DO DIGITAL OUTPUT
AI ANALOG INPUT (Ni, 0-10V, 4-20mA Field Devices)
AO ANALOG OUTPUT
SW SOFTWARE POINTS
CP/MCC/MCP
CONTROL PANEL / MOTOR CONTROL CENTER /
MOTOR CONTROL PANEL
REFERENCE DRAWINGS
DRAWING NO. TITLE REV.
CODE D REJECTED
CODE N NOTED
NO ACTION IS REQUIRED
F
C
Sign/Date
E
D
Consultant
Sign/Date
C
B
Approval shall not relieve the Contractor of any of his obligations under the Contract or constitute authorization
D
A
of any change to Contract Documents or Variation to the works. Response provided does not constitute a time
or cost impact to the project.
Contractor is responsible for dimensions,quantities and coordination with other trades.
SHOP DRAWINGS
KATARA TOWERS
HOTEL MANAGEMENT WLL
A
C
B
Katara Hospitality Building, Marina District, Lusail City,
PO Box 2977 Doha, Qatar
(C.P.) SALT
(C.P.) SODA CHLORINATOR PUMP CP/MCC DESIGN & SUPERVISING CONSULTANT:
MAIN CONTRACTOR:
A A A A A
SUBCONTRACTOR: SUBCONTRACTOR:
NORMAL/FAULT (TRIP)
SALT CHLORINATOR STATUS
SET ENABLE/DISABLE
SODA ASH NORMAL/FAULT
STATUS (ON/OFF)
AND
SODA ASH STATUS
PROJECT TITLE:
SHEET TITLE:
DI 1 1 1 1 1 2 2 2 2 2 DI
DO 2 DO
BMS CONTROL SCHEMATIC DIAGRAM
Ni Ni
AI 0-10V 0-10V AI
4-20mA 1 4-20mA
AO AO THIS IS A CAD DRAWING AND MUST NOT BE ALTERED MANUALLY
SW SW DRAWING NUMBER: SCALE 1:100 SIZE: A0 REV.
- Sht. 06 of 20 00
Legend & Symbols
A 2C, 18AWG SHIELDED CABLE
B 2C, 22AWG SHIELDED CABLE
C CAT-6 CABLE
DI DIGITAL INPUT
DO DIGITAL OUTPUT
AI ANALOG INPUT (Ni, 0-10V, 4-20mA Field Devices)
AO ANALOG OUTPUT
SW SOFTWARE POINTS
CP/MCC/MCP
CONTROL PANEL / MOTOR CONTROL CENTER /
MOTOR CONTROL PANEL
REFERENCE DRAWINGS
DRAWING NO. TITLE REV.
CODE D REJECTED
CODE N NOTED
NO ACTION IS REQUIRED
B
SHOP DRAWINGS
F
C
F
B
A
E
D
E
A
00 ISSUED FOR APPROVAL 06-05-2021 RAB DRD DRD
KATARA TOWERS
HOTEL MANAGEMENT WLL
Katara Hospitality Building, Marina District, Lusail City,
B
B
PO Box 2977 Doha, Qatar
A
A
Qatar Project Management
MAIN CONTRACTOR:
IN "MANUAL" POSITION AT MCC
NORMAL/FAULT (TRIP)
SALT CHLORINATOR STATUS
SET ENABLE/DISABLE
SODA ASH NORMAL/FAULT
STATUS (ON/OFF)
WATER LINE PRESSURE
SAND FILTER STATUS
ON/OFF STATUS
WATER LEVEL
WATER LEVEL
IMAR Trading & Contracting Co. W.L.L. – Midmac Contracting Company W.L.L. Buzwair Bldg B-2, 6th Floor, Bldg# 57, Zone 25, Street 330 Al Mansoura,
TRIP STATUS
TRIP STATUS
Tel.: +974 44131770 | Fax: +974 44369529 | P.o. Box: 22403 | Doha – Qatar P.O.Box: 30774, Doha Qatar, Tel: 974 4437 1906, Fax: 974 4460 1970
Email: info@sogeleciskan.com
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
PUMP
BMS SYSTEM SPECIALIST:
DI 1 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 1 DI AND
DO 2 2 DO
Ni Ni
PROJECT TITLE:
AI 0-10V 0-10V AI
4-20mA 1 1 1 1 1 1 1 4-20mA
AO AO
Katara Twin Tower
SW 1 1 1 1 1 1 SW Hotel Project
Lusail District, Doha
SHEET TITLE:
CP/MCC/MCP
CONTROL PANEL / MOTOR CONTROL CENTER /
MOTOR CONTROL PANEL
REFERENCE DRAWINGS
DRAWING NO. TITLE REV.
