Eh WHP Jacket Boatlanding Installation Procedure - 01
Eh WHP Jacket Boatlanding Installation Procedure - 01
Eh WHP Jacket Boatlanding Installation Procedure - 01
GL: better to put this crane in the other side and use one other crane here
2 Appendix 1 GL Noted and will be incorporated in the next revision
(same that the upending)
GLF-WHP02-EPCI4
Remarks:
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 1 of 20
Block 5 - AL SHAHEEN FIELD Development
REVISION HISTORY
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 2 of 20
Block 5 - AL SHAHEEN FIELD Development
TABLE OF CONTENTS
LIST OF FIGURES .................................................................................................................................... 4
1. PURPOSE ........................................................................................................................................ 5
2. SCOPE ............................................................................................................................................ 5
3. REFERENCES .................................................................................................................................. 6
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 3 of 20
Block 5 - AL SHAHEEN FIELD Development
LIST OF FIGURES
Figure 2-1 : General Arrangement of Lifting EH WHP Jacket Boat landing from Temporary Support to
Final Position in EH Jacket ........................................................................................................................5
Figure 5-1 : Al-Shaheen Field Block 5 Location. ........................................................................................8
Figure 5-2 : Field Layout for Gallaf Project. ..............................................................................................9
Figure 6-1 : CoG Location of CE WHP Jacket Horizontal Frame El. (+) 7.700M View ..............................10
Figure 6-2 : CE WHP Location in Yard Lay-out.......................................................................................11
LIST OF TABLES
Table 6-1 : Weight and CoG Summary ...................................................................................................10
Table 6-2 : Crawler Crane Data ..............................................................................................................12
Table 6-3 : Lifting Rigging Data During Flip Over....................................................................................12
Table 6-4 : Rigging Data During Lifting to Final Position .........................................................................13
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 4 of 20
Block 5 - AL SHAHEEN FIELD Development
1. PURPOSE
The purpose of this document is to present lifting procedure of Gallaf Batch 2 EH WHP Jacket Boat landing with an
appropriate design condition to meet the requirements.
2. SCOPE
This document presents general activity and procedure during installation of EH WHP Jacket Boat landing from temporary
fabrication support to final position in EH Jacket. This procedure covers the methodology, lifting arrangement, equipment
and engineering calculation for the entire activities in the most efficient and practical way.
Figure 2-1 : General Arrangement of Lifting EH WHP Jacket Boat landing from Temporary Support to Final Position in EH Jacket
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 5 of 20
Block 5 - AL SHAHEEN FIELD Development
3. REFERENCES
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 6 of 20
Block 5 - AL SHAHEEN FIELD Development
4. NOMENCLATURE
4.1. Acronym
Acronym Description
4.2. Definitions
Term Definition
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 7 of 20
Block 5 - AL SHAHEEN FIELD Development
5. PROJECT DESCRIPTION
The Al-Shaheen field is QATAR’s largest oil field. It is a conventional oil field (of approximately 60 m water depth) situated
offshore the State of Qatar approximately 70 km north-north-east of Ras Laffan. The field overlays the giant pre-Khuff gas field
known as North Field.
Thirty three platforms, including five production hubs, are installed in Al-Shaheen field. These are spread over nine different
areas across the field – Locations A to I. Crude is exported by tanker via tandem offloading from two FSOs which are
permanently moored in the field to two (of three) SPMs. Gas is gathered in a gas grid pipeline system and exported via North
Field Alpha.
The field has been developed through several phases and further development phases are envisaged by COMPANY as operator
of the Al-Shaheen concession.
In order to improve the field production capacity COMPANY has initiated Al-Shaheen Gallaf project. Gallaf project consists in
installing 7 new WHPs and 1 process platform to existing Al-Shaheen field platforms. The project is planned to be developed in
3 batches:
i. The first batch (Batch 1) consists of three (3) new wellhead platforms (DC, EG and FC) bridge-linked to existing
platforms (DA, ED and FA).
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 8 of 20
Block 5 - AL SHAHEEN FIELD Development
ii. The second batch (Batch 2) consists of 2 new wellhead platforms (CE and EH) bridge-linked to existing platforms (CD
and EG).
iii. The third batch (Batch 3) consists of 2 new remote wellhead platforms and one new process platform bridge-linked to
existing platform GD.
As a base case, platforms shall be designed for full 24 well-slot access and operation using 60-foot drilling jack-ups on one
defined footprint.
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 9 of 20
Block 5 - AL SHAHEEN FIELD Development
6. GENERAL INFORMATION
The EH WHP Jacket Boat landing weight and CoG summary are shown in Table 6-1 below.
Figure 6-1 : CoG Location of CE WHP Jacket Horizontal Frame El. (+) 7.700M View
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 10 of 20
Block 5 - AL SHAHEEN FIELD Development
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 11 of 20
Block 5 - AL SHAHEEN FIELD Development
The rigging equipment to be used during lifting are presented in Table below.
