Discipline Manager: Bradley Laubscher DATE: 19TH AUGUST 2019

MEDUPI ALL UNIT DESIGN CHANGE CONNECTION ENGINEERING CHANGE NOTICE (ECN) REGISTER FOR STEEL STRUCTURE
Supervisor : Sibusiso Nkumb

TRANSMITTAL TRANSMITTAL APPROVED


ITEM UNIT TRANSMITTAL TRANSMITTAL
ORIGINATOR DISCRIPTION ECN# WI# AFFECTED DRWAING REFERENCE REFERENCE BY ESKOM REMARKS
NUMBER NUMBER DATE DATE
TO ESKOM FROM ESKOM YES/NO
WI#10679 161F1-550-GA10000 – Rev1
164-832-GA3250 – Rev6
WI#10684
Connections designs are being reviewed to ensure 164-832-3302 – Rev2
they comply with the latest revisions of the structural 164-831-GA3006 – Rev3
analysis and detail erection drawings. Some WI#10685 164-831-3031 – Rev2
connections have been identified through the review 164-831-3158 – Rev2
process or site inspections that require additional 161-126-GA3012 – Rev6
WI#10686
1 Sibusiso Nkumbi modifications/stiffening/strengthening. Details of these B114116-07-01-GH11-04008-AA M-6 161-126-GA3033 – Rev10 HPS-ESK-12089 21-05-2019 Yes
modifications are included in the attached site 161-440-GA8016 – Rev0
instructions/memos. These modifications do not affect WI#10688 161-240GA8014 – Rev1
the overall integrity or stability of the boiler support 161-340-GA8015 – Rev0
structure nor the certificates already issued to the WI#10698 161-126-GA3033 – Rev10
client by the MHPSA design engineer.
WI#10699 161-126-GA3012 – Rev5
WI#10700 161-126-GA3012 – Rev6
WI#10648 Rev1 164-831-GA-3006-Rev3.
161-126-GA3012 – Rev6
WI#10686
Connections designs are being reviewed to ensure 161-126-GA3033 – Rev10
they comply with the latest revisions of the structural WI#10739 162-731-GA3005-1 – Rev3.
analysis and detail erection drawings. Some
WI#10649 – Rev1. 164-832-GA3250 – Rev5
connections have been identified through the review
process or site inspections that require additional WI#10753 161-520-GA3016 – Rev4.
2 Sibusiso Nkumbi modifications/stiffening/strengthening. Details of these B114116-07-01-GH11-04016 M-6 161-122-GA3003 – Rev11. To be transmitted Awaiting Internal Approval
modifications are included in the attached site WI#10788 161-122-GA3030 - Rev13.
instructions/memos. These modifications do not affect 161-122-3148 – Rev 4
the overall integrity or stability of the boiler support WI#10775 161-123-GA3005 – Rev8.
structure nor the certificates already issued to the
client by the MHPSA design engineer. WI#10724 161F1-154-GA10001 – Rev1.
WI#10728 161-122-GA-3003 – Rev11.
WI#10732 161-122-GA3003 – Rev11.

WI#10680 151-550-GA10000 Rev4


151-250-GA10001 Rev2
151-350-GA10001 Rev3
WI#10689
Connections designs are being reviewed to ensure 151-450-GA10001 Rev2
they comply with the latest revisions of the structural
analysis and detail erection drawings. Some 154-834-3005 Rev2
connections have been identified through the review 154-834-3005 Rev2 – END VIEW A A
process or site inspections that require additional (10)
3 Sibusiso Nkumbi modifications/stiffening/strengthening. Details of these B114116-07-01-GH11-04009-AA M-5 154-834-3005 Rev2 – VIEW A-A (R) HPS-ESK-12089 21-05-2019 Awaiting Eskom Approval
modifications are included in the attached site WI#10692 154-834-3005 Rev2 – SECTION D –
instructions/memos. These modifications do not affect D (T)
the overall integrity or stability of the boiler support 154-834-3005 Rev2 – SECTION D –
structure nor the certificates already issued to the D (U)
client by the MHPSA design engineer. 154-834-3007 Rev2
WI#10693 154-833-GA3000 Rev1

WI#10701 151-126-GA1003 Rev1

WI#10725 151-154-GA10001- Rev5


Connections designs are being reviewed to ensure
they comply with the latest revisions of the structural WI#10729 151-122-GA1001-Rev2
analysis and detail erection drawings. Some
connections have been identified through the review WI#10735 152-713-GA1003-1-Rev2
process or site inspections that require additional
4 Sibusiso Nkumbi modifications/stiffening/strengthening. Details of these B114116-07-01-GH11-04012 M-5 WI#10745 151-124-GA1001-Rev4 HPS-ESK-12106 12-Jun-19 Yes
modifications are included in the attached site
instructions/memos. These modifications do not affect
the overall integrity or stability of the boiler support
structure nor the certificates already issued to the WI#10754 151-520-GA1000-Rev3
client by the MHPSA design engineer.

