DAILY ACTIVITY REPORT JOB SITE - MA

NO DATE UNIT NO. UNIT MODEL UNIT S/N E/G MODEL


1 13-Apr-21 ADI DM 02 HCR 1500 3253914 CATERPILLAR C9

2 14-Apr-21 ADI DM 02 HCR 1500 3253914 CATERPILLAR C9

3 15-Apr-21 ADI DM 01 SD 1300 E 184 cummins 6CTAAC8.3-C

4 16-Apr-21 ADI DM 02 HCR 1500 3253914 CATERPILLAR C9


5 4/17/2021 DM 0 1 HCR 1500 3253914 CATERPILLAR C9

6 4/18/2021 ADI DM 0 1 HCR 1500 3253914 CATERPILLAR C9

7 4/19/2021 ADI DM 0 1 HCR 1500 3253914 CATERPILLAR C9

8 4/20/2021 ADI DM 0 1 HCR 1500 3253914 CATERPILLAR C9

9 4/21/2021 ADI DM 0 1 HCR 1500 3253914 CATERPILLAR C9


10 4/22/2021 ADI DM 01 SD 1300 E 184 Cummins 6CTAAC8.3-C
11 4/23/2021 ADI DM 02 HCR 1500 3253914 Caterpillar C9

ADI DM 01 SD 1300 E 184 Cummins 6CTAAC8.3-C

12 4/24/2021 ADI DM 01 SD 1300 E 184 Cummins 6CTAAC8.3-C

ADI DM 02 HCR 1500 3253914 Caterpillar C9

13 4/25/2021 ADI DM 01 SD 1300 E 184 Cummins 6CTAAC8.3-C

ADI DM 02 HCR 1500 3253914 Caterpillar C9

14 4/26/2021 ADI DM 02 HCR 1500 3253914 Caterpillar C9

ADI DM 01 SD 1300 E 184 Cummins 6CTAAC8.3-C

15 4/27/2021 ADI DM 02 HCR 1500 3253914 Caterpillar C9


ADI DM 01 SD 1300 E 184 Cummins 6CTAAC8.3-C

16 4/28/2021 ADI DM 01 SD 1300 E 184 Cummins 6CTAAC8.3-C

HILUX TOYOTA

ADI DM 02 HCR 1500 3253914 Caterpillar C9

17 4/29/2021 ADI DM 01 SD 1300 E 184 Cummins 6CTAAC8.3-C

18 4/30/2021 ADI DM 02 HCR 1500 3253914 Caterpillar C9

ADI DM 01 SD 1300 E 184 Cummins 6CTAAC8.3-C


EPORT JOB SITE - MALOKO
E/G SERIAL NUMBER
JSC07801

JSC07801

73159099

JSC07801
JSC07801

JSC07801

JSC07801

JSC07801

JSC07801
73159099
JSC07801

73159099

73159099

JSC07801

73159099

JSC07801

JSC07801

73159099

JSC07801
73159099

73159099

JSC07801

73159099

JSC07801

73159099
EQUIPMENT & MAINTENANC
E - MALOKO
JOB DESCRIPTION TIME START
Overhaul
drain oil hydraulic ,200 liter 7:00
drain oil compressor, 40 liter 8:00
Release pipa air radiator in 8:30
Release pipa air radiator out 8:40
Release line hose pompa hydraulic 1, 2, 3 8:50
Release baut pengikat shaf pompa ke rubber coupling 9:20
Release pompa hydrulic 2 dan 3 9:30
Release pompa 1 11:00
Release line hose compressor 15:00
Release baut pengikat compressor 15:15
Release kabel sensor thermostat compressor 15:45

Overhaul
naikan pompa hydraulic 1 7:00
Release hose fuel 7:25
Release v-belt 7:40
Release alternator 7:50
Release compressor AC 8:15
Release braket Alternator dan compressor AC, tensioner AC 8:35
Release clip 9:00
Release hose as 9:20
Release hose pumps disposal 10:05
Release kabel motor starter 10:45
Release sensor temperatur 11:00
Release wireharnes 11:20
Release tube as, filler 13:00
Release compressor 13:30