B
C
A
C
A
CODE A APPROVED
CODE B APPROVED AS NOTED
WORK MAY PROCEED SUBJECT TO INCORPORATION OF COMMENTS
E
A
A
REVISE AND RESUBMIT
F
B
B
CODE C
WORK MAY NOT PROCEED
CODE D REJECTED
CODE N NOTED
NO ACTION IS REQUIRED
A
C
SHOP DRAWINGS
KATARA TOWERS
HOTEL MANAGEMENT WLL
(C.P.) SALT Katara Hospitality Building, Marina District, Lusail City,
PO Box 2977 Doha, Qatar
PUMP CP/MCC (C.P.) SODA CHLORINATOR (C.P.) UVS
MAIN CONTRACTOR:
SALT CHLORINATOR NORMAL/FAULT
IN "OFF" POSITION AT MCC
NORMAL/FAULT (TRIP)
SUBCONTRACTOR: SUBCONTRACTOR:
STATUS (ON/OFF)
WATER LINE PRESSURE
M.E.P Contracting
SODA ASH STATUS
IMAR Trading & Contracting Co. W.L.L. – Midmac Contracting Company W.L.L. Buzwair Bldg B-2, 6th Floor, Bldg# 57, Zone 25, Street 330 Al Mansoura,
Tel.: +974 44131770 | Fax: +974 44369529 | P.o. Box: 22403 | Doha – Qatar P.O.Box: 30774, Doha Qatar, Tel: 974 4437 1906, Fax: 974 4460 1970
Email: info@sogeleciskan.com
ON/OFF STATUS
TRIP STATUS
AND
PUMP
PUMP
PUMP
PUMP
PUMP
PROJECT TITLE:
CP/MCC/MCP
CONTROL PANEL / MOTOR CONTROL CENTER /
MOTOR CONTROL PANEL
REFERENCE DRAWINGS
DRAWING NO. TITLE REV.
CODE D REJECTED
C
CODE N NOTED
D
NO ACTION IS REQUIRED
M
B
C
F
B
STRUCTURAL ARCHITECTURAL ELECTRICAL MECHANICAL OTHERS
A
D
E
A
M Contractor
Sign/Date
B
D
A
Consultant
Sign/Date
M
B
Approval shall not relieve the Contractor of any of his obligations under the Contract or constitute authorization
A
of any change to Contract Documents or Variation to the works. Response provided does not constitute a time
D
M or cost impact to the project.
B
Contractor is responsible for dimensions,quantities and coordination with other trades.
A
B
A
SHOP DRAWINGS
B
A
A
D
A
C
B
00 ISSUED FOR APPROVAL 06-05-2021 RAB DRD DRD
B
A
A
Rev. Description DATE DWN CHKD APPD APPD
CLIENT:
KATARA TOWERS
A HOTEL MANAGEMENT WLL
(C.P.) SALT Katara Hospitality Building, Marina District, Lusail City,
PUMP CP/MCC A B (C.P.) SODA CHLORINATOR
PO Box 2977 Doha, Qatar
MAIN CONTRACTOR:
M.E.P Contracting
IMAR Trading & Contracting Co. W.L.L. – Midmac Contracting Company W.L.L. Buzwair Bldg B-2, 6th Floor, Bldg# 57, Zone 25, Street 330 Al Mansoura,
Tel.: +974 44131770 | Fax: +974 44369529 | P.o. Box: 22403 | Doha – Qatar P.O.Box: 30774, Doha Qatar, Tel: 974 4437 1906, Fax: 974 4460 1970
Email: info@sogeleciskan.com
PUMP
PUMP
PUMP
PUMP
PUMP
DI 2 2 2 2 2 1 2 2 1 1 1 1 DI AND
DO 2 2 2 DO
Ni Ni PROJECT TITLE:
AI 0-10V 0-10V AI
4-20mA 1 1 1 1 4-20mA Katara Twin Tower
AO 1 AO Hotel Project
SW SW Lusail District, Doha
SHEET TITLE:
RETURN
T
REFERENCE DRAWINGS
DRAWING NO. TITLE REV.
