Ws 22-4-21 Daily Activity Report Imt Team

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 25

DAILY ACTIVITY REPORT JOB SITE - MA

NO DATE UNIT NO. UNIT MODEL UNIT S/N E/G MODEL

1 4/22/2021 ADI DM 01 SD 1300 E 184 Cummins 6CTAAC8.3-C


2 4/23/2021 ADI DM 02 HCR 1500 3253914 Caterpillar C9

ADI DM 01 SD 1300 E 184 Cummins 6CTAAC8.3-C

3 4/24/2021 ADI DM 01 SD 1300 E 184 Cummins 6CTAAC8.3-C

ADI DM 02 HCR 1500 3253914 Caterpillar C9

4 4/25/2021 ADI DM 01 SD 1300 E 184 Cummins 6CTAAC8.3-C

ADI DM 02 HCR 1500 3253914 Caterpillar C9

5 4/26/2021 ADI DM 02 HCR 1500 3253914 Caterpillar C9

ADI DM 01 SD 1300 E 184 Cummins 6CTAAC8.3-C


EPORT JOB SITE - MALOKO
E/G SERIAL NUMBER

73159099
JSC07801

73159099

73159099

JSC07801

73159099

JSC07801

JSC07801

73159099
EQUIPMENT & MAINTENANC
E - MALOKO
JOB DESCRIPTION TIME START

over houl
remove door L H 7:00
remove door R H 7:10
remove Top A 7:20
remove top B 7:30
remove cover Mufler 7:40
remove support A B C 7:55
remove Gas Spring 8:05
remove cover Track L H 8:15
remove cover track R H 8:20
remove tool box assy 8:25
remove air pre cleaner 8:30
remove engine hood 8:35
remove wiring harnes 8:40
remove pipe related to engine 8:45
release water coolant 8:55
remove pipe E/G air cleaner 9:00
remove pipe A 9:05
Remove pipe C 9:10
remove pipe D 9:15
releae release oil engine 9:20
release oil Gear box 9:25
remove accel cable 9:30
remove compressor AC and related parts 9:40
remove Compresor AC belt 9:50
remove mufler and related part (bracket) 9:55
remove mufler pad 10:15
remove U- bolt 10:25

remove hydraulic pump 10:35


drain hydraulic oil 11:10
remove hydraulic hose of hydraulic pump suction and discharge 11:15
remove gear box and related parts 11:30
remove comp wheel 11:30
remove flange 11:30
remove air breather 13:00
drain gear box oil 13:15
remove hose of gear box 13:20
remove pilot filter and bracket 13:30
remove regulator 13:40
remove hose fuel engine from tank 13:55
remove hose flexible 14:10
remove connection tur oil drain 14:20
remove harness A, B, dan C 14:25
remove kabel HM Percussion 14:45
measuring hose 15:30
cleaning sochet wiaring harness 16:00
instal clam ke air cleaner 16:15
repair cover engine yang retak (plastik steel) 16:20
instal hose baru 16:35

Remove Bush, Clevis (piston rod) boom lift cylinder 7:00


remove valve double pilot dan single throttle check 9:00
remove rod (piston) assy 9:10
* release seal dust 9:40
* release o-ring 9:50
* release ring backup 10:00
* release packing rod 10:10
* realese packing piston 10:20
remove bush, clevis tube cylinder 10:30
instal rod piston assy ke tube cylinder 13:05
instal boom lift cylinder 14:30

Remove box Panel Electrical 10:00

cleaning Unit 7:05


Repairing Electrical 13:00

cleaning Unit 7:05


Repairing Electrical 13:00

cleaning Unit 7:05


Repairing Electrical 13:00

cleaning Unit 7:05


Repairing Electrical 13:00

Remove pin guide tilt cylinder 7:05


remove guide tilt cylinder 8:00
release cover rod guide tilt cylindrer 8:30
reseal guide tilt cylinder 9:30
instal rod ke tube cylinder 10:40
instal guide tilt cylinder assy ke unit 13:00
cleaning engine lama 15:00

release elbow pompa hydraulic and cleaning 14:15


T & MAINTENANCE DEPARTMENT

TIME FINISH TOTAL (TIME) STATUS LOKASI CUSTOMER

breakdown workshop
7:10 0:10
7:20 0:10
7:30 0:10
7:40 0:10
7:55 0:15
8:05 0:10
8:15 0:10
8:20 0:05
8:25 0:05
8:30 0:05
8:35 0:05
8:40 0:05
8:45 0:05
8:55 0:10
9:00 0:05
9:05 0:05
9:10 0:05
9:15 0:05
9:20 0:05
9:25 0:05
9:30 0:05
9:40 0:10
9:50 0:10
9:55 0:05
10:15 0:20
10:25 0:10
10:35 0:10

11:10 0:35
11:15 0:05
11:30 0:15
12:05 0:35
12:05 0:35
12:05 0:35
13:15 0:15
13:20 0:05
13:30 0:10
13:40 0:10
13:55 0:15
14:10 0:15
14:20 0:10
14:25 0:05
14:45 0:20
15:30 0:45
16:00 0:30
16:15 0:15
16:20 0:05
16:35 0:15
16:55 0:20

9:00 2:00 breakdown workshop


9:10 0:10
9:40 0:30
9:50 0:10
10:00 0:10
10:10 0:10
10:20 0:10
10:30 0:10
11:45 1:15
14:30 1:25
16:00 1:30

11:00 1:00

11:55 4:50 breakdown workshop


16:00 3:00

11:55 4:50
16:00 3:00

11:55 4:50 breakdown workshop


16:00 3:00

11:55 4:50
16:00 3:00

8:00 0:55
8:30 0:30
9:30 1:00
10:40 1:10
11:55 1:15
14:15 1:15
16:00 1:00

15:00 0:45
58:00:00
REMARK
Bush Sulit di lepas, kurang pelumasan. (seal lokal)

kotoran menumpuk, dan keras. ( perlu steam)


kabel putus dan rapuh

s-leeve bawaan dipasang kembali

You might also like