Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

Wafiullah barakati

Syracuse, NY
wafiullahbarakati5_ota@indeedemail.com
3152005433

Civil Engineer experienced in Construction Management, Project Management, Quality Control


management, Schedule P6, and Project Control. Significant experience involving concrete, PEB
structures, roads, utilities, water tanks erections and wastewater treatment plants.

Willing to relocate: Anywhere


Authorized to work in the US for any employer

Work Experience

Project Engineer
Clark Construction JV - Bethesda, MD
February 2020 to September 2020
• Review subcontractors potential Change Orders
• Confirm/review change order with project Superintendent
• Draft change order request for Project Manager review and approval
• Data entry in Smart sheet to track each subcontractor COR (change order request)
• Upload the COR with support document to e Builders for Client review and approval

Project Manager /Scheduler


SGTR, LLC and E Smith Contractors - Syracuse, NY
2017 to 2020
• Worked on variety of projects including roads and parking lots, airfield taxiways, military, university
dormitories, hospital, schools, and exposition center.
• Managed entire construction process, review bid documents, draft price and technical proposal,
supervise and lead site teams & subcontractor
• Attended weekly meetings, create Payment Application, applied for permits, witness site executed
tests, follow up progress, order material and equipment, interprets scope of work and drawings to the
site supervisor
• Create QC, Test, Environmental and Health and Safety plans and project close out

Project Coordinator
US Army Corps of Engineers (USACE)
2014 to 2017
• Job Description: 110kV Electrical Transmission Line NEPS (Contract amount 35 Million USD), Afghanistan
110KV Electrical Transmission Line SEPS I & II and Two Substations (110 Million USD)
• Work Performed: Interviewed and hired personnel for the project. Assisted Project Manager,
Quality Control (QC) Manager and Health and Safety Manager with their decisions, documentation,
implementation and follow-up. Tracked schedule with project team, client and subcontractors; lead
weekly and monthly meeting with client and subcontractors. Tracked material approval status with QC
Manager and oversee the preparation of documentation for each defined work. Reviewed and evaluated
price and company profile for short-listed companies. Coordinated design- related issues with design
team and tracked drawing preparation and submission to client on time. Tracked and followed-up long-
lead items with manufactures and shipping companies. Assisted QC Manager with preparing the Quality
Control Correction Plan for noncompliance items. Evaluated and recommended subcontractors.

Project Manager
Arabian Insulation FZE
2013 to 2014
• Job Description: Design & build of Extruded Foam Factory and warehouse. The total built area is 26900
Ft.
• Work Performed: Evaluating and review the Consultant and construction proposals, check and inspect
the compaction, concrete placement and finishing, PEB erection, sewer and water and Firefighting piping
layout and related tests. Water tanks erection and tests. Follow up daily and weekly progress, update
project schedule, Approve the subcontractor Payment Applications inspect material deliveries, Punch list
and close out.

US AFCEE/ Ch2MHILL/RCC, Kabul, Afghanistan


Quality Control Manager
• Project Description: Kabul Afghanistan International Airport (Contract amount 15 Million USD): Open
bay barracks, laundry, dining facility, warehouse, Quick Reaction Force building, asphalt and concrete
parking lot, medical clinic, electrical utilities, sidewalks, storm water management system.

Work description: Implemented the Project Quality Control System. Prepared the Contractor Quality
Control Plan, Pre-Construction data submittal including site plan, and health and safety plan. Prepared
Construction Material data submittal. Conducted three-phase control inspection process in accordance
with Army Corps of Engineers policies (Preparatory Phase, Initial Phase, Follow-Up Phase). Monitored
field and lab testing and maintained punch list. Provided technical and administrative assistance
to subordinate engineers, supervisors and subcontractors. Reviewed, supervised, and analyzed each
definable feature of work to ensure compliance with Statement of Work. Prepared construction estimates,
cost engineering studies, schedules and resource plans. Assisted procurement /logistics manager and
team in expediting local and overseas material deliveries. Prepared operation and maintenance manuals
and project close-out documentation. Prepared end user training materials to ensure understanding and
proper use of systems and equipment. Track labor and material with subcontractor, supervise and lead
the concrete team, carpenter, steel fixer, plumbers, electrician and civil workers.

Quality Control Manager


US AFCEE/ AMEC/ RCC
2010 to 2011
• Project Description: Afghanistan National Defense, Command headquarters, communication class
rooms, maintenance garages, warehouse, Dining Facility, barracks, auditorium, wash rack and sidewalks
concrete water Storage, Waste water treatment plant.

• Work description: Prepared Construction QC Plan, Pre-Construction Submittal, Construction Material


Submittal. Conducted three phase inspections. Monitored field and lab testing. Create and follow
up punch list. Prepared operation and maintenance manuals and project close-out documentation.
Prepared end user training ensures understanding and proper use of systems and equipment. Daily work
inspections, to make sure each feature of work compliance with project requirement.
Quality Control Manager
A Military Force Garrison HQ
2009 to 2010
• Project Description: A Military Force Garrison HQ that includes Embedded Training Team (ETT), barracks,
ETT Offices, ETT Dining Facility, Welfare and Recreation (MWR) facility, Enlisted Barracks for Afghan
National Army, Dining Facility for 1500 soldiers, Wash Rack, Vehicle Maintenance Garage, Fitness Center,
Training Facility, Power Plant, Bachelor Officers' Quarters, Ammunition Supply Point, Arms Storage,
Battalion HQ, Water well Boring, well house, Pump house and 2x 125K Gal water storage and Waste
Water Networks with laterals and connecting to the building Facilities, Electrical Distribution Network
with Substation Transformer.

• Work description: Managed the Construction Quality (CQC) Program; prepared the CQC Plan; prepared
Pre-Construction and Construction Material Submittals; conducted three phases inspections; monitored
field and lab testing; review data sheet for selecting material, submitting the selected material which
compliance with specification of project to the client for approval, rebar, formwork, concrete placement
inspections, Exfiltration and infiltration test for Sewer pipes and pressure test for water lines and concrete
water storage testing, maintained Punch List. Ensured project implementation in accordance with the
scope of work and approved drawings.

Quality Control Engineer


US Army Corps of Engineers (USACE)
2000 to 2006

Education

Bachelor's in Civil Engineering


kabul
January 2000 to January 2006

Skills
• Primavera 6
• Microsoft Office (Word, Excel, Power point) MS Project
• AutoCAD
• SAP 2000
• Safe V 08
• Procore
• e Builders
• Project Planning
• Quality Systems
• Quality Assurance
• Smartsheet
• Project Implementation
• Procurement Management
• Computer Networking
• Project Engineering
• Concrete Finishing
• Electrical Experience
• Construction Management
• Project Coordination
• Oracle
• Pricing
• Quality management
• Construction
• Project management

Military Service

Branch: United States Army


Rank: contractor

You might also like