~
Consultant
Sign/Date
T
T M Approval shall not relieve the Contractor of any of his obligations under the Contract or constitute authorization
of any change to Contract Documents or Variation to the works. Response provided does not constitute a time
or cost impact to the project.
Contractor is responsible for dimensions,quantities and coordination with other trades.
~
SHOP DRAWINGS
B AHU MCC FACP
00 ISSUED FOR APPROVAL 06-05-2021 RAB DRD DRD
A A A A A A A A A
CHILLED WATER RETURN TEMPERATURE
KATARA TOWERS
HOTEL MANAGEMENT WLL
Katara Hospitality Building, Marina District, Lusail City,
PO Box 2977 Doha, Qatar
MOTORIZED AIR DAMPER COMMAND
SPACE TEMPERATURE
BAG FILTER STATUS
MAIN CONTRACTOR:
SUBCONTRACTOR: SUBCONTRACTOR:
FAN
FAN
FAN
FAN
FAN
M.E.P Contracting
IMAR Trading & Contracting Co. W.L.L. – Midmac Contracting Company W.L.L. Buzwair Bldg B-2, 6th Floor, Bldg# 57, Zone 25, Street 330 Al Mansoura,
Tel.: +974 44131770 | Fax: +974 44369529 | P.o. Box: 22403 | Doha – Qatar P.O.Box: 30774, Doha Qatar, Tel: 974 4437 1906, Fax: 974 4460 1970
Email: info@sogeleciskan.com
DO 1 1 1 AND
Ni PROJECT TITLE:
EXHAUST FAN W/ VFD EXHAUST FAN VAV WITH & WITHOUT CO2 T
T/H
TEMP
TEMPERATURE AND HUMIDITY SENSOR
TEMPERATURE SENSOR
CO₂
CARBON DIOXIDE
MOTORIZED DAMPER
M KWH METER
CP/MCC/MCP
CONTROL PANEL / MOTOR CONTROL CENTER /
MOTOR CONTROL PANEL
REFERENCE DRAWINGS
SUPPLY AIR
DRAWING NO. TITLE REV.
CODE D REJECTED
CODE N NOTED
NO ACTION IS REQUIRED
B MCC
00 ISSUED FOR APPROVAL 06-05-2021 RAB DRD DRD
CLIENT:
A A A
A A A KATARA TOWERS
HOTEL MANAGEMENT WLL
PUMP IN "MANUAL" POSITION AT MCC
VIA THERMOSTAT
VIA THERMOSTAT
VIA THERMOSTAT
DAR AL HANDASAH CONSULTANTS
(Shair and Partners)
Tel: +974 4438 9389
Fax:+974 4465 4989
MAIN CONTRACTOR:
VFD
VFD
VFD
VFD
FAN
FAN
FAN
FAN
SUBCONTRACTOR: SUBCONTRACTOR:
DI 1 1 1 1 1 DI 1 1 1 1 1 DI 1
DO 1 DO 1 DO IMAR Trading & Contracting Co. W.L.L. – Midmac Contracting Company W.L.L.
M.E.P Contracting
Buzwair Bldg B-2, 6th Floor, Bldg# 57, Zone 25, Street 330 Al Mansoura,
Tel.: +974 44131770 | Fax: +974 44369529 | P.o. Box: 22403 | Doha – Qatar P.O.Box: 30774, Doha Qatar, Tel: 974 4437 1906, Fax: 974 4460 1970
Ni Ni Ni Email: info@sogeleciskan.com
SHEET TITLE:
HLFCU WITH THERMOSTAT & CO2 FCU WITH RETURN SENSOR POOL BAR GLASS
TEMP
T TEMPERATURE SENSOR
CO₂
CARBON DIOXIDE
MOTORIZED DAMPER
M KWH METER
CP/MCC/MCP
CONTROL PANEL / MOTOR CONTROL CENTER /
MOTOR CONTROL PANEL
A SHOP DRAWINGS
A
POOL BAR GLASS
VALVE CONTROL
DAR AL HANDASAH CONSULTANTS
(Shair and Partners)
Tel: +974 4438 9389
Fax:+974 4465 4989
MAIN CONTRACTOR:
SUBCONTRACTOR: SUBCONTRACTOR:
DI DI 1 DI 1
DO 1 DO 1 DO
M.E.P Contracting
Ni Ni 1 Ni IMAR Trading & Contracting Co. W.L.L. – Midmac Contracting Company W.L.L.
