GFRP Rebar and Embediment (angular bar) installation Inspection for Slab Foundation gridline 3-8/B-C at Fire
1 CR18G-RFI-CIV-2766 Civil Fire Station 9:30 AM Cesar Mr.Rafique H H
Station
2 CR18G-RFI-CIV-2767 Civil Formwork installation Inspection for Slab Foundation gridline 3-8/B-C at Fire Station Fire Station 10:00 AM Cesar Mr.Rafique H H
3 CR18G-RFI-CIV-2768 Civil Concrete Sampling Testing and Placement inspection for Slab Foundation gridline 3-8/B-C at Fire Station Fire Station 1:30 PM Cesar Mr.Rafique W W
5 CR18G-RFI-CIV-2779 Civil Surface preparation prior to screed at Musallah Bldg, (as highlighted) Musallah Bldg. 10:15 AM Cesar Mr.Rafique H H
6 CR18G-RFI-CIV-2780 Civil Concrete Sampling Testing and Placement inspection for screed concrete at Musallah Bldg. Musallah Bldg. 2:15 PM Cesar Mr.Rafique W W
7 CR18G-RFI-CIV-2781 Civil Surface preparation prior to screed at Fire Sta., (as highlighted) Fire Station 10:45 AM Cesar Mr.Rafique H H
8 CR18G-RFI-CIV-2782 Civil Concrete Sampling Testing and Placement inspection for screed concrete at Fire Sta. Fire Station 2:30 PM Cesar Mr.Rafique W W
9 CR18G-RFI-CIV-2783 Civil Concrete Sampling Testing and Placement inspection for Striffener Columns at Admin. Bldg. Admin. Bldg 1:30 PM Cesar Mr.Rafique W W
Concrete Compressive Strength Test for 28day for Natural Ring Foundation casted on 17 February, 2021 at
10 CR18G-RFI-CIV-2784 Civil Osaimi Lab. 1:30 PM Javeed Mr.Rafique H H/W
Osaimi Lab.
2/14/2021
Fillplacement Inspection for 3rd layer arround the MH-1/7 ,1/8,1/9,1/9/1 and 2nd layer
Compction Testing Inspection for 3rd layer arround the MH-1/7 ,1/8,1/9,1/9/1 and 2nd layer for MH-1/5,1/6 at sto
Fillplacement Inspection for Road Base form MH-3/1 ,3/2 ,3/3 ,3/4, 3/5, 3/6 to all their
Compction Testing Inspection for Road Base form MH-3/1 ,3/2 ,3/3 ,3/4, 3/5, 3/6 to all their Catch basins at storm
Compction Testing Inspection for existing sand bedding form MH-3/1/1 ,3/1/2 ,3/1/3 ,3/1/4, 3/1/5, 3/1/6 to all thei
S
and 2nd layer for MH-1/5,1/6 at storm system (as per attached highlighted Drawing)
S
3/6 to all their Catch basins at storm system (as per attached highlighted Drawing)
,3/1/3 ,3/1/4, 3/1/5, 3/1/6 to all their Catch basins at storm system (as per attached highlighted Drawing)