Professional Documents
Culture Documents
Design Change Connexion - ECN - Register
Design Change Connexion - ECN - Register
MEDUPI ALL UNIT DESIGN CHANGE CONNECTION ENGINEERING CHANGE NOTICE (ECN) REGISTER FOR STEEL STRUCTURE
Supervisor : Sibusiso Nkumb
1 OF 3
Discipline Manager: Bradley Laubscher DATE: 19TH AUGUST 2019
MEDUPI ALL UNIT DESIGN CHANGE CONNECTION ENGINEERING CHANGE NOTICE (ECN) REGISTER FOR STEEL STRUCTURE
Supervisor : Sibusiso Nkumb
WI#10727 131-154-GA10001–Rev1
Connections designs are being reviewed to ensure
they comply with the latest revisions of the structural
analysis and detail erection drawings. Some WI#10731 131-122-GA1001-Rev1
connections have been identified through the review
process or site inspections that require additional WI#10747 131-124-GA1001-Rev0
8 Bheki Nene modifications/stiffening/strengthening. Details of these B114116-07-01-GH11-04014 M-3 HPS-ESK-12106 12-Jun-19 Awaiting Eskom Approval
modifications are included in the attached site WI#10748 131-152-GA10003-Rev3
instructions/memos. These modifications do not affect
the overall integrity or stability of the boiler support
structure nor the certificates already issued to the WI#10756 131-520-GA1000-Rev0
client by the MHPSA design engineer.
WI#10924 161F1-154-GA10001-Rev1
Connections designs are being reviewed to ensure
they comply with the latest revisions of the structural WI#10928 161-122-GA30003-Rev11
analysis and detail erection drawings. Some WI#10932 161-122-GA30003-Rev11
connections have been identified through the review 162-723-GA2003-1-Rev4
process or site inspections that require additional WI#10733 162-723-GA2003-2-Rev4
modifications/stiffening/strengthening. Details of these
10 Sibusiso Nkumbi B114116-07-01-GH11-04010 M-6 HPS-ESK-12106 12-Jun-19 Awaiting Eskom Approval
modifications are included in the attached site WI#10734 162-713-GA1003-1-Rev6
instructions/memos. These modifications do not affect
the overall integrity or stability of the boiler support WI#10737 162-723-GA2003-2-Rev4
structure nor the certificates already issued to the WI#10753 161-520-GA3016-Rev4
client by the MHPSA design engineer.
WI#10757 161-123-GA3031-Rev10
WI#10732 161-122-GA3003-Rev11.
WI#10733 162-723-GA2003-1-Rev4.
WI#10754 151--520-GA-1000-Rev3.
Connections designs are being reviewed to ensure
they comply with the latest revisions of the structural WI#10789 152-710-GA1004 – Rev2.
analysis and detail erection drawings. Some
connections have been identified through the review WI#10786 162-731-GA3005-1– Rev2.
process or site inspections that require additional WI#10740 152-731-GA3005-1– Rev3.
modifications/stiffening/strengthening. Details of these WI#10711 152-723-GA2003-1-Rev1
11 Bheki Nene B114116-07-01-GH11-04018 M-5 WI#10712 152-723-GA2003-2- Rev2 To be transmitted Awaiting Internal Approval
modifications are included in the attached site
instructions/memos. These modifications do not affect WI#10776 151-123-GA1000-Rev2
the overall integrity or stability of the boiler support WI#10729 151-122-GA1001-Rev2
structure nor the certificates already issued to the
client by the MHPSA design engineer. WI#10735 152-713-GA1003-1-Rev2
WI#10745 151-124-GA1001-Rev 4
WI#10798 164-831-GA-3006-Rev3.
Connections designs are being reviewed to ensure WI#10785 142-710-GA1004.
they comply with the latest revisions of the structural WI#10741 142-731-GA3005-1-REV1.
analysis and detail erection drawings. Some
WI#10790 141-122-GA1001-Rev3.
connections have been identified through the review
WI#10777 141-123-GA1000-Rev4.
process or site inspections that require additional
modifications/stiffening/strengthening. Details of these WI#107671 144-831-GA3000
12 Sibusiso Nkumbi B114116-07-01-GH11-04017 M-4 WI#10672 144-832-GA3000 To be transmitted Awaiting Internal Approval
modifications are included in the attached site
instructions/memos. These modifications do not affect WI#10697 134-834-3018-0
the overall integrity or stability of the boiler support WI#10682 141F1-550-GA10055-Rev1.
structure nor the certificates already issued to the 141F1-250-GA10064
client by the MHPSA design engineer. 141F1-450-GA10006
WI#10732
141F1-350-GA10005
2 OF 3
Discipline Manager: Bradley Laubscher DATE: 19TH AUGUST 2019
MEDUPI ALL UNIT DESIGN CHANGE CONNECTION ENGINEERING CHANGE NOTICE (ECN) REGISTER FOR STEEL STRUCTURE
Supervisor : Sibusiso Nkumb
3 OF 3