Total
Designated Diameter Length SWL Quantity
Item Description Weight
Rigging
(mm) (m) (mT) (Ea) (mT)
Sling 1 Wire rope sling 38.00 6.00 20.20 1.00 0.05
Sling 2 Wire rope sling 28.00 3.15 10.00 1.00 0.02
Sling 3 Wire rope sling 38.00 6.00 20.20 1.00 0.05
Sling 4 Wire rope sling 28.00 3.15 10.00 1.00 0.02
Sling 5 Wire rope sling 38.00 6.00 20.20 1.00 0.05
Sling 6 Wire rope sling 28.00 3.15 10.00 1.00 0.02
Sling 7 Wire rope sling 38.00 6.00 20.20 1.00 0.05
Sling 8 Wire rope sling 28.00 3.15 10.00 1.00 0.02
Sling 9 Wire rope sling 38.00 6.00 20.20 1.00 0.05
Sling 10 Wire rope sling 28.00 3.15 10.00 1.00 0.02
Sling 11 Wire rope sling 38.00 6.00 20.20 1.00 0.05
Sling 12 Wire rope sling 28.00 3.15 10.00 1.00 0.02
Shackle 1 Shackle anchor bolt type - - 35.00 1.00 0.02
Shackle 2 Shackle anchor bolt type - - 12.00 1.00 0.01
Shackle 3 Shackle anchor bolt type - - 17.00 1.00 0.01
Shackle 4 Shackle anchor bolt type - - 35.00 1.00 0.02
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 12 of 20
Block 5 - AL SHAHEEN FIELD Development
Total
Designated Diameter Length SWL Quantity
Item Description Weight
Rigging
(mm) (m) (mT) (Ea) (mT)
Shackle 5 Shackle anchor bolt type - - 12.00 1.00 0.01
Shackle 6 Shackle anchor bolt type - - 17.00 1.00 0.01
Shackle 7 Shackle anchor bolt type - - 35.00 1.00 0.02
Shackle 8 Shackle anchor bolt type - - 12.00 1.00 0.01
Shackle 9 Shackle anchor bolt type - - 17.00 1.00 0.01
Total rigging weight at Hook 1 (All degree) 0.18
Total rigging weight at Hook 2 (0 degree and 45 degree) 0.18
Total rigging weight at Hook 2 (84.45 degree, 135 degree, and 180 degree) 0.18
Total
Designated Diameter Length SWL Quantity
Item Description Weight
Rigging
(mm) (m) (mT) (Ea) (mT)
Sling 1 Wire rope sling 38.00 6.00 20.20 1.00 0.05
Sling 2 Wire rope sling 28.00 3.15 10.00 1.00 0.02
Sling 3 Wire rope sling 38.00 6.00 20.20 1.00 0.05
Sling 4 Wire rope sling 28.00 3.15 10.00 1.00 0.02
Sling 5 Wire rope sling 38.00 6.00 20.20 1.00 0.05
Sling 6 Wire rope sling 28.00 5.00 10.00 1.00 0.02
Sling 7 Wire rope sling 38.00 6.00 20.20 1.00 0.05
Sling 8 Wire rope sling 28.00 5.00 10.00 1.00 0.02
Sling 9 Wire rope sling 38.00 6.00 20.20 1.00 0.05
Sling 10 Wire rope sling 38.00 6.00 20.20 1.00 0.05
Sling 11 Wire rope sling 38.00 6.00 20.20 1.00 0.05
Sling 12 Wire rope sling 38.00 6.00 20.20 1.00 0.05
Shackle 1 Shackle anchor bolt type - - 35.00 1.00 0.02
Shackle 2 Shackle anchor bolt type - - 12.00 1.00 0.01
Shackle 3 Shackle anchor bolt type - - 17.00 1.00 0.01
Shackle 4 Shackle anchor bolt type - - 17.00 1.00 0.01
Shackle 5 Shackle anchor bolt type - - 55.00 1.00 0.04
Shackle 6 Shackle anchor bolt type - - 35.00 1.00 0.02
Shackle 7 Shackle anchor bolt type - - 55.00 1.00 0.04
Shackle 8 Shackle anchor bolt type - - 17.00 1.00 0.01
Shackle 9 Shackle anchor bolt type - - 25.00 1.00 0.02
Shackle 10 Shackle anchor bolt type - - 35.00 1.00 0.02
Shackle 11 Shackle anchor bolt type - - 35.00 1.00 0.02
Total rigging weight at Hook 1 0.56
Total rigging weight at Hook 2 0.18
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 13 of 20
Block 5 - AL SHAHEEN FIELD Development
1. Job Risk Assessment (JRA) meeting shall be conducted with all relevant parties i.e. Engineering Team, Construction
Team, HSE Team, Riggers and Lifting Supervisor to ensure the procedure and safety during lifting operation.
2. All lifting rigging equipment and certificates shall be checked in accordance with Lifting Plan Checklist to ensure all the
equipment is as per lifting design.
3. Environmental assessment shall be performed prior to lifting operation to ensure the current wind speed does not
exceed the maximum wind speed limit of 15 Knots based on in-house Safe Work Practices Manual Lifting Operations.
4. All perimeters shall be secured by using barricade fences prior to lifting operation. Only authorized personnel shall be
permitted to enter the perimeter during lifting operation.
5. All crane routes shall be checked for any obstacle prior to start the lifting activity.
1. Crawler cranes are in initial position. Crane 150mT shall set the boom length and working radius to 51.85 m and 12.00
m respectively. Crane 65mT shall set the boom length and working radius to 21.34 m and 10.67 m.
2. All rigging equipment is connected to crane hooks.
3. Lift all crane hooks to start tensioning all slings. The jacket frame shall remain supported on the temporary support.
4. Increase the crane load incrementally by 10% of lift weight until the reading on the crane load reaches 100% lift
weight. Crane operator to report each reading of crane load to the Lifting Supervisor.
5. After reading on crane load shows 100% lift weight have been taken by the crane, start the lift-up the frame by raising
the hook connected to crane 150mT. Crane 65mT shall follow suit and steadying the sling tension to prevent the
structure from swaying.
6. After vertical condition of the frame, crane 65mT start to release the weight until all lift weight at the crane 150mT.
7. Release the rigging equipment at crane 65mT, and then rotate the boat landing structure 180 degree.
8. Hook crane 65mT connected to the next designated lifting point. After that, lift up the crane hook to start tensioning
all slings.
9. Raising the hook crane 65mT and lowering the hook crane 150mT until the boat landing structure in horizontal
condition.
