This thesis writing aims to determine the effect of contracts on costs and time, and
The theory used is a theory to control time and costs, where this is one of the
conditions for a project to be successful. To analyze time control is the optimization method,
while the theory used for cost control analysis is the B.O.W method, which can predict the
In a case study that using a lump sum contract, the results show that the alternative
with the cheapest cost is the alternative by increasing labor productivity, with a comparison
The conclusion obtained from writing this thesis is that all types of contracts have
their own risks, so that all parties involved must choose the type of contract that has the smallest
risk for a type of project, so that no party feels disadvantaged. Suggestions that can be given
are There must be work supervision so that things that are desired do not occur, so that the
results obtained from the completion of the project have maximum results.