WI#10682 141F1-550-GA10056 – Rev1


141F1-250-GA10064 – Rev0
Connections designs are being reviewed to ensure
141F1-450-GA10006 – Rev0
they comply with the latest revisions of the structural WI#10690
141F1-350-GA10005 – Rev0
analysis and detail erection drawings. Some
connections have been identified through the review
WI#10694 144-833-GA3000 - Rev0
process or site inspections that require additional
5 Sibusiso Nkumbi modifications/stiffening/strengthening. Details of these B114116-07-01-GH11-04006-AA M-4 WI#10696 140-150-5015 & 144-834-BL3015 – Rev0 HPS-ESK-12089 21-05-2019 Yes
modifications are included in the attached site
instructions/memos. These modifications do not affect
the overall integrity or stability of the boiler support
structure nor the certificates already issued to the WI#10702 141-420-GA1000 – Rev2
client by the MHPSA design engineer.

Connections designs are being reviewed to ensure WI#10726 141F1-154-GA10031 – Rev3


they comply with the latest revisions of the structural
analysis and detail erection drawings. Some WI#10730 141-122-GA1001-Rev3
6 Sibusiso Nkumbi connections have been identified through the review B114116-07-01-GH11-04013 M-4 HPS-ESK-12106 12-Jun-19 Awaiting Eskom Approval
process or site inspections that require additional WI#10736 141F1-154-GA10031 – Rev3
modifications/stiffening/strengthening. Details of these
modifications are included in the attached site WI#10746 141-124-GA1001-Rev2
instructions/memos. These modifications do not affect
WI#10681 131-550-GA1000 – Rev1
Connections designs are being reviewed to ensure
131-250-GA10001 – Rev1
they comply with the latest revisions of the structural
131-250-GA10001 – Rev1
analysis and detail erection drawings. Some WI#10691
131-450-GA10001 – Rev1
connections have been identified through the review
process or site inspections that require additional
7 Sibusiso Nkumbi modifications/stiffening/strengthening. Details of these B114116-07-01-GH11-04007-AA M-3 WI#10695 134-833-GA3000 – Rev0 HPS-ESK-12089 21-05-2019 Yes
modifications are included in the attached site 130-150-5015 – Rev0
instructions/memos. These modifications do not affect WI#10697 134-834-3018 – Rev0
the overall integrity or stability of the boiler support
structure nor the certificates already issued to the
client by the MHPSA design engineer. WI#10703 131-420-GA1000 – Rev0

1 OF 3
Discipline Manager: Bradley Laubscher DATE: 19TH AUGUST 2019
MEDUPI ALL UNIT DESIGN CHANGE CONNECTION ENGINEERING CHANGE NOTICE (ECN) REGISTER FOR STEEL STRUCTURE
Supervisor : Sibusiso Nkumb

TRANSMITTAL TRANSMITTAL APPROVED


ITEM UNIT TRANSMITTAL TRANSMITTAL
ORIGINATOR DISCRIPTION ECN# WI# AFFECTED DRWAING REFERENCE REFERENCE BY ESKOM REMARKS
NUMBER NUMBER DATE DATE
TO ESKOM FROM ESKOM YES/NO

WI#10727 131-154-GA10001–Rev1
Connections designs are being reviewed to ensure
they comply with the latest revisions of the structural
analysis and detail erection drawings. Some WI#10731 131-122-GA1001-Rev1
connections have been identified through the review
process or site inspections that require additional WI#10747 131-124-GA1001-Rev0
8 Bheki Nene modifications/stiffening/strengthening. Details of these B114116-07-01-GH11-04014 M-3 HPS-ESK-12106 12-Jun-19 Awaiting Eskom Approval
modifications are included in the attached site WI#10748 131-152-GA10003-Rev3
instructions/memos. These modifications do not affect
the overall integrity or stability of the boiler support
structure nor the certificates already issued to the WI#10756 131-520-GA1000-Rev0
client by the MHPSA design engineer.