10. After horizontal condition of the frame, lift down all hook cranes to set up the frame in temporary support.
1. EH WHP Jacket boat landing is located on the temporary support after that structure is reversed.
2. Crane 150mT will be used for this lifting activity.
3. Install all the rigging equipment on the designated lift points.
4. Visual inspection to ensure all rigging equipment and arrangement are as per lifting plan.
1. Crawler crane is in initial position. Crane 150mT shall set the boom length and working radius to 51.85 m and 12.00 m
respectively. Crane 65mT shall set the boom length and working radius to 21.34 m and 10.67 m.
2. All rigging equipment is connected to crane hook.
3. Lift crane hook to start tensioning all slings. The jacket frame shall remain supported on the temporary support.
4. Increase the crane load incrementally by 10% of lift weight until the reading on the crane load reaches 100% lift
weight. Crane operator to report each reading of crane load to the Lifting Supervisor.
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 14 of 20
Block 5 - AL SHAHEEN FIELD Development
5. After reading on crane load shows 100% lift weight have been taken by the crane, start the lift-up the frame by raising
the hook connected to crane 150mT. Crane 65mT shall follow suit and steadying the sling tension to prevent the
structure from swaying.
6. After final condition of the frame, crane 65mT start to release the weight until all lift weight at the crane 150mT.
7. Release the rigging equipment at crane 65mT, and then rotate the boat landing structure 180 degree.
1. At the final position, the hook block could be lowered down or lift up to set up the frame in jacket structures.
2. Lifting Supervisor to communicate with Dimensional Controller to achieve the correct installation position.
3. After the frame has been installed, crawler crane 150mT shall release the crane loads gradually by 10% of lift weight
until the reading on the crane shows that the crane is remain 10% load. Crane Operators to report the reading of
crane load to Lifting Supervisor.
4. All rigging equipment shall be dismantled and then the crane hook shall be raised up and secured in the safe clearance
from jacket structure after minimum 30% welding at each joints.
8. APPENDICES
APPENDIX 1 – Drawings
APPENDIX 2 – Miscellaneous Calculation
APPENDIX 3 – Crane Data
APPENDIX 4 – SACS Summary
APPENDIX 5 – Soil Capacity Assessment
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 15 of 20
Block 5 - AL SHAHEEN FIELD Development
APPENDIX 1 – DRAWINGS
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 16 of 20
CRANE 1 (TYP.)
CRANE 150 MT
SUMITOMO LS248RH-5
WORKING RADIUS
12000
INITIAL POSITION
1
34°
8486
MO
W
V
O
E
CR
R
KI
12
AN
0
FINAL POSITION G
00
75 AV
E
EH - JACKET R
69
AD
TR
45°
4
IU
S
EL
IN
G
16490
5106 CLR
CLR
CRANE TRAVELING
GA-004
10901
CLR
W
12
O
00
R
KI
0
16410
N
G
45°
R
AD
MOVE
IU
S
MOVE MOVE
135
°
°
56
NOTE:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATION IN
SHAPOORJI PALLONJI METERS U.N.O.
April 2020 - Feb. 2021 2. ALL LIFTING AND SHIFTING AREA MUST BE ALREADY CLEAR
ELECT. 8872 53918 AND SECURE BEFORE LIFTING FAST RESCUE BOAT LANDING
PANEL CLR CRANE TRAVELING 3. GRATING AND HANDRAIL ARE INCLUDED IN THE LIFTING
PROCEDURE BUT NOT DESCRIBED IN THIS DRAWING
PROCEDURE
13059
- -
FORMOSA BATCH 4
01 28/05/2021 IFR ISSUED FOR REVIEW AM SG YM
-
00 24/05/2021 IFR ISSUED FOR REVIEW AM SG YM
PT SMOE
-
GALLAF BATCH 2 - DETAILED DESIGN
EH WHP JACKET
RESCUE BOAT LANDING INSTALLATION PROCEDURE
LIFTING SEQUENCE - PLAN VIEW
DRW 65 - DE 2
1:250 A1 TBA-GA-001 001 01
CRANE 1
CRANE 2 WORKING RADIUS 12m
BOOM LENGTH 51.850m CRANE 1
WORKING RADIUS 10.668m
BOOM LENGTH 21.336m SWL 150 MT CRANE 2 WORKING RADIUS 12m
SWL 65 MT BOOM LENGTH 51.850m
WORKING RADIUS 10.668m SWL 150 MT
BOOM LENGTH 21.336m
CRANE 1 SWL 65 MT
WORKING RADIUS 12m
BOOM LENGTH 51.850m - LOWER DOWN SLING 2
SWL 150 MT 5°
CRANE 2
NAME
BOO
5185 GTH
M
NAME NAME
LEN
0
45°
- LIFT UP THE BOAT LANDING
NAME
4001
CLR
8000
8000
HT
NG
LE 6
3
OM 213
B
BO
6°
(TYP.)
4751
7184
7184
NAME
2125
2125
3426
CRANE 2 10668 12000 CRANE 1
MOBILE CRANE 65 MT WORKING RADIUS WORKING RADIUS CRANE 150 MT
RT765E-2 LS248RH-5
1
CRANE 1 CRANE 1 CRANE 1
CRANE 200 MT CRANE 200 MT CRANE 200 MT
LS248RH-5 LS248RH-5 LS248RH-5
NOTE:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATION IN
METERS U.N.O.