Repair Electrical Junjin SD 1300 E 7:00


Reposisi Unit 16:00

Overhaul
Menunggu excavator + cek Engine baru 7:00
menurunkan engine dari mobil expedisi 9:00
Angkat kompresor dari unit 9:30
angkat pompa hydraulic 1 dari unit 10:05
Release braket dari engine baru, pasang ke engine lama 10:20
menurunkan engine dari unit 10:30
memindahkan braket engine dan braket mounting ke engine baru 13:00
memindahkan pompa oli engine lama ke engine baru 13:15
Instal Engine baru ke unit 14:00
naikan kompresos ke unit 15:30
naikan pompa hydraulic 1 16:00

Membeli perlengkapan kerja dan alat-alat kerja 7:00


pasang bolt bracket engine dan mounting 9:00
bongkar pasang pompa oli engine 9:30
pasang hose oli ke pompa engine 10:00
pasang hose output oli engine 10:20
pasang tube as filler 10:30
bongkar pasang bracket alternator 10:45
memasang kompresor AC 13:00
Pasang Alternator 13:30
pasang kabel motor starter 14:00
pasang kabel alternator dan kabel Kompressor AC 14:15
pasang harness 14:30
Pasang output pipa radiator 15:00

Melepas wearing Harness output injector 7:00


lepas sensor oli 8:00
pasang kompressor dan bolt mounting kompressor 8:15
pasang hose kompressor 10:00
pasang pipa inline ke turbocharger 10:20
pasang pipa outline ke turbocharge 10:50
pasang pipa ke intake manifold 13:00
pasang pipa filter udara 13:30
pasang bracket-bracket 14:00
pasang upper 15:00
pasang pipa utama oli kompressor 15:30

Membeli peralatan dan perlengkapan kerja 7:10


release bolt braket centaflex/rubber coupling 9:00
instal braket centaflex ke engine baru 11:30
release bearing pompa hydraulic 13:00
release hub coupling dari pompa hydraulic 14:00
kikir hub coupling 15:00
instal cover braket oil filter ke engine lama 15:45

Membeli peralatan dan perlengkapan kerja 7:05


pencekan hose-hose dan part number 9:05
pengecekan backloge 10:45
repair pompa hydraulic 1 13:00
membeli perlengkapan 14:35

instal kondensor AC 7:00


Cleaning sensor-sensor 8:00
remove cover bawah unit dan bersihkan 10:00
instal clam filter udara 11:40
instal bearing coupling pompa 13:00
instal pompa hydraulic 1 13:30
instal pompa hydraulic 2 dan 3 15:00
instal hose pompa hydraulic 15:30

over houl
remove door L H 7:00
remove door R H 7:10
remove Top A 7:20
remove top B 7:30
remove cover Mufler 7:40
remove support A B C 7:55
remove Gas Spring 8:05
remove cover Track L H 8:15
remove cover track R H 8:20
remove tool box assy 8:25
remove air pre cleaner 8:30
remove engine hood 8:35
remove wiring harnes 8:40
remove pipe related to engine 8:45
release water coolant 8:55
remove pipe E/G air cleaner 9:00
remove pipe A 9:05
Remove pipe C 9:10
remove pipe D 9:15
releae release oil engine 9:20
release oil Gear box 9:25
remove accel cable 9:30
remove compressor AC and related parts 9:40
remove Compresor AC belt 9:50
remove mufler and related part (bracket) 9:55
remove mufler pad 10:15
remove U- bolt 10:25

remove hydraulic pump 10:35


drain hydraulic oil 11:10
remove hydraulic hose of hydraulic pump suction and discharge 11:15
remove gear box and related parts 11:30
remove comp wheel 11:30
remove flange 11:30
remove air breather 13:00
drain gear box oil 13:15
remove hose of gear box 13:20
remove pilot filter and bracket 13:30
remove regulator 13:40
remove hose fuel engine from tank 13:55
remove hose flexible 14:10
remove connection tur oil drain 14:20
remove harness A, B, dan C 14:25
remove kabel HM Percussion 14:45
measuring hose 15:30
cleaning sochet wiaring harness 16:00
instal clam ke air cleaner 16:15
repair cover engine yang retak (plastik steel) 16:20
instal hose baru 16:35

Remove Bush, Clevis (piston rod) boom lift cylinder 7:00


remove valve double pilot dan single throttle check 9:00
remove rod (piston) assy 9:10
* release seal dust 9:40
* release o-ring 9:50
* release ring backup 10:00
* release packing rod 10:10
* realese packing piston 10:20
remove bush, clevis tube cylinder 10:30
instal rod piston assy ke tube cylinder 13:05
instal boom lift cylinder 14:30