The bottom flange of a plate girder on +16m level had


to be notched to clear a pipe connecting to Mill 40, as
stated on the Eskom Punch list Ref# I&TN No &
9 Sibusiso Nkumbi B114116-07-01-GH11-04011 M-1 N/A B114108-07-01-IG04-413-013 - Rev00 HPS-ESK-12160 21-05-2019 Yes
Activity No.: 2882/143 of AFI SPF No. 348-964411 –
on Unit 1.

WI#10924 161F1-154-GA10001-Rev1
Connections designs are being reviewed to ensure
they comply with the latest revisions of the structural WI#10928 161-122-GA30003-Rev11
analysis and detail erection drawings. Some WI#10932 161-122-GA30003-Rev11
connections have been identified through the review 162-723-GA2003-1-Rev4
process or site inspections that require additional WI#10733 162-723-GA2003-2-Rev4
modifications/stiffening/strengthening. Details of these
10 Sibusiso Nkumbi B114116-07-01-GH11-04010 M-6 HPS-ESK-12106 12-Jun-19 Awaiting Eskom Approval
modifications are included in the attached site WI#10734 162-713-GA1003-1-Rev6
instructions/memos. These modifications do not affect
the overall integrity or stability of the boiler support WI#10737 162-723-GA2003-2-Rev4
structure nor the certificates already issued to the WI#10753 161-520-GA3016-Rev4
client by the MHPSA design engineer.
WI#10757 161-123-GA3031-Rev10
WI#10732 161-122-GA3003-Rev11.
WI#10733 162-723-GA2003-1-Rev4.
WI#10754 151--520-GA-1000-Rev3.
Connections designs are being reviewed to ensure
they comply with the latest revisions of the structural WI#10789 152-710-GA1004 – Rev2.
analysis and detail erection drawings. Some
connections have been identified through the review WI#10786 162-731-GA3005-1– Rev2.
process or site inspections that require additional WI#10740 152-731-GA3005-1– Rev3.
modifications/stiffening/strengthening. Details of these WI#10711 152-723-GA2003-1-Rev1
11 Bheki Nene B114116-07-01-GH11-04018 M-5 WI#10712 152-723-GA2003-2- Rev2 To be transmitted Awaiting Internal Approval
modifications are included in the attached site
instructions/memos. These modifications do not affect WI#10776 151-123-GA1000-Rev2
the overall integrity or stability of the boiler support WI#10729 151-122-GA1001-Rev2
structure nor the certificates already issued to the
client by the MHPSA design engineer. WI#10735 152-713-GA1003-1-Rev2
WI#10745 151-124-GA1001-Rev 4
WI#10798 164-831-GA-3006-Rev3.
Connections designs are being reviewed to ensure WI#10785 142-710-GA1004.
they comply with the latest revisions of the structural WI#10741 142-731-GA3005-1-REV1.
analysis and detail erection drawings. Some
WI#10790 141-122-GA1001-Rev3.
connections have been identified through the review
WI#10777 141-123-GA1000-Rev4.
process or site inspections that require additional
modifications/stiffening/strengthening. Details of these WI#107671 144-831-GA3000
12 Sibusiso Nkumbi B114116-07-01-GH11-04017 M-4 WI#10672 144-832-GA3000 To be transmitted Awaiting Internal Approval
modifications are included in the attached site
instructions/memos. These modifications do not affect WI#10697 134-834-3018-0
the overall integrity or stability of the boiler support WI#10682 141F1-550-GA10055-Rev1.
structure nor the certificates already issued to the 141F1-250-GA10064
client by the MHPSA design engineer. 141F1-450-GA10006
WI#10732
141F1-350-GA10005

2 OF 3
Discipline Manager: Bradley Laubscher DATE: 19TH AUGUST 2019
MEDUPI ALL UNIT DESIGN CHANGE CONNECTION ENGINEERING CHANGE NOTICE (ECN) REGISTER FOR STEEL STRUCTURE
Supervisor : Sibusiso Nkumb

TRANSMITTAL TRANSMITTAL APPROVED


ITEM UNIT TRANSMITTAL TRANSMITTAL
ORIGINATOR DISCRIPTION ECN# WI# AFFECTED DRWAING REFERENCE REFERENCE BY ESKOM REMARKS
NUMBER NUMBER DATE DATE
TO ESKOM FROM ESKOM YES/NO