2. ALL LIFTING AND SHIFTING AREA MUST BE ALREADY CLEAR
AND SECURE BEFORE LIFTING FAST RESCUE BOAT LANDING
WORKING RADIUS
WORKING RADIUS
WORKING RADIUS
12000
12000
PROCEDURE
4. ALL SLINGS HAS BEEN INSTALLED ON EACH LIFTING POINT
14298
14298
1430 1530
1000 1000
- -
CL COG
BOAT LANDING SUPPORT BOAT LANDING SUPPORT
CL COG BOAT LANDING SUPPORT CL COG
WORKING RADIUS
10668
10668
10668
-
GALLAF BATCH 2 - DETAILED DESIGN
CRANE 2 CRANE 2
MOBILE CRANE 65 MT MOBILE CRANE 65 MT
RT765E-2 RT765E-2
EH WHP JACKET
RESCUE BOAT LANDING INSTALLATION PROCEDURE
FLIP OVER SEQUENCE (SHEET 1)
SECTION B INITAL CONDITION SECTION B AFTER FLIPOVER CONDITION
SCALE :180 - SCALE :180 - DRW 65 - DE 2
1:50 A1 TBA-GA-002 002 01
CRANE 1
WORKING RADIUS 12m
BOOM LENGTH 51.850m CRANE 1
SWL 150 MT
CRANE 1 WORKING RADIUS 12m
BOOM LENGTH 51.850m
WORKING RADIUS 12m SWL 150 MT CRANE 1
BOOM LENGTH 51.850m CRANE 1
CRANE 2 WORKING RADIUS 12m
SWL 150 MT WORKING RADIUS 12m
CRANE 2 BOOM LENGTH 51.850m WORKING RADIUS 10.668m BOOM LENGTH 51.850m
WORKING RADIUS 10.668m SWL 150 MT BOOM LENGTH 21.336m SWL 150 MT
BOOM LENGTH 21.336m SWL 65 MT CRANE 2
SWL 65 MT LIFT UP 3° CRANE 2
180° WORKING RADIUS 10.668m 4°
- TURNING THE BOAT LANDING 1° BOOM LENGTH 21.336m WORKING RADIUS 10.668m
4° SWL 65 MT BOOM LENGTH 21.336m
13° SWL 65 MT
LOWER DOWN
NAME
8000
8000
ON CRANE 2 SLOWLY
2298
- AND CONTINUE LOWER DOWN THE SLING
CRANE 2 TRAVELING
6460
ON CRANE 1 SLOWLY
- LOWER DOWN THE SLING
6° 6° 6° ON CRANE 1 SLOWLY
- MOVE FORWARD THE CRANE 2
3426
3426
3426
2125
STEP 4 STEP 5 STEP 6 STEP 7 STEP 8 (AFTER FLIP OVER CONDITION)
SCALE 1:50 SCALE 1:50 SCALE 1:50 SCALE 1:50 SCALE 1:50
NOTE:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATION IN
1 METERS U.N.O.
2. ALL LIFTING AND SHIFTING AREA MUST BE ALREADY CLEAR
AND SECURE BEFORE LIFTING FAST RESCUE BOAT LANDING
3. GRATING AND HANDRAIL ARE INCLUDED IN THE LIFTING
PROCEDURE BUT NOT DESCRIBED IN THIS DRAWING
PROCEDURE
4. ALL SLINGS HAS BEEN INSTALLED ON EACH LIFTING POINT
BEFORE THE LIFTING STARTED
- -
PT SMOE
-
GALLAF BATCH 2 - DETAILED DESIGN
EH WHP JACKET
RESCUE BOAT LANDING INSTALLATION PROCEDURE
FLIP OVER SEQUENCE (SHEET 2)
DRW 65 - DE 2
1:50 A1 TBA-GA-003 003 01
BOO
BOO
BOO
BOO
5185 GTH
5185 GTH
5185 GTH
5185 GTH
M LE
M LE
M LE
M LE
0
0
0
0
N
N
1
-
180°
TH
TH
TH
NG
LE 6
NG
NG
LE 6
LE 6
3
3
OM 13
OM 13
OM 13
BO 2
BO 2
BO 2
CLR
156
11°
LIFT UP LIFT UP
LOWER DOWN
C 34
INITIAL LIFTING
LR
4
10668 12000 10668 12000 10668 12000 12000
WORKING RADIUS WORKING RADIUS WORKING RADIUS WORKING RADIUS WORKING RADIUS WORKING RADIUS WORKING RADIUS
157
STEP 1 (LIFT UP) STEP 2 (TRANSFER LOAD) STEP 3 (TURNING) STEP 4 (TRAVELING & INSTALLATION CONDITION) CLR
SCALE 1:250 SCALE 1:250 SCALE 1:250 SCALE 1:250
D 1
-
18343
8389
AND SECURE BEFORE LIFTING FAST RESCUE BOAT LANDING
3. GRATING AND HANDRAIL ARE INCLUDED IN THE LIFTING
BOOM
8811
9689
PROCEDURE
9689
LENGH
- -
12° 6°
2324
CLR
-
GALLAF BATCH 2 - DETAILED DESIGN
8486 CRANE 1
CRANE 150 MT
LS248RH-5 EH WHP JACKET
RESCUE BOAT LANDING INSTALLATION PROCEDURE
SECTION A INSTALLATION CONDITION SECTION C LAVELING POSITION SECTION C FINAL POSITION INSTALLATION SEQUENCE
SCALE :250 GA-001 SCALE :150 - SCALE :150 - DETAIL 1
SCALE 1:50 -
DRW 65 - DE 2
1:250 A1 TBA-GA-004 004 01
CL COG
2298
E
- J K
- -
LIFT POINT 3
EL. (+) 3.860
LIFT POINT 1
2577
SLING 1 SLING 3
6000
6000
WIRE SLING, WIRE SLING,
DSR WIRE DSR WIRE SWL 20.2 MT SWL 20.2 MT
6000
6000
WIRE SLING, WIRE SLING, Ø38mm, LENGTH 6m Ø38mm, LENGTH 6m
SLING 1 SLING 3 SWL 20.2 MT SWL 20.2 MT
DSR WIRE DSR WIRE Ø38mm, LENGTH 6m Ø38mm, LENGTH 6m
EL. (+) 1.430
6000
WIRE SLING, WIRE SLING,
6000
CL COG SWL 20.2 MT SWL 20.2 MT
9190
9129
9129
Ø38mm, LENGTH 6m Ø38mm, LENGTH 6m
9190
8811
8786
8723
15° 17°
7641
7572
SHACKLE 5 SHACKLE 5
SWL 17 MT SWL 35 MT
SHACKLE 1 SHACKLE 3
2803
2397 2602
2803
SLING 2 SLING 6 SLING 8
2325
2325
LIFTING POINT 6 SLING 4 SLING 2 DSR WIRE DSR WIRE
1375
1375
DSR WIRE SLING 4
WIRE SLING, DSR WIRE DSR WIRE WIRE SLING, WIRE SLING,
WIRE SLING, DSR WIRE SWL 20.2 MT SWL 20.2 MT
SWL 10 MT WIRE SLING,
Ø28mm, LENGTH 3.15m SWL 10 MT WIRE SLING, Ø38mm, LENGTH 6m Ø38mm, LENGTH 6m
SWL 10 MT
Ø38mm, LENGTH 5m SWL 10 MT
Ø28mm, LENGTH 3.15m
LIFT POINT ARRANGEMENT Ø38mm, LENGTH 5m
SCALE 1:50
SECTION F SECTION G SECTION H SECTION I SECTION J SECTION K
LIFTING POINT 5 SCALE :50 - SCALE :50 - SCALE :50 - SCALE :50 - SCALE :50 - SCALE :50 -
4596
1
FLIP OVER CONDITION
SCALE 1:50
CL
H I
- -
SECTION E
SCALE :50 -
NOTE:
F G 1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATION IN
- - METERS U.N.O.