Tel.: +974 44131770 | Fax: +974 44369529 | P.o. Box: 22403 | Doha – Qatar
Buzwair Bldg B-2, 6th Floor, Bldg# 57, Zone 25, Street 330 Al Mansoura,
P.O.Box: 30774, Doha Qatar, Tel: 974 4437 1906, Fax: 974 4460 1970
Email: info@sogeleciskan.com
SHEET TITLE:
WINE SELLER
CO₂
CARBON DIOXIDE
MOTORIZED DAMPER
M KWH METER
CP/MCC/MCP
CONTROL PANEL / MOTOR CONTROL CENTER /
MOTOR CONTROL PANEL
T/H T/H
KATARA TWIN TOWERS HOTEL PROJECT, LUSAIL
CODE D REJECTED
CODE N NOTED
NO ACTION IS REQUIRED
SHOP DRAWINGS
KATARA TOWERS
HOTEL MANAGEMENT WLL
Katara Hospitality Building, Marina District, Lusail City,
PO Box 2977 Doha, Qatar
OUTDOOR HUMITIDY
MAIN CONTRACTOR:
SUBCONTRACTOR: SUBCONTRACTOR:
M.E.P Contracting
IMAR Trading & Contracting Co. W.L.L. – Midmac Contracting Company W.L.L. Buzwair Bldg B-2, 6th Floor, Bldg# 57, Zone 25, Street 330 Al Mansoura,
Tel.: +974 44131770 | Fax: +974 44369529 | P.o. Box: 22403 | Doha – Qatar P.O.Box: 30774, Doha Qatar, Tel: 974 4437 1906, Fax: 974 4460 1970
Email: info@sogeleciskan.com
DI DI DI 1 1 DI 1 1 AND
DO DO DO DO PROJECT TITLE:
SW SW SW SW
THIS IS A CAD DRAWING AND MUST NOT BE ALTERED MANUALLY
DRAWING NUMBER: SCALE 1:100 SIZE: A0 REV.
- Sht. 13 of 20 00
Legend & Symbols
A 2C, 18AWG SHIELDED CABLE
B 2C, 22AWG SHIELDED CABLE
C CAT-6 CABLE
DI DIGITAL INPUT
DO DIGITAL OUTPUT
AI ANALOG INPUT (Ni, 0-10V, 4-20mA Field Devices)
AO ANALOG OUTPUT
SW SOFTWARE POINTS
CP/MCC/MCP
CONTROL PANEL / MOTOR CONTROL CENTER /
MOTOR CONTROL PANEL
REFERENCE DRAWINGS
DRAWING NO. TITLE REV.
