Professional Documents
Culture Documents
Water and Electric Bill (May 2018 To April 2020)
Water and Electric Bill (May 2018 To April 2020)
MFL continuously working for their own work assignments on site. This
June_2020 Present time also when personnel of Architect Lim is no longer occupying and
staying at site barracks. They are regularly going in and out of the site
every day as their respective house are just nearby.
January_2021 Present AC on control room run 24/7 wherein half of the day is run via normal
power and the other half was run by UPS.