2. ALL LIFTING AND SHIFTING AREA MUST BE ALREADY CLEAR
AND SECURE BEFORE LIFTING FAST RESCUE BOAT LANDING
8786
8723
8389
18° 20°
TRAVELING AND INSTALLATION CONDITION
1
- -
7184
PT SMOE
-
GALLAF BATCH 2 - DETAILED DESIGN
LIFTING POINT 1 LIFTING POINT 2
TRAVELING TRAVELING
& INSTALLATION 4999 & INSTALLATION
CONDITION CONDITION
EH WHP JACKET
FLIP OVER CONDITION RESCUE BOAT LANDING INSTALLATION PROCEDURE
TYPICAL AT 3 LIFTING LOCATION RIGGING ARRANGEMENT
SIMILAR AT 1 LIFTING LOCATION DURING TRAVELING & INSTALLATION CONDITION TRAVELING & INSTALLATION CONDITION
SCALE 1:50 LIFTING POINT 3 AND 4
1 DRW 65 - DE 2
SCALE 1:50
1:250 A1 TBA-GA-005 005 01
Block 5 - AL SHAHEEN FIELD Development
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 17 of 20
1
CALCULATION SHEET
PROJECT : GALLAF BATCH 2 DATE : REV'N. :
EH WHP JACKET 28-May-21 01
SUBJECT : Lifting EH WHP Jacket Boat Landing to Final Position PREP'D. BY CHECKED BY :
Rigging Calculation SG YM
A. DESCRIPTION
This spreadsheet presents rigging equipments capacity check againts occuring load during lifting panel EH Jacket
boat landing to Final Position. The occuring loads, taken as maximum sling tensions, are obtained from SACS
analysis result.
As per Section 16.3.4 of DNVGL-ST-N0001 (Ref.8), the sling design load shall be taken as maximum calculated
dynamic axial load in the sling by considering relevant factors. The factors considered for this are as per the
the following
FSD = DF x Static Sling Tension
DF = CF x CoGF x DAF x YF x SKL
Where :
CF = Weight contingency factor = 1.05
CoGF = CoG variation factor = 1.05
DAF = Dynamic Amplification Factor = 1.10
YF = Yaw factor = 1.05
SKL = Skew load factor = 1.10
Total Design Load Factor (DF) = 1.40
2
CALCULATION SHEET
PROJECT : GALLAF BATCH 2 DATE : REV'N. :
EH WHP JACKET 28-May-21 01
SUBJECT : Lifting EH WHP Jacket Boat Landing to Final Position PREP'D. BY CHECKED BY :
Rigging Calculation SG YM
C. INPUT DATA
Input data is taken from SACS output as sling member end forces in static condition (LCOMB 1000). Summary of sling
forces is listed in table below.
Based on the above sling forces data, the designated riggings are as per table below.
Item
SWL Design Load (FSD) Safety Factor SWL Eficiency Check
Description
No. Sling mT mT SWL/FSD (FSD/SWL)x100(%) SF>1, OK!
Sling 1 20.20 3.84 5.26 19.03 OK!
Sling 3 20.20 3.59 5.62 17.79 OK!
Sling 5 20.20 3.61 5.60 17.85 OK!
Sling 7 20.20 3.86 5.24 19.09 OK!
Sling 9 20.20 4.99 4.05 24.70 OK!
Sling 11 20.20 4.83 4.18 23.93 OK!
4
CALCULATION SHEET
PROJECT : GALLAF BATCH 2 DATE : REV'N. :
EH WHP JACKET 28-May-21 01
SUBJECT : Lifting EH WHP Jacket Boat Landing to Final Position PREP'D. BY CHECKED BY :
Rigging Calculation SG YM
Item
SWL Design Load (FSD) Safety Factor SWL Eficiency Check
Description
No. Sling mT mT SWL/FSD (FSD/SWL)x100(%) SF>1, OK!
Shackle 1 35.00 3.84 9.11 10.98 OK!
Shackle 2 12.00 3.59 3.34 29.95 OK!
Shackle 3 17.00 3.59 4.73 21.14 OK!
Shackle 4 17.00 3.61 4.72 21.21 OK!