ROOM
SAUNA H. CODE A
KATARA TWIN TOWERS HOTEL PROJECT, LUSAIL
APPROVED
UPS TRANSFORMER T
MCP/MCC CP / MCC CODE B
CODE C
APPROVED AS NOTED
WORK MAY PROCEED SUBJECT TO INCORPORATION OF COMMENTS
CODE D REJECTED
CODE N NOTED
NO ACTION IS REQUIRED
SHOP DRAWINGS
ENABLE/DISABLE COMMAND
STATUS (ON/OFF)
DESIGN & SUPERVISING CONSULTANT:
ROOM TEMPERATURE
CHARGING FAILURE
ON/OFF STATUS
MAIN CONTRACTOR:
TRIP STATUS
TRIP STATUS
HEATER
HEATER
HEATER
HEATER
HEATER
SUBCONTRACTOR: SUBCONTRACTOR:
M.E.P Contracting
IMAR Trading & Contracting Co. W.L.L. – Midmac Contracting Company W.L.L. Buzwair Bldg B-2, 6th Floor, Bldg# 57, Zone 25, Street 330 Al Mansoura,
Tel.: +974 44131770 | Fax: +974 44369529 | P.o. Box: 22403 | Doha – Qatar P.O.Box: 30774, Doha Qatar, Tel: 974 4437 1906, Fax: 974 4460 1970
Email: info@sogeleciskan.com
DO DO DO DO 1 AND
Ni Ni Ni Ni PROJECT TITLE:
AO AO AO AO SHEET TITLE:
STEAM HAMMAS GENERATOR MOTORIZED FIRE KITCHEN GAS 3-WAY MOTORIZED VALVE
HOT & CHILLED WATER 2-WAY MOTORIZED VALVE
CO₂
TEMP
TEMPERATURE AND HUMIDITY SENSOR
TEMPERATURE SENSOR
CARBON DIOXIDE
MOTORIZED DAMPER
M KWH METER
CP/MCC/MCP
CONTROL PANEL / MOTOR CONTROL CENTER /
MOTOR CONTROL PANEL
REFERENCE DRAWINGS
DRAWING NO. TITLE REV.
CODE C
APPROVED AS NOTED
WORK MAY PROCEED SUBJECT TO INCORPORATION OF COMMENTS
CP / MCC KGP
WORK MAY NOT PROCEED
CODE D REJECTED
CODE N NOTED
NO ACTION IS REQUIRED
A A A A SHOP DRAWINGS
KATARA TOWERS
HOTEL MANAGEMENT WLL
Katara Hospitality Building, Marina District, Lusail City,
ENABLE/DISABLE COMMAND
ON/OFF STATUS
(Shair and Partners)
Tel: +974 4438 9389
Fax:+974 4465 4989
TRIP STATUS
MAIN CONTRACTOR:
HEATER
HEATER
HEATER
HEATER
HEATER
STATUS
SUBCONTRACTOR: SUBCONTRACTOR:
M.E.P Contracting
DI 1 1 1 1 DI 1 1 1 DI 1 DI 1 1 IMAR Trading & Contracting Co. W.L.L. – Midmac Contracting Company W.L.L.
Tel.: +974 44131770 | Fax: +974 44369529 | P.o. Box: 22403 | Doha – Qatar
Buzwair Bldg B-2, 6th Floor, Bldg# 57, Zone 25, Street 330 Al Mansoura,
P.O.Box: 30774, Doha Qatar, Tel: 974 4437 1906, Fax: 974 4460 1970
Email: info@sogeleciskan.com
DO 1 DO 1 1 DO DO
Ni Ni Ni Ni BMS SYSTEM SPECIALIST:
SHEET TITLE:
BOARDS
WATER LEVEL SENSOR
WATER HIGH/MEDIUM/LOW LEVEL SENSOR IN TANK
DIFFERENTIAL PRESSURE (DP) SWITCH
2-WAY MOTORIZED VALVE
3-WAY MOTORIZED VALVE
HOT & CHILLED WATER 2-WAY MOTORIZED VALVE
T/H TEMPERATURE AND HUMIDITY SENSOR
TEMP
T TEMPERATURE SENSOR
CO₂
CARBON DIOXIDE
MOTORIZED DAMPER
M KWH METER
CP/MCC/MCP
CONTROL PANEL / MOTOR CONTROL CENTER /
MOTOR CONTROL PANEL
REFERENCE DRAWINGS
DRAWING NO. TITLE REV.