Remove box Panel Electrical 10:00

cleaning Unit 7:05


Repairing Electrical 13:00

cleaning Unit 7:05


Repairing Electrical 13:00

cleaning Unit 7:05


Repairing Electrical 13:00

cleaning Unit 7:05


Repairing Electrical 13:00

Remove pin guide tilt cylinder 7:05


remove guide tilt cylinder 8:00
release cover rod guide tilt cylindrer 8:30
reseal guide tilt cylinder 9:30
instal rod ke tube cylinder 10:40
instal guide tilt cylinder assy ke unit 13:00
cleaning engine lama 15:00

release elbow pompa hydraulic and cleaning 14:15

cleaning unit 7:45


repairing filter hydraulic and hose 10:10
cleaning engine 11:00
cleaning engine 13:15

remove centaflex 15:00


ukur diameter flywheel 15:30

Cleaning Tangki hydraulic 9:00


instal cover tangki hydraulic 10:30
instal element return 11:00
instal filter suction hydraulic 11:20

Repairng Pengereman 7:00

mengisi tangki hydraulic dengan oil hydraulic (200 l) 13:00


membeli keperluan mess 14:30

repairing electrical junjin 7:00


backloge hose junjine

cleaning hose-hose untuk stok 7:05

Remove AC junjine 7:05


Cleaning AC junjine 10:00
repairing electrical cabin 13:00
cleaning cabin 15:00
T & MAINTENANCE DEPARTMENT

TIME FINISH TOTAL (TIME) STATUS LOKASI CUSTOMER


Breakdown workshop
8:00 1:00
8:30 0:30
8:40 0:10
8:50 0:10
9:20 0:30
9:30 0:10
11:00 1:30
15:00 3:00
15:15 0:15
15:45 0:30
15:55 0:10

Breakdown workshop
7:25 0:25
7:40 0:15
7:50 0:10
8:15 0:25
8:35 0:10
9:00 0:25
9:20 0:20
10:05 0:25
10:45 0:40
11:00 0:15
11:20 0:20
11:45 0:25
13:30 0:30
15:45 2:45

16:00 9:00 Breakdown workshop


17:05 1:05

Breakdown workshop
9:00 2:00
9:30 0:30
10:05 0:35
10:20 0:15
10:30 0:10
12:00 1:30
13:15 0:15
14:00 0:45
15:30 1:30
16:00 0:30
16:15 0:15

9:00 2:00 Breakdown workshop


9:30 0:30
10:00 0:30
10:20 0:20
10:30 0:10
10:45 0:15
11:55 0:20
13:30 0:30
14:00 0:30
14:15 0:15
14:30 0:15
15:00 0:30
15:55 0:55

8:00 1:00 Breakdown workshop


8:15 0:15
10:00 0:45
10:20 0:20
10:55 0:35
11:55 1:05
13:30 0:30
14:00 0:30
15:00 1:00
15:30 0:30
16:00 0:30

9:00 1:50 Breakdown workshop


11:30 2:30
12:15 0:45
14:00 1:00
15:00 1:00
15:45 0:45
15:55 0:10
Breakdown workshop
9:05 2:00
10:45 1:40
11:55 1:10
14:35 1:35
15:55 1:20

8:00
10:00
11:40
11:55
13:30
15:00
15:30
16:00

breakdown workshop
7:10 0:10
7:20 0:10
7:30 0:10
7:40 0:10
7:55 0:15
8:05 0:10
8:15 0:10
8:20 0:05
8:25 0:05
8:30 0:05
8:35 0:05
8:40 0:05
8:45 0:05
8:55 0:10
9:00 0:05
9:05 0:05
9:10 0:05
9:15 0:05
9:20 0:05
9:25 0:05
9:30 0:05
9:40 0:10
9:50 0:10
9:55 0:05
10:15 0:20
10:25 0:10
10:35 0:10

11:10 0:35
11:15 0:05
11:30 0:15
12:05 0:35
12:05 0:35
12:05 0:35
13:15 0:15
13:20 0:05
13:30 0:10
13:40 0:10
13:55 0:15
14:10 0:15
14:20 0:10
14:25 0:05
14:45 0:20
15:30 0:45
16:00 0:30
16:15 0:15
16:20 0:05
16:35 0:15
16:55 0:20