Shackle 5 55.00 3.61 15.26 6.55 OK!
Shackle 6 35.00 3.86 9.08 11.02 OK!
Shackle 7 55.00 3.86 14.26 7.01 OK!
Shackle 8 17.00 4.99 3.41 29.35 OK!
Shackle 9 25.00 4.99 5.01 19.96 OK!
Shackle 10 35.00 4.83 7.24 13.81 OK!
Shackle 11 35.00 4.83 7.24 13.81 OK!
1
CALCULATION SHEET
PROJECT : GALLAF BATCH 2 DATE : REV'N. :
EH WHP JACKET 28-May-21 00
SUBJECT : Flip Over Lifting EH WHP Jacket Boat Landing PREP'D. BY CHECKED BY :
at Temporary Position
SG YM
Rigging Calculation
A. DESCRIPTION
This spreadsheet presents rigging equipments capacity check againts occuring load during flip over lifting CE jacket
boat landing at temporary position. The occuring loads, taken as maximum sling tensions, are obtained from SACS
analysis result.
B. DESIGN CRITERIA
As per Section 16.3.4 of DNVGL-ST-N0001 (Ref.8), the sling design load shall be taken as maximum calculated
dynamic axial load in the sling by considering relevant factors. The factors considered for this are as per the
the following
FSD = DF x Static Sling Tension
C. INPUT DATA
Input data is taken from SACS output as sling member end forces in static condition (LCOMB 1000). Summary of sling
forces is listed in table below.
Based on the above sling forces data, the designated riggings are as per table below.
Item
SWL Design Load (FSD) Safety Factor SWL Eficiency Check
Description
No. Sling mT mT SWL/FSD (FSD/SWL)x100(%) SF>1, OK!
Sling 1 20.20 7.70 2.62 38.12 OK!
Sling 3 20.20 7.20 2.81 35.64 OK!
Sling 5 20.20 3.85 5.24 19.08 OK!
Sling 7 20.20 3.61 5.60 17.85 OK!
Sling 9 20.20 7.71 2.62 38.18 OK!
Sling 11 20.20 7.21 2.80 35.69 OK!
Item
SWL Design Load (FSD) Safety Factor SWL Eficiency Check
Description
No. Sling mT mT SWL/FSD (FSD/SWL)x100(%) SF>1, OK!
Shackle 1 35.00 7.70 4.55 22.00 OK!
Shackle 2 12.00 7.20 1.67 59.99 OK!
Shackle 3 17.00 7.20 2.36 42.34 OK!
Shackle 4 35.00 3.85 9.08 11.01 OK!
Shackle 5 12.00 3.61 3.33 30.04 OK!
Shackle 6 17.00 3.61 4.72 21.21 OK!
Shackle 7 35.00 7.71 4.54 22.03 OK!
Shackle 8 12.00 7.21 1.66 60.08 OK!
Shackle 9 17.00 7.21 2.36 42.41 OK!
CALCULATION SHEET
PROJECT : GALLAF BATCH 2 ORIGINATOR : SG
SUBJECT : PIPE CHECK DUE TO SLING CHECK'D BY : YM
REVISION : 01 DATE : 05/28/2021
PIPE__LOCAL__CHECK__DUE__TO__SLING__REACTION
During flip over lifting at temporary position
CALCULATION SHEET
PROJECT : GALLAF BATCH 2 ORIGINATOR : SG
SUBJECT : PIPE CHECK DUE TO SLING CHECK'D BY : YM
REVISION : 01 DATE : 05/28/2021
Based on the above table,it is found that maximum sling force occurs on Sling 9 and sling
10 during flip over lifting at temporary position where the sling shall be attached to pipe
219.10 mm OD x 12.7 mm WT. localstresscheck on the pipe due to sling force is presented
in the followings.
P R 3 tonne
Local stress at pipe σ K ln 1.25 10
2 t 2
t m
Material yield strength Fy 345 MPa
Allowable stress σallow 0.75 Fy 258.75 MPa
σ ge 2
Stress UC UC 4.75 10
σallow
Block 5 - AL SHAHEEN FIELD Development
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 18 of 20
Load chart
Radius #0001
in Main boom length in feet
feet
36 40 50 **60 70 80 90 100 110
130,000 90,300 90,300 *62,500
10
(69.5) (71.5) (75.5) (78)
112,500 90,300 90,300 62,500 *40,200
12
(65.5) (68.5) (73) (76.5) (78)
93,250 90,300 90,250 62,500 40,200 *40,200
15
(60) (63.5) (69.5) (73.5) (76) (78)
71,550 71,500 71,300 62,500 40,200 40,200 40,200 *36,900
20
(49.5) (55) (63) (68) (71.5) (74.5) (78) (78)
56,650 56,600 56,350 53,650 40,200 40,200 37,950 34,900 *25,150
25
(36.5) (45) (56) (63) (67) (70.5) (73) (75) (78)
43,500 44,300 43,950 43,650 40,200 36,050 32,750 30,200 25,150
30
(11.5) (32) (48.5) (57.5) (62.5) (66.5) (69.5) (72) (74)
33,550 33,700 34,700 31,450 28,550 26,400 24,700
35
(40) (51.5) (58) (62.5) (66) (69) (71.5)
25,800 26,150 26,900 27,700 25,200 23,300 21,800
40
(28) (44.5) (52.5) (58.5) (62.5) (66) (68.5)
20,650 21,450 22,300 22,400 20,700 19,400
45
(36.5) (47) (54) (59) (62.5) (65.5)
16,550 17,400 18,250 19,100 18,550 17,350
50
(26.5) (41) (49.5) (55) (59.5) (62.5)
14,300 15,150 16,000 16,400 15,600
55
(33.5) (44) (51) (56) (60)
11,800 12,700 13,550 13,950 14,100
60
(23.5) (38.5) (46.5) (52.5) (56.5)
10,700 11,550 11,950 12,300
65
(31.5) (41.5) (48.5) (53.5)
9010 9920 10,250 10,650
70
(22.5) (36) (44) (50)
8510 8890 9250
75
(29.5) (39.5) (46)
7260 7690 8050
80
(21) (34.5) (42.5)
6620 7010
85
(28.5) (38)
5630 6100
90
(20) (33)
5240
95
(27)
4480
100
(19.5)
Minimum boom angle (° ) for indicated length (no load) 0
Maximum boom length (ft ) at 0° boom angle (no load) 110
NOTE: ( ) Boom angles are in degrees.