CODE C
APPROVED AS NOTED
WORK MAY PROCEED SUBJECT TO INCORPORATION OF COMMENTS
CODE D REJECTED
CODE N NOTED
NO ACTION IS REQUIRED
SHOP DRAWINGS
MAIN CONTRACTOR:
SUBCONTRACTOR: SUBCONTRACTOR:
M.E.P Contracting
IMAR Trading & Contracting Co. W.L.L. – Midmac Contracting Company W.L.L. Buzwair Bldg B-2, 6th Floor, Bldg# 57, Zone 25, Street 330 Al Mansoura,
Tel.: +974 44131770 | Fax: +974 44369529 | P.o. Box: 22403 | Doha – Qatar P.O.Box: 30774, Doha Qatar, Tel: 974 4437 1906, Fax: 974 4460 1970
Email: info@sogeleciskan.com
DI 1 1 DI 1 1 n n DI 1 1 n n DI 1 1 n n
AND
DO DO DO DO
PROJECT TITLE:
Ni Ni Ni Ni
Katara Twin Tower
AI 0-10V AI 0-10V AI 0-10V AI 0-10V Hotel Project
4-20mA 4-20mA 4-20mA 4-20mA Lusail District, Doha
AO AO AO AO SHEET TITLE:
CP/MCC/MCP
CONTROL PANEL / MOTOR CONTROL CENTER /
MOTOR CONTROL PANEL
REFERENCE DRAWINGS
DRAWING NO. TITLE REV.
CODE D REJECTED
CODE N NOTED
C B B A NO ACTION IS REQUIRED
Consultant
Sign/Date
Approval shall not relieve the Contractor of any of his obligations under the Contract or constitute authorization
of any change to Contract Documents or Variation to the works. Response provided does not constitute a time
or cost impact to the project.
Contractor is responsible for dimensions,quantities and coordination with other trades.
SHOP DRAWINGS
KATARA TOWERS
HOTEL MANAGEMENT WLL
Katara Hospitality Building, Marina District, Lusail City,
PO Box 2977 Doha, Qatar
MAIN CONTRACTOR:
FACP STATUS
SUBCONTRACTOR: SUBCONTRACTOR:
M.E.P Contracting
IMAR Trading & Contracting Co. W.L.L. – Midmac Contracting Company W.L.L. Buzwair Bldg B-2, 6th Floor, Bldg# 57, Zone 25, Street 330 Al Mansoura,
Tel.: +974 44131770 | Fax: +974 44369529 | P.o. Box: 22403 | Doha – Qatar P.O.Box: 30774, Doha Qatar, Tel: 974 4437 1906, Fax: 974 4460 1970
Email: info@sogeleciskan.com
AND
DI DI DI 1
PROJECT TITLE:
DO DO DO
Katara Twin Tower
Ni Ni Ni Hotel Project
Lusail District, Doha
AI 0-10V AI 0-10V AI 0-10V
SHEET TITLE:
4-20mA 4-20mA 4-20mA
BMS CONTROL SCHEMATIC DIAGRAM
AO AO AO
SW 1 SW 1 SW 1
THIS IS A CAD DRAWING AND MUST NOT BE ALTERED MANUALLY
DRAWING NUMBER: SCALE 1:100 SIZE: A0 REV.
- Sht. 17 of 20 00
Legend & Symbols
A 2C, 18AWG SHIELDED CABLE
B 2C, 22AWG SHIELDED CABLE
C CAT-6 CABLE
DI DIGITAL INPUT
DO DIGITAL OUTPUT
AI ANALOG INPUT (Ni, 0-10V, 4-20mA Field Devices)
AO ANALOG OUTPUT
SW SOFTWARE POINTS
FAN COIL UNIT FACP PANEL BAGGAGE HANDLING ACCESS CONTROL DIFFERENTIAL PRESSURE (DP) SWITCH
2-WAY MOTORIZED VALVE
CP/MCC/MCP
CONTROL PANEL / MOTOR CONTROL CENTER /
MOTOR CONTROL PANEL
REFERENCE DRAWINGS
DRAWING NO. TITLE REV.
REJECTED
CODE N NOTED
NO ACTION IS REQUIRED
C C C C Contractor
Sign/Date
Consultant
Sign/Date
Approval shall not relieve the Contractor of any of his obligations under the Contract or constitute authorization
of any change to Contract Documents or Variation to the works. Response provided does not constitute a time
or cost impact to the project.
Contractor is responsible for dimensions,quantities and coordination with other trades.