9:00 2:00 breakdown workshop


9:10 0:10
9:40 0:30
9:50 0:10
10:00 0:10
10:10 0:10
10:20 0:10
10:30 0:10
11:45 1:15
14:30 1:25
16:00 1:30

11:00 1:00

11:55 4:50 breakdown workshop


16:00 3:00

11:55 4:50
16:00 3:00

11:55 4:50 breakdown workshop


16:00 3:00

11:55 4:50
16:00 3:00

8:00 0:55
8:30 0:30
9:30 1:00
10:40 1:10
11:55 1:15
14:15 1:15
16:00 1:00

15:00 0:45

10:10 2:25 breakdown workshop


11:00 0:50
11:45 0:45
14:35 1:20

15:30 0:30
15:45 0:15

10:30 1:30 breakdown workshop


11:00 0:30
11:20 0:20
11:45 0:25

9:00 2:00

14:00 1:00
16:45 2:15

16:45 9:45 breakdown workshop

8:00 0:55 breakdown workshop

10:00 2:55
11:50 1:50
15:00 2:00
16:00 1:00
REMARK
baut centaflex slek (las, dibor , diketok)

hub keadaan Aus (bearing rusak)

kunci dan kebutuhan unit (bolt)

Lemari
Bush Sulit di lepas, kurang pelumasan. (seal lokal)

kotoran menumpuk, dan keras. ( perlu steam)


kabel putus dan rapuh

s-leeve bawaan dipasang kembali ( sealkit lokal)


mei

NO DATE UNIT NO. UNIT MODEL UNIT S/N E/G MODEL


1 5/1/2021 ADI DM 04 SD 1300 E Cummins 6CTAAC8.3-C

ADI DM 02 HCR 1500 3253914 Caterpillar C9

ADI DM 01 SD 1300 E 184 Cummins 6CTAAC8.3-C

2 5/2/2021 ADI DM 02 HCR 1500 3253914 Caterpillar C9

ADI DM 01 SD 1300 E 184 Cummins 6CTAAC8.3-C

3 5/3/2021 ADI DM 02 HCR 1500 3253914 Caterpillar C9

4 5/4/2021 ADI DM 02 HCR 1500 3253914 Caterpillar C9

6 5/5/2021 ADI DM 01 SD 1300 E 184 Cummins 6CTAAC8.3-C

7 5/6/2021 ADI DM 02 HCR 1500 3253914 Caterpillar C9

8 5/7/2021 ADI DM 02 HCR 1500 3253914 Caterpillar C9


E/G SERIAL NUMBER

JSC07801

73159099

JSC07801

73159099

JSC07801

JSC07801

73159099

JSC07801

JSC07801
JOB DESCRIPTION TIME START
Reseal Drifter 7:00

Recheck unit 7:00


isi coolant radiator

Instal AC Junjine 13:00

repairing electrical (Jamper inverter dgn accu) 7:05


ground test 10:30
remove kompressor AC 13:00
Remove Pully AC 13:30

Cleaning Unit 7:05

cleaning hose-hose 7:00


cari pully kompressor AC 9:00
bubut and center pully 13:00

instal pully kompressor ac 7:00


instal kompressor AC di engine 7:45
ground Test + pengecekan kebocoran-kebocoran 10:00

Instal hose-hose 7:00


Las Frame Undercarriage bagian kiri 13:00

Instalasi Electrical 7:00


ground test 13:00

membuat dan instal Braket lamp 7:00


cleaning unit 10:00
Las frame undercarriage bagian kanan 13:00
instal hose dust collector 15:00
cleaning area Unit 16:05
TIME FINISH TOTAL (TIME) STATUS LOKASI CUSTOMER
11:55 breakdown Site maloko

11:55 breakdown workshop

16:00

10:30 breakdown workshop


11:55
13:30
15:45

16:00

9:00 breakdown workshop


11:55
15:45

7:45 breakdown workshop


10:00
15:50

11:45 breakdown workshop


15:50

12:00 breakdown workshop


14:00

10:00 breakdown workshop


11:30
15:00
16:05
16:30
REMARK
seal back up oli dan o-ring belum diganti

accu 12 volt

cleaning dengan steam

kondisi kabel rapuh

frame kondisi retak (pembersihan dan gerinda)