#LMI operating code. Refer to LMI manual for operating instructions.
*This capacity is based on maximum boom angle.
Lifting capacities at zero degree boom angle
Boom Main boom length in feet
angle 36 40 50 **60 70 80 90 100 110
30,350 25,700 17,950 13,050 10,050 7790 6300 4900 3900
0°
(30.1) (34.2) (44.2) (54.6) (64.2) (74.2) (84.2) (94.2) (104.2)
NOTE: ( ) Reference radii in feet. 80039604
** Boom length is with inner-mid fully extended and outer-mid & fly fully retracted.
THIS CHART IS ONLY A GUIDE AND SHOULD NOT BE USED TO OPERATE THE CRANE.
The individual crane’s load chart, operating instructions and other instructional plates must be read and understood prior to operating the crane.
BOLT TYPE • Capacities 1/3 thru 150 metric tons. BOLT TYPE
• Working Load Limit permanently shown on every shackle.
ANCHOR • Forged — Quenched and Tempered, with alloy pins.
CHAIN
SHACKLES • Hot Dip galvanized or Self Colored. SHACKLES
Shackles
• Fatigue rated (1/3t - 55t).
• Shackles 25t and larger are RFID EQUIPPED.
• Crosby products meet or exceed all requirements of
ASME B30.26 including identification, ductility, design factor, proof load
and temperature requirements. Importantly, Crosby products meet other
critical performance requirements including fatigue life, impact
properties and material traceability, not addressed by ASME B30.26.
• Sizes 1/2t-25t meet the performance requirements of EN13889:2003.
• Shackles 55 metric tons and smaller can be furnished proof tested with
certificates to designated standards, such as ABS, DNV, Lloyds, or other
G-2130 S-2130 certification when requested at time of order. G-2150 S-2150
Bolt Type Anchor shackles with thin Bolt Type Chain shackles. Thin hex head
• Shackles 85 metric tons and larger can be provided as follows.
head bolt - nut with cotter pin. Meets the bolt - nut with cotter pin. Meets the
performance requirements of Federal • Non Destructive Tested performance requirements of Federal
Specification RR-C-271D Type IVA, • Serialized Pin and Bow Specification RR-C271D Type IVB, Grade
Grade A, Class 3, except for those provi- • Material Certification (Chemical) Certification must be A, Class 3, except for those provisions
sions required of the contractor. For requested at time of order. required of the contractors. For
additional information, see page 391. • Look for the Red Pin® . . . the mark of genuine Crosby quality. additional information, see page 391.
• Type Approval and certification in accordance with ABS 2006 Steel Vessel
Rules 1-1-17.7, and ABS Guide for Certification of Cranes.
s e l k c a h S e p y T t l o B ® y •b s o r C
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 19 of 20
EH WHP JACKET BOAT LANDING SACS SUMMARY
EH BOAT LANDING (Flip Over Condition - 0 Deg.)
EH BOAT LANDING (Flip Over Condition – 45 Deg.)
EH BOAT LANDING (Flip Over Condition – 84.45 Deg. – 1 Crane)
EH BOAT LANDING (Flip Over Condition – 84.45 Deg. – 2 Crane)
EH BOAT LANDING (Flip Over Condition – 135 Deg.)
EH BOAT LANDING (Flip Over Condition – 180 Deg.)
EH BOAT LANDING (Lifting to Final Position – Initial Condition)
EH BOAT LANDING (Lifting to Final Position – Final Condition)
Deflection Check EH BOAT LANDING (Lifting to Final Position – Final Condition)
First Joint (1) Second Joint(2) Third Joint (3) Relative Relative Allowable
Load
Joint Absolute Joint Absolute Joint Absolute Deflection Deflection Span Deflection
Comb.