SHOP DRAWINGS
KATARA TOWERS
HOTEL MANAGEMENT WLL
VIA BACNET/IP SOFTWARE INTERFACE
MAIN CONTRACTOR:
SUBCONTRACTOR: SUBCONTRACTOR:
M.E.P Contracting
IMAR Trading & Contracting Co. W.L.L. – Midmac Contracting Company W.L.L. Buzwair Bldg B-2, 6th Floor, Bldg# 57, Zone 25, Street 330 Al Mansoura,
DI DI DI DI Tel.: +974 44131770 | Fax: +974 44369529 | P.o. Box: 22403 | Doha – Qatar P.O.Box: 30774, Doha Qatar, Tel: 974 4437 1906, Fax: 974 4460 1970
Email: info@sogeleciskan.com
Ni Ni Ni Ni
AND
AI 0-10V AI 0-10V AI 0-10V AI 0-10V
PROJECT TITLE:
4-20mA 4-20mA 4-20mA 4-20mA
Katara Twin Tower
AO AO AO AO Hotel Project
SW 1 SW 1 SW 1 SW 1 Lusail District, Doha
SHEET TITLE:
TEMP
TEMPERATURE AND HUMIDITY SENSOR
TEMPERATURE SENSOR
MOTORIZED DAMPER
M KWH METER
CP/MCC/MCP
CONTROL PANEL / MOTOR CONTROL CENTER /
MOTOR CONTROL PANEL
REFERENCE DRAWINGS
DRAWING NO. TITLE REV.
CODE D REJECTED
VSS SIS VPS IPTVS CODE N NOTED
NO ACTION IS REQUIRED
C C C C Consultant
Sign/Date
Approval shall not relieve the Contractor of any of his obligations under the Contract or constitute authorization
of any change to Contract Documents or Variation to the works. Response provided does not constitute a time
or cost impact to the project.
Contractor is responsible for dimensions,quantities and coordination with other trades.
SHOP DRAWINGS
KATARA TOWERS
HOTEL MANAGEMENT WLL
VIA BACNET/IP SOFTWARE INTERFACE
MAIN CONTRACTOR:
SUBCONTRACTOR: SUBCONTRACTOR:
DI DI DI DI
DO DO DO DO IMAR Trading & Contracting Co. W.L.L. – Midmac Contracting Company W.L.L.
M.E.P Contracting
Buzwair Bldg B-2, 6th Floor, Bldg# 57, Zone 25, Street 330 Al Mansoura,
Tel.: +974 44131770 | Fax: +974 44369529 | P.o. Box: 22403 | Doha – Qatar P.O.Box: 30774, Doha Qatar, Tel: 974 4437 1906, Fax: 974 4460 1970
Ni Ni Ni Ni Email: info@sogeleciskan.com
SHEET TITLE:
CP/MCC/MCP
CONTROL PANEL / MOTOR CONTROL CENTER /
MOTOR CONTROL PANEL
REFERENCE DRAWINGS
DRAWING NO. TITLE REV.
CODE D REJECTED
CODE N NOTED
C C C NO ACTION IS REQUIRED
SHOP DRAWINGS
KATARA TOWERS
HOTEL MANAGEMENT WLL
VIA BACNET/IP SOFTWARE INTERFACE
MAIN CONTRACTOR:
SUBCONTRACTOR: SUBCONTRACTOR:
M.E.P Contracting
IMAR Trading & Contracting Co. W.L.L. – Midmac Contracting Company W.L.L. Buzwair Bldg B-2, 6th Floor, Bldg# 57, Zone 25, Street 330 Al Mansoura,
Tel.: +974 44131770 | Fax: +974 44369529 | P.o. Box: 22403 | Doha – Qatar P.O.Box: 30774, Doha Qatar, Tel: 974 4437 1906, Fax: 974 4460 1970
Email: info@sogeleciskan.com
AND
DI DI DI
PROJECT TITLE:
DO DO DO Katara Twin Tower
Ni Ni Ni Hotel Project
Lusail District, Doha
AI 0-10V AI 0-10V AI 0-10V
SHEET TITLE:
4-20mA 4-20mA 4-20mA
BMS CONTROL SCHEMATIC DIAGRAM
AO AO AO
SW 1 SW 1 SW 1 THIS IS A CAD DRAWING AND MUST NOT BE ALTERED MANUALLY
DRAWING NUMBER: SCALE 1:100 SIZE: A0 REV.
- Sht. 20 of 20 00