ID Deflection ID Deflection ID Deflection (1)-(2) (3)-(2) (SPAN/200)
1000 LP03 -2.51 0018 -2.643 LP05 -2.641 0.133 0.002 5360 26.8
1000 LP04 -2.61 0042 -2.74 LP06 -2.30 0.13 0.44 5360 26.8
s
Block 5 - AL SHAHEEN FIELD Development
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 20 of 20
CALCULATION SHEET
DATE : REV:
PROJECT : GALLAF BATCH 2 PROJECT
28-May-21 01
EH WHP JACKET BOAT LANDING SOIL BEARING PRESSURE CHECK WITH CRANE 150T PREP'D. BY : CHECKED BY :
SUBJECT :
SG YM
1 Crane Configuration
For this Analysis Cartesian coordinate will be use to determine the CoG Location with its X axis parallel to the Crane Rail direction and Y axis perpendicular to the X axis. With
Center of Rotation (CoR) of crane act as base point at (x,y = 0,0 )
CALCULATION SHEET
DATE : REV:
PROJECT : GALLAF BATCH 2 PROJECT
28-May-21 01
EH WHP JACKET BOAT LANDING SOIL BEARING PRESSURE CHECK WITH CRANE 150T PREP'D. BY : CHECKED BY :
SUBJECT :
SG YM
2 Lifting Configuration
- Crane A
WEIGHT ORIGIN COG (m)* Crane Boom Angle 0 Deg to CoR
CRANE PART
(Ton) X Y X Y
MAIN BOOM 51,85 M 15.70 6.69 0.00 6.69 0.00
BASE MACHINE +
27.20 0.00 0.00 0.00 0.00
CARBODY
COUNTER WEIGHT 57.10 -4.38 0.00 -4.38 0.00
HOOK 2.60 12.00 0.00 12.00 0.00
CRAWLER 39.40 0.00 0.00 0.00 0.00
COG LOCATION
WEIGHT Crane Boom Angle 0 Deg to CoR
LIFTED OBJECT (m)***
(Ton)**
X Y X Y
EXPECTED LIFT 13.24 12.00 0.00 12.00 0.00
EH WHP JACKET BOAT LANDING SOIL BEARING PRESSURE CHECK WITH CRANE 150T PREP'D. BY : CHECKED BY :
SUBJECT :
SG YM
3 Ground Pressure Calculation (with steel plate 3.20 m x 9.00 m below each crawler track)
- Crane A
Crane Boom angle 0 Deg from CoG (allign with crawler direction)
Plate* Width (B) = 3.20 m
*)
Steel plate to be installed at bottom of crawler crane for greater bearing area
**)
The following expression are use for determine the Ground pressure per case :
***) ****)
The following expression are use for determine the Ratio : The following expression are use for determine the Ground pressure use value based on Meyerhof (1956) formula :
; ; 3 1 "#
$
', ,
1 2 & ', $ ) (
; ; 4 1 2 "#
"# ,with : "# and "# "#
$, ,
4 Check Ground Pressure Capacity (with steel plate 3.20 m x 9.00 m below each crawler track)
- Crane A
Soil Bearing Capacity (qall) = 50.00 Ton/m2
Maximum Ground Pressure (qeqv) = 2.88 Ton/m
2
EH WHP JACKET BOAT LANDING SOIL BEARING PRESSURE CHECK WITH CRANE 150T PREP'D. BY : CHECKED BY :
SUBJECT :
SG YM
***) ****)
The following expression are use for determine the Ratio : The following expression are use for determine the Ground pressure use value based on Meyerhof (1956) formula :
; ; 3 1 "#
$
', ,
1 2 & ', $ ) (
; ; 4 1 2 "#
"# ,with : "# and "# "#
$, ,
6 Check Ground Pressure Capacity (without steel plate below crawler track)
- Crane A
Soil Bearing Capacity (qall) = 50.00 Ton/m
2
EH WHP JACKET BOAT LANDING SOIL BEARING PRESSURE CHECK WITH MOBILE CRANE 65T PREP'D. BY : CHECKED BY :
SUBJECT :
SG YM
1 Crane Configuration
For this Analysis Cartesian coordinate will be use to determine the CoG Location with its X axis parallel to the Crane Rail direction and Y axis perpendicular to the X axis. With
Center of Rotation (CoR) of crane act as base point at (x,y = 0,0 )
CALCULATION SHEET
DATE : REV:
PROJECT : GALLAF BATCH 2 PROJECT
28-May-21 01
EH WHP JACKET BOAT LANDING SOIL BEARING PRESSURE CHECK WITH MOBILE CRANE 65T PREP'D. BY : CHECKED BY :
SUBJECT :
SG YM
2 Lifting Configuration
- Crane A
WEIGHT ORIGIN COG (m)* Crane Boom Angle 0 Deg to CoR
CRANE PART
(Ton) X Y X Y
MAIN BOOM 21.34 M 10.54 6.03 0.00 6.03 0.00
BASE MACHINE +
31.31 0.00 0.00 0.00 0.00
CARBODY + CHASSIS +
COUNTER WEIGHT 6.52 -3.64 0.00 -3.64 0.00
HOOK 0.48 10.67 0.00 10.67 0.00
COG LOCATION
WEIGHT Crane Boom Angle 0 Deg to CoR
LIFTED OBJECT (m)***
(Ton)**
X Y X Y
EXPECTED LIFT 12.82 10.67 0.00 10.67 0.00
EH WHP JACKET BOAT LANDING SOIL BEARING PRESSURE CHECK WITH MOBILE CRANE 65T PREP'D. BY : CHECKED BY :
SUBJECT :
SG YM
3 Ground Pressure Calculation (with steel plate 3.20 m x 9.00 m below each crawler track)
- Crane A
Crane Boom angle 0 Deg from CoG (allign with crawler direction)
Plate* Width (B) = 3.20 m
*)
Steel plate to be installed at bottom of crawler crane for greater bearing area
**)
The following expression are use for determine the Ground pressure per case :
***) ****)
The following expression are use for determine the Ratio : The following expression are use for determine the Ground pressure use value based on Meyerhof (1956) formula :
; ; 3 1 "#
$
', ,
1 2 & ', $ ) (
; ; 4 1 2 "#
"# ,with : "# and "# "#
$, ,
4 Check Ground Pressure Capacity (with steel plate 3.20 m x 9.00 m below each crawler track)
- Crane A
Soil Bearing Capacity (qall) = 50.00 Ton/m2
Maximum Ground Pressure (qeqv) = 3.10 Ton/m
2
EH WHP JACKET BOAT LANDING SOIL BEARING PRESSURE CHECK WITH MOBILE CRANE 65T PREP'D. BY : CHECKED BY :
SUBJECT :
SG YM
***) ****)
The following expression are use for determine the Ratio : The following expression are use for determine the Ground pressure use value based on Meyerhof (1956) formula :
; ; 3 1 "#
$
', ,
1 2 & ', $ ) (
; ; 4 1 2 "#
"# ,with : "# and "# "#
$, ,
6 Check Ground Pressure Capacity (without steel plate below crawler track)
- Crane A
Soil Bearing Capacity (qall) = 50.00 